Power supply area source network load storage edge autonomous regulation and control method based on intelligent fusion terminal
By constructing weighted identification samples and verifying the voltage sensitivity matrix, adjusting the model confidence score, and generating mutually exclusive execution candidate instructions, the problem of unstable resource regulation under the conditions of transformer topology changes and asynchronous measurement was solved, and a reliable local regulation process was realized.
Patent Information
- Application Number
- CN202611643962.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-10-23
- Publication Date
- 2026-11-24
AI Technical Summary
Under conditions of time-varying topology relationships in transformer substations, asynchronous measurement data, mutually coupled resource actions, and limited computing power of edge terminals, existing technologies struggle to form reliable local control bases, leading to problems such as unstable resource control actions, over-adjustment, and frequent switching.
By constructing weighted identification samples, verifying the voltage sensitivity matrix, adjusting the model confidence score, generating mutually exclusive execution candidate instructions, and performing effect confirmation and pre-execution setpoint restoration processing, a local control process suitable for transformer area topology changes and measurement asynchrony conditions is formed.
It enables verifiable execution order and effect confirmation of resource actions, reduces action overlap, avoids local over-adjustment and frequent switching, and ensures the reliability and stability of control.
Smart Images

Figure CN123163013A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of AC distribution network operation and control technology, specifically to a method for autonomous control of source-grid-load-storage edge based on intelligent fusion terminals in distribution areas. Background Technology
[0002] With the continuous integration of rooftop photovoltaic systems, user-side energy storage, charging piles, adjustable loads, and reactive power compensation equipment into low-voltage distribution areas, the original unidirectional power receiving terminals are gradually evolving into local energy units with multi-object coupling of power sources, grids, loads, and energy storage. In actual operation, smart integrated terminals typically use electricity meters, smart switches, inverter communication interfaces, energy storage converters, and charging facilities to collect voltage, current, power, and switch status, and generate commands based on load factor, voltage over-limit, and resource power status. This type of technology is mainly applied in residential communities, industrial parks, rural distributed photovoltaic access areas, and areas with dense charging facilities. Its goal is to ensure voltage quality at the end of the distribution network, alleviate equipment overload, and improve the local consumption capacity of distributed energy.
[0003] Chinese patent document CN116526574A discloses a method and system for coordinated regulation of power grid distribution area source-load-storage system. The system mainly includes a charging pile connection circuit breaker and an energy storage grid-connected circuit breaker. The charging pile is connected to the target power grid via the charging pile connection circuit breaker; the energy storage is connected to the target power grid via the energy storage grid-connected circuit breaker. During operation, the system acquires the grid voltage, grid current, and rated power of the target power grid to calculate the target grid load rate; it acquires the current and voltage of the charging pile connected to the grid and calculates the charging pile power; it acquires the voltage and current of the photovoltaic grid connection and calculates the photovoltaic power generation; it acquires the voltage and current of the energy storage grid connection and calculates the energy storage power; and it regulates the energy storage grid-connected circuit breaker and the charging pile connection circuit breaker based on the photovoltaic power generation, energy storage power, load rate, and charging pile power. Subsequently, it determines the overvoltage state based on the transformer three-phase voltage and the photovoltaic grid-connected voltage. When the photovoltaic output, load rate, energy storage charging / discharging state, and charging pile charging / discharging state meet or exceed a threshold, it performs actions such as closing, opening, or reducing photovoltaic power. This solution enables the integrated use of operational data from photovoltaic, energy storage, and charging piles at the distribution station side, thereby forming a coordinated control process for circuit breaker switching and power control.
[0004] However, for low-voltage distribution areas with high penetration of distributed photovoltaic power, rapid fluctuations in charging load, and frequent switching of user-side energy storage, on-site measurements are not naturally synchronized.
[0005] Different energy meters, smart switches, inverters, and energy storage interfaces have different reporting cycles, and measurement messages may experience communication queuing delays and loss. The transformer area topology and user access relationships may also change due to maintenance, branch switching, or load migration. The aforementioned technologies primarily trigger regulation based on the relationship between current voltage, current, load rate, and the power of various resources and preset thresholds, without fully considering the dynamic correspondence between resource actions and node voltage changes. When multiple resources experience power changes within a similar timeframe, the voltage change at the same node may be simultaneously affected by photovoltaic output, charging load, energy storage actions, and line voltage drops. Relying solely on thresholds and circuit breaker status makes it difficult to distinguish the contribution of each regulation action, potentially leading to unstable action sequences, local over-adjustment, re-exceeding limits after recovery, frequent circuit breaker switching, and reliance on manual setting for edge control strategies.
[0006] Therefore, the urgent technical problem to be solved is: under the conditions of time-varying topology relationships, asynchronous measurement data, mutually coupled resource actions, and limited computing power of edge terminals, how to form a reliable local control basis and output resource control actions that are sequentially controlled, verifiable, and reversible, based on the pre-set values. Summary of the Invention
[0007] To address the shortcomings of existing technologies, this invention provides an autonomous control method for the generation, grid, load, and storage edge of a distribution transformer area based on an intelligent fusion terminal. By constructing weighted identification samples based on power disturbance events, verifying the voltage sensitivity matrix, adjusting the voltage safety margin according to the model credibility score, and executing mutually exclusive candidate instructions, a local control process suitable for changes in distribution transformer topology, asynchronous measurements, and limited terminal computing resources is formed. This ensures that resource actions have a verifiable execution sequence, effect confirmation, and pre-execution setpoint restoration process.
[0008] To achieve the above objectives, the present invention provides the following technical solution:
[0009] The autonomous regulation method of source-grid-load-storage edge based on intelligent fusion terminal is performed by the intelligent fusion terminal in the following steps: collecting node voltage, resource power and resource status; constructing weighted identification samples according to the upper limit of the pairing time interval before and after the power disturbance event; recursively deriving candidate voltage sensitivity matrix; updating the matrix when both the excitation sufficiency test and the sign consistency test pass; otherwise, retaining the previous matrix and updating the model credibility score.
[0010] Based on the matrix and the score, a voltage-constrained feasible region is constructed. Combined with resource state constraints and a solution path is selected according to the computational resource budget to generate a candidate instruction set.
[0011] Based on the matrix, score, and action cost sorting, each instruction is reviewed and issued sequentially using mutual exclusion control; the effect is confirmed by combining execution receipts and measured voltage changes; in case of anomalies, the pre-execution set value is restored and the corresponding resources are suspended from participating in regulation; the verified action response is fed back to the sample construction step.
[0012] Furthermore, power disturbance events include natural power fluctuation events, control action feedback events, and limiting active power disturbance events; sample weights are determined based on the source of the disturbance, the measurement time interval before and after the event, the integrity of the measurement data, and the deviation relative to the middle value of the sliding window.
[0013] When the necessary measurements for incremental calculation exist and are successfully paired, the acceptance flag of the corresponding identified sample is set to 1; when the necessary measurements before or after the event are missing, the corresponding increment is not calculated and the missing measurement data flag is retained, and 0 is not used to replace the missing measurement.
[0014] Furthermore, an incentive sufficiency test is performed based on the regression vector and information matrix of the weighted identification samples to generate an incentive pass flag; the symbol constraint element set is determined based on the resource type, phase flag, and access location identifier, and the symbol consistency is checked on the corresponding elements of the candidate voltage sensitivity matrix to generate a symbol pass flag; when both flags are 1, the candidate voltage sensitivity matrix and the corresponding recursive auxiliary matrix are confirmed; otherwise, the previously confirmed result is retained.
[0015] Furthermore, the reliability score of the model is updated based on the sample weights, the results of the two identification and verification processes, and the normalized voltage prediction residual. A voltage constraint feasible region is constructed based on the score, the voltage margin benchmark vector, the node voltage upper and lower limits, and the voltage sensitivity matrix. When other risk factors remain unchanged, a decrease in the score increases the voltage safety margin, while a recovery in the score decreases the voltage safety margin according to the established calculation relationship, and the basic safety margin is retained.
[0016] Furthermore, at least one of the following is used to generate candidate voltage sensitivity matrices: recursive least squares identifier, Kalman filter identifier, sliding window minimum absolute deviation regression identifier, and neural network identifier with sign constraints. The output of each identifier is subject to excitation sufficiency test and sign consistency check. If both checks fail, the previous voltage sensitivity matrix is not replaced.
[0017] Furthermore, in addition to the global instruction execution state, separate phase execution permission, branch execution permission, and resource control disabling flags are maintained. A candidate instruction is allowed to be issued only when the global instruction execution state is idle, the corresponding phase and branch are allowed to execute, and the corresponding resources are not disabled. Other candidate instructions remain in a waiting state until the execution result or set value restoration result of the previous instruction has been verified. The resource disabling state is maintained independently of the global instruction execution state.
[0018] Furthermore, the model credibility score is first determined; when the score drops to the lower limit or the continuous identification verification fails, a preset conservative control rule is adopted; in other cases, when the calculated resource budget meets the constraint optimization solution conditions, constraint optimization solution is performed, otherwise resource upper and lower limit amplitude and voltage constraint verification are performed; voltage and resource state constraints are retained for each path, and no new control action is added when a candidate instruction that passes the verification cannot be obtained.
[0019] Furthermore, the operation and maintenance interface displays the candidate instruction sorting, global instruction execution status, resource control disabled status, setpoint recovery reason, control action feedback event number, and model credibility rating. When both the execution receipt and the measured voltage change meet the confirmation conditions, the corresponding instruction is marked as confirmed. When a receipt times out or the confirmation is invalid, the corresponding resource identifier is displayed, and the statuses of setpoint recovery instruction issued, setpoint recovery confirmed, and setpoint recovery result pending verification are distinguished.
[0020] Furthermore, each candidate instruction is encapsulated into an instruction frame, which includes a resource identifier, action direction, action range, instruction sequence number, instruction issuance timestamp, confirmation time limit, pre-execution set value, and verification field. The acknowledgment frame returned by the resource includes a resource identifier, instruction sequence number, execution status, acknowledgment timestamp, and verification result. After matching the acknowledgment with the corresponding instruction and completing the validity check, the execution effect is judged in conjunction with the measured voltage change obtained within the confirmation time limit.
[0021] Furthermore, a closed-loop event log is generated, which is associated with the identification sample, voltage sensitivity matrix version, voltage constraint feasible domain version, candidate instruction set, global instruction execution status, acknowledgment result, pre-execution set value, and control action feedback event by event number; action confirmation result and set value recovery result are recorded respectively; abnormal records are retained for power changes that have not been verified or responses that lack necessary measurements, and they are not written as valid identification samples.
