A multi-zone cooperative regulation method, system, device and medium
By employing a multi-regional coordinated control method and utilizing a four-level architecture and reinforcement learning optimization strategy, the problems of coarse control hierarchy, insufficient inter-regional coordination capability, and slow emergency fault response when distributed photovoltaic power is connected to the distribution network are solved, thus achieving efficient distribution network operation and management.
Patent Information
- Application Number
- CN202611252947.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-08-18
- Publication Date
- 2026-11-24
AI Technical Summary
Existing distributed photovoltaic (PV) control schemes, when connected to the distribution network at a high proportion, suffer from problems such as coarse control levels, insufficient inter-distributor coordination capabilities, slow emergency fault isolation response, and lack of dynamic evaluation and optimization of control strategies, making it difficult to adapt to the continuous changes in the operating status of distributed PV and the distribution network.
A multi-transformer area collaborative control method is adopted. By acquiring distribution network operation data, power flow analysis is performed to identify abnormal states. Control requirements are decomposed step by step according to a four-level architecture. When the regulation capacity of low-voltage transformer areas is insufficient, the remaining adjustable capacity of adjacent transformer areas is used for collaborative autonomous control. The control strategy is optimized by combining reinforcement learning.
It improves the regulation efficiency of the distribution network, ensures safe and stable operation in scenarios with a high proportion of distributed photovoltaic access, reduces problems such as unreasonable allocation of regulation resources and insufficient response speed, and enhances the adaptability to changes in the operating status of the distribution network.
Smart Images

Figure CN123163000A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of distributed energy regulation, and in particular to a method, system, device and medium for coordinated regulation of multiple distribution zones. Background Technology
[0002] With the rapid development of new energy technologies and the continuous expansion of distributed energy applications, the proportion of distributed photovoltaic (PV) systems connected to distribution networks is constantly increasing. The large-scale connection of distributed PV equipment to low-voltage distribution areas has altered the power flow distribution characteristics of traditional distribution networks, leading to greater volatility and complexity in their operation. When PV output does not match the local load absorption capacity, it can easily cause problems such as reverse overload of distribution transformers, voltage exceeding limits at nodes, and three-phase imbalance, affecting the safe and stable operation of the distribution network.
[0003] Existing distributed photovoltaic (PV) control schemes typically employ centralized control or simple hierarchical control architectures, with coarse control levels that hinder the rational allocation of control resources. Furthermore, existing schemes have limited information exchange and resource sharing capabilities between different low-voltage distribution areas. When the control capacity of a single low-voltage distribution area is insufficient, it is difficult to utilize the control capacity of adjacent low-voltage distribution areas in a timely manner, resulting in low collaborative response efficiency. In addition, existing technologies lack sufficient fault isolation speed when facing emergency operating conditions such as short circuits and severe voltage anomalies, making it difficult to promptly mitigate the impact of abnormal conditions on the distribution network. Simultaneously, existing control strategies are usually executed according to fixed rules, lacking dynamic evaluation and optimization mechanisms based on control effects, making it difficult to adapt to the continuously changing needs of distributed PV output and distribution network operating conditions. Summary of the Invention
[0004] This invention provides a method, system, device, and medium for coordinated control of multiple distribution zones, which can improve the control efficiency of distribution network operation in scenarios where a high proportion of distributed photovoltaic power is connected to the distribution network.
[0005] In a first aspect, embodiments of the present invention provide a method for coordinated control of multiple transformer zones, comprising: Obtain power distribution network operation data; Power flow analysis is performed on the power distribution network operation data to determine abnormal operating states in the power distribution network, and control requirements are generated based on the abnormal operating states. Based on the four-level architecture consisting of substation level, busbar level, medium-voltage line level and low-voltage distribution area level, the control requirements are decomposed level by level to determine the control targets corresponding to the low-voltage distribution area level. The operating status information of photovoltaic equipment in each low-voltage distribution area is obtained respectively. The adjustable capacity corresponding to each low-voltage distribution area is calculated according to the operating status information, so as to determine the power adjustment amount corresponding to each low-voltage distribution area based on the adjustable capacity. The power adjustment amount is compared with the control target corresponding to the low-voltage distribution area level. When there is a low-voltage distribution area that does not meet the control target, the remaining adjustable capacity information between adjacent low-voltage distribution areas is obtained, and multi-distribution area collaborative autonomous control is performed according to the remaining adjustable capacity information.
[0006] This invention improves the control efficiency of distribution networks in scenarios with high-proportion distributed photovoltaic (PV) grid integration by comprehensively understanding the real-time operating status of the distribution network under these conditions, providing an accurate data foundation for subsequent regulation. It also enhances the control efficiency by promptly identifying operational issues such as voltage overruns and reverse overloads, and formulating targeted control requirements. Furthermore, it improves the precision of control target allocation by accurately mapping global control requirements to specific low-voltage distribution areas. By generating matching power regulation amounts based on the actual regulation capabilities of each low-voltage distribution area, it avoids unreasonable allocation of control resources. Finally, it improves the control efficiency by quickly utilizing the remaining regulation capabilities of adjacent low-voltage distribution areas to achieve coordinated control when the regulation capacity of a single low-voltage distribution area is insufficient, reducing reliance on central dispatch and improving coordinated response speed.
[0007] Furthermore, the step of performing power flow analysis on the distribution network operation data to determine abnormal operating states in the distribution network includes: Power flow calculations are performed on the power distribution network operation data to obtain the node voltage and branch power of each node in the power distribution network. The abnormal operating state in the distribution network is determined based on the voltage of each node, the power of each branch, and the preset abnormal judgment conditions.
[0008] The above steps, by performing power flow calculations on the distribution network operation data and combining them with preset anomaly judgment conditions to determine abnormal operating states, can accurately identify operational problems such as abnormal node voltage and abnormal branch power, providing a reliable basis for generating subsequent control requirements. This can improve the control efficiency of distribution network operation in scenarios with a high proportion of distributed photovoltaic access to the distribution network.
[0009] Furthermore, the control requirements are decomposed level by level according to the four-level architecture consisting of substation level, busbar level, medium-voltage line level, and low-voltage distribution area level, and the control objectives corresponding to the low-voltage distribution area level are determined, including: Based on the aforementioned control requirements, the overall control target for the substation is determined. Based on the over-limit amplitude and over-limit duration corresponding to each bus, the first allocation weight corresponding to each bus is determined. Based on each of the first allocation weights, the total control target is decomposed to each bus to obtain the control target corresponding to the bus level. Based on the photovoltaic installed capacity and line load margin of each medium-voltage line, the second allocation weight of each medium-voltage line is determined. Based on the second allocation weight, the control target corresponding to the bus level is decomposed to each medium-voltage line to obtain the control target corresponding to the medium-voltage line level. Based on the photovoltaic installed capacity and adjustable margin of each low-voltage distribution area, the third allocation weight of each low-voltage distribution area is determined. Based on the third allocation weight, the control target corresponding to the medium-voltage line level is decomposed to each low-voltage distribution area to obtain the control target corresponding to the low-voltage distribution area level.
[0010] The above steps, by decomposing the control requirements level by level according to the hierarchical structure of substations, busbars, medium-voltage lines and low-voltage distribution areas, combined with the degree of exceeding limits, line load rate and low-voltage distribution area regulation capacity, can more accurately allocate control targets to the corresponding low-voltage distribution areas, reduce the problem of unreasonable allocation of control resources, and thus improve the control efficiency of distribution network operation in scenarios with a high proportion of distributed photovoltaic access to the distribution network.
[0011] Furthermore, the step of calculating the adjustable capacity corresponding to each low-voltage distribution area based on the operating status information, and determining the power adjustment amount corresponding to each low-voltage distribution area based on each adjustable capacity, includes: The adjustable power corresponding to each photovoltaic device is calculated based on the operating status information, and the adjustable capacity of the low-voltage distribution area is determined based on the adjustable power corresponding to each photovoltaic device in the same low-voltage distribution area. According to the rated capacity ratio of each photovoltaic device, the adjustable capacity is decomposed to each photovoltaic device to obtain the power adjustment amount corresponding to each low-voltage distribution area.
[0012] The above steps determine the adjustable capacity of the low-voltage distribution area based on the operating status of each photovoltaic device, and allocate the adjustable capacity to each photovoltaic device according to the rated capacity ratio. This enables the power regulation amount to match the actual regulation capacity of each photovoltaic device, reducing the problem of uneven allocation of regulation resources. As a result, the regulation efficiency of the distribution network can be improved in scenarios where a high proportion of distributed photovoltaics are connected to the distribution network.
