A network configuration method and system based on power grid operation limit improvement

By calculating the limits and constraints of transmission sections within the power grid area and rationally configuring grid-type equipment, the power system stability problem caused by the access of new energy sources was solved, and the voltage support capacity and new energy absorption capacity of the power grid were improved.

CN123162995APending Publication Date: 2026-11-24STATE GRID ELECTRIC POWER RES INST +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611092189.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-07-22
Publication Date
2026-11-24

AI Technical Summary

Technical Problem

With the large-scale integration of new energy sources, the installed capacity of traditional conventional generating units has slowed down, affecting the stable operation of the power system. New energy power plants are mostly built at the end of the power grid, which poses a risk of oscillation. The increase in the grid connection scale of traditional converters has led to a decrease in system inertia and voltage stability, affecting the absorption of new energy and the power receiving capacity of the receiving-end grid.

Method used

By calculating the limits and constraints of different transmission sections within the power grid area, we can rationally configure grid-building equipment, increase the placement of grid-building equipment in appropriate locations to enhance grid strength and voltage support capacity, and optimize the power configuration of sections to improve the absorption capacity of new energy sources and the power supply level of the receiving-end grid.

Benefits of technology

While taking into account economic efficiency, it has improved the transient stability margin and power interaction capability of the power grid, and enhanced the absorption capacity of new energy sources and the power supply level of the receiving-end power grid.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123162995A_ABST
    Figure CN123162995A_ABST
Patent Text Reader

Abstract

This invention discloses a method and system for configuring grid-type equipment based on the operational limits of a large power grid. The method includes: identifying several optimizable sections based on the limits and constraints of each section of the regional power grid at various levels; for each optimizable section, if a non-thermal stability problem exists in the N-1 / N-2 check, increasing the number of grid-type equipment until the upper limit of grid-type equipment configuration considering regional economy is reached, then reducing the section power and ending the judgment process; if the check has been met but a thermal stability problem exists, reducing the section power and ending the judgment process; if no thermal stability problem exists, continuing the judgment process by considering the static stability limit with margin; finally, obtaining the section limits considering grid-type equipment and the planned distribution and capacity of the corresponding grid-type equipment. This invention effectively improves the grid strength and voltage support capability of the entire system by rationally configuring grid-type equipment, while improving the absorption capacity of new energy sources and the power supply level to the receiving-end grid while taking into account economy.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention belongs to the field of power grid planning, and specifically relates to a method and system for configuring grid-type equipment based on improving the operational limits of large power grids. Background Technology

[0002] Currently, with the large-scale integration of new energy sources into the grid, the installed capacity of traditional conventional generating units has slowed down, affecting the stable operation of the power system. New energy power plants are mostly located at the end of the grid, resulting in low short-circuit ratios and oscillation risks. Grid-connected equipment, simulating the voltage source operating characteristics of synchronous generators, can output controllable short-circuit currents under both normal system operating conditions and fault disturbances, directly improving the grid's equivalent short-circuit capacity and short-circuit ratio. However, there is limited verification of the impact of new energy integration on the inter-regional and intra-regional power exchange capabilities of the large power grid.

[0003] Key interconnections between and within large power grid regions are called transmission sections. By performing N-1 / N-2 checks on the grid infrastructure, the power transmission / receiving limits of the transmission sections are obtained according to guidelines. With the increasing grid-connected scale of converters using traditional grid-following control strategies and the significant improvement in power system electronics, the system's inertia level and voltage stability decrease, while also affecting the system's synchronization stability. The resulting power angle issues, voltage problems, and oscillation problems further reduce the transmission section limits, impacting the absorption of new energy sources and the power receiving capacity of the receiving grid. Summary of the Invention

[0004] The purpose of this invention is to provide a method and system for configuring grid-type equipment based on the improvement of the operating limits of a large power grid. By calculating the limits of different transmission sections within the power grid area and their corresponding constraints, the grid-type equipment is configured in a reasonable manner, which effectively improves the power grid strength and voltage support capacity of the entire system. While taking into account economic efficiency, it also enhances the absorption capacity of new energy sources and the power supply level to the receiving-end power grid.

[0005] To achieve the above objectives, the solution of the present invention is:

[0006] A method for configuring grid-type equipment based on improving the operational limits of large power grids, including:

[0007] Based on the limits and constraints of each section of the regional power grid, several sections that can be optimized were identified.

[0008] For each optimizable section, if a non-thermal stability problem is found in the N-1 / N-2 check, add network-type equipment at appropriate locations until the non-thermal stability problem is eliminated or the configuration capacity limit is reached; if the non-thermal stability problem is eliminated, continue to check if a thermal stability problem exists in the N-1 / N-2 check; if the configuration capacity limit has been reached, reduce the section power by the power step size and obtain the limit data of the section and the current distribution and capacity of the network-type equipment.

[0009] If it is determined that there are no non-thermal stability issues in the N-1 / N-2 check, then it is determined whether there are thermal stability issues in the N-1 / N-2 check. If there are thermal stability issues, the power of the cross-section is reduced by the power step size to obtain the limit data of the cross-section and the distribution and capacity of the current network-type equipment. If there are no thermal stability issues and the cross-section has not reached the static stability limit considering the margin, then the power of the cross-section is increased by the power step size before determining non-thermal stability issues. If there are no thermal stability issues and the cross-section has reached the static stability limit considering the margin, then the power of the cross-section is reduced by the power step size to obtain the limit data of the cross-section and the distribution and capacity of the current network-type equipment.