[0022] This invention provides a method for autonomous control of power grid-source-load-storage edge based on intelligent fusion terminals, which has the following beneficial effects:
[0023] 1. By pairing multi-source asynchronous measurements with power disturbance events as a benchmark, the resource power increment, node voltage increment, and quality flag of the same event are written into the weighted identification sample, providing traceable input for voltage sensitivity matrix identification. Through excitation sufficiency testing and sensitivity coefficient sign consistency verification, the impact of weak excitation, abnormal measurements, and candidate results that do not conform to the predetermined response direction on the formal model is limited; for disturbances from mixed sources, the source flag is retained to avoid unconditionally attributing all voltage changes to a single command.
[0024] 2. By using model confidence scores for voltage safety margin calculations and combining them with constraints such as energy storage state of charge, resource capacity, equipment interlocking, and recovery intervals to screen candidate actions, candidate commands are simultaneously constrained by voltage boundaries and equipment executable conditions. The resource budget is used to select the solution path but does not replace or eliminate voltage constraints and resource state constraints.
[0025] 3. The system adapts to different computational loads and model reliability states through three approaches: constraint optimization, resource-by-resource upper and lower limit limiting and voltage constraint verification, and preset conservative control rules. It reduces the overlap of actions between unconfirmed instructions by using instruction mutual exclusion control, pre-issuance verification of each instruction, execution receipts, and joint confirmation with measured voltage changes. Abnormal executions are handled by restoring pre-execution setpoints and suspending related resources from participating in regulation, with measured responses provided after result verification. Actions are not forcibly issued if no candidate action passes verification, thus avoiding using computational degradation errors as grounds for violating physical constraints. Attached Figure Description
[0026] Figure 1 This is a schematic diagram of the closed-loop process of the autonomous regulation method at the edge of the power grid, source, load and storage area of the present invention;
[0027] Figure 2 This is a schematic diagram of the asynchronous measurement pairing and weighted identification sample construction process of the present invention;
[0028] Figure 3 This is a schematic diagram of the voltage sensitivity matrix identification and model credibility scoring calculation process of the present invention;
[0029] Figure 4 This is a schematic diagram of the voltage constraint feasible region construction and solution path selection process of the present invention;
[0030] Figure 5 This is a schematic diagram of the instruction mutual exclusion execution, set value restoration processing and action response feedback process of the present invention;
[0031] Figure 6 This is a schematic diagram illustrating the application scenario of autonomous regulation and control at the edge of the low-voltage distribution area source-grid-load-storage system according to the present invention. Detailed Implementation
[0032] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.
[0033] Please see Figures 1-6 This invention provides a method for autonomous control of power grid-source-load-storage edge based on intelligent fusion terminals, comprising:
[0034] Step 1: Transform the asynchronous, low-frequency, and intermittently packet-loss-prone transformer area measurement streams into identification samples that can be directly accessed for subsequent voltage sensitivity matrix identification. The samples retain information on disturbance sources, measurement time errors, channel integrity, and phase information. The following steps are all executed by the intelligent fusion terminal. This intelligent fusion terminal obtains node voltage, resource active power, resource reactive power, phase flags, resource status, and communication status from the measurement channels, and locally maintains an event buffer, sample queue, voltage sensitivity matrix, model confidence score, voltage constraint feasible region, candidate instruction set, and global instruction execution state machine.
[0035] In this embodiment, the phase identifier is uniformly denoted as... It is used to characterize the phase to which the measurement node or controllable resource belongs; the regression vector is uniformly denoted as , by the resource power change vector Obtained by expanding according to a preset resource order, it is used for voltage sensitivity matrix identification in step two. The upper limit of the pairing time interval is uniformly denoted as... Generate separately for each measurement channel; the voltage sensitivity matrix is uniformly denoted as... The candidate voltage sensitivity matrix is uniformly denoted as The model credibility score is uniformly denoted as... The expected control vector is uniformly denoted as... Candidate control vectors are uniformly denoted as The maximum confirmation time limit is uniformly recorded as: .
[0036] In this embodiment, the voltage sensitivity matrix The rows correspond to resource power components arranged in a fixed order, and the columns correspond to monitoring nodes and phases; let the number of resource power components be... The number of node voltage components is Then its dimension is Regression vector Node voltage change vector Both the candidate control vectors and the control vectors are column vectors with dimensions of 1 and 2 respectively. , and Voltage increment prediction uniformly adopts When the number or configuration of resources changes, the dimensions and version are updated; within the same version, the resource identifier and vector position maintain a one-to-one correspondence.
[0037] All resource power is uniformly defined as positive when injected into the distribution network: increases in power generation or energy storage discharge are positive active power increments, increases in power consumption or energy storage charging are negative active power increments, increases in reactive power injection are positive reactive power increments, and increases in reactive power absorption are negative reactive power increments. When equipment messages or setting interfaces use the opposite positive direction, the conversion is performed at the interface before entering the identification and control calculations. When this paper involves power component addition, norm calculation, and information matrix comparison, a fixed power reference is used to normalize active and reactive power separately; the acquisition increments, candidate actions, resource capacities, and power limits in the same matrix version use the same reference, and are converted back to equipment units before outputting commands. Node voltages and their increments, boundaries, and margins are uniformly defined using volts or per-unit values under the same fixed voltage reference.
[0038] Event Number Used to correlate the original message with the disturbance; to identify the sequence of actions. This indicates the order in which the recursive update is initiated; the control cycle uses the step sequence identifier of the most recently confirmed model. The resource power component index and the candidate instruction index are defined in their respective formulas. The candidate control vector represents the adjustment increment relative to the set value before the current execution; a component of 0 indicates no new adjustment, but does not indicate that the absolute power of the device is 0.
[0039] Step 1 outputs the identified sample queue, including the power disturbance event number, disturbance source flag, phase flag, resource power change vector, node voltage change vector, valid measurement flag, sample weight, and acceptance flag. Step 2 outputs the voltage sensitivity matrix, model confidence score, excitation pass flag, symbol pass flag, and mutation trigger flag. Step 3 outputs the candidate control vector and candidate instruction set. Step 4, after verifying the execution results, writes the actual resource power change and node voltage change into the control action feedback event and sends it back to Step 1. Unverified results are separately recorded as anomalies.
[0040] The intelligent converged terminal on the transformer substation side simultaneously connects to the distribution transformer outlet meter, branch monitoring unit, user-side energy meter, photovoltaic inverter, energy storage converter, charging pile controller, and reactive power compensation device. These devices report voltage, power, phase, operating status, and equipment availability indicators via high-speed power line carrier channel, serial bus channel, or low-power wireless channel.
[0041] Due to differences in reporting cycles, communication delays, and message integrity among measurement channels, data arriving simultaneously may not correspond to the same physical time. The intelligent fusion terminal organizes measurement pairings based on power disturbance events, retaining the actual measurement timestamp and source of each component to reduce the risk of misattributing natural load changes to a single control action. This event correlation does not equate to proving that all voltage changes are caused solely by that action; when other observable disturbances exist within the same window, their power changes and mixed source indicators are also recorded.
[0042] The intelligent fusion terminal maintains a measurement timestamp buffer for each measurement channel and a status buffer for each adjustable resource. Upon message arrival, it reads the measurement timestamp, message reception timestamp, and device serial number. If a measurement timestamp is missing, the local reception timestamp can be used, but it should be marked as having low time accuracy and should not be considered the known actual sampling time. A missing measurement data flag is retained for missing messages, and identification samples are constructed only for those that meet the necessary measurement conditions. Sources of power disturbance events include: natural power fluctuations in photovoltaic output, charging load, or production load; energy storage charging / discharging, inverter reactive power setting, or load switching executed after obtaining permission in step four; and limited active power disturbances arranged when voltage margin is sufficient but excitation insufficiency persists. All types of events are registered uniformly, but disturbance source flags are stored separately.
[0043] When natural power fluctuations create power disturbance events, the intelligent fusion terminal maintains the background power fluctuation scale for each controllable resource. The background power fluctuation scale From resources The changes in active and reactive power within the nearest neighbor window are generated. If the power disturbance intensity is higher than... Reaching the power disturbance trigger threshold This generates a natural power perturbation event:
[0044]
[0045] Among them, the power disturbance intensity ratio Representing resources In identifying the steps The degree to which power changes are prominent relative to background fluctuations; active power changes From resources The current active power reported value is obtained by subtracting the previous valid active power reported value; reactive power change. From resources The reactive power conversion factor is obtained by subtracting the previous valid reactive power report value from the current reactive power report value. Used to convert reactive power changes to the same triggering scale as active power changes, taking a non-negative value; background power fluctuation scale. From resources Median generation of absolute power changes within a neighboring window; excitation smoothing constant A positive number is used to prevent the denominator from being zero when the background power fluctuation scale is too small; power disturbance trigger threshold. A preset value greater than 1 is used to exclude ordinary noise and minor jitter.
[0046] After a power disturbance event is confirmed, the intelligent fusion terminal does not immediately use the most recent message as the event's beginning and end points. Instead, it establishes a pre-event measurement time window and a post-event measurement time window on either side of the event's time. The pre-event measurement time window is used to find stable measurements that were not affected by the excitation before it occurred, while the post-event measurement time window is used to find measurements that have reflected the voltage response after the excitation propagated. Both are bounded by the upper limit of the pairing time interval and prioritize paired messages from the same monitoring node, the same phase, and the same channel source. The engineering intention of this approach is to limit the error of asynchronous data to an interpretable range, while allowing low-frequency meter data to participate in edge identification without requiring all devices to have synchronous sampling capabilities. The preferred pairing and acceptance relationship is executed according to the following formula:
[0047]
[0048] Among them, the power disturbance event number Used to distinguish disturbances; pre-event measurement timestamp and post-event measurement timestamp These measurements originate from their respective time windows, and satisfy the condition that pre-event measurements precede the disturbance and post-event measurements follow the resource response wait time. The time interval between pre- and post-event measurements. The absolute value of the difference between two timestamps; the upper limit of the pairing time interval. The maximum allowed pairing span is set according to the actual channel reporting interval, device response time, and the permissible level of other disturbances; it is not pre-set to be less than the channel reporting cycle. Acceptance flag. It can be 0 or 1; it is 1 only if the necessary measurement exists and the time condition is met, otherwise it is 0. Indicator function Output 1 if the condition is true, otherwise output 0.