[0013] Furthermore, when there are low-voltage distribution areas that do not meet the control target, obtaining the remaining adjustable capacity information between adjacent low-voltage distribution areas, and performing multi-distribution area collaborative autonomous control based on the remaining adjustable capacity information, includes: When the power adjustment amount is less than the control target, a communication connection is established between the low-voltage distribution area and the adjacent low-voltage distribution area based on the preset Dianhong distributed soft bus, so as to send a coordinated control request to the adjacent low-voltage distribution area based on the communication connection. Receive the remaining adjustable capacity information returned according to the coordinated control request, and determine the coordinated control area based on each of the remaining adjustable capacity information; The regulation tasks corresponding to the regulation targets are assigned to the coordinated regulation areas to complete the coordinated autonomous regulation of multiple areas.
[0014] The above steps establish communication connections between adjacent low-voltage distribution areas when the regulation capacity of a single low-voltage distribution area is insufficient, and utilize the remaining adjustable capacity of adjacent low-voltage distribution areas to share the regulation task. This enables rapid coordinated regulation among multiple distribution areas, reduces the impact of limited regulation of a single low-voltage distribution area on the overall regulation effect, and thus improves the regulation efficiency of the distribution network in scenarios with a high proportion of distributed photovoltaic access.
[0015] Furthermore, the step of allocating the regulation tasks corresponding to the regulation target to the coordinated regulation areas to complete multi-area coordinated autonomous regulation includes: The regulation tasks corresponding to the regulation targets are assigned to the coordinated regulation stations, and regulation process data is obtained during the execution of the assigned tasks. Based on the data from the aforementioned control process, the control response delay, voltage over-limit improvement rate, reverse overload elimination rate, and three-phase imbalance improvement rate are calculated. The regulation response delay, the voltage over-limit improvement rate, the reverse heavy overload elimination rate, and the three-phase imbalance improvement rate are input into a preset reinforcement learning model to learn the adjustment actions corresponding to the regulation strategy parameters. Based on the aforementioned adjustments, the control strategy parameters are continuously optimized to achieve coordinated autonomous control across multiple transformer areas.
[0016] The above steps, by quantitatively evaluating the response delay, voltage improvement, heavy overload elimination, and three-phase imbalance improvement during the multi-region coordinated control process, and by continuously optimizing the control strategy parameters using a reinforcement learning model, can improve the adaptability of the control strategy to changes in the operating state of the distribution network, thereby improving the control efficiency of the distribution network in scenarios with a high proportion of distributed photovoltaic access.
[0017] Furthermore, the step of inputting the regulation response delay, the voltage over-limit improvement rate, the reverse overload elimination rate, and the three-phase imbalance improvement rate into a preset reinforcement learning model to learn the adjustment actions corresponding to the regulation strategy parameters includes: A state space for reinforcement learning is constructed based on the regulation response delay, the voltage over-limit improvement rate, the reverse heavy overload elimination rate, and the three-phase imbalance improvement rate. Based on the state space, the preset parameter adjustment action space, and the preset reward function, a preset reinforcement learning model is used to perform iterative optimization of the policy with the goal of maximizing the expected cumulative value of the reward function, thereby determining the adjustment action corresponding to the control policy parameters.
[0018] The above steps construct a reinforcement learning state space based on the control response delay, voltage improvement, heavy overload elimination, and three-phase imbalance improvement, and combine it with the parameter adjustment action space and reward function for strategy iterative optimization. This enables the adaptive generation of better control strategy parameter adjustment actions, thereby improving the control efficiency of distribution network operation in scenarios with a high proportion of distributed photovoltaic access.
[0019] Secondly, embodiments of the present invention provide a multi-zone collaborative control system, the system comprising: an acquisition module, an analysis module, a decomposition module, an adjustment module, and a control module; The acquisition module is used to acquire power distribution network operation data; The analysis module is used to perform power flow analysis on the power distribution network operation data, determine abnormal operating states in the power distribution network, and generate control requirements based on the abnormal operating states. The decomposition module is used to decompose the control requirements level by level according to the four-level architecture consisting of substation level, busbar level, medium-voltage line level and low-voltage distribution area level, and determine the control target corresponding to the low-voltage distribution area level. The adjustment module is used to acquire the operating status information of photovoltaic equipment in each low-voltage area, calculate the adjustable capacity corresponding to each low-voltage area based on the operating status information, and determine the power adjustment amount corresponding to each low-voltage area based on each adjustable capacity. The control module is used to compare each of the power adjustment amounts with the control targets corresponding to the low-voltage distribution area level. When there is a low-voltage distribution area that does not meet the control targets, it obtains the remaining adjustable capacity information between adjacent low-voltage distribution areas and performs multi-distribution area collaborative autonomous control based on the remaining adjustable capacity information.
[0020] This invention provides an embodiment of the power distribution network that performs power flow analysis on the network's operating status, decomposes control requirements at each level using a four-level architecture, determines power regulation based on the actual adjustable capacity of each low-voltage distribution area, and utilizes the remaining adjustable capacity of adjacent low-voltage distribution areas for coordinated control when the control capacity is insufficient. This improves the accuracy of control target allocation and the coordinated response capability of multiple distribution areas, thereby enhancing the control efficiency of the power distribution network in scenarios with a high proportion of distributed photovoltaic power access.
[0021] Thirdly, embodiments of the present invention provide a terminal device, including: a processor, a memory, a communication interface, and a communication bus, wherein the processor, the memory, and the communication interface communicate with each other through the communication bus; The memory is used to store at least one executable instruction that causes the processor to perform the operation of a multi-zone coordinated control method as described in this application.
[0022] Fourthly, embodiments of the present invention provide a computer-readable storage medium comprising a stored computer program, wherein, when the computer program is executed, it controls the device or system where the computer-readable storage medium is located to perform a multi-zone coordinated control method as described in this application.
[0023] The above description is merely an overview of the technical solutions of the embodiments of the present invention. In order to better understand the technical means of the embodiments of the present invention and to implement them in accordance with the contents of the specification, and to make the above and other objects, features and advantages of the embodiments of the present invention more apparent and understandable, specific embodiments of the present invention are described below. Attached Figure Description
[0024] To more clearly illustrate the technical solution of this application, the drawings used in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this application. For those skilled in the art, other drawings can be obtained from these drawings without creative effort.
[0025] Figure 1 This is a flowchart illustrating an embodiment of a multi-station coordinated control method provided in this application; Figure 2 This is a flowchart illustrating the decomposition of the four-level control targets provided in this application; Figure 3 This is a flowchart illustrating the optimization of the multi-station coordinated control strategy provided in this application; Figure 4 This is a schematic diagram of the structure of one embodiment of a multi-station coordinated control system provided in this application. Detailed Implementation
[0026] To make the objectives, technical solutions, and advantages of this application clearer, the technical solutions of this application will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of this application, not all embodiments. Based on the embodiments of this application, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of this application.
[0027] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this application pertains; the terminology used herein is for the purpose of describing particular embodiments only and is not intended to limit the application; the terms “comprising” and “having”, and any variations thereof, in the specification, claims, and foregoing description of the drawings are intended to cover non-exclusive inclusion.
[0028] In the description of the embodiments of this application, technical terms such as "first" and "second" are used only to distinguish different objects and should not be construed as indicating or implying relative importance or implicitly specifying the number, specific order, or primary and secondary relationship of the indicated technical features. In the description of the embodiments of this application, "multiple" means two or more, unless otherwise explicitly defined.
[0029] In this document, the term "embodiment" means that a particular feature, structure, or characteristic described in connection with an embodiment may be included in at least one embodiment of this application. The appearance of this phrase in various places throughout the specification does not necessarily refer to the same embodiment, nor is it a separate or alternative embodiment mutually exclusive with other embodiments. It will be explicitly and implicitly understood by those skilled in the art that the embodiments described herein can be combined with other embodiments.
[0030] In the description of the embodiments in this application, the term "and / or" is merely a description of the relationship between related objects, indicating that three relationships can exist. For example, A and / or B can represent: A existing alone, A and B existing simultaneously, and B existing alone. Additionally, the character " / " in this document generally indicates that the preceding and following related objects have an "or" relationship.
[0031] In the description of the embodiments of this application, the term "multiple" refers to two or more (including two), similarly, "multiple sets" refers to two or more (including two sets), and "multiple pieces" refers to two or more (including two pieces).
[0032] In the description of the embodiments of this application, unless otherwise expressly specified and limited, technical terms such as "installation," "connection," "joining," and "fixing" should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral part; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium; they can refer to the internal communication of two components or the interaction between two components. For those skilled in the art, the specific meaning of the above terms in the embodiments of this application can be understood according to the specific circumstances.