[0010] Based on the limit data of each optimizable section and the distribution and capacity of the network-type equipment, the section limit considering the network-type equipment and the corresponding planned distribution and capacity of the network-type equipment are obtained.

[0011] Based on the limits and constraints of various cross-sections in the regional power grid, several optimizable cross-sections were identified, including...

[0012] Based on the typical mode of the current regional power grid, calculate the transmission section limit of N-1 / N-2 from the end of the regional power grid to the external interconnection line of the regional power grid under normal mode;

[0013] Based on the calculation results, the regional power grid is divided into n transmission sections from the end to the tie line, and the limits and constraints of each transmission section are defined.

[0014] When it is determined that there is a non-thermal stability problem in the N-1 / N-2 check, a network-type device is added at an appropriate location, including:

[0015] When it is determined that there is a non-thermal stability problem in the N-1 / N-2 check, site selection tests are conducted at the lowest point of the transient first swing voltage, the near-zone of the thermal power unit with the maximum transient first swing power angle, the fault point, and the regional hub station. In each round of site selection tests, a grid-type device is added at a certain location, and the improvement effect of the grid-type device is analyzed.

[0016] Compare the improvement effects of adding mesh-type equipment at various locations, determine the optimal location, and add the mesh-type equipment at the optimal location.

[0017] The non-thermal stability problems include power angle problems, low voltage problems, and dynamic stability problems. When it is determined that there is a power angle problem in the N-1 / N-2 check, the position that best suppresses power angle instability is taken as the optimal position. When it is determined that there is a dynamic stability problem in the N-1 / N-2 check, the position that best improves the damping ratio is taken as the optimal position. When it is determined that there is a low voltage problem in the N-1 / N-2 check, the position of the lowest steady-state / transient voltage point is taken as the optimal position.

[0018] This includes reducing / increasing the power step size of the cross-sectional power, including:

[0019] Determine the power step size based on the current transmission section's limiting conditions;

[0020] The output of new energy sources within the cross section is uniformly reduced / increased, thereby reducing / increasing the power step size of the cross section.

[0021] When non-thermal stability issues are identified in the N-1 / N-2 verification, network-type devices are added at appropriate locations until no non-thermal stability issues exist or the configuration capacity limit is reached. This includes...

[0022] When it is determined that there is a non-thermal stability problem in the verification of a certain optimizable cross section N-1 / N-2, add mesh-type equipment at appropriate locations;

[0023] Determine if there are non-thermal stability issues in the N-1 / N-2 check of the optimizable section. If so, add grid-type equipment at appropriate locations and then determine if the configured capacity of the grid-type energy storage has reached the upper limit. If it has, reduce the power of the section by the power step size and obtain the limit data of the section and the distribution and capacity of the current grid-type equipment. If the configured capacity of the grid-type energy storage has not reached the upper limit, add grid-type equipment at appropriate locations and continue to determine if there are non-thermal stability issues. If there are no non-thermal stability issues, continue to determine if there are thermal stability issues in the N-1 / N-2 check.

[0024] A grid-based equipment configuration system based on enhancing the operational limits of large power grids includes,

[0025] The cross-section confirmation module is configured to confirm several optimizable cross-sections based on the limits and constraints of cross-sections at all levels of the regional power grid.

[0026] The non-thermal stability problem adjustment module is configured to, for each optimizable section, if a non-thermal stability problem exists in the N-1 / N-2 check, add network-type equipment at appropriate locations until there is no non-thermal stability problem or the configuration capacity limit is reached; if there is no non-thermal stability problem, continue to check if there is a thermal stability problem in the N-1 / N-2 check; if the configuration capacity limit has been reached, reduce the section power by the power step size, and obtain the limit data of the section at this time and the distribution and capacity of the current network-type equipment.

[0027] The thermal stability issue adjustment module is configured to, if it determines that there are no non-thermal stability issues in the N-1 / N-2 checks, continue to determine whether there are thermal stability issues in the N-1 / N-2 checks; if there are thermal stability issues, the cross-sectional power is reduced by a power step size to obtain the limit data of that cross-section and the distribution and capacity of the current network-type equipment; if there are no thermal stability issues and the cross-section has not reached the static stability limit considering the margin, the cross-sectional power is increased by a power step size before determining non-thermal stability issues; if there are no thermal stability issues and the cross-section has reached the static stability limit considering the margin, the cross-sectional power is reduced by a power step size to obtain the limit data of that cross-section and the distribution and capacity of the current network-type equipment; and,

[0028] The planning scheme acquisition module is configured to obtain the cross-sectional limits considering the network-type equipment and the corresponding planned distribution and capacity of the network-type equipment based on the limit data of each optimizable cross section and the distribution and capacity of the network-type equipment.

[0029] The section confirmation module identifies several optimizable sections based on the limits and constraints of each section at various levels of the regional power grid, including...

[0030] Based on the typical mode of the current regional power grid, calculate the transmission section limit of N-1 / N-2 from the end of the regional power grid to the external interconnection line of the regional power grid under normal mode;

[0031] Based on the calculation results, the regional power grid is divided into n transmission sections from the end to the tie line, and the limits and constraints of each transmission section are defined.

[0032] When the non-thermal stability problem adjustment module determines that a non-thermal stability problem exists in the N-1 / N-2 check, it adds a network-type device at an appropriate location, including:

[0033] When it is determined that there is a non-thermal stability problem in the N-1 / N-2 check, site selection tests are conducted at the lowest point of the transient first swing voltage, the near-zone of the thermal power unit with the maximum transient first swing power angle, the fault point, and the regional hub station. In each round of site selection tests, a grid-type device is added at a certain location, and the improvement effect of the grid-type device is analyzed.