[0049] Maximum pairing time interval Generate separately for each measurement channel. For each measurement channel... The intelligent fusion terminal calculates the adjacent arrival intervals of the most recent valid packets in the channel and takes the median value as the channel reporting period. And read the communication delay compensation amount of the channel. ;
[0050] The communication delay compensation amount It is generated by subtracting the message measurement timestamp from the local message reception timestamp. The upper limit of the channel pairing time interval is obtained by the following formula:
[0051]
[0052] Among them, the upper limit of the channel pairing time interval Indicates measurement channel In identifying the steps Pairing allowance boundaries are used to replace the uniform pairing time interval upper limit. Measurement pairing before and after the event; pairing interval ratio coefficient A positive number, preset by the data collection cycle and pairing strictness of the distribution area; channel reporting cycle. By channel The effective message arrival interval is obtained from statistics; communication delay compensation amount. The difference between the local message reception timestamp and the message measurement timestamp is statistically obtained. This difference represents the communication delay experienced by the message from the measurement time to its reception by the intelligent fusion terminal. When the time bases of the device and the terminal are comparable, this value is not less than 0. Under otherwise unchanged conditions, the greater the communication delay, the greater the communication delay compensation. The larger the value, the higher the upper limit of the channel pairing time interval. The range is increased accordingly to compensate for the impact of communication delay on the pairing of measurement messages before and after the event; the lower limit of the pairing time interval. To prevent the loss of all valid samples due to excessively small tolerance; upper limit of pairing time interval. Used to avoid incorrect attribution caused by excessively long time spans; pruning operator Indicates when input Less than the lower limit of the pairing time interval Time output When input Greater than the upper limit of the pairing time interval Time output Output in other cases .
[0053] The aforementioned communication delay statistics are only used when the device and terminal time bases are comparable. When the time bases are not comparable or the measurement timestamps are missing, a preset non-negative delay margin is used, and the corresponding time quality weight is reduced. The transmission delay is not calculated based on unknown clock deviations. Both the upper and lower limits of the pairing time interval are non-negative time values, and the upper limit is not less than the lower limit. If the upper limit setting is insufficient to accommodate valid measurements before and after an event on the channel, pairing is rejected in this round, and the reason is recorded. Samples are not obtained by forging measurements or shortening the message time interval.
[0054] For example, during low-load periods at night in a residential transformer area, an energy storage converter changes its charging and discharging settings after receiving permission in step four. The transformer outlet voltage and the voltages of several user meters are reported at different time intervals. The intelligent fusion terminal uses this setting change as a power disturbance event, extracts the most recent stable voltage of each node in the window before the event, and extracts voltage messages that have exceeded the equipment response delay in the window after the event, forming a pair of messages before and after the same event. If a user meter has an excessively long delay, the user meter is not deleted as a permanently invalid node, but it does not enter the set with the acceptance flag set to 1 in this round of power disturbance events; when subsequent messages recover to within the upper limit of the pairing time interval, the node can continue to participate in sample construction. This process limits channel quality fluctuations to the sample layer without disrupting the overall data entry of the transformer area.
[0055] After determining the measurement time window before and after the event, the intelligent fusion terminal calculates the power increment and voltage increment under the condition that the resource identifier, node identifier, and phase identifier are consistent. For three-phase unbalanced transformer areas, phase-specific samples are prioritized; if the phase is not reliably determined, the un-phased flag is retained, and no forced sign constraints are imposed for the corresponding phase. The power increment and voltage increment are associated with the same event number. The timestamps before and after the event in the following formula represent the paired timestamps of the corresponding components, and do not imply synchronous sampling across all channels:
[0056]
[0057] Among them, the resource power vector Indicates the timestamp of the measurement before the event. The active and reactive power combinations of each controllable resource; resource power vector Indicates the measurement timestamp after the event. The active and reactive power combinations of each controllable resource; resource power change vector Indicates power disturbance events The resulting resource-side changes are the regression input in step two; node voltage vector. Indicates the timestamp of the measurement before the event. Voltage values at each monitoring node; node voltage vector Indicates the measurement timestamp after the event. Voltage values at each monitoring node; node voltage change vector Indicates power disturbance events The response to the node voltage is the regression output of step two.
[0058] Resource power vector Arranged in a fixed resource identifier order, with the active power component of the same resource appearing first, followed by the reactive power component. Resource power change vector. The component in the value is calculated based on the measured values before and after the corresponding resource event. Even if no control command is issued to the resource, its natural power change is retained; it is recorded as 0 only when valid measurements show that the power before and after is equal. The component cannot be filled as 0 if the necessary power measurement is missing.
[0059] Node voltage vector Arranged in the order of fixed node identifiers: distribution transformer outlet node, branch monitoring node, and user terminal node; when the same node has phase-specific measurements, they are arranged according to phase identifiers. Fixed arrangement.
[0060] If a node lacks necessary voltage measurements before or after an event, its voltage increment is not calculated, its corresponding model column does not participate in this round of updates, and the missing measurement data flag is retained. When necessary power measurements are missing in the selected identification sub-model, the sub-model is not updated with an incomplete regression vector. Node groups with complete input and output measurements continue processing, while missing nodes retain the previous result; if necessary, a recursive auxiliary matrix is maintained for each node group to ensure that the effective output is consistent with the model column participating in the update. Subsequent measurements, once recovered and meeting the pairing conditions, can continue to participate in sample construction.
[0061] For example, during the daytime rise in photovoltaic (PV) output, the reactive power setting of the PV inverter remains unchanged, but the active power output jumps due to the movement of cloud shadows; no power change is shown in the measurements of charging piles before and after within the same distribution area. The intelligent converged terminal marks this natural power fluctuation as a natural power disturbance event and writes the active power change of PV resources into the resource power change vector. The voltage changes of each monitoring node are written into the node voltage change vector. If step four subsequently issues another reactive power compensation device action, this action forms a new power disturbance event, which is not merged with the aforementioned natural power disturbance event. Through this calculation of power increment and voltage increment corresponding to the same event, the terminal puts natural disturbances, control actions, and active power disturbances into the same data structure without confusing the sources of disturbances, enabling step two to set different sample weights according to the source flag.
[0062] After obtaining the difference vector, the intelligent fusion terminal continues to perform quality labeling on the samples. The quality label not only indicates whether the message has arrived, but also indicates the pairing time interval and time accuracy, channel integrity, phase reliability, the reliability of the disturbance source, and whether the difference amplitude is meaningful.
[0063] For isolated spikes, the intelligent fusion terminal uses anomaly sample weighting based on the middle value and deviation scale of the sliding window, without directly replacing the original measurement; for missing measurements, it does not reconstruct voltage or power values, but only continues processing within the identification sub-model with complete necessary input and output; for mixed source disturbances formed by multiple resource actions within the same time window, it retains each measured power change and adds a mixed source flag, so that it enters the identification with a lower weight.
[0064] Abnormal sample deweighting only reduces the sample's contribution to the candidate matrix update; it is not equivalent to deleting the sample or limiting the voltage value. If any necessary measurement is missing before or after the event, the corresponding increment cannot be considered a valid observation; if necessary measurements exist but samples contain abnormal biases, time uncertainties, or mixed sources, deweighting can be performed while retaining the quality indicators.
[0065] For a sample group with the same set of valid nodes, calculate the median of the historical sliding window for each node and phase, and form a median vector with the same dimension as the node voltage change vector. Sample bias amplitude and deviation scale parameters The vector's first norm degenerates to its absolute value when there is only one node, as calculated by the following formula:
[0066]
[0067] Among them, the sample bias amplitude The current voltage increment relative to the middle vector of the sliding window. The sum of absolute deviations; The components are generated by the window. The median of the historical voltage increments for in-phase nodes within the same node is used. Deviation scale parameter. The nonnegative scale used to normalize sample bias; the basic bias scale. It is a non-negative number, and the positive smoothing constant, which will be discussed later, is used to ensure that the denominator is positive.
[0068] Sliding window It consists of the most recent valid samples obtained during the current event processing, and does not depend on future measurements that have not yet been generated. For the sample index within the window; For sliding windows Inner The node voltage change vector of each valid sample, relative to the node voltage change vector of the current sample. The same event is obtained by differentiating the events before and after, and both correspond to the same set of valid nodes and the order of node and phase arrangement. Indicates the first Each valid sample relative to the median vector The sum of absolute deviations, deviation scale parameter The median of the sum of the absolute deviations of all valid samples within the window is then compared with the baseline deviation scale. The median is obtained by adding them together. This is used to reduce the impact of a few isolated spikes on the bias scale. Samples from different effective node sets are not directly mixed to calculate the vector bias.
[0069]
[0070] Among them, sample weights The value ranges from 0 to 1, representing the contribution of the current sample to the identification update. Perturbation source weight coefficient. Pairing time interval weighting coefficient and data integrity weighting coefficient Values range from 0 to 1, reflecting the source of disturbance, pairing time interval, and measurement integrity, respectively. Normalized sample bias. From the sample bias amplitude Divide by the deviation scale parameter With positive smoothing constant The sum of these is a nonnegative scalar. , and Using the same voltage scale, It is a dimensionless quantity.
[0071] Abnormal sample weighting function This represents a continuous mapping where the greater the deviation, the lower the weight. Its specific form is: This facilitates implementation using fixed-point arithmetic on the end side.
[0072] Sample weights The weighting coefficients in the data are generated as follows:
[0073]
[0074] Among them, the pairing time interval weighting coefficient The measurement time interval before and after the event is reflected relative to the upper limit of the pairing, and its value ranges from 0 to 1; Calculated from the pre-event measurement timestamp and the post-event measurement timestamp; upper limit of channel pairing time interval. Generated by channel reporting period and communication delay compensation; minimum value function This means that when the ratio exceeds 1, it is set to 1 to ensure that the weight coefficient of the pairing time interval is not less than 0.
[0075]
[0076] Among them, the data integrity weight coefficient Reflects the completeness of the predetermined measurement set for the event; the number of missing measurements. The required number of measurements for the number of missing messages in the predetermined set. The total number of messages in the predetermined set, ensuring that the number of missing messages is no greater than the total number. Positive smoothing constant. Used to prevent the denominator from being zero, the calculation result is limited to 0 to 1. This weight only reduces the contribution of valid sample groups that have met the necessary input-output conditions, and does not turn missing measurements into valid observations. Perturbation source weight coefficient. Preset by event source: control actions confirmed by receipts and actual measurements are at a higher level, natural power fluctuations are at a medium level, and mixed-source disturbances and active power disturbances are at a limited level. All level values are within 0 to 1.