[0033] With the large-scale integration of distributed photovoltaic (PV) power into the distribution network, the mismatch between PV output and load absorption capacity can easily lead to problems such as reverse overload, voltage exceeding limits, and three-phase imbalance. Existing control schemes suffer from problems such as coarse control levels, insufficient inter-station coordination capabilities, slow emergency fault isolation response, and a lack of dynamic evaluation and optimization of control strategies, making it difficult to adapt to the continuous changes in the operating status of distributed PV and the distribution network.
[0034] See Figure 1 In order to improve the control efficiency of distribution network operation in scenarios with a high proportion of distributed photovoltaic power grid access, an embodiment of the present invention provides a method for coordinated control of multiple distribution areas, including steps S101 to S105. Step S101: Obtain power distribution network operation data; In some embodiments, distribution network operation data refers to data characterizing the grid operation status within the distributed photovoltaic (PV) access area. This data includes substation operation data, 10kV busbar operation data, medium-voltage line operation data, low-voltage distribution area operation data, and PV equipment operation data. The cloud-based control center establishes data communication connections with various data acquisition terminals within the distribution network through the Dianhong IoT operating system. It also uses the Dianhong IoT unified IoT model to perform unified data parsing on different manufacturers and types of power equipment to obtain real-time operation data for each device. Substation operation data includes substation number, 10kV bus voltage, bus three-phase current, bus active power, bus reactive power, power factor, and current load factor of the substation; 10kV bus operation data includes bus node voltage, power flow direction of each outgoing line, active power of each outgoing line, reactive power of each outgoing line, and bus voltage deviation data; medium-voltage line operation data includes 10kV feeder number, feeder current, feeder power, line load factor, line power direction, and number of transformer substations within the line's power supply range; low-voltage transformer substation operation data includes distribution transformer number, substation load factor, substation three-phase current, substation voltage, substation power factor, and user load change data within the substation; photovoltaic equipment operation data includes each photovoltaic grid connection point number, current active output power, reactive output power, rated capacity, current power factor, operating status of the photovoltaic inverter, and SOC (state of charge) data of the energy storage equipment. The cloud-based control center periodically collects the aforementioned operational data according to a preset collection cycle, which is determined based on the operating status of the distribution network. Under normal operating conditions, the data is acquired at a 5-minute collection cycle; when voltage exceedances, reverse power flow, or abnormal load rate changes are detected, the collection cycle is adjusted to the second level.
[0035] In some embodiments, after acquiring distribution network operation data, time synchronization processing is performed on each piece of operation data. Using the unified time synchronization mechanism provided by the Dianhong IoT operating system, a unified timestamp is added to data from different acquisition terminals, and the data uploaded by different devices is time-aligned based on the timestamps, ensuring that substation-side data, line-side data, transformer-side data, and equipment-side data correspond to the same operating time. After time synchronization, the distribution network operation data undergoes a data validity check to determine if each piece of operation data meets preset data range requirements. When data loss, abnormal data mutations, or data exceeding the rated operating range of the equipment are detected, the data is supplemented or corrected based on the historical operation data of the corresponding equipment and data collected at adjacent time points. For abnormal data that cannot be corrected, a data anomaly identifier is generated, and the corresponding anomaly record is retained. The distribution network operation data after validity checking is standardized and converted according to the Dianhong IoT unified IoT model, transforming the raw data uploaded by different devices into a unified format data set. The device identifier, device type, hierarchical level, acquisition time, operating parameters, and data status information corresponding to each device are associated and stored, forming a distribution network operation dataset containing device topology relationships and real-time operating status. The distribution network operation dataset is stored in layers according to the substation level, bus level, medium-voltage line level, and low-voltage distribution area level, so that subsequent power flow analysis, control demand identification, and four-level control strategy generation can be performed based on the distribution network operation dataset.
[0036] Through the above steps, it is possible to uniformly collect, synchronize, verify the validity and standardize the multi-level operation data of distributed photovoltaic power grid, forming a power grid operation dataset that includes equipment topology relationships and real-time operating status. This improves the integrity, consistency and accuracy of the operation data, and provides a reliable data foundation for subsequent power flow analysis, abnormal state identification and generation of four-level coordinated control strategies.
[0037] Step S102: Perform power flow analysis on the power distribution network operation data to determine abnormal operating states in the power distribution network, and generate control requirements based on the abnormal operating states. In some embodiments, the step of performing power flow analysis on the power distribution network operation data to determine the abnormal operating state in the power distribution network includes: performing power flow calculation on the power distribution network operation data to obtain the node voltage corresponding to each node and the branch power corresponding to each branch in the power distribution network; and determining the abnormal operating state in the power distribution network based on the node voltage, the branch power, and preset abnormal judgment conditions.
[0038] In some embodiments, power flow calculations are performed on the distribution network operation data to obtain the node voltage and branch power corresponding to each node and branch in the distribution network. Specifically, after the cloud control center obtains the distribution network operation data, it parses the data to extract the network topology information and the operating parameters of each power device. Based on the 10kV busbar data of substations, medium-voltage line data, and low-voltage distribution area data in the distribution network operation data, the connection relationships between nodes in the distribution network are determined, and the distribution network topology is constructed according to the node number, line to which it belongs, power supply relationship, and equipment type of each node. Nodes include substation busbar nodes, medium-voltage line nodes, low-voltage distribution area nodes, and photovoltaic grid-connected nodes; branches include substation outgoing branches, medium-voltage feeder branches, and distribution area power supply branches. Based on the distribution network topology and the node load data, photovoltaic output data, line parameter data, and transformer operation data in the distribution network operation data, a power flow calculation model for the distribution network is established. The active and reactive loads, photovoltaic active power output, and photovoltaic reactive power output of each node are used as node power input parameters. The line impedance parameters, transformer parameters, and branch connection relationships of each branch are used as branch calculation parameters. Based on these input parameters, a forward-backward substitution method is employed to calculate the power flow of the distribution network. During the power flow calculation, based on the initial voltage state of each node and the distribution network topology, power forward calculation is performed from the end node to the beginning node to obtain the active and reactive power of each branch. Based on the active and reactive power of each branch, voltage backward substitution calculation is performed from the beginning node to the end node to update the node voltage. This forward-subtraction and backward-subtraction calculations are repeated until the change in node voltage between two consecutive calculations is less than a preset convergence threshold. After the power flow calculation is completed, node voltage data and branch power data for each node and branch in the distribution network are obtained. These node voltage data and branch power data are then associated with the corresponding node and branch identifiers to form power flow calculation results used for identifying abnormal operating conditions. The node voltage data includes the three-phase voltage value, voltage deviation value, and voltage change trend of each node; the branch power data includes the active power, reactive power, power direction, and load rate data of each branch.
[0039] In some embodiments, the abnormal operating state in the distribution network is determined based on the node voltage, the branch power, and preset anomaly judgment conditions. Specifically, the cloud control center obtains the node voltage data and branch power data from the power flow calculation results, and performs anomaly detection on the node voltage data and branch power data according to the preset anomaly judgment conditions. Based on the branch power and rated capacity of each branch, the real-time load rate of each branch is calculated, and it is determined whether the real-time load rate exceeds a preset load rate threshold. Based on the power direction information in the branch power, it is determined whether there is a situation where photovoltaic power is being transmitted back to the distribution network in the current branch. When the load rate of any transformer or line exceeds 80%, and the power direction of the corresponding branch is the photovoltaic reverse direction, and the duration exceeds 15 minutes, the corresponding transformer or line is identified as a reverse overload abnormal area, and a corresponding reverse overload abnormal state is generated. The node voltage value of each node is compared with the rated voltage value to determine whether there is a voltage over-limit state at each node. When any node voltage exceeds +7% of the rated voltage for more than 5 minutes, the corresponding node is identified as an abnormal node with voltage exceeding the upper limit. When any node voltage is detected to be -10% of the rated voltage for more than 5 minutes, the corresponding node is identified as an abnormal node with voltage exceeding the lower limit. Based on the three-phase voltage data of each node and the three-phase current data of each branch obtained from power flow calculations, the three-phase operating deviation at each location in the distribution network is calculated. When the three-phase current imbalance of any node or branch exceeds 15% for more than 10 minutes, the corresponding location is identified as a three-phase imbalance abnormal area. Based on the above anomaly detection results, the detected abnormal operating states are classified, and the severity level of the anomaly is determined by combining the anomaly location, anomaly type, and anomaly duration. When a reverse overload anomaly is detected, the severity level is determined based on the degree to which the load rate of the corresponding branch exceeds 80% and the duration. When a voltage exceeding the limit anomaly is detected, the severity level is determined based on the magnitude of the node voltage deviation from the rated voltage and the duration. When a three-phase imbalance anomaly is detected, the severity level is determined based on the degree to which the three-phase current imbalance exceeds 15% and the duration. After identifying abnormal operating states, a control requirement list is generated. This list includes the location of the abnormal operation, the type of abnormal state, the severity level of the abnormality, the corresponding control direction, and the estimated control amount. Specifically, for the reverse overload abnormal state, the control direction is used to indicate reducing the reverse power transmission of photovoltaic power or adjusting the power distribution of the transformer area; for the voltage exceeding the limit abnormal state, the control direction is used to indicate adjusting the active or reactive power output of the photovoltaic inverter; and for the three-phase imbalance abnormal state, the control direction is used to indicate adjusting the power output distribution of the corresponding transformer area.