[0034] Compare the improvement effects of adding mesh-type equipment at various locations, determine the optimal location, and add the mesh-type equipment at the optimal location.

[0035] The non-thermal stability problems include power angle problems, low voltage problems, and dynamic stability problems. When it is determined that there is a power angle problem in the N-1 / N-2 check, the position that best suppresses power angle instability is taken as the optimal position. When it is determined that there is a dynamic stability problem in the N-1 / N-2 check, the position that best improves the damping ratio is taken as the optimal position. When it is determined that there is a low voltage problem in the N-1 / N-2 check, the position of the lowest steady-state / transient voltage point is taken as the optimal position.

[0036] This includes reducing / increasing the power step size of the cross-sectional power, including:

[0037] Determine the power step size based on the current transmission section's limiting conditions;

[0038] The output of new energy sources within the cross section is uniformly reduced / increased, thereby reducing / increasing the power step size of the cross section.

[0039] Specifically, when the non-thermal stability issue adjustment module determines that a non-thermal stability issue exists in the N-1 / N-2 check, it adds network-type devices at appropriate locations until the non-thermal stability issue is resolved or the configuration capacity limit is reached. This includes...

[0040] When it is determined that there is a non-thermal stability problem in the verification of a certain optimizable cross section N-1 / N-2, add mesh-type equipment at appropriate locations;

[0041] Determine if there are non-thermal stability issues in the N-1 / N-2 check of the optimizable section. If so, add grid-type equipment at appropriate locations and then determine if the configured capacity of the grid-type energy storage has reached the upper limit. If it has, reduce the power of the section by the power step size and obtain the limit data of the section and the distribution and capacity of the current grid-type equipment. If the configured capacity of the grid-type energy storage has not reached the upper limit, add grid-type equipment at appropriate locations and continue to determine if there are non-thermal stability issues. If there are no non-thermal stability issues, continue to determine if there are thermal stability issues in the N-1 / N-2 check.

[0042] A computer device includes a memory, a processor, and a computer program stored in the memory and executable on the processor; when the processor executes the computer program, it implements the steps of the grid-type equipment configuration method based on the aforementioned improvement of the operating limits of a large power grid.

[0043] A computer-readable storage medium storing a computer program; when executed by a processor, the computer program implements the steps of the grid-type equipment configuration method based on the improvement of the operating limits of a large power grid as described above.

[0044] By adopting the above scheme, this invention calculates the limits and corresponding constraints of different transmission sections within the power grid area, rationally configures grid-building equipment, and leverages the ability of grid-building equipment to enhance voltage support during fault transient processes, thereby improving the system's transient stability margin and relaxing power grid stability constraints. While considering economic efficiency, by configuring grid-building equipment of appropriate capacity at key nodes of the power grid, the ultimate goal is to increase the maximum transmission power of key transmission sections, enhance the energy exchange capacity between and within regions, and further improve the absorption of new energy sources and the power reception level of the receiving-end power grid. Attached Figure Description

[0045] Figure 1 The diagram shown is a power grid topology diagram of the grid-type equipment configuration based on the improvement of the operating limits of a large power grid, provided by the present invention.

[0046] Among them, power grids 1-1, 1-2, and 1-3 are three sub-regions of regional power grid 1. Power grids 1-1 and 1-2 are connected by a tie line to form transmission section D1, and the connection between power grids 1-2 and 1-3 is similar. The tie line between power grids 1-3 and the main grid forms transmission section D3.

[0047] Figure 2 The diagram shown is a partial power grid configuration diagram of the grid-type equipment configuration based on the improvement of the operating limits of a large power grid, provided by the present invention.

[0048] The system includes conventional generating units, wind power, and photovoltaic power, which are typical of a power grid. It is also divided into conventional generating unit near-area nodes G1 and G2, new energy and load near-area nodes that are prone to low voltage L1 and L2, regional key hub station S1, and regional tie line fault nodes F1 and F2, depending on the power source, load and location.

[0049] Figure 3 The diagram shows a schematic of the process of the grid-type equipment configuration method based on the improvement of the operating limits of a large power grid provided by the present invention.

[0050] Figure 4 The figure shown is a comparative diagram of the power angle curves of Embodiment 3 provided by the present invention;

[0051] Figure 5 The diagram shown is a schematic diagram of the prony analysis of the power angle curve of the optimized algorithm layout in Embodiment 3 of the present invention.

[0052] Figure 6 The figure shown is a schematic diagram of the power angle curve prony analysis of the uniformly arranged hub stations provided by the present invention in Embodiment 3.

[0053] Figure 7 The diagram shown is a schematic diagram of the prony analysis of the power angle curve at the end of the region in Embodiment 3 of the present invention. Detailed Implementation

[0054] The technical solution of the present invention will be described in detail below with reference to the accompanying drawings and specific embodiments. It should be understood that the embodiments of the present invention and the specific features in the embodiments are detailed descriptions of the technical solution of the present invention, rather than limitations thereof. In the absence of conflict, the embodiments of the present invention and the technical features in the embodiments can be combined with each other.

[0055] The term "and / or" simply describes the relationship between related objects, indicating that three relationships can exist. For example, A and / or B can represent: A alone, A and B simultaneously, or B alone. Additionally, the character " / " generally indicates that the preceding and following related objects have an "or" relationship.

[0056] Example 1

[0057] This embodiment introduces a grid-type equipment configuration method based on improving the operational limits of large power grids, such as... Figure 3 As shown, it includes:

[0058] By simulating and analyzing the limits of N-1 / N-2 and their corresponding constraints at each level of the regional power grid, we determine whether the constraints of each level of transmission section are the first preset conditions for power angle, low voltage or weak damping (dynamic stability problem).