[0077] For example, when the time windows of industrial load start-up / shutdown and energy storage setting changes overlap, the events are registered separately; when they cannot be separated into independent responses, the samples are marked as mixed sources, and the weighting coefficient of the disturbance source is reduced. The greater the deviation of the voltage spike from the middle value within the sliding window, the more effective the outlier reduction function becomes. The smaller the output, the lower the sample weight. The lower the weight, the better. While retaining the original measurements and quality indicators, low-weight samples still require subsequent necessary measurement conditions and stimulus sufficiency tests. The identification results cannot be confirmed solely because the samples are retained.
[0078] Regarding measurement channels, power line high-speed carrier channels, serial bus channels, low-power wireless channels, and Ethernet acquisition channels can all be used as input sources. After entering the unified measurement timestamp buffer, different channels generate samples according to the power disturbance event number, the measurement timestamp before the event, the measurement timestamp after the event, and the acceptance flag. For low-power distribution areas that do not have the ability to report complete resource power, coarse-grained samples can be formed by power changes at the distribution transformer outlet and a small number of end voltage changes. For distribution areas with phase-by-phase metering capabilities, phase-by-phase samples with phase flags are preferred. For scenarios where master station communication is available, equipment action records issued by the master station can be used as sources of control action disturbances, but sample pairing is still completed locally by the intelligent fusion terminal. Active power disturbances are not independent control targets, but rather provide constrained excitations when natural fluctuations and confirmed control actions are insufficient for a long period. Their amplitude is constrained by the feasible region of voltage constraints in step three, and after generation, they still enter the sample queue according to the same power disturbance event structure, thereby avoiding the formation of another isolated process.
[0079] When constructing aggregated samples using distribution transformer outlet power and a small amount of terminal voltage, the resulting matrix only represents the voltage response of that aggregated power channel and cannot be used to directly infer the sensitivity of each independent resource. Only when an independent resource has corresponding power measurements and attributable action data can a model row be formed for that resource. Active power disturbances are also treated as candidate commands and undergo constraint screening in step three and command mutual exclusion control in step four, without opening a separate parallel issuance channel.
[0080] Step one converts asynchronous messages into power and voltage increments associated with the same event by determining and pairing measurement time windows based on events. It then distinguishes between missing observations, anomalous biases, and disturbances from mixed sources using valid measurement markers, sample weights, and source indicators. Only samples with the necessary measurements are included in the corresponding identification sub-model; whether to formally update the voltage sensitivity matrix is still determined by the two checks in step two.
[0081] Step 2: Using the identified sample queue output from Step 1, an online voltage sensitivity matrix that can be called up in Step 3 is formed without relying on the complete transformer area topology parameters. and its model credibility score .
[0082] Photovoltaic inverters, energy storage converters, charging piles, and interruptible loads in low-voltage distribution areas may be in a state of small fluctuations for extended periods. To avoid weak excitation or abnormal measurements being continuously written into the formal model, this step distinguishes between candidate matrix calculation and formal matrix update: first, the candidate voltage sensitivity matrix is calculated based on the most recently confirmed result, and then excitation sufficiency and sensitivity coefficient sign consistency checks are performed; the candidate result is confirmed only when both checks pass, otherwise the previous result is retained and the model confidence score is reduced according to established rules.
[0083] The following actions are all performed by the intelligent fusion terminal. The input is the identification sample queue from step one, and the output is a voltage sensitivity matrix with phase identification. Model credibility score Identify and verify records and mutation status indicators.
[0084] The intelligent fusion terminal retrieves the acceptance flag from the identification sample queue. The sample is 1, and the power disturbance event is numbered. The order in which entries are entered into the identification process is mapped to the identification steps. Resource power change vector Expanded into a regression vector Node voltage change vector Keep the node and phase order unchanged, sample weights The system inherits the disturbance source weights, pairing time interval weights, data integrity weights, and outlier sample weighting results from step one. The intelligent fusion terminal first uses the most recently validated voltage sensitivity matrix... As a benchmark, a candidate voltage sensitivity matrix is generated. Then use the information matrix Determine the regression vector Does it lead to a new independent direction? Then use the sensitivity coefficient sign constraint table. Check the candidate voltage sensitivity matrix The positive and negative directions of the matrix elements subject to sign constraints. When both identification checks pass, the candidate voltage sensitivity matrix... Confirmed as voltage sensitivity matrix If any identification verification fails, the intelligent fusion terminal will continue to use the voltage sensitivity matrix. Abnormal candidates are not included in step three, and the model confidence score is lowered. .
[0085] Regression vector From the resource power change vector Expand according to the fixed resource identifier order. For the same resource, active power increments are arranged first, followed by reactive power increments; phase components are processed in a fixed order of phase A, phase B, phase C, and undifferentiated components. The fixed position of each power component is retained in the current matrix version, and resources for which no instructions have been issued still use their actual power increments; when the required power measurement is missing, the unknown increment is not set to 0, and the incomplete regression vector is not used to update the corresponding sub-model.
[0086] The candidate update is not an inversion of the transformer area's line impedance, but rather a local learning of the equivalent incremental mapping from resource changes to node voltage changes. The intelligent fusion terminal reads the regression vector each time an incoming sample arrives. Node voltage change vector and sample weights Based on the previous round's input inverse covariance matrix Calculate the gain vector Sample weights Without changing the physical dimensions, only control the writing of the residual into the candidate voltage sensitivity matrix. The magnitude of the amplitude is such that the mixed-source samples, samples with large pairing time intervals, and samples with partially missing measurements identified in step one have a smaller impact. The preferred recursive form is:
[0087] ; ;
[0088] ;
[0089] Wherein, gain vector The dimension is The input inverse covariance matrix and regression vector calculate; The auxiliary matrix for recursive identification has a dimension of . It is initialized as a diagonal positive definite matrix. For regression vectors The transpose of, i.e., dimension is The row vector; For the regression vector With the input inverse covariance matrix The calculated scalar reflects the regression vector. Input inverse covariance matrix Weighted magnitude, regression vector The larger the magnitude or the more frequently it falls in the direction of previously accumulated weaker stimuli, the larger the scalar; this scalar is related to the forgetting factor. The sum of these is used as the gain vector. The denominator is used to calculate the gain vector. Normalization is performed. Sample weights only adjust the magnitude of the residual correction term and do not participate in the calculation of the gain denominator in this formula.
[0090] Regression vector From the resource power change vector The expanded result includes active and reactive power changes, serving to indicate the direction of the current stimulus; forgetting factor. Indicates the degree of retention of historical samples, with values greater than 0 and not greater than 1, preferably a value close to 1 for end-side stability; Candidate voltage sensitivity matrix This indicates the incremental relationship of resource voltage that has not yet passed the identification and verification, and its purpose is to provide a screening tool for subsequent sensitivity coefficient sign consistency verification.
[0091] Voltage sensitivity matrix This indicates the response relationships that passed the verification in the previous round, which serves as the baseline for this update; Voltage sensitivity matrix The transpose of, with dimension ; According to the voltage sensitivity matrix of the previous round For this regression vector The calculated predicted voltage increment has the following dimension: ; The difference between the node voltage change vector of this sample and the predicted voltage increment, i.e., the residual mentioned above; gain vector ( Column vector) on the left, transpose of the current residual ( Multiply the row vectors on the right, then multiply by the sample weights. The dimension is obtained as The residual correction term, which is related to the voltage sensitivity matrix of the previous round. The candidate voltage sensitivity matrix is obtained by adding them together. Sample weights The value ranges from 0 to 1, representing the sample quality from step one; the node voltage change vector. This represents the voltage response output of this sample; the candidate input inverse covariance matrix. This represents the candidate recursive auxiliary matrix calculated based on the current regression vector. It is only confirmed as the current input inverse covariance matrix after passing the identification and verification; transpose symbol This represents the transpose of a vector or matrix, used to maintain dimensionality matching between the regression vector and the voltage sensitivity matrix. The input is the inverse covariance matrix. It is initialized as a diagonal positive definite matrix, and the diagonal elements are used to set the initial recursive gain scale for each power component;
[0092] For newly accessed resources or resources that have undergone local mutations, their corresponding diagonal elements are set to large positive numbers; the remaining resources use the elements of the input inverse covariance matrix from the previous identification step. Forgetting factor. A preset value greater than 0 and not greater than 1 is used to control the degree of retention of historical samples; when the load in the transformer area fluctuates significantly, the forgetting factor is adjusted. To enhance tracking capability, a smaller value is chosen; when the transformer area operates relatively smoothly, the forgetting factor... Take a value close to 1 to enhance smoothness.
[0093] When the incentive passes through the flag and symbols through signs When both are 1, the candidate input inverse covariance matrix It has been confirmed as the current input inverse covariance matrix. When any identification verification fails, the current input inverse covariance matrix is... Using the previous input inverse covariance matrix Candidate input inverse covariance matrix It will not be included in subsequent calculations.
[0094] Information Matrix Used to accumulate excitation information that satisfies the necessary measurement conditions, and the input inverse covariance matrix. Separate maintenance; when the current candidate matrix fails the verification, the excitation information of valid samples can continue to be accumulated, but unconfirmed candidate voltage sensitivity matrices or candidate input inverse covariance matrices cannot be written into the formal model.
[0095] For example, when photovoltaic output changes slowly during the day, step one continuously generates multiple natural power disturbance samples. The intelligent fusion terminal first converts the resource power change vector of each sample... Expanding in a fixed order of photovoltaic active power, photovoltaic reactive power, energy storage active power, and energy storage reactive power, then converting the node voltage change vector... The recursive formula is input in a fixed order: distribution transformer outlet, branch node, and end user. If a certain end meter has a measurement time deviation in this event, the sample weight is adjusted. The sensitivity matrix of the candidate voltages in this round has been reduced in step one. It can still absorb useful directions, but will not deviate significantly due to a single point of anomaly in the meter. This processing enables the end-side program to maintain continuous update capability even with varying sample quality, while retaining an exit point for subsequent identification and verification of rejected candidates.