[0040] Through the above steps, power flow calculations can be accurately completed based on the distribution network topology and real-time operating data, abnormal operating states such as reverse overload, voltage over-limit, and three-phase imbalance can be identified in a timely manner, and a list of control requirements including the location of the abnormality, severity level, control direction, and estimated control amount can be generated. This improves the accuracy of abnormal state identification in the distribution network and the pertinence of control requirement generation, providing a reliable basis for subsequent four-level collaborative autonomous control.
[0041] Step S103: According to the four-level architecture consisting of substation level, busbar level, medium-voltage line level and low-voltage distribution area level, the control requirements are decomposed level by level to determine the control targets corresponding to the low-voltage distribution area level. Please refer to Figure 2 In some embodiments, the control requirements are decomposed level by level according to the four-level architecture consisting of substation level, bus level, medium voltage line level and low voltage distribution area level, and the control targets corresponding to the low voltage distribution area level are determined, including steps S201 to S204. Step S201: Determine the overall control target corresponding to the substation based on the control requirements; Step S202: Determine the first allocation weight corresponding to each bus based on the over-limit amplitude and over-limit duration of each bus, and decompose the total control target to each bus based on each first allocation weight to obtain the control target corresponding to the bus level. Step S203: Based on the photovoltaic installed capacity and line load margin of each medium-voltage line, determine the second allocation weight of each medium-voltage line, and decompose the control target corresponding to the bus level to each medium-voltage line based on each second allocation weight to obtain the control target corresponding to the medium-voltage line level. Step S204: Based on the photovoltaic installed capacity and adjustable margin of each low-voltage distribution area, determine the third allocation weight corresponding to each low-voltage distribution area, and decompose the control target corresponding to the medium-voltage line level to each low-voltage distribution area based on the third allocation weight, so as to obtain the control target corresponding to the low-voltage distribution area level.
[0042] In this first embodiment, the cloud-based control center obtains a control demand list from power flow analysis. This list includes the location of abnormal operation, the type of abnormal state, the severity level of the abnormality, the suggested control direction, and the estimated control quantity. Based on the control direction and estimated control quantity for each abnormal operating state within the substation's coverage area, the overall control demand for the current substation is determined. The control quantities corresponding to each abnormal area are then summarized to obtain the overall control target corresponding to the substation level. The overall control target includes active power control targets and reactive power control targets. When the abnormal operating state is reverse overload, the control target for reducing photovoltaic active power output is determined based on the photovoltaic backfeed power situation. When the abnormal operating state is voltage over-limit, the corresponding active power adjustment target or reactive power adjustment target is determined based on the node voltage deviation situation. After determining the overall control target, it is used as the initial input for the four-level control strategy decomposition, and the control target is decomposed level by level according to the hierarchical structure of substation, busbar, medium-voltage line, and low-voltage distribution area.
[0043] In this first embodiment, the cloud-based control center acquires node voltage data and abnormal operating status detection results for each 10kV busbar under the substation. Based on the over-limit amplitude and duration of each busbar, the severity of the problem is determined. For buses with voltage over-limit anomalies, the over-limit amplitude is determined based on the deviation between the actual operating voltage and the rated voltage, and the over-limit duration is determined based on the duration of the abnormal state. A problem weight for the corresponding busbar is generated based on the over-limit amplitude and duration. Let the total active power control target for the current substation be... The current substation includes The first 10kV busbar, the The problem weight corresponding to each busbar is Then the first The first allocation weight corresponding to each busbar is: ,in, Indicates the first The first allocation weight corresponding to each busbar; Indicates the first The problem weight corresponding to each bus is determined based on the over-limit magnitude and over-limit duration of that bus. This indicates the number of 10kV busbars corresponding to the current substation; This indicates the busbar number. Based on the first allocation weight corresponding to each busbar, the overall control target corresponding to the substation level is decomposed to each busbar, resulting in the control target corresponding to each busbar. The control targets corresponding to each busbar are: ,in, Indicates the first The active power control target corresponding to each busbar. This indicates the total active power control target for the substation. Indicates the first The first allocation weight corresponding to each busbar.
[0044] In this first embodiment, the cloud-based control center acquires the photovoltaic installed capacity and line operation status data corresponding to the medium-voltage lines under each 10kV bus. Based on the photovoltaic installed capacity and line load margin of each medium-voltage line, the control capability corresponding to each medium-voltage line is determined. The photovoltaic installed capacity of the corresponding medium-voltage line is obtained by statistically analyzing the rated capacity of the photovoltaic inverters connected to each medium-voltage line; the line load margin is determined based on the difference between the current medium-voltage line load rate and the maximum allowable load rate of the line. Let the control target corresponding to the current bus level be... The bus line contains The first medium-voltage line, The photovoltaic installed capacity corresponding to each medium-voltage line is The corresponding line load margin is Then the first The second allocation weight corresponding to the medium-voltage line is: ,in, Indicates the first The second allocation weight corresponding to the medium-voltage line, Indicates the first The photovoltaic installed capacity corresponding to the medium-voltage line, Indicates the first The line load margin corresponding to each medium-voltage line. This indicates the number of medium-voltage lines currently connected to the busbar. This indicates the medium-voltage line number. Based on the second allocation weight corresponding to each medium-voltage line, the control targets corresponding to the busbar level are decomposed to each medium-voltage line, resulting in the control targets corresponding to the medium-voltage line level. The control target corresponding to the medium-voltage line is: ,in, Indicates the first The active power control target corresponding to the medium-voltage line. This indicates the active power control target corresponding to the busbar level. Indicates the first The second allocation weight corresponding to the medium-voltage line.
[0045] In this first embodiment, the cloud-based control center acquires photovoltaic (PV) installed capacity data and PV inverter operating data corresponding to the low-voltage distribution areas under each medium-voltage line. Based on the PV installed capacity and adjustability margin of each low-voltage distribution area, the control capability of each low-voltage distribution area is determined. The PV installed capacity of the corresponding low-voltage distribution area is obtained by statistically analyzing the rated capacity of the PV inverters connected within each low-voltage distribution area; the adjustability margin of the corresponding low-voltage distribution area is determined based on the difference between the current PV inverter output power and its rated capacity. Let the control target corresponding to the current medium-voltage line level be... The medium-voltage line includes The first low-voltage distribution area, the first The photovoltaic installed capacity corresponding to each low-voltage distribution area is: The corresponding adjustability margin coefficient is Then the first The third allocation weight corresponding to each low-voltage distribution area is: ,in, Indicates the first The third allocation weight corresponding to each low-voltage distribution area; Indicates the first The photovoltaic installed capacity corresponding to each low-voltage distribution area; Indicates the first The adjustable margin coefficient corresponding to each low-voltage distribution area is smaller as the current photovoltaic output approaches the rated capacity. This indicates the number of low-voltage distribution areas under the current medium-voltage line; This indicates the low-voltage distribution area number. Based on the third allocation weight corresponding to each low-voltage distribution area, the control targets corresponding to the medium-voltage line level are decomposed to each low-voltage distribution area, thus obtaining the control targets corresponding to the low-voltage distribution area level. The control targets for each low-voltage distribution area are: ,in, Indicates the first The active power control target corresponding to each low-voltage distribution area This indicates the active power control target corresponding to the medium-voltage line level. Indicates the first The third allocation weight corresponds to each low-voltage distribution area. After completing the above three-level target decomposition, a four-level control strategy matrix is generated, which includes the substation level, bus level, medium-voltage line level, and low-voltage distribution area level. The four-level control strategy matrix includes the active power control target, reactive power control target, control time limit, and constraints corresponding to each control unit, and is sent to the corresponding smart distribution area terminal through the unified message bus of the Dianhong IoT operating system.
[0046] Through the above steps, the control requirements can be decomposed level by level based on the four-level architecture consisting of substations, busbars, medium-voltage lines, and low-voltage distribution areas. The control targets can be differentiated by combining the severity of exceeding limits, line operating margins, and the adjustability of distribution areas. This improves the rationality of control resource allocation and the accuracy of low-voltage distribution area control targets, providing precise target basis for subsequent collaborative autonomous control of multiple distributed photovoltaic distribution areas.