[0059] If the current limiting factor for the transmission section is not the power angle problem, low voltage problem, or dynamic stability (weak damping) problem, and does not meet the first preset condition, then the limiting factor is the thermal stability limit, which is a physical constraint of the power grid system. According to the requirements of the power system guidelines, it is not possible to further improve the limit of the transmission section by adding grid-type equipment. The next transmission section capacity improvement verification analysis can be carried out.

[0060] If any one of the factors currently restricting the transmission section—power angle problem, low voltage problem, or dynamic stability (weak damping) problem—meets the first preset condition, then grid-building equipment should be added at the point of lowest transient first swing voltage, near the thermal power unit with the largest transient first swing power angle, at the fault point, and at the regional hub station, respectively. Considering an initial capacity of N, the power capacity can be determined by combining economic indicators or local power balance needs. Then, it should be determined whether the transmission section N-1 / N-2 meets the first preset condition again. If the power angle problem, low voltage problem, or dynamic stability (weak damping) problem still exists, it is necessary to determine whether the configured grid-building equipment meets the second preset condition, considering the upper limit of the economic configuration capacity.

[0061] If the configuration of grid-type equipment meets the second preset condition, it is an economic constraint of the power grid system. It is impossible to further improve the limit of the transmission section by adding grid-type equipment. In this case, the capacity improvement verification analysis of the next transmission section can be carried out.

[0062] For cases where the first and second preset conditions are not met, a third preset condition check is performed on the line's thermal stability limit and static stability limit. If the condition is not met, it indicates that the power grid still has untapped transmission potential under economic conditions. By uniformly increasing the power supply / load output within the cross-section and increasing the cross-section step size M, the first preset condition is returned, and further grid-type equipment configuration is added to improve the transmission cross-section limit. If the third preset condition is met, the limiting factor is the physical constraint of the power grid system. According to the power system guidelines, it is not possible to further improve the transmission cross-section limit by adding grid-type equipment, and the next transmission cross-section capacity improvement check analysis can be performed.

[0063] The final output is the location and capacity scheme for the transmission section limits of each level of the regional power grid and the corresponding grid-type equipment.

[0064] Example 2

[0065] Confirmation of the limits and limiting factors of each level of transmission section of the regional power grid when grid-connected equipment is not connected, including:

[0066] Define the typical operation modes of the current regional power grid, including but not limited to the two basic operation modes of external transmission and internal transmission;

[0067] According to the requirements of the power system guidelines, calculate the transmission section limit from the end of the regional power grid to the N-1 / N-2 external interconnection line of the regional power grid under normal conditions;

[0068] Based on the calculation results, the regional power grid is divided into n transmission sections, D1, D2, ..., Dn, from the end to the tie line, and the limits and constraints of each transmission section are defined.

[0069] The verification problems of power system N-1 / N-2 are divided into two main categories: thermal stability problems and non-thermal stability problems. Thermal stability problems are physical constraints of the power grid system; according to power system guidelines, the transmission section limits cannot be further improved by adding grid-type equipment. For non-thermal stability problems such as power angle problems, low voltage problems, and dynamic stability (weak damping) problems, grid-type equipment can be added at the point of lowest transient first swing voltage during a fault, near the thermal power unit with the largest transient first swing power angle, at the fault point, and at the regional hub station.

[0070] By comparing the improvement effects of adding grid-type equipment on the transmission section at the lowest point of the transient first swing voltage, the near area of ​​the thermal power unit with the largest transient first swing power angle, the fault point, and the regional hub station during the fault: Specifically, based on the different improvement effects of adding grid-type equipment to different key nodes within the transmission section, the weakest node within the section is selected, and the initial capacity of the added grid-type equipment is N. The N-1 / N-2 check of the transmission section is performed. If there are still non-thermal stability problems such as power angle problems, low voltage problems, and dynamic stability (weak damping) problems, and the upper limit of grid-type equipment configuration considering regional economy is not reached, the capacity of grid-type equipment N is further increased at the same location and the check continues until the N-1 / N-2 check is met or the upper limit of grid-type equipment configuration considering regional economy is reached.

[0071] For non-thermal stability problems that do not meet the requirements of power angle, low voltage, and dynamic stability (weak damping), a second preset condition check is needed to verify whether the capacity configuration of the internal grid-type equipment of this section is economical:

[0072] Determine whether the configuration capacity of the grid-type equipment has reached the second preset condition of the configuration capacity limit within the cross section under the consideration of economy. If the second preset condition has been met, it means that further increasing the grid-type equipment is not economical, and the current calculation results of the limit of the Di section and the location and capacity of the grid-type equipment can be maintained.

[0073] If the calculated result does not meet the second preset condition, it means that there is still a margin in the configuration of the grid-type equipment in the section, and the limit of the transmission section can be further improved by adding grid-type equipment.

[0074] If the second preset condition is not met, check whether the current cross-section has reached the third preset condition, which represents the theoretical limit under the space frame:

[0075] If the thermal stability limit is reached after the N-1 / N-2 check of the equipment, it means that the limit of the transmission section cannot be further improved according to the power system guidelines. Similarly, calculate the static stability limit of the transmission section. If the static stability limit considering the margin is reached, the limit of the transmission section cannot be further improved according to the guidelines.

[0076] The fact that the third preset condition was not met, i.e., the thermal stability problem existed after N-1 / N-2 was not met, and the thermal stability limit of the transmission section margin was not reached, indicates that the transmission section still has the potential for improvement.