[0096] After the candidate update is completed, the intelligent fusion terminal does not immediately confirm the candidate voltage sensitivity matrix. First, the incentive sufficiency test checks whether the nearest neighbor samples provide sufficient direction within the resource space to avoid spurious convergence caused by multiple samples moving along the same resource with slight fluctuations. Then, the sensitivity coefficient sign consistency check checks whether the candidate response direction conforms to the local sensitivity coefficient sign constraint table. Matching. Sensitivity coefficient sign constraint table. Generated by resource type, node phase, and access location identifier, it records the unidirectional effect of in-phase reactive power injection on the phase voltage and the non-reverse constraint of in-node active power injection on voltage rise; no sign constraint is applied to cross-phase coupling elements with unclear response directions. Preferred approach:
[0097]
[0098] Among them, information matrix Indicates the sequence of identification steps up to the end. The cumulative excitation direction is represented by a positive semi-definite matrix; information decay factor. This indicates the degree of retention of the old incentive direction, with a value greater than 0 and not greater than 1; the previous information matrix. Indicates the cumulative result of the excitation direction of the previous identification step; sample weights With regression vector Together they determine the information matrix of this sample pair Contributions;
[0099] Minimum eigenvalue Represents the incentive support in the weakest resource direction; the largest eigenvalue. Indicates the incentive support in the direction of the strongest resource; information smoothing constant. A positive number is used to avoid the denominator being too small; the excitation amplitude benchmark. A positive number is used to suppress spurious sufficiency caused by minimal perturbations; the first norm. This indicates the total magnitude of the resource change.
[0100] Incentive adequacy index The value ranges from 0 to 1, corresponding to the information threshold. Comparison. Initial information matrix The matrix is either a zero matrix or a small positive diagonal matrix, with dimensions consistent with the number of resource power components participating in this round of identification. For fixed components that lack long-term adjustability and do not require identification, their zero rows and columns are not included in the eigenvalue comparison of the incentive sufficiency index; for components with adjustability but currently minimal changes, corresponding checks are still retained. When resources are added, removed, or their configurations change, the active components and matrix versions are updated according to the identifier mapping; unchanged components retain their original mappings.
[0101] Among them, incentives are achieved through symbols. Generate using the following formula:
[0102]
[0103] Among them, incentives are achieved through symbols. The value can be 0 or 1; Incentive sufficiency index Information matrix and regression vector Calculated; Information threshold A preset threshold, greater than 0 and not greater than 1, is generated from the median value of the incentive sufficiency index or the preset value of the control strategy from historical samples identified in the transformer area. If the incentive sufficiency index... Information threshold not reached The candidate voltage sensitivity matrix was not confirmed in this study.
[0104] Sensitivity Coefficient Sign Constraint Table Based on resource type and phase identifier It is generated together with the access location identifier. The access location identifier only indicates a known branch or terminal area and is not equivalent to the complete network topology. (Regarding power components...) and monitoring nodes Only when the direction of its local response can be determined based on the known access relationship and operating mode will it be included in the set of symbolic constraint elements. Under the aforementioned unified injected power positive direction, for components where increased injection within the same region has been confirmed not to decrease voltage, the sign constraint coefficient is... Set the sign constraint coefficient to 1; the increase in reactive power absorption is manifested as a negative power increment, and the signs of the coefficients in the same matrix row are not reversed. For combinations that are clearly inversely coupled, the sign constraint coefficient can be set to −1. When the phase or connection relationship cannot be clearly defined, no sign constraint is forcibly imposed on the combination, but effective observations can still be used for predictive residual calculation.
[0105]
[0106] Among them, symbols are used through signs The value is either 0 or 1, used to represent the candidate voltage sensitivity matrix. Whether the sensitivity coefficient sign consistency check has been passed; set of sign constraint elements. This indicates a combination of resource nodes that require sign verification, excluding matrix elements with unknown access locations and no sign constraints imposed.
[0107] Resource Power Component Index Corresponding candidate voltage sensitivity matrix row, node index Corresponding to its columns; the active and reactive power of the same resource are different row components. Sign constraint coefficients. The value of 1 or -1 indicates the expected direction of the voltage response within the local effective operating range when the power component increases.
[0108] Candidate voltage sensitivity coefficient For the candidate matrix, the first Line number The column's numerical value is not the number of entries. Symbol tolerance. It is a non-negative number, using the same scale as the sensitivity coefficient, to tolerate small numerical deviations close to zero. Step function In the input Output 1 if not less than 0, output 0 if less than 0; multiplication operator Set of symbolic constraint elements Multiply the results of each internal examination.
[0109] For example, in a three-phase unbalanced distribution area, after a photovoltaic inverter in a certain phase performs reactive power absorption, the voltage at the end of that phase should change in the corresponding direction. The voltages of adjacent phases, due to weaker coupling, are set as matrix elements without sign constraints. If the candidate voltage sensitivity matrix... If a reverse occurs on a key entry in this phase, the intelligent fusion terminal will not write that candidate into the current voltage sensitivity matrix. Instead, it uses the voltage sensitivity matrix from the previous round. If the reverse only appears in matrix elements with unsigned constraints and unknown access locations, then this entry is not included in the sign-through flag. The product determination. This distinction avoids misjudging the weak coupling uncertainty caused by incomplete field topology as a global failure, while blocking candidates that clearly violate physical mechanisms before step three.
[0110] After the two identification and verification processes are completed, the intelligent fusion terminal updates the model's reliability score based on the sample weights, verification results, and normalized voltage prediction residuals. This score is a bounded engineering score used for constraint adjustment and does not represent a probability-calibrated statistical confidence level. Normalized voltage prediction residuals. The ratio of the first norm of the voltage prediction error to the first norm of the measured voltage increment is used for calculation, and it is a dimensionless quantity.
[0111] ; ;
[0112] Among them, the normalized voltage prediction residual Represents the current voltage sensitivity matrix For the node voltage change vector The explanatory bias is not less than 0; According to the current voltage sensitivity matrix For this regression vector Calculated predicted voltage increment; Voltage prediction error; current voltage sensitivity matrix When all identification and verification passes, the candidate voltage sensitivity matrix is selected. If the identification and verification fails, the voltage sensitivity matrix from the previous round is retrieved. Residual smoothing constant A positive number is used to avoid the node voltage change vector. If the denominator is too small, the fraction will be too small.
[0113] Model credibility score The value is at the lower limit of the score. The values between 1 and 1 serve as inputs for the voltage constraint feasible region contraction in step three; the reliability score of the previous model. Indicates the model confidence state output from the previous identification step; gain step size A positive number, used to control the rate at which the model's credibility score increases when the identification and verification pass; decay step size. A positive number is used to control the rate at which the model's credibility score decreases when the identification and verification fail; the positive number is used to incentivize the passing flag. The value can be either 0 or 1, determined by the incentive sufficiency index. With information threshold The comparison yields the following results;
[0114] Symbols through signs Acceptance of sensitivity coefficient sign consistency verification results; sample weights Continuing from step one, sample quality; pruning operator Indicates when input Less than the lower limit of the score Time output When input Output 1 if the value is greater than 1, otherwise output 1. This specific form ensures the model's credibility score. It has clear boundaries.
[0115] Initial model credibility score Lower limit of score Preset values between 1 and 2; lower limit of rating This is used to ensure that step three still enters the preset conservative control rule instead of stopping regulation under low confidence conditions; gain step size and decay step size All are positive numbers, preset by the regional control strategy, and the decay step size is... Not less than the gain step size Failure to pass the identification and verification process imposes stronger constraints on the model's credibility score. The above parameters remain consistent during operation within the same distribution area and are reloaded by the intelligent fusion terminal after any changes in distribution area configuration.
[0116] Lower limit of rating satisfy When the model's confidence score drops to the lower limit, a low-confidence processing branch is triggered. If there is no confirmed initial matrix, a preset conservative control rule is used to accumulate samples; historically confirmed matrices with traceable sources can be used as initial matrices, and unverified coefficients are not directly used for normal optimization.
[0117] when Too small and the incentive passes through the flag When the value is 0, the intelligent fusion terminal does not use the normalized voltage prediction residual to improve the credibility score of the model, so as to avoid false credibility caused by weakly stimulated samples.
[0118] Intelligent converged terminal based on sudden change trigger flag Determine whether to enter local re-identification:
[0119]
[0120] Among them, mutation triggering flag This indicates whether there is a need for local re-identification in the current identification sequence. A value greater than 0 triggers local re-identification; number of consecutive residual exceedances. Represents the normalized voltage prediction residual When the residual threshold is exceeded continuously Number of times; threshold for consecutive counts Used to prevent re-identification triggered by an anomaly in a measurement; resource availability flag change flag. Indicates whether the access, exit, locking, or unlocking status of the controllable resource has changed, with a value of 0 or 1; (Alternate conflict flag) This indicates a conflict between different flags occurring within adjacent periods for the same node or resource, and its value is either 0 or 1. (Mutation trigger flag) When the value is greater than 0, the intelligent fusion terminal will only reset the rows and columns of the input inverse covariance matrix related to the mutation resource or mutation node, while the other rows and columns will retain the results of the previous identification step.
[0121] For example, charging loads begin to connect gradually in the evening, and the direction of resource power change is concentrated on the load side in a short period of time, thus incentivizing the sufficiency index. The information threshold was not reached. The intelligent fusion terminal still records samples and normalized voltage prediction residuals. However, incentives are provided through symbols. Since the value is 0, the candidate voltage sensitivity matrix is not confirmed in this round. Model credibility score According to decay step size decline.
[0122] Subsequent authorized reactive power actions from energy storage generate new power disturbance events. If the excitation sufficiency index reaches the information threshold and the symbol pass flag is 1, the candidate voltage sensitivity matrix is confirmed and provided to step three. When local access relationships change, local re-identification is triggered based on continuous prediction residual exceeding limits, changes in resource availability flags, or phase conflicts. The rows and columns of the input inverse covariance matrix of the relevant resource power components are reset to the initial positive definite sub-blocks, and the cross terms associated with these sub-blocks are cleared, while the remaining sub-blocks remain unchanged. Historical samples retain event and version information; configurations before and after changes cannot be directly mixed as the same version.
[0123] Candidate matrices can be generated using recursive least squares, Kalman filtering, sliding window minimum absolute deviation regression, or a neural network with sign constraints. Kalman filtering uses the elements of the voltage sensitivity matrix as the state to be estimated and the voltage increment as the observation; window regression fits a local linear mapping on the most recent valid samples; and the neural network outputs candidate coefficients based on power increment and quality information. All alternative implementations adhere to the same matrix dimension and power direction conventions and undergo two identification checks before being formally written, without bypassing the main process.
[0124] In phase-series scenarios, voltage sensitivity matrices can be maintained separately for each phase. Substitute input forms for positive and negative sequence components are only used when three-phase voltage and current phasors can be obtained and corresponding sequence component characteristics can be constructed accordingly. When only voltage amplitude and active and reactive power messages are available, they are not directly considered as data capable of completing phasor sequence component transformation. When using substitute features, the feature dimensions, response matrix, and constraint correspondences should be determined simultaneously.