[0047] Step S104: Obtain the operating status information of photovoltaic equipment in each low-voltage distribution area, calculate the adjustable capacity corresponding to each low-voltage distribution area based on the operating status information, and determine the power adjustment amount corresponding to each low-voltage distribution area based on each adjustable capacity. In some embodiments, the step of calculating the adjustable capacity corresponding to each low-voltage distribution area based on the operating status information, and determining the power adjustment amount corresponding to each low-voltage distribution area based on each adjustable capacity, includes: calculating the adjustable power corresponding to each photovoltaic device based on the operating status information, and determining the adjustable capacity of the low-voltage distribution area based on the adjustable power corresponding to each photovoltaic device within the same low-voltage distribution area; and decomposing the adjustable capacity to each photovoltaic device according to the rated capacity ratio corresponding to each photovoltaic device to obtain the power adjustment amount corresponding to each low-voltage distribution area.
[0048] In some embodiments, the adjustable power corresponding to each photovoltaic device is calculated based on the operating status information, and the adjustable capacity of the low-voltage distribution area is determined based on the adjustable power corresponding to each photovoltaic device within the same low-voltage distribution area. Specifically, the smart distribution area terminal obtains the real-time operating status information corresponding to each photovoltaic inverter within the same low-voltage distribution area through the Dianhong IoT agent unit. The real-time operating status information includes the current active power output, rated capacity, and current power factor. Assume that the same low-voltage distribution area contains... Taiwan photovoltaic inverter, the first The current active power output corresponding to the photovoltaic inverter is The corresponding rated capacity is The corresponding minimum output limit is Based on the current active power output and rated capacity of each photovoltaic inverter, calculate the upward adjustable power and downward adjustable power corresponding to each photovoltaic inverter. Among them, the... The upward adjustable power corresponding to the photovoltaic inverter is: ,in, Indicates the first The upward adjustable power corresponding to the photovoltaic inverter. Indicates the first The rated capacity corresponding to the photovoltaic inverter. Indicates the first The current active power output corresponding to the photovoltaic inverter. The downward adjustable power corresponding to the photovoltaic inverter is: ,in, Indicates the first The downward adjustable power corresponding to the photovoltaic inverter. Indicates the first The current active power output corresponding to the photovoltaic inverter. Indicates the first The minimum output limit for each photovoltaic inverter is set at 10% of its rated capacity. Based on the adjustable power output of each photovoltaic inverter within the same low-voltage distribution area, the total adjustable capacity for that low-voltage distribution area is determined. ,in, This indicates the total upward adjustable capacity corresponding to this low-voltage distribution area. This indicates the number of photovoltaic inverters within the low-voltage distribution area. Based on the downward adjustable power of each photovoltaic inverter within the same low-voltage distribution area, the total downward adjustable capacity of that low-voltage distribution area is determined. ,in, This indicates the total downward adjustable capacity corresponding to this low-voltage distribution area. This indicates the number of photovoltaic inverters in the low-voltage distribution area. The smart distribution area terminal also counts the State of Charge (SOC) of the energy storage system in the low-voltage distribution area, and reports the total adjustable capacity, total adjustable capacity, and SOC as the adjustable capacity information for the low-voltage distribution area to the cloud control center in real time.
[0049] In some embodiments, the adjustable capacity is decomposed to each photovoltaic device according to the rated capacity ratio of each photovoltaic device to obtain the power regulation amount corresponding to each low-voltage distribution area. Specifically, the intelligent distribution area terminal obtains the low-voltage distribution area-level control target issued by the cloud, and decomposes the control target corresponding to the low-voltage distribution area to each photovoltaic inverter according to the rated capacity of each photovoltaic inverter in the same low-voltage distribution area using an equal proportion allocation algorithm. Let the total active power control target corresponding to the low-voltage distribution area be... The same low-voltage distribution area includes Taiwan photovoltaic inverter, the first The rated capacity corresponding to the photovoltaic inverter is Then the first The capacity allocation ratio for each photovoltaic inverter is as follows: ,in, Indicates the first The capacity allocation ratio corresponding to each photovoltaic inverter. Indicates the first The rated capacity corresponding to the photovoltaic inverter. This indicates the number of photovoltaic inverters in the low-voltage distribution area. This indicates the photovoltaic inverter number. Based on the capacity allocation ratio corresponding to each photovoltaic inverter, the total active power regulation target for this low-voltage distribution area is decomposed to each photovoltaic inverter, resulting in the power regulation amount corresponding to each photovoltaic inverter: ,in, Indicates the first The active power regulation corresponding to a photovoltaic inverter. This indicates the total active power control target corresponding to this low-voltage distribution area. Indicates the first The capacity allocation ratio corresponding to each photovoltaic inverter. When, it indicates that the corresponding photovoltaic inverter is performing power generation adjustment; when When the power regulation is activated, it indicates that the corresponding photovoltaic inverter is implementing power reduction regulation. The smart distribution area terminal generates corresponding active power regulation commands and reactive power regulation commands based on the power regulation amount of each photovoltaic inverter, and sends them to each photovoltaic inverter through the Dianhong IoT agent unit. The regulation commands are transmitted using the Modbus TCP protocol (an industrial communication protocol based on TCP / IP) or the IEC 61850 MMS protocol (a message communication protocol for power automation equipment), with a command issuance cycle of 1 second. At the same time, a smooth regulation method is used to control the rate of change of the output power of the photovoltaic inverter, so that the adjustment step per minute does not exceed 20% of the rated capacity of the corresponding photovoltaic inverter, in order to avoid the impact of power surges on the operation of the distribution network.
[0050] Through the above steps, the upward and downward adjustable capacity of the low-voltage distribution area can be accurately calculated based on the real-time operating status of each photovoltaic inverter. The control target is decomposed to each photovoltaic inverter according to the rated capacity ratio. At the same time, by smoothly adjusting the rate of power change, the accuracy of the assessment of the low-voltage distribution area's control capability and power allocation can be improved, and the impact of power fluctuations on the operation of the distribution network can be reduced.
[0051] Step S105: Compare each of the power adjustment amounts with the control targets corresponding to the low-voltage substation level. When there are low-voltage substations that do not meet the control targets, obtain the remaining adjustable capacity information between adjacent low-voltage substations, and perform multi-substation collaborative autonomous control based on the remaining adjustable capacity information.
[0052] In some embodiments, when there are low-voltage distribution areas that do not meet the control target, obtaining the remaining adjustable capacity information between adjacent low-voltage distribution areas and performing multi-distribution area collaborative autonomous control based on each of the remaining adjustable capacity information includes: when the power adjustment amount is less than the control target, establishing a communication connection between the low-voltage distribution area and adjacent low-voltage distribution areas based on a preset distributed soft bus, and sending a collaborative control request to the adjacent low-voltage distribution areas based on the communication connection; receiving the remaining adjustable capacity information returned according to the collaborative control request, determining the collaborative control distribution area based on each of the remaining adjustable capacity information; and allocating the control task corresponding to the control target to the collaborative control distribution area to complete multi-distribution area collaborative autonomous control.
[0053] In some embodiments, when the power adjustment amount is less than the control target, a communication connection is established between the low-voltage distribution area and adjacent low-voltage distribution areas based on a preset Elec-Hong distributed soft bus. This connection is used to send a collaborative control request to the adjacent low-voltage distribution areas. Specifically, the intelligent distribution area terminal monitors the control execution status of its own low-voltage distribution area in real time and compares the currently executed power adjustment amount with the low-voltage distribution area-level control target issued by the cloud. When the downward adjustable capacity of the low-voltage distribution area is less than 80% of the control target reduction amount, or when the voltage over-limit problem or reverse overload problem is not eliminated after 5 minutes of control execution, or when the received control target exceeds the adjustable capacity range of the low-voltage distribution area, it is determined that the low-voltage distribution area cannot independently complete the control target, and cross-distribution area collaborative control is triggered. Based on Elec-Hong distributed soft bus technology, a point-to-point virtual communication connection is established between the low-voltage distribution area and adjacent low-voltage distribution areas under the same medium-voltage line. The Elec-Power distributed soft bus uses the mDNS protocol (Automatic Discovery Protocol for Local Area Networks) to automatically discover and register terminals in adjacent transformer substations. It establishes a low-latency communication link via UDP (User Datagram Transport Protocol) and a reliable transport layer protocol, and employs DTLS 1.3 (Datagram Transport Layer Security 1.3) for end-to-end encrypted transmission. After the communication connection is established, this low-voltage transformer substation acts as the requesting substation, broadcasting a coordinated control request to all adjacent low-voltage transformer substations on the same feeder via the communication connection. The coordinated control request includes the requesting substation identifier, the required control amount, the control type, and the urgency level.