[0077] For operating conditions with the potential to increase the transmission section, the section step size M is increased by uniformly increasing the power supply / load within the section: the power selection of M is based on the appropriate step size according to the current limit conditions of the transmission section;

[0078] In areas with uniform growth, new energy sources should be prioritized for power supply, and the power supply must meet the guidelines that the short-circuit ratio at the generator terminal should not be less than 1.5 and the short-circuit ratio at the grid connection point should not be less than 2 after the growth.

[0079] Considering the limit of the growth section step M, the upper limit of the new capacity of grid-connected equipment should be determined according to the economic needs of different regions, different grid strengths, and different power source / load types.

[0080] The method for determining the transmission section limit of section Di within a region is as follows:

[0081] If the N-1 / N-2 cross-section limit check is not met after adding a new cross-section step size M and the capacity limit of the network-type equipment in the cross-section area is reached to consider the economy, then the power supply / load of the area is reduced uniformly so that the current cross-section limit is restored to the previous output result, and is used as the calculation limit of cross-section Di. The configuration location and configuration capacity of the corresponding network-type equipment are used as the site selection and capacity setting scheme of the network-type equipment.

[0082] If, after adding the new cross-section step M, there is still room for further increasing the transmission cross-section limit, that is, if the non-thermal stability problems of reactive power angle, low voltage, and dynamic stability (weak damping) after the addition of grid-type equipment have not reached the thermal stability limit after N-1 / N-2 or the static stability limit considering the margin, then further increase until any of the above conditions are not met.

[0083] When considering the site selection and capacity determination method for grid-type equipment for transmission sections 1, 2, ..., n within a region, since the electrical distance gradually approaches the main grid, the limiting factor of the upper-level transmission section may still be the stability problem of the lower-level region. Therefore, the site selection range of grid-type equipment is not limited to the area between the current-level transmission section and the lower-level transmission section. The configuration method of grid-type equipment is considered by traversing the transmission sections 1, 2, ..., n within the region, taking into account the ability to improve the economic efficiency and safety and stability limits.

[0084] Example 3

[0085] Based on Example 1, this example provides a detailed description of the technical solution.

[0086] like Figure 1 As shown, regional power grid 1 is initially divided into three sub-grids: grid 1-1, grid 1-2, and grid 1-3, based on the number of tie lines. The sub-grids are connected by tie lines to form transmission sections D1 and D2, while the transmission section between grid 1-3 and the main grid is D3. The transmission sections have the following characteristics:

[0087] 1. Completeness: The power grid can be divided into two independent subsystems, meaning that the energy exchange channel between the two power grids is only the transmission section;

[0088] 2. Criticality: The power grid needs to meet the guidelines, that is, meet the N-1 check. The transmission section is the channel connecting two sub-networks, and its transmission capacity determines the upper limit of energy interaction between the two sub-networks.

[0089] 3. Variability: As the main grid is reinforced, the original transmission sections may be eliminated, meaning they no longer constrain the power transmission and receiving capacity of lower-level subgrids. The widespread integration of new energy sources leads to deterioration of the voltage characteristics of lower-level subgrids, reducing the transmission section limit. Grid-type equipment possesses voltage source characteristics, providing reactive power support during transient periods and improving the transmission section limit.

[0090] Based on the N-1 verification results, the problems are categorized into thermal stability problems and non-thermal stability problems. Thermal stability problems arise from the presence of small conductors in the power grid or the exhaustion of the transmission potential of the current transmission corridor, making them unsolvable by configuring grid-type equipment. Solutions include adjusting the operating mode and strengthening the grid structure. For non-thermal stability problems, such as power angle instability, adding grid-type equipment at weak points can provide reactive power support during transient periods, reducing the acceleration area and potentially increasing the transmission section limit. For low-voltage problems, configuring grid-type equipment can also provide sufficient transient / steady-state reactive power support in the low-voltage near-field area, resolving the localized low-voltage problem and thus increasing the transmission section limit. This invention is primarily applied to non-thermal stability problems involving section improvement.

[0091] I. Calculation of transmission section limits and site selection for grid-type equipment

[0092] Using simulation software, taking transmission section D1 as an example, we calculate its grid connection limit Pd1s and grid disconnection limit Pd1x.

[0093] 1. For grid connection scenarios, this is mainly applied in areas with widespread access to new energy sources or abundant hydropower resources, where there is a need for grid connection. The specific process is as follows:

[0094] To uniformly increase the power output within grid 1-1, for areas with widespread renewable energy integration, while meeting the minimum operating conditions of conventional generating units, the renewable energy output in these areas should be increased uniformly. Simultaneously, to ensure power conservation, grid 1-2 needs to uniformly reduce renewable energy output or uniformly increase the load within this subgrid, thereby increasing the cross-sectional power of transmission section Pd1.

[0095] According to the guidelines, the lines in power grid 1-1 are subjected to an N-1 check, resulting in either meeting or failing the N-1 check. For those meeting the N-1 check, the above steps are repeated, further increasing the power at section Pd1 and performing the N-1 check again, until the N-1 check condition is no longer met. For those failing the N-1 check, it is first determined whether the problem is thermal stability or non-thermal stability.

[0096] For the thermal stability problem, reducing Pd1 to N-1 satisfies the thermal stability limit of a certain line. At this point, Pd1 is used as the transmission section limit of the sub-network to the upper-level power grid.