[0125] When using a Kalman filter as an alternative identifier, the voltage sensitivity matrix is... The elements are expanded into a state vector in a fixed order. , node voltage change vector As an observation, the regression vector Construct as an observation matrix The state prediction and observation model is as follows:
[0126]
[0127] Wherein, the state vector Represents the voltage sensitivity matrix The vectorized result; The voltage sensitivity matrix confirmed in the previous identification step The vectorized result; the predicted state vector Represents the candidate state before absorbing the current sample; observation matrix From the regression vector Obtained by expanding along the node dimension; observation noise This represents the measurement and pairing error. The candidate states output by the Kalman filter are then restored to the candidate voltage sensitivity matrix. And continue to undergo stimulus adequacy testing and sensitivity coefficient sign consistency verification.
[0128] When the matrix elements are stacked column by column, the observation matrix can be written as: ,in The identity matrix is the node dimension. This represents the Kronecker product. This observation model is used for Kalman measurement updates; the state estimation error covariance matrix of the filter and the input inverse covariance matrix of the aforementioned recursive least squares are different objects and should be maintained separately. They cannot be used interchangeably simply because they are both auxiliary matrices.
[0129] When using sliding window minimum absolute deviation regression for identification, regression vectors are collected within the window. and corresponding voltage increment The input matrix is formed by column-wise operations. and output matrix The window candidate voltage sensitivity matrix is obtained with the sum of the absolute values of the predicted residuals as the objective.
[0130]
[0131] Among them, the window candidate voltage sensitivity matrix The row and column definitions are the same as the current matrix; the number of samples in the window is... When, input matrix The dimension is Output matrix The dimension is ; The unknown voltage sensitivity matrix in the solution process has dimensions of . ; This is a matrix composed of columns representing the predicted voltage increments calculated for each regression vector within the window, with dimensions [missing information]. ; Indicates selection Take the minimum value As a candidate voltage sensitivity matrix for the window ; This represents the sum of the absolute values of all elements in the matrix, not the induced norm of the matrix. After obtaining the candidate window results, an excitation sufficiency test and a sensitivity coefficient sign consistency check are still performed; if these fail, the result is not confirmed.
[0132] When a neural network with symbolic constraints is used as an alternative identifier, the neural network includes an input layer, a first fully connected layer, a nonlinear activation layer, a second fully connected layer, and an output layer. The input layer receives a vector of resource power changes. Separation marks Encoding amount, sample weight Reliability score of the previous model The input vector is formed by concatenation; the output layer outputs the candidate voltage sensitivity matrix. The matrix elements subject to sign constraints. During training or edge fine-tuning, the loss function is constructed using the response residual term and the sign penalty term:
[0133]
[0134] Among them, the loss function This indicates that the neural network is capable of identifying the step sequence. The update target; node voltage change vector From step one, the identified samples; regression vector From the resource power change vector Expanding yields the candidate voltage sensitivity matrix. For neural network output; The predicted voltage increment is calculated based on the candidate voltage sensitivity matrix for this regression vector; For the response residual term; sign penalty coefficient A non-negative number used to increase the weight of physical symbolic consistency constraints; the set of symbolic constraint elements. Constraints on the Sign of Sensitivity Coefficient The matrix elements subject to the applied sign constraint are consistent; the sign constraint coefficients Representing resources For nodes Desired response direction; candidate voltage sensitivity coefficient Represents the corresponding entry in the candidate voltage sensitivity matrix; maximum value function Indicates when For timing output ,when The output is 0 when the value is negative. This neural network outputs a candidate voltage sensitivity matrix. It still needs to undergo the sufficiency of incentive test and the sign consistency check of sensitivity coefficient, and does not bypass the main chain of step two.
[0135] Through the excitation sufficiency test, weak-direction, same-direction, and minimal disturbance samples will not be mistaken for sufficient identification conditions; through the sensitivity coefficient sign consistency check, candidate voltage sensitivity matrices that violate the basic response direction of the distribution network are identified. Do not proceed to step three. Use model credibility scoring. The boundary-oriented output, step three can shrink the feasible region of voltage constraints based on the identification confidence level, and step four can be based on the voltage sensitivity matrix. Evaluate the effect of the command action.
[0136] Step 3: Based on the voltage sensitivity matrix output in Step 2 and model credibility score Candidate instructions are constructed by combining node voltage boundaries and resource state constraints; the resource budget is calculated only to determine which solution path to use, without changing the effectiveness of physical constraints.
[0137] Among them, the voltage sensitivity matrix The model reliability score is given based on the direction and intensity of the node voltages corresponding to resource actions. This determines the degree to which the direction and strength can be trusted; when the model confidence score is high, the intelligent fusion terminal allows for fuller utilization of energy storage, photovoltaic inverter reactive power and interruptible loads; when the model confidence score is low, the intelligent fusion terminal shrinks the voltage boundary inward and prioritizes small steps, resource actions that can restore the pre-execution setpoints and are loosely coupled.
[0138] The tendency for node voltage to exceed limits requires timely adjustments, but incomplete phase information, local connection changes, and load disturbances can affect the applicability of the voltage sensitivity matrix. This step first determines the voltage safety margin based on the model's reliability score, then forms a constraint set based on resource feasibility conditions, and finally selects a solution path based on the model's reliability and computational resource budget. Actions that cannot be confirmed to satisfy the constraints are not included in the issuance process. Different paths can output restricted candidate actions, or return an empty candidate set when no action is available. Ensuring action is required every cycle cannot be used as a reason to relax voltage or equipment boundaries.
[0139] The intelligent fusion terminal first reads the voltage estimation vector of the current node. Node voltage lower limit vector Node voltage upper limit vector Voltage sensitivity matrix Model credibility score Resource state vector And resource availability indicators. Subsequently, the intelligent fusion terminal generates the desired control vector based on the direction of exceeding the limit. For nodes with high voltage, the desired control vector is... The focus is on reducing active power transmission or absorbing reactive power; for nodes with low voltage, the desired control vector is... The focus is on releasing reactive power to support energy supply or adjusting energy storage output. The aforementioned expected amounts are still just targets and will not be directly allocated.
[0140] The intelligent fusion terminal first scores the model's credibility. Write the voltage safety boundary, then overlay the resource capacity, energy storage state of charge, tap, action holding time, and equipment interlocking conditions. Finally, select the solution path according to the end-side calculated resource budget, output the candidate instruction set, and hand it over to step four for instruction mutual exclusion control.
[0141] The intelligent fusion terminal first estimates the vector based on the current node voltage. With the target voltage vector Generate voltage deviation vector Then, based on the voltage sensitivity matrix Generate desired control vector :
[0142]
[0143] Wherein, voltage deviation vector Indicates the direction of deviation of the current node voltage from the target voltage vector; current node voltage estimation vector. Formed from the latest valid measurement in step one, the temporarily held measurement is accompanied by a timestamp and validity mark; when a necessary monitoring node lacks a currently available measurement, the indefinitely held value is not used as the basis for safe operation; target voltage vector Located at the lower limit vector of node voltage With node voltage upper limit vector Between; expected control vector Indicates resource action objectives that have not undergone constraint screening; adjusts the step size. Positive numbers are used to limit the expected action magnitude in a single cycle; resource weight matrix. It is a diagonal non-negative matrix, whose diagonal elements are determined by the resource availability flag, action cost, and recovery interval; resource action lower bound vector. and resource action upper limit vector It is generated from resource capacity, latching state, and resource constraint domain; the pruning operator is used to limit the range of resource actions on an element-by-element basis.
[0144] The target voltage vector is generated from the internal target between the node voltage lower limit vector and the node voltage upper limit vector; in a voltage high event, the internal target is closer to the inside of the node voltage upper limit vector; in a voltage low event, the internal target is closer to the inside of the node voltage lower limit vector; when no clear over-limit direction is formed, the internal target is taken as the intermediate operating target between the two, and is kept unchanged within the same control cycle by the transformer area operation strategy.
[0145] The intelligent fusion terminal adjusts the incremental prediction node voltage based on the candidate power and uses model credibility scoring. Adjust the voltage safety margin. Voltage margin reference vector. Composed of a basic margin and risk factors, the actual voltage safety margin is a margin coefficient. The product of the vector.
[0146] With other risk factors remaining constant, a decrease in score increases the margin coefficient; a recovery in score decreases the margin coefficient, but not below the base margin coefficient. The feasible region of voltage constraints is defined as the set of resource power adjustment vectors that satisfy the corresponding voltage boundaries.
[0147]
[0148] Among them, the voltage-constrained feasible region Candidate resource action vectors that satisfy the listed voltage inequalities composition. It only includes the active or reactive power adjustment increments corresponding to the regression vector; the compensation device level is first converted to the corresponding reactive power increment, and the dimensionless level number cannot be directly mixed with the power component in the matrix multiplication. Node voltage lower limit vector With upper limit vector Allowable boundary. Margin coefficient. It is a positive number; the basic margin coefficient Positive number; low confidence margin coefficient It is a non-negative number.
[0149] Voltage margin reference vector The components are non-negative voltage quantities; the current node voltage estimation vector Uses the same node order and scale as the upper and lower voltage limits. Voltage sensitivity matrix. Using the results confirmed in step two, For predicting voltage increments. Basic margin factor. To ensure a high model confidence score while retaining a basic margin; low confidence margin coefficient Increase the level of conservatism when the control score decreases. Prioritize the use of preset conservative control rules when continuous identification and verification fail; do not substitute increased margin for handling the failure model.
[0150] Voltage-constrained feasible region Constructed separately for each node and phase to avoid mixing voltage margins and resource actions for different phases. Voltage margin reference vector. It is generated by combining the basic margin and the risk margin:
[0151]
[0152] Among them, the voltage margin reference vector This represents the additional voltage boundary distance that each node needs to retain during the current control cycle; the basic margin vector. It is a non-negative vector, preset by the area operation strategy; pairing time risk vector. Generates a phase risk vector from nodes whose measurement time intervals before and after the event in step one are close to the upper limit of the pairing time interval. Generated from nodes with undetermined phase markers or conflicting phase markers; mutation risk vector The mutation trigger flag in step two Mapping to relevant nodes; symbolic risk items This indicates that a uniform margin is added to all nodes when the sign consistency check of the sensitivity coefficient fails; margin weight. , , and All are non-negative numbers; all-one vectors The dimension is consistent with the node voltage vector.