[0054] In some embodiments, receiving the remaining adjustable capacity information returned according to the coordinated control request, and determining the coordinated control area based on the remaining adjustable capacity information, specifically involves: each adjacent low-voltage distribution area, upon receiving the coordinated control request, assessing its current remaining adjustable capacity. Each adjacent low-voltage distribution area calculates the remaining adjustable capacity it can provide based on the current output, rated capacity, adjustable margin of the photovoltaic inverter within its area, and the SOC status of the energy storage system. When a corresponding adjacent low-voltage distribution area has surplus control capacity, it returns a response message to the requesting distribution area via the Elec-Tech distributed soft bus. The response message includes the adjacent low-voltage distribution area identifier, the available control amount, and the response time. The requesting distribution area receives the remaining adjustable capacity information returned by all adjacent low-voltage distribution areas and summarizes the remaining adjustable capacity of each adjacent low-voltage distribution area. Based on the remaining adjustable capacity corresponding to each adjacent low-voltage distribution area and its relative position to the requesting distribution area, the requesting distribution area selects the coordinated control area according to the principle of "margin priority, distance priority". Adjacent low-voltage distribution areas with larger remaining adjustable capacity have higher priority; when the remaining adjustable capacity is the same or close, adjacent low-voltage distribution areas that are closer to the requested distribution area by electrical distance have higher priority.
[0055] In some embodiments, the adjustment tasks corresponding to the control target are assigned to the coordinated control areas to complete multi-area coordinated autonomous control. Specifically, the requesting area splits the remaining adjustment tasks corresponding to the control target based on the determined coordinated control areas and the available control quantities for each coordinated control area. The requesting area assigns the remaining adjustment tasks to each coordinated control area according to the available control quantities for each coordinated control area and generates corresponding task confirmation messages. The requesting area sends task confirmation messages to each coordinated control area via the Elec-Tech Distributed Soft Bus. After receiving the task confirmation messages, each coordinated control area confirms and begins to execute the corresponding control task. During the coordinated control execution process, each participating area synchronizes the control execution progress in real time via the Elec-Tech Distributed Soft Bus, including the completed control quantities, remaining control quantities, and current execution status. After completing the corresponding control task, each coordinated control area returns control result information to the requesting area. After receiving the control result information returned by each coordinated control area, the requesting area summarizes all coordinated control results to obtain the total execution result of this multi-area coordinated control, and reports the total execution result to the cloud control center. The entire process, from requesting a coordinated control request from a low-voltage transformer area to completing the negotiation of the control task, is completed within 200ms, thereby achieving rapid coordinated autonomous control between low-voltage transformer areas.
[0056] In some embodiments, the intelligent micro-circuit emergency disconnection module is deployed at each photovoltaic grid-connected point to monitor the electrical operating status of the grid-connected point in real time. It quickly disconnects the photovoltaic power supply when abnormal conditions such as short-circuit faults, overvoltage, undervoltage, overfrequency, underfrequency, or islanding are detected, thereby achieving safety protection for the distributed photovoltaic grid-connected point. The electrical quantity acquisition unit uses a high-precision metering chip to collect real-time electrical quantity data such as three-phase voltage, three-phase current, frequency, and phase angle of the grid-connected point at a sampling frequency of 10kHz (kilohertz), and transmits this data to the anomaly judgment unit via an internal bus. The anomaly judgment unit calculates the current change rate of the grid-connected point in real time. When the current change rate meets the specified conditions... And the current amplitude satisfies The fault was determined to be a short circuit. Indicates the rate of change of current. Indicates the real-time current amplitude at the grid connection point. The rated current is indicated, and the short-circuit fault criterion's action time is less than 10ms; the anomaly criterion unit also uses inverse time characteristics for overvoltage and undervoltage determination, where the rated voltage is set to... ,when When the action is immediate and the action time is less than 20ms, The action lasts 0.5 seconds. The action lasts for 2 seconds. The action lasts for 5 seconds, when When the action is immediate and the action time is less than 20ms, The action lasts for 2 seconds, during which... The unit indicates the real-time voltage at the grid connection point; the anomaly detection unit also monitors the grid connection point frequency in real time, and when the frequency meets the requirements... or And the duration satisfies When the frequency is determined to be excessive or insufficient, protection actions are executed. Indicates the real-time frequency of the grid connection point. This indicates the duration of frequency exceeding the limit. The anomaly judgment unit also employs a combination of Active Frequency Deviation (AFD) and Voltage Phase Change Detection for islanding detection. When an abnormal system frequency response is detected after an active frequency deviation and a voltage phase change is simultaneously detected, it is determined to be in an islanded operating state. The islanding detection time is less than 100ms, and the detection blind zone is less than 2%. When the anomaly judgment unit determines that there is a short circuit fault, overvoltage, undervoltage, overfrequency, underfrequency, or islanded operation, it sends a tripping command to the micro-circuit breaker unit. The micro-circuit breaker unit uses a permanent magnet operating mechanism and a double-break contact structure. It completes contact disconnection within 20ms after receiving the tripping command, quickly isolating the photovoltaic power supply. The rated operating voltage of the micro-circuit breaker unit is AC. 230V / 400V (AC 230V / 400V power supply voltage level), rated current of 63A, opening time not exceeding 20ms, breaking capacity of 6kA, and mechanical life of 10,000 cycles; after opening, the event record is reported to the smart distribution terminal through the IoT agent unit. The event record includes the action time, action reason, and electrical quantity snapshot information before the action; after the fault is cleared, it supports remote closing or local manual closing to restore power supply, and automatically detects whether the grid side voltage has returned to normal before performing closing to prevent closing with a fault.
[0057] Please refer to Figure 3 In some embodiments, the step of assigning the adjustment task corresponding to the control target to the collaborative control area to complete the collaborative autonomous control of multiple areas includes: steps S301 to S304. Step S301: Assign the control task corresponding to the control target to the coordinated control station area, and obtain the control process data during the execution of the assigned task; Step S302: Calculate the control response delay, voltage over-limit improvement rate, reverse overload elimination rate, and three-phase imbalance improvement rate based on the control process data. Step S303: Input the control response delay, the voltage over-limit improvement rate, the reverse heavy overload elimination rate, and the three-phase imbalance improvement rate into a preset reinforcement learning model to learn the adjustment action corresponding to the control strategy parameters; Step S304: Based on the adjustment action, continuously optimize the control strategy parameters to complete the collaborative autonomous control of multiple transformer areas.
[0058] In this first embodiment, the requesting distribution area, based on the available control capacity of each coordinated control distribution area, splits and allocates the remaining control tasks corresponding to the control target to each coordinated control distribution area, and sends task confirmation messages to each coordinated control distribution area via the Elec-Tech distributed soft bus. After each coordinated control distribution area confirms receipt of the corresponding control task, it begins to execute active power control tasks and reactive power control tasks, and synchronizes the control execution progress in real time via the Elec-Tech distributed soft bus during the execution process. The cloud control center synchronously collects the time-series data of the entire control process through the data acquisition unit. The control process data includes: the time when the control command is issued. The timing of each distribution station terminal receiving control commands The time when each photovoltaic inverter begins power regulation. ; Time of completion of control task execution The following data are collected: average node voltage for each node 5 minutes before control; average node voltage for each node 5 minutes after control; average power flow for each branch 5 minutes before control; average power flow for each branch 5 minutes after control; average load rate for each transformer substation 5 minutes before control; and average load rate for each transformer substation 5 minutes after control. A timestamp is added to all the above control process data, and the data is stored in a time-series database for subsequent control effect evaluation and control strategy optimization.
[0059] In this first embodiment, the cloud-based control center calculates multiple control effect evaluation indicators based on the control process data. The control response delay is the time difference between the issuance of the control command and the completion of the control task, and its calculation formula is: ,in, Indicates the delay in regulatory response. Indicates the time when the control task is completed. This indicates the time when the control command was issued. The voltage exceedance improvement rate is calculated based on the number of voltage exceedance nodes before and after control, using the following formula: ,in, Indicates the voltage over-limit improvement rate. This indicates the number of voltage-over-limit nodes before regulation. This indicates the number of voltage over-limit nodes after regulation. The reverse overload elimination rate is calculated based on the number of reverse overload areas before and after regulation; the formula is as follows: ,in, Indicates the reverse overload elimination rate. This indicates the number of reverse overloaded transformer areas before the adjustment. This indicates the number of reverse overload transformer areas after regulation. The three-phase imbalance improvement rate is calculated based on the three-phase imbalance before and after regulation; the calculation formula is as follows: ,in, This indicates the improvement rate of three-phase imbalance. This indicates the degree of three-phase imbalance before regulation. This indicates the three-phase imbalance after regulation. The target regulation amount and the actual regulation amount completed are obtained. The target regulation amount is the total regulation target issued from the cloud to each low-voltage distribution area, and the actual regulation amount completed is the sum of the regulation amounts actually executed by each participating distribution area. The regulation accuracy is calculated according to the following formula: ,in, Indicates the accuracy of regulation. This indicates the actual amount of regulation completed. Indicates the target control amount. This represents the absolute deviation between the actual and target control values. When the actual and target control values are perfectly aligned, the control accuracy is 100%. The smaller the deviation between the actual and target control values, the higher the control accuracy. This control accuracy serves as one of the indicators for evaluating control effectiveness and is used in subsequent reinforcement learning models to optimize the control strategy parameters.