[0097] For non-thermal stability issues, the power is first reduced to N-1 without problems, and an appropriate power increase step size ΔPd1 is selected based on the transmission section power Pd1 at this point. For site selection, using... Figure 2 For example, if the problem is a power angle issue, first determine whether the instability is caused by the unit in the G1 or G2 area. Add grid-connected equipment with a capacity of N near the power plant that first experienced instability, ensuring that ΔPd1 meets the economic requirements of the region. If the problem is a low voltage issue, first identify the low voltage point, which could be a terminal renewable energy station or a terminal load. Configure grid-connected equipment near the low voltage point or at the fault point, using the same capacity selection method. If the problem is a weakly damped power angle issue, grid-connected equipment can be configured near the amplitude source unit, at the fault point, or at the lowest point of the transient first swing voltage. Compare the improvement effects of different locations on the transmission section limits to select the optimal location for the grid-connected equipment.

[0098] II. Configuring appropriate capacity grid-type equipment and improving cross-sectional limits

[0099] Based on the initial transmission section limit and the optimal position of the grid-type equipment in the subgrid calculated in the first point, starting from transmission section D1, we first calculate and analyze the grid-type equipment configuration scheme and the improved transmission section limit Pd1s of section D1.

[0100] Without grid-connected equipment, the maximum transmission power Pd1 of transmission section D1 that meets the N-1 check is obtained through simulation calculation. Based on the transmission section power Pd1 at this time, an appropriate power growth step size ΔPd1 is selected, and grid-connected equipment with a capacity of N is configured at the optimal grid-connected equipment configuration point in grid 1-1. The configured capacity needs to meet the economic requirements of the region.

[0101] If Pd1+ΔPd1 satisfies the N-1 check with a grid-type equipment configuration of capacity N, has no thermal stability issues, and has not reached the static stability limit considering margin, it indicates that transmission section D1 still has potential for improvement. Continuously increase the transmission section power until the N-1 check is no longer met. If the configured grid-type equipment of capacity N has reached the upper limit of the region's economic constraints, directly output the configuration scheme for section D1 and the corresponding previous transmission section limit. If the upper limit of the region's economic constraints has not been reached, further add grid-type equipment of capacity N at the optimal grid-type equipment configuration point in grid 1-1, and repeat the above process. Continue until the transmission section power satisfies N-1 and reaches the thermal stability limit, the static stability limit considering margin, or the upper limit of the region's grid-type equipment configuration capacity considering economy. Output the previous transmission section limit as the power transmission limit Pd1s for section D1, and the corresponding grid-type equipment configuration capacity and location as the grid-type equipment configuration scheme considering the improvement of the large power grid's operational limits.

[0102] The transmission section limit method of section D1 is applied to transmission sections D2 and D3 to obtain the corresponding transmission section limits Pd2s and Pd3s and the corresponding grid-type equipment configuration scheme.

[0103] Unlike transmission section D1, where the optimal network configuration location is only within grid 1-1, the optimal network configuration location for transmission section D2 should include not only grid 1-2 but also critical nodes within grid 1-1. This is because D1 and D2 form a chain-like power supply network, and a failure in D2 could trigger stability issues within grid 1-1. Similarly, with the configuration of network configuration equipment in grid 1-1, the limit for transmission section D2 compared to grid 1-1 without network configuration equipment is further improved. Therefore, the limit for configuring network configuration equipment in grid 1-1 needs to be recalculated.

[0104] If the constraints on transmission section D2 are still within grid 1-1, and if D2 and D1 can be considered as a whole, and some of the grid-building equipment configuration quota in region D2 is allocated to region D1, then the limit Pd2s of section D2 and the corresponding grid-building equipment configuration scheme can be calculated by using a similar method to the limit of D1, treating grid 1-2 and grid 1-1 as a whole. If D2 and D1 cannot be considered as a whole, then the configuration range of grid-building equipment can only be narrowed down to grid 1-2, the optimal grid-building equipment configuration position within grid 1-2 can be recalculated, and the calculation method of D1 can be repeated to finally obtain the limit Pd2s of section D2 and the corresponding grid-building equipment configuration scheme.

[0105] The calculation method for transmission section D3 is analogous to that for D2. By iterating through D1, D2, and D3, the transmission section limits Pd1s, Pd2s, and Pd3s, as well as the corresponding network equipment configuration scheme, are finally obtained.

[0106] Example 4

[0107] Specifically applied to a power grid, the method of this invention is compared with common uniform reinforcement schemes and reinforcement schemes at the end of regional power grids through calculation. Figures 4-7 As shown, the optimized location and capacity determination scheme, when configured with the same capacity of grid-type equipment, has better power angle characteristics than the other two conventional methods. This indicates that the scheme can significantly improve the dynamic characteristics of the regional power grid and enhance the transmission section limit.

[0108] Example 5

[0109] This invention provides a grid-based equipment configuration system based on enhancing the operational limits of large power grids, comprising:

[0110] The cross-section confirmation module is configured to confirm several optimizable cross-sections based on the limits and constraints of cross-sections at all levels of the regional power grid.

[0111] The cross-section adjustment module is configured to, for each optimizable cross-section, if a non-thermal stability issue is detected in the N-1 / N-2 check, increase the number of grid-type equipment until the N-1 / N-2 check is met or the regional economic upper limit for grid-type equipment configuration is reached; if a thermal stability issue is detected in the N-1 / N-2 check, uniformly increase the power output / load within that cross-section, increasing the cross-section power by a power step size until the static stability limit considering margin is reached; and...

[0112] The planning scheme acquisition module is configured to acquire the limit data of each optimizable section, and obtain the section limit considering the network-type equipment and the corresponding planning distribution and capacity of the network-type equipment.