[0153] The aforementioned risk vector can be set to 0 or 1 for each of the corresponding node's time quality anomalies, phase uncertainties, or mutation flags; the margin weights convert these risk flags into voltage quantities, maintaining the same scale as the basic margin vector. If the lower limit of a node after contraction is higher than the upper limit, or if the feasible domain of the voltage constraint and the resource constraint domain have no intersection, optimization instructions cannot be directly output. Instead, the system should switch to the preset conservative control rules and re-verify; if no action passes the verification, an empty candidate set is output and an alarm is recorded.
[0154] For example, if midday solar power transmission causes the voltage of a certain end node to approach its upper limit and the model's confidence score is low, the intelligent fusion terminal increases the voltage safety margin that the node needs to maintain, requiring the predicted voltage after the action to be between stricter upper and lower limits. This processing limits the voltage range after the action and does not necessarily reduce the magnitude of the action for any resource; when the current voltage is close to or exceeds the upper limit, it may also require more thorough correction or make the feasible set empty. If subsequent confirmed action samples restore the score and other risks remain unchanged, the margin coefficient decreases according to a predetermined relationship, and the feasible region is correspondingly widened.
[0155] Furthermore, resource constraint domain It consists of both continuous resource constraints and discrete resource constraints:
[0156]
[0157] Among them, the resource constraint domain This represents the set of allowed candidate power adjustment increments at the device level; upper and lower limits for resource actions. , The incremental range is obtained by subtracting the current power baseline from the absolute power allowable range. The upper and lower limits for unavailable resources are both 0. This is the current power vector before this action. Let be the power vector expected during the hold period. The power vector involved in the linear state prediction in the above equation is... The continuous state components, such as the state of charge, can be approximately updated by the power integral. and Within its permissible range. Conditions such as action holding time, recovery interval, lockout indicator, and gear position are checked separately and are not assumed to all conform to the same linear integral formula.
[0158] State update matrix Describes the effect of power on continuous state changes; when used for energy storage state of charge, the coefficient is determined based on the rated available energy, the current charge / discharge direction, and the corresponding efficiency. Discharge corresponds to a decrease in state of charge, while charging corresponds to an increase in state of charge. Control cycle length. To estimate the hold time, the time unit should be compatible with the power and energy units. Discrete motion components. Indicates the first The equivalent power increment of a discrete resource based on the current gear level; allowing sets It is generated by the power difference and interlocking / recovery interval conditions corresponding to each selectable gear of the equipment.
[0159] The resource state vector is generated by the state messages of each resource controller and includes at least the energy storage charge state, inverter reactive power margin, reactive power compensation device level, interruptible load hold time, communication availability flag, and equipment lockout flag. The intelligent fusion terminal converts the resource state vector into a resource action lower limit vector and a resource action upper limit vector in each control cycle, and then forms a projection space together with the voltage constraint feasible region.
[0160] In the voltage-constrained feasible region Internally, the intelligent fusion terminal continues to superimpose resource physical constraints, making the candidate control vector... Not only must voltage boundaries be met, but also the operational conditions of the equipment itself. Energy storage resources must meet the upper and lower limits of state of charge, the switching interval between charging and discharging directions, and the in-station protection lockout status; inverter reactive power must meet capacity margin, operating mode, and communication availability indicators; interruptible loads must meet user-side hold-up time, recovery interval, and whether they have already participated in regulation in the current cycle; compensation devices must meet the requirements of tap-level dispersion, mechanical lockout status, and previous action feedback. The intelligent converged terminal writes the above constraints into the resource constraint domain. Among them, the resource constraint domain With voltage-constrained feasible region The intersection of these elements constitutes the projection space. If the availability flag of a resource is invalid, the upper and lower limits of the power increment for that resource in this cycle are both set to 0; if a resource is in a recovery interval, it is only allowed to maintain its original state; if an action of a resource causes the energy storage state of charge to cross the resource state limit vector... or resource state upper limit vector The action was deleted before projection.
[0161] After completing the constraint combination, the intelligent fusion terminal obtains candidate control vectors with the goal of approximating the desired control vector; device hold time, recovery interval, and action cost are used to limit unnecessary frequent adjustments. When only continuous variables are included and the constraints are linear, active set quadratic programming can be used; when discrete gears are included, allowable gear combinations are first enumerated and solved for continuous variables, or a suitable mixed integer solution method is used. The output of ordinary continuous quadratic programming cannot be directly used as discrete gears. When the computational resource budget is insufficient, resource-by-resource upper and lower limit amplitude and voltage constraint verification are used. Candidate instructions save resource identifier, action direction, action amplitude, hold period, source period, phase, and pre-execution setpoint association information for verification in step four.
[0162] Candidate control vectors under constrained optimization solution path It is generated by the following formula:
[0163]
[0164] Among them, candidate control vector This represents the resource actions after being pruned from the voltage-constrained feasible region and the resource-constrained region; the expected control vector. Represents the unprojected target action; voltage-constrained feasible region Constructed from the voltage boundary determined by the model confidence score; resource constraint domain Constructed from resource status, capacity, gear, and locking conditions; projected weight matrix. It is a diagonal positive definite matrix, whose diagonal elements are generated by the resource action cost, the setpoint recovery difficulty, and the recovery interval; minimization operator This indicates the selection of the resource action that minimizes the weighted distance and satisfies the constraints. Continuous subproblems can be solved using active set quadratic programming or interior point methods; when discrete gears are involved, gear enumeration or appropriate discrete optimization methods should be used first, and the results should be fully constrained and verified.
[0165] For example, when the load on charging piles increases in the evening, causing the terminal voltage to be low, the desired control vector is... There will be a tendency to increase the reactive power support of the inverter and release the active power of the energy storage. If the state of charge of a certain energy storage unit is already close to the lower limit, the resource constraint domain... It will limit its continued discharge; if a compensation device has just completed a gear shift and is in a mechanically locked state, the gear shift change is temporarily excluded; if an inverter has available communication and its reactive power capacity still has a margin, its reactive power operation is retained in the candidate space. The candidate control vector obtained after projection. Therefore, the regulation responsibility is shifted to the inverter's reactive or interruptible loads that still meet the state conditions, rather than forcibly using unsustainable resources. This process allows the voltage-constrained feasible region and the device state to work together, avoiding the emergence of candidate instructions that are voltage-safe but unexecutable by the device.
[0166] In preferred implementation, candidate control vectors, solution path indicators, and resource rejection reasons from the most recent few cycles are saved to identify resources that are continuously reversed or repeatedly restricted. For continuously restricted resources, their subsequent usage priority can be reduced according to a preset strategy, and they can be reselected from other resources in the same phase or with a clear response relationship. The numerical effect of the resource weight matrix and the instruction priority score are defined separately, and the increase or decrease of the diagonal values of the matrix cannot be directly equated to the ranking.
[0167] The intelligent converged terminal runs in an edge-side container environment. The same device also undertakes tasks such as data acquisition, protocol parsing, message forwarding, and local alarms. Projection solving cannot occupy the processor for a long time.
[0168] Step 3 first checks the model's credibility status, then checks the computational resource budget. If the model's credibility score drops to the lower limit or continuous identification verification fails, the preset conservative control rules are used first. Otherwise, if the budget meets the requirements, constrained optimization is used; if the budget does not meet the requirements or the actual solution times out, resource-by-resource upper and lower limit limits and voltage constraints are used for verification. All three paths retain voltage and equipment status checks; there are no paths that automatically ignore physical constraints due to solution degradation.
[0169] Among them, the intelligent fusion terminal reads the computational budget satisfaction flag before entering the projection solution. :
[0170]
[0171] Among them, the calculation budget meets the criteria. The value is either 0 or 1, used to determine whether to perform constrained optimization; the solution time is estimated. The maximum solution time is estimated based on the actual solution time of the same candidate set in the previous period and the current resource quantity; This indicates the maximum time allocated by the intelligent fusion terminal for projection tasks in this cycle; processor utilization. Provided by the intelligent converged terminal operating system or container runtime environment; maximum processor utilization. This indicates the upper limit of resources required to initiate constraint optimization solutions; the number of candidate resources. This indicates the number of resources that entered the candidate set in this period; the maximum number of candidate resources. This indicates the acceptable resource size for the constraint optimization solution path. Only when the model confidence score is above the lower limit and the continuous verification failure condition is not triggered, constraint optimization or resource-by-resource upper and lower limit and voltage constraint verification is selected based on the computational budget satisfaction flag; the lower confidence branch has higher priority than this computational budget judgment.
[0172] Under the resource-by-resource limiting and verification path, the intelligent fusion terminal first follows the voltage sensitivity matrix. The impact on the target node is ranked according to the resources, and then resource actions are restricted one by one according to the ranking:
[0173]
[0174] Among them, subscript In this formula, the position of the power component in the vector arranged in a fixed resource identifier order is represented, relative to the candidate instruction index in step four. Different meanings; The desired control vector The Each component; the order of the limits for each resource remains in accordance with the aforementioned magnitude of impact; actions following the limit. From expected action Based on resource action upper and lower limits and Extract each item one by one. After each limiting step is completed, substitute the current cumulative power adjustment vector into the voltage constraint feasible region. and resource constraint domain Perform a review; if the conditions are not met, reduce the action within the allowable range and review again. Reducing the action to 0 only indicates that no new adjustments will be made, and does not automatically prove that the current voltage has met the boundary; if there are still no feasible results, discard the candidate action, and return to an empty candidate set if necessary.
[0175] The preset conservative control rules take the direction of exceeding limits, resource phase, resource availability flag, and resource regulation disabling flag as inputs. When the voltage is too high, the candidate action of the in-phase inverter absorbing a small amount of reactive power is prioritized; when the voltage is too low, the candidate action of the in-phase inverter injecting a small amount of reactive power is prioritized. Energy storage maintains its current permissible state, compensation devices maintain their current permissible level, and interruptible loads are not added for switching. Each action still needs to be verified by voltage and resource status; a hold indication with a candidate increment of 0 is not considered a valid adjustment command waiting for voltage improvement confirmation. If constraints cannot be verified or there is no action, no new command is added, and the reason is recorded.
[0176] For example, when multiple measurement channels lose packets and the terminal is processing retransmission messages, if the model confidence score drops to the lower limit or the continuous identification verification fails, conventional constraint optimization will not be initiated; instead, a preset conservative control rule will be used first. For resources that still have necessary valid measurements, known phases, and whose equipment status allows, small reactive power candidate actions will be proposed and constraint verification will be performed. For resources whose status cannot be verified, actions will not be forcibly issued due to computational congestion. After communication is restored, the samples will be reconstructed and the model updated. The corresponding conventional path will be used only when the score recovers and the computational budget is satisfied.