[0060] In this first embodiment, the cloud-based control center inputs the control response delay, voltage over-limit improvement rate, reverse overload elimination rate, three-phase imbalance improvement rate, and control accuracy as control effect evaluation results into a preset deep reinforcement learning model. This deep reinforcement learning model employs a DQN (Deep Q-Network Reinforcement Learning) model. Based on the current control effect evaluation results, the DQN model learns the influence relationship between different control strategy parameters and the control effect, and outputs corresponding parameter adjustment actions. These control strategy parameters include: bus weights in the four-level decomposition algorithm; feeder margin coefficients; transformer area margin coefficients; multi-transformer area collaborative triggering thresholds; control effect judgment thresholds; intelligent micro-circuit protection criterion thresholds; power adjustment step size; and power adjustment rate parameters. Based on historical control data and the current control effect evaluation results, the DQN model learns the parameter adjustment directions that improve control accuracy, reduce response delay, and enhance voltage management, and outputs corresponding adjustment actions.
[0061] In this first embodiment, the cloud-based control center updates the control strategy parameters based on the parameters output by the DQN model. The bus weight, feeder margin coefficient, and transformer area margin coefficient in the four-level decomposition algorithm are adjusted to optimize the allocation ratio of control targets among substations, buses, medium-voltage lines, and low-voltage transformer areas. The multi-transformer area collaborative triggering threshold and control effect judgment threshold are adjusted to optimize the triggering timing of collaborative control. The intelligent micro-circuit protection criterion threshold is adjusted to optimize fault detection and disconnection actions. The power regulation step size and power regulation rate parameters are adjusted to optimize the smoothness of photovoltaic inverter regulation. A combination of offline training and online fine-tuning is used to continuously optimize the control strategy parameters. Daily offline training updates are performed using the full control data from the previous day, and online fine-tuning is performed based on the evaluation results of each control operation during operation, thereby continuously improving the collaborative autonomous control effect of multiple transformer areas.
[0062] In some embodiments, the step of inputting the control response delay, the voltage over-limit improvement rate, the reverse heavy overload elimination rate, and the three-phase imbalance improvement rate into a preset reinforcement learning model to learn the adjustment actions corresponding to the control strategy parameters includes: constructing a state space for reinforcement learning based on the control response delay, the voltage over-limit improvement rate, the reverse heavy overload elimination rate, and the three-phase imbalance improvement rate; and using the preset reinforcement learning model, performing iterative optimization of the strategy with the goal of maximizing the expected cumulative value of the reward function, based on the state space, the preset parameter adjustment action space, and the preset reward function, to determine the adjustment actions corresponding to the control strategy parameters.
[0063] In some embodiments, a state space for reinforcement learning is constructed based on the control response delay, the voltage over-limit improvement rate, the reverse overload elimination rate, and the three-phase imbalance improvement rate. Specifically, the control response delay, voltage over-limit improvement rate, reverse overload elimination rate, three-phase imbalance improvement rate, and control accuracy are normalized and combined to form the state vector of the reinforcement learning model. The state space includes: ,in, This represents the state space of the reinforcement learning model. Indicates the delay in regulatory response. Indicates the voltage over-limit improvement rate. Indicates the reverse overload elimination rate. This indicates the improvement rate of three-phase imbalance. This represents the accuracy of the control. The state space described above characterizes the operational effectiveness of the current multi-regional collaborative autonomous control.
[0064] In some embodiments, based on the state space, a preset parameter adjustment action space, and a preset reward function, a preset reinforcement learning model is used to perform iterative optimization of the strategy with the objective of maximizing the expected cumulative value of the reward function. This determines the adjustment actions corresponding to the control strategy parameters. Specifically, a parameter adjustment action space is pre-set, including actions to increase, decrease, or remain unchanged for bus weight, feeder margin coefficient, transformer area margin coefficient, multi-transformer area collaborative triggering threshold, intelligent micro-circuit protection threshold, and power regulation step size. A reward function is pre-set, where positive rewards are obtained when voltage over-limit improvement rate, reverse overload elimination rate, three-phase imbalance improvement rate, and control accuracy are improved, and negative rewards are obtained when control response delay is increased. The current state space is input into the DQN model. The DQN model selects the corresponding parameter adjustment action from the parameter adjustment action space and calculates the reward value based on the control effect after executing the parameter adjustment action. The DQN model, with the optimization objective of maximizing the expected cumulative value of the reward function, learns the optimal parameter adjustment action corresponding to different states by continuously executing the strategy iteration process of "state input - action selection - reward calculation - parameter update". After completing the strategy iteration and optimization, the adjustment action corresponding to the current control strategy parameters is output, which is used to update the fourth-level control strategy parameters and guide the subsequent multi-region collaborative autonomous control.
[0065] Through the above steps, the current control effect can be quantitatively evaluated based on the response delay, voltage over-limit improvement rate, reverse heavy overload elimination rate, three-phase imbalance improvement rate, and control accuracy during the multi-zone coordinated control process. Furthermore, the DQN model is used to continuously adjust the strategy parameters such as four-level target decomposition, coordinated triggering, protection criteria, and power regulation, thereby improving the response speed, control accuracy, and abnormal operation status management effect of multi-zone coordinated autonomous control.
[0066] like Figure 4 As shown, based on the above method embodiments, corresponding apparatus embodiments are provided; An embodiment of the present invention provides a schematic diagram of the structure of a multi-station coordinated control system, including: an acquisition module 100, an analysis module 200, a decomposition module 300, an adjustment module 400, and a control module 500; The acquisition module 100 is used to acquire power distribution network operation data; The analysis module 200 is used to perform power flow analysis on the power distribution network operation data, determine abnormal operating states in the power distribution network, and generate control requirements based on the abnormal operating states. The decomposition module 300 is used to decompose the control requirements level by level according to the four-level architecture consisting of substation level, busbar level, medium voltage line level and low voltage distribution area level, and determine the control target corresponding to the low voltage distribution area level. The adjustment module 400 is used to acquire the operating status information of the photovoltaic equipment in each low-voltage area, calculate the adjustable capacity corresponding to each low-voltage area based on the operating status information, and determine the power adjustment amount corresponding to each low-voltage area based on each adjustable capacity. The control module 500 is used to compare each of the power adjustment amounts with the control targets corresponding to the low-voltage distribution area level. When there is a low-voltage distribution area that does not meet the control targets, it obtains the remaining adjustable capacity information between adjacent low-voltage distribution areas and performs multi-distribution area collaborative autonomous control based on the remaining adjustable capacity information.
[0067] It is understood that the above-described device embodiments correspond to the method embodiments of the present invention, and can implement the multi-zone coordinated control method provided by any of the above-described method embodiments of the present invention. For a more detailed workflow and principle of this system, please refer to the relevant descriptions of the above methods.
[0068] It should be noted that the device embodiments described above are merely illustrative, and some or all of the modules can be selected to achieve the purpose of this embodiment according to actual needs. Furthermore, in the accompanying drawings of the device embodiments provided by this invention, the connection relationships between modules indicate that they have communication connections, which can specifically be implemented as one or more communication buses or signal lines. Those skilled in the art can understand and implement this without any creative effort.
[0069] Based on the above-described embodiment of the multi-station coordinated control method, another embodiment of the present invention provides a terminal device, which includes a processor, a memory, and a computer program stored in the memory and configured to be executed by the processor. When the processor executes the computer program, it implements a multi-station coordinated control method according to any embodiment of the present invention.
[0070] For example, in this embodiment, the computer program can be divided into one or more modules, which are stored in the memory and executed by the processor to complete the present invention. The one or more modules may be a series of computer program instruction segments capable of performing a specific function, which describe the execution process of the computer program in the terminal device.
[0071] The terminal device may be a desktop computer, laptop, handheld computer, or cloud server, etc. The terminal device may include, but is not limited to, a processor and a memory.
[0072] The processor can be a Central Processing Unit (CPU), or other general-purpose processors, digital signal processors (DSPs), application-specific integrated circuits (ASICs), field-programmable gate arrays (FPGAs), or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. A general-purpose processor can be a microprocessor or any conventional processor. The processor is the control center of the terminal device, connecting all parts of the terminal device via various interfaces and lines.