[0113] Example 6

[0114] This invention also provides another computer device, including a processor and a memory configured to store a computer program capable of running on the processor; wherein, when the processor is configured to run the computer program, it performs the method steps described in the foregoing embodiments.

[0115] In practical applications, the aforementioned processor includes a Field-Programmable Gate Array (FPGA), and the processor can be a Central Processing Unit (CPU) or a Digital Signal Processor (DSP). It is understood that for different devices, the electronic devices used to implement the above-mentioned processor functions can also be other types, and this embodiment of the invention does not impose specific limitations.

[0116] The aforementioned memory can be volatile memory, such as random-access memory (RAM); or non-volatile memory, such as read-only memory (ROM), flash memory, hard disk drive (HDD), or solid-state drive (SSD); or a combination of the above types of memory, and provides instructions and data to the processor.

[0117] Example 7

[0118] In an exemplary embodiment, the present invention also provides a computer-readable storage medium for storing a computer program.

[0119] Optionally, the computer-readable storage medium can be applied to any of the methods in the embodiments of the present invention, and the computer program causes the computer to execute the corresponding processes implemented by the processor in the various methods of the embodiments of the present invention. For the sake of brevity, these will not be described in detail here.

[0120] In the several embodiments provided by this invention, it should be understood that the disclosed devices and methods can be implemented in other ways. The device embodiments described above are merely illustrative. For example, the division of units is only a logical functional division, and in actual implementation, there may be other division methods, such as: multiple units or components can be combined, or integrated into another system, or some features can be ignored or not executed. In addition, the coupling, direct coupling, or communication connection between the various components shown or discussed can be through some interfaces, and the indirect coupling or communication connection between devices or units can be electrical, mechanical, or other forms.

Claims

1. A method for configuring grid-type equipment based on improving the operational limits of large power grids, characterized in that: include, Based on the limits and constraints of each section of the regional power grid, several sections that can be optimized were identified. For each optimizable section, if a non-thermal stability problem is found in the N-1 / N-2 check, add network-type equipment at appropriate locations until the non-thermal stability problem is eliminated or the configuration capacity limit is reached; if the non-thermal stability problem is eliminated, continue to check if a thermal stability problem exists in the N-1 / N-2 check; if the configuration capacity limit has been reached, reduce the section power by the power step size and obtain the limit data of the section and the current distribution and capacity of the network-type equipment. If it is determined that there are no non-thermal stability issues in the N-1 / N-2 check, then it is determined whether there are thermal stability issues in the N-1 / N-2 check. If there are thermal stability issues, the power of the cross-section is reduced by the power step size to obtain the limit data of the cross-section and the distribution and capacity of the current network-type equipment. If there are no thermal stability issues and the cross-section has not reached the static stability limit considering the margin, then the power of the cross-section is increased by the power step size before determining non-thermal stability issues. If there are no thermal stability issues and the cross-section has reached the static stability limit considering the margin, then the power of the cross-section is reduced by the power step size to obtain the limit data of the cross-section and the distribution and capacity of the current network-type equipment. Based on the limit data of each optimizable section and the distribution and capacity of the network-type equipment, the section limit considering the network-type equipment and the corresponding planned distribution and capacity of the network-type equipment are obtained.

2. The method as described in claim 1, characterized in that: Based on the limits and constraints of various cross-sections in the regional power grid, several optimizable cross-sections were identified, including... Based on the typical mode of the current regional power grid, calculate the transmission section limit of N-1 / N-2 from the end of the regional power grid to the external interconnection line of the regional power grid under normal mode; Based on the calculation results, the regional power grid is divided into n transmission sections from the end to the tie line, and the limits and constraints of each transmission section are defined.

3. The method as described in claim 1, characterized in that: When a non-thermal stability issue is identified in the N-1 / N-2 check, add network-type equipment at appropriate locations, including: When it is determined that there is a non-thermal stability problem in the N-1 / N-2 check, site selection tests are conducted at the lowest point of the transient first swing voltage, the near-zone of the thermal power unit with the maximum transient first swing power angle, the fault point, and the regional hub station. In each round of site selection tests, a grid-type device is added at a certain location, and the improvement effect of the grid-type device is analyzed. Compare the improvement effects of adding mesh-type equipment at various locations, determine the optimal location, and add the mesh-type equipment at the optimal location.

4. The method as described in claim 3, characterized in that: The non-thermal stability problems include power angle problems, low voltage problems, and dynamic stability problems. When it is determined that there is a power angle problem in the N-1 / N-2 check, the position that best suppresses power angle instability is taken as the optimal position. When it is determined that there is a dynamic stability problem in the N-1 / N-2 check, the position that best improves the damping ratio is taken as the optimal position. When it is determined that there is a low voltage problem in the N-1 / N-2 check, the position of the lowest steady-state / transient voltage point is taken as the optimal position.

5. The method as described in claim 1, characterized in that: Decrease / increase the power step size of the cross-sectional power, including, Determine the power step size based on the current transmission section's limiting conditions; The output of new energy sources within the cross section is uniformly reduced / increased, thereby reducing / increasing the power step size of the cross section.