[0177] The solution path is not limited to active set quadratic programming. For transformer areas with a small number of resources, the intelligent fusion terminal enumerates discrete gear positions and projects coordinates onto continuous resources; for transformer areas with a large number of resources, the intelligent fusion terminal first calculates the voltage sensitivity matrix. The computational resources are ranked based on their impact, and then local projection is performed on the resources ranked higher. For stations with master station collaboration, the master station issues prior action priorities, and the intelligent fusion terminal still scores based on model credibility. Voltage-constrained feasible region and resource constraint domain Re-cut.
[0178] Before candidate control vectors enter the execution step, a pre-instruction verification based on the voltage sensitivity matrix is performed. This verification reads the current effective node voltage, the confirmed matrix, the candidate power adjustment vector, the model confidence score, and the resource status, and checks the power direction conversion, the applicable version of the matrix, and the voltage constraints; this verification reuses the currently confirmed voltage sensitivity matrix and constraints.
[0179] Pre-issuance verification pass flag Takes a value of 0 or 1. For candidate control vectors Based on the confirmed voltage sensitivity matrix Calculate the predicted voltage change:
[0180]
[0181] Among them, the predicted voltage change vector Candidate control vector In the voltage sensitivity matrix The impact on the voltage of each node.
[0182] For matrix elements with signed constraints, check if their coefficients match the signed constraint coefficients, and calculate the corresponding voltage contribution based on the sign of the actual power increment, avoiding misjudging "voltage drop due to reactive power absorption" as a violation of the positive sensitivity coefficient constraint. Then, compare the predicted voltage with the current contracted node upper and lower limits, and simultaneously verify resource state constraints. Once all checks pass, a pre-deployment verification flag is displayed. If the value is 1, it is 0 otherwise. Unsuccessful candidate control vectors will not be included in the executable candidate set.
[0183] The fact that the overall candidate control vector satisfies the constraints does not mean that any execution order after splitting will satisfy the constraints. Step four involves reviewing the voltage and resource state constraints after executing only that instruction, using the latest verified measurements and the current state formed by the preceding confirmed actions. After the previous instruction is confirmed, the execution conditions and priorities of the remaining instructions are recalculated; the predicted voltage contribution of the preceding action should not be superimposed when the current measurement already reflects it. If there are no instructions that can be executed independently and pass the review, the solution is recalculated or new actions are stopped; mutually canceling actions are not issued in parallel to bypass intermediate state checks.
[0184] Model reliability scoring influences the candidate action range through voltage safety margin; resource constraints ensure actions simultaneously satisfy equipment capacity, energy storage status, gear position, and interlocking conditions; computational resource budget is used for selection among different solution paths. Candidate instructions generated by each path undergo pre-issuance review and the same mutually exclusive execution process. Abnormal records are retained for cycles without actionable actions, and continuous operation is not equated with the mandatory issuance of instructions.
[0185] During the evaluation process, records can be kept of the solution path selection, constraint hit reasons, number of times the preset conservative control rule was triggered, number of times the candidate instruction setpoint recovery processing was performed, and voltage over-limit interception records. These records are used to verify whether this step has transformed the identification results from step two into executable boundaries, rather than simply generating target values. The evaluation mainly focuses on whether candidate actions have crossed boundaries, whether resource locking has been identified, and whether the instruction execution order has been maintained after degradation.
[0186] Step 4: Transform the candidate instruction set into an execution flow of line-by-line review, mutually exclusive issuance, effect confirmation, and action response feedback. Within the same execution confirmation window, only one candidate instruction from this method is allowed to be in an incomplete confirmation state; other candidate instructions are pending. This restriction does not prohibit natural load fluctuations or independent equipment protection actions; when such simultaneous changes occur, the mixed source flag must still be recorded.
[0187] Energy storage, inverters, reactive power compensation devices, and interruptible loads differ in their operating speed, communication acknowledgment, and hold time. If multiple candidate commands are issued simultaneously, it increases the difficulty of measurement attribution and anomaly recovery. Therefore, the intelligent fusion terminal implements command mutual exclusion control through the global command execution status and independently maintains the control and disabling flags for each resource. After confirming validity, the current command occupancy ends; in case of an anomaly, it switches to pre-execution setpoint restoration processing or execution result verification; if the relevant results are not yet determined, it does not directly declare global idle.
[0188] Intelligent fusion terminal receives candidate control vectors Solve path flags, constraint check records and candidate instruction sets, and read the confirmed voltage sensitivity matrix. and model credibility score First, exclude disabled resources and instructions that have not passed pre-issuance review, then calculate the priority of executable candidate instructions. When the global instruction execution status is idle, select one instruction, register its execution usage, save the pre-execution settings, and then issue it; do not overwrite or add other candidate instructions before its confirmation is completed. In case of an anomaly, suspend the corresponding resource from participating in regulation, and restore it according to the verified equipment status; only feed back the verified actions and measurement responses to step one.
[0189] Instruction sorting is not simply queuing candidate instructions according to their generation order, but rather using the voltage sensitivity matrix formed in step two. Step 3 Candidate control vector and resource state vector Both are used together for instruction priority calculation. For high voltage events, candidate instructions that can reduce the voltage of the target node and leave a margin for other nodes are given priority; for low voltage events, candidate instructions that can raise the voltage of the target node and whose resource status allows for continued maintenance are given priority.
[0190] If the voltage effects of two candidate instructions are similar, the intelligent fusion terminal prioritizes the action with lower execution cost, a clear path to restore the pre-set values, and a more significant supplementary resource action to the excitation direction in step two. The preferred ranking relationship is as follows:
[0191] ;
[0192] ;
[0193] Among them, instruction priority scoring Indicates candidate instructions During the regulatory cycle Priority for obtaining permission within the specified timeframe, with higher values indicating earlier status; response improvement amount. Represents the candidate resource action vector It is expected that the current node voltage estimation vector will be made Approaching the target voltage vector The degree of [value] can be positive or negative; the current node voltage estimation vector Formed from the latest valid measurements in step one, it represents the current voltage of each monitoring node when calculating the command priority. After the preceding command is confirmed, it is updated according to the latest verified measurements and compared with the target voltage vector. Use the same node and phase arrangement order; Indicates execution of candidate instructions The sum of the absolute deviations of the voltages of all monitoring nodes relative to the target voltage; According to the voltage sensitivity matrix Candidate instructions for computation The predicted voltage increment; To execute only candidate instructions The subsequent node voltage prediction value, which is related to the target voltage vector The norm of the difference represents the sum of the expected absolute deviations after execution; the amount of response improvement. A positive value indicates that the candidate instruction is expected to bring the node voltage closer to the target voltage, while a negative value indicates that it is expected to increase the deviation; supplementary scoring based on identification information. Indicates candidate instructions The degree of supplementation for subsequent identification of incentive directions is taken as a non-negative value, derived from the candidate resource action vector. The information matrix direction gap from step two is obtained;
[0194] Model credibility score Following the output from step two, the value is located at the lower limit of the score. Up to 1; Action Cost This represents the combined burden of resource actions on equipment lifespan, recovery interval, user-side hold conditions, and difficulty in restoring setpoints; a non-negative value is used. (Weighting coefficient) , , and All are non-negative numbers, configured by the transformer area operation strategy, used to adjust the roles of voltage improvement, information supplementation, confidence support, and action cost in the ranking; target voltage vector This represents the internal target for voltage regression in this period, located at the lower bound vector of the node voltage. With node voltage upper limit vector between;
[0195] Model confidence score within the same control period Since all candidate instructions are identical, an additional item is added. It is a common bias and does not change the relative order of candidate instructions in the same cycle; the impact of the score on the actual selection is mainly reflected through voltage safety margin, candidate set screening, and solution path. Each score component adopts a fixed scale, and the weight coefficients are responsible for the conversion between different dimensions or numerical ranges.
[0196] Candidate resource action vector It has the same dimension as the complete control vector, but only retains the power adjustment component of the resource involved in the current candidate instruction; other components are 0. This represents the candidate instruction index, not directly the matrix row index. (1-norm) It is the sum of the absolute values of each component.
[0197] Among them, the identification information supplementary scoring It is based on the action vector of the candidate resource. Information matrix Different degrees of weak direction supplementation are generated respectively:
[0198]
[0199] Among them, the identification information supplementary scoring Indicates candidate instructions The degree of supplementation for the insufficient incentive direction in step two is taken as a non-negative value; candidate resource action vector Indicates the resource action quantity corresponding to the candidate instruction; information matrix This is the result of accumulating the excitation direction following step two; information smoothing constant. It is a positive number; this constant is used to ensure matrix invertibility and avoid zero denominators; identity matrix. A square matrix whose main diagonal elements are all 1s and all other elements are 0s, its dimension and information matrix They are the same, both are ; Information matrix Overlay The inverse matrix after that, and the information matrix Having the same eigenvector, its eigenvalues are Corresponding eigenvalues and The reciprocal of the sum, therefore in A smaller eigenvalue corresponds to a larger eigenvalue in the direction where the cumulative excitation is weaker; under the condition of the same action amplitude, the molecule The larger the value, the better the candidate resource action vector. The more it is distributed in the direction where the cumulative excitation in step two is weaker; denominator Used to normalize by the amplitude of movement, so that the score mainly reflects the direction of movement; L2 norm This represents the square root of a vector.
[0200] Among them, action cost Generate based on resource action range, recovery interval usage, lockout risk, and set recovery difficulty:
[0201]
[0202] Among them, action cost It is a nonnegative scalar; The sum of power adjustment magnitudes for candidate instructions, resource capacity To correspond to the scalar scale that allows for adjustable capacity, a positive smoothing constant is used. It uses the same normalized power scale as the others. Maintain occupancy flags. The value is 1 when the action occupies the hold time or recovery interval, and 0 otherwise; lock risk indicator. The value is 1 when the action approaches the locking condition, and 0 otherwise. The setting value restores the difficulty indicator. The weight is 1 when an additional recovery step is required even though a verifiable recovery path exists, and 0 when a directly available automatic recovery path exists; , , and All values are non-negative. Instructions that are locked or lack verifiable pre-execution settings and recovery paths should be excluded from the candidate screening, thus lowering their ranking score.
[0203] For example, when the voltage is high at the midday end, candidate commands may include photovoltaic inverters absorbing reactive power, energy storage increasing charging power, and load restoration