[0073] Based on the above-described method embodiments, another embodiment of the present invention provides a computer-readable storage medium including a stored computer program, wherein, when the computer program is executed, it controls the device where the computer-readable storage medium is located to execute a multi-zone collaborative control method as described in any of the above-described method embodiments of the present invention.
[0074] The modules / units integrated in the device / terminal equipment, if implemented as software functional units and sold or used as independent products, can be stored in a computer-readable storage medium. Based on this understanding, all or part of the processes in the above embodiments of the present invention can also be implemented by a computer program instructing related hardware. The computer program can be stored in a computer-readable storage medium, and when executed by a processor, it can implement the steps of the various method embodiments described above. The computer program includes computer program code, which can be in the form of source code, object code, executable files, or certain intermediate forms. The computer-readable medium can include: any entity or device capable of carrying the computer program code, a recording medium, a USB flash drive, a portable hard drive, a magnetic disk, an optical disk, a computer memory, a read-only memory (ROM), a random access memory (RAM), an electrical carrier signal, a telecommunication signal, and a software distribution medium, etc.
[0075] The specific embodiments described above further illustrate the purpose, technical solution, and beneficial effects of the present invention. It should be understood that the above descriptions are merely specific embodiments of the present invention and are not intended to limit the scope of protection of the present invention. In particular, it should be noted that any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the scope of protection of the present invention for those skilled in the art.
Claims
1. A method for coordinated control of multiple transformer zones, characterized in that, include: Obtain power distribution network operation data; Power flow analysis is performed on the power distribution network operation data to determine abnormal operating states in the power distribution network, and control requirements are generated based on the abnormal operating states. Based on the four-level architecture consisting of substation level, busbar level, medium-voltage line level and low-voltage distribution area level, the control requirements are decomposed level by level to determine the control targets corresponding to the low-voltage distribution area level. The operating status information of photovoltaic equipment in each low-voltage distribution area is obtained respectively. The adjustable capacity corresponding to each low-voltage distribution area is calculated according to the operating status information, so as to determine the power adjustment amount corresponding to each low-voltage distribution area based on the adjustable capacity. The power adjustment amount is compared with the control target corresponding to the low-voltage distribution area level. When there is a low-voltage distribution area that does not meet the control target, the remaining adjustable capacity information between adjacent low-voltage distribution areas is obtained, and multi-distribution area collaborative autonomous control is performed according to the remaining adjustable capacity information.
2. The method of claim 1, wherein the plurality of zones are coordinated by a plurality of zone controllers. The step of performing power flow analysis on the distribution network operation data to determine abnormal operating states in the distribution network includes: Power flow calculations are performed on the power distribution network operation data to obtain the node voltage and branch power of each node in the power distribution network. The abnormal operating state in the distribution network is determined based on the voltage of each node, the power of each branch, and the preset abnormal judgment conditions.
3. The method of claim 1, wherein the plurality of zones are coordinated by a plurality of zone controllers. The four-level architecture, consisting of substation level, busbar level, medium-voltage line level, and low-voltage distribution area level, decomposes the control requirements level by level to determine the control objectives corresponding to the low-voltage distribution area level, including: The overall control target for the substation is determined based on the aforementioned control requirements. Based on the over-limit amplitude and over-limit duration corresponding to each bus, the first allocation weight corresponding to each bus is determined. Based on each of the first allocation weights, the total control target is decomposed to each bus to obtain the control target corresponding to the bus level. Based on the photovoltaic installed capacity and line load margin of each medium-voltage line, the second allocation weight of each medium-voltage line is determined. Based on the second allocation weight, the control target corresponding to the bus level is decomposed to each medium-voltage line to obtain the control target corresponding to the medium-voltage line level. Based on the photovoltaic installed capacity and adjustable margin of each low-voltage distribution area, the third allocation weight of each low-voltage distribution area is determined. Based on the third allocation weight, the control target corresponding to the medium-voltage line level is decomposed to each low-voltage distribution area to obtain the control target corresponding to the low-voltage distribution area level.
4. The method of claim 1, wherein the plurality of zones are coordinated by a plurality of zone controllers. The step of calculating the adjustable capacity corresponding to each low-voltage distribution area based on the operating status information, and determining the power adjustment amount corresponding to each low-voltage distribution area based on each adjustable capacity, includes: The adjustable power corresponding to each photovoltaic device is calculated based on the operating status information, and the adjustable capacity of the low-voltage distribution area is determined based on the adjustable power corresponding to each photovoltaic device in the same low-voltage distribution area. According to the rated capacity ratio of each photovoltaic device, the adjustable capacity is decomposed to each photovoltaic device to obtain the power adjustment amount corresponding to each low-voltage distribution area.
5. The method of claim 1, wherein the plurality of zones are coordinated by a plurality of zone controllers. When there are low-voltage distribution areas that do not meet the control target, the remaining adjustable capacity information between adjacent low-voltage distribution areas is obtained, and multi-distribution area collaborative autonomous control is performed based on the remaining adjustable capacity information, including: When the power adjustment amount is less than the control target, a communication connection is established between the low-voltage distribution area and the adjacent low-voltage distribution area based on the preset Dianhong distributed soft bus, so as to send a coordinated control request to the adjacent low-voltage distribution area based on the communication connection. Receive the remaining adjustable capacity information returned according to the coordinated control request, and determine the coordinated control area based on each of the remaining adjustable capacity information; The regulation tasks corresponding to the regulation targets are assigned to the coordinated regulation areas to complete the coordinated autonomous regulation of multiple areas.
6. The method of claim 5, wherein the plurality of zones are coordinated by a plurality of zone controllers. The step of allocating the regulation tasks corresponding to the regulation targets to the coordinated regulation areas to complete multi-area coordinated autonomous regulation includes: The regulation tasks corresponding to the regulation targets are assigned to the coordinated regulation stations, and regulation process data is obtained during the execution of the assigned tasks. Based on the data from the aforementioned control process, the control response delay, voltage over-limit improvement rate, reverse overload elimination rate, and three-phase imbalance improvement rate are calculated. The regulation response delay, the voltage over-limit improvement rate, the reverse heavy overload elimination rate, and the three-phase imbalance improvement rate are input into a preset reinforcement learning model to learn the adjustment actions corresponding to the regulation strategy parameters. Based on the aforementioned adjustments, the control strategy parameters are continuously optimized to achieve coordinated autonomous control across multiple transformer areas.
7. The method of claim 6, wherein the plurality of zones are coordinated by a plurality of zone controllers. The step of inputting the regulation response delay, the voltage over-limit improvement rate, the reverse overload elimination rate, and the three-phase imbalance improvement rate into a preset reinforcement learning model to learn the adjustment actions corresponding to the regulation strategy parameters includes: A state space for reinforcement learning is constructed based on the regulation response delay, the voltage over-limit improvement rate, the reverse heavy overload elimination rate, and the three-phase imbalance improvement rate. Based on the state space, the preset parameter adjustment action space, and the preset reward function, a preset reinforcement learning model is used to perform iterative optimization of the policy with the goal of maximizing the expected cumulative value of the reward function, thereby determining the adjustment action corresponding to the control policy parameters.
8. A coordinated control system of multiple zones, characterized by, The system includes: an acquisition module, an analysis module, a decomposition module, an adjustment module, and a control module; The acquisition module is used to acquire power distribution network operation data; The analysis module is used to perform power flow analysis on the power distribution network operation data, determine abnormal operating states in the power distribution network, and generate control requirements based on the abnormal operating states. The decomposition module is used to decompose the control requirements level by level according to the four-level architecture consisting of substation level, busbar level, medium-voltage line level and low-voltage distribution area level, and determine the control target corresponding to the low-voltage distribution area level. The adjustment module is used to acquire the operating status information of photovoltaic equipment in each low-voltage area, calculate the adjustable capacity corresponding to each low-voltage area based on the operating status information, and determine the power adjustment amount corresponding to each low-voltage area based on each adjustable capacity. The control module is used to compare each of the power adjustment amounts with the control targets corresponding to the low-voltage distribution area level. When there is a low-voltage distribution area that does not meet the control targets, it obtains the remaining adjustable capacity information between adjacent low-voltage distribution areas and performs multi-distribution area collaborative autonomous control based on the remaining adjustable capacity information.
9. A terminal device, comprising: The system includes a processor, a memory, and a computer program stored in the memory and configured to be executed by the processor. When the processor executes the computer program, it implements a multi-zone coordinated control method as described in any one of claims 1-7.
10. A computer-readable storage medium, characterized in that, include: A stored computer program, wherein, when the computer program is executed, it controls the device where the computer-readable storage medium is located to perform a multi-zone coordinated control method as described in any one of claims 1-7.