6. The method as described in claim 1, characterized in that: When non-thermal stability issues are identified in the N-1 / N-2 verification, add network-type devices at appropriate locations until the non-thermal stability issues are resolved or the configuration capacity limit is reached, including: When it is determined that there is a non-thermal stability problem in the verification of a certain optimizable cross section N-1 / N-2, add mesh-type equipment at appropriate locations; Determine if there are non-thermal stability issues in the N-1 / N-2 check of the optimizable section. If so, add grid-type equipment at appropriate locations and then determine if the configured capacity of the grid-type energy storage has reached the upper limit. If it has, reduce the power of the section by the power step size and obtain the limit data of the section and the distribution and capacity of the current grid-type equipment. If the configured capacity of the grid-type energy storage has not reached the upper limit, add grid-type equipment at appropriate locations and continue to determine if there are non-thermal stability issues. If there are no non-thermal stability issues, continue to determine if there are thermal stability issues in the N-1 / N-2 check.

7. A grid-type equipment configuration system based on improving the operational limits of large power grids, characterized in that: include, The cross-section confirmation module is configured to confirm several optimizable cross-sections based on the limits and constraints of cross-sections at all levels of the regional power grid. The non-thermal stability problem adjustment module is configured to, for each optimizable section, if a non-thermal stability problem exists in the N-1 / N-2 check, add network-type equipment at appropriate locations until there is no non-thermal stability problem or the configuration capacity limit is reached; if there is no non-thermal stability problem, continue to check if there is a thermal stability problem in the N-1 / N-2 check; if the configuration capacity limit has been reached, reduce the section power by the power step size, and obtain the limit data of the section at this time and the distribution and capacity of the current network-type equipment. The thermal stability problem adjustment module is configured to, if it determines that there are no non-thermal stability problems in the N-1 / N-2 checks, continue to determine whether there are thermal stability problems in the N-1 / N-2 checks; if there are thermal stability problems, the power of the cross section is reduced by the power step size to obtain the limit data of the cross section and the distribution and capacity of the current network-type equipment; if there are no thermal stability problems and the cross section has not reached the static stability limit considering the margin, the power of the cross section is increased by the power step size before determining non-thermal stability problems; if there are no thermal stability problems and the cross section has reached the static stability limit considering the margin, the power of the cross section is reduced by the power step size to obtain the limit data of the cross section and the distribution and capacity of the current network-type equipment. as well as, The planning scheme acquisition module is configured to obtain the cross-sectional limits considering the network-type equipment and the corresponding planned distribution and capacity of the network-type equipment based on the limit data of each optimizable cross section and the distribution and capacity of the network-type equipment.

8. The system as described in claim 7, characterized in that: The cross-section confirmation module identifies several optimizable cross-sections based on the limits and constraints of cross-sections at all levels of the regional power grid, including: Based on the typical mode of the current regional power grid, calculate the transmission section limit of N-1 / N-2 from the end of the regional power grid to the external interconnection line of the regional power grid under normal mode; Based on the calculation results, the regional power grid is divided into n transmission sections from the end to the tie line, and the limits and constraints of each transmission section are defined.

9. The system as described in claim 7, characterized in that: When the non-thermal stability problem adjustment module determines that a non-thermal stability problem exists in the N-1 / N-2 check, it adds network-type equipment at appropriate locations, including: When it is determined that there is a non-thermal stability problem in the N-1 / N-2 check, site selection tests are conducted at the lowest point of the transient first swing voltage, the near-zone of the thermal power unit with the maximum transient first swing power angle, the fault point, and the regional hub station. In each round of site selection tests, a grid-type device is added at a certain location, and the improvement effect of the grid-type device is analyzed. Compare the improvement effects of adding mesh-type equipment at various locations, determine the optimal location, and add the mesh-type equipment at the optimal location.

10. The system as described in claim 9, characterized in that: The non-thermal stability problems include power angle problems, low voltage problems, and dynamic stability problems. When it is determined that there is a power angle problem in the N-1 / N-2 check, the position that best suppresses power angle instability is taken as the optimal position. When it is determined that there is a dynamic stability problem in the N-1 / N-2 check, the position that best improves the damping ratio is taken as the optimal position. When it is determined that there is a low voltage problem in the N-1 / N-2 check, the position of the lowest steady-state / transient voltage point is taken as the optimal position.

11. The system as described in claim 7, characterized in that: Decrease / increase the power step size of the cross-sectional power, including, Determine the power step size based on the current transmission section's limiting conditions; The output of new energy sources within the cross section is uniformly reduced / increased, thereby reducing / increasing the power step size of the cross section.

12. The system as described in claim 7, characterized in that: When the non-thermal stability issue adjustment module determines that a non-thermal stability issue exists in the N-1 / N-2 check, it adds network-type devices at appropriate locations until the non-thermal stability issue is resolved or the configuration capacity limit is reached, including... When it is determined that there is a non-thermal stability problem in the verification of a certain optimizable cross section N-1 / N-2, add mesh-type equipment at appropriate locations; Determine if there are non-thermal stability issues in the N-1 / N-2 check of the optimizable section. If so, add grid-type equipment at appropriate locations and then determine if the configured capacity of the grid-type energy storage has reached the upper limit. If it has, reduce the power of the section by the power step size and obtain the limit data of the section and the distribution and capacity of the current grid-type equipment. If the configured capacity of the grid-type energy storage has not reached the upper limit, add grid-type equipment at appropriate locations and continue to determine if there are non-thermal stability issues. If there are no non-thermal stability issues, continue to determine if there are thermal stability issues in the N-1 / N-2 check.

13. A computer device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor; characterized in that: When the processor executes the computer program, it implements the steps of the grid-type equipment configuration method based on the improvement of the operating limits of a large power grid as described in any one of claims 1 to 6.

14. A computer-readable storage medium storing a computer program; characterized in that: When the computer program is executed by the processor, it implements the steps of the grid-type equipment configuration method based on the improvement of the operating limits of a large power grid as described in any one of claims 1 to 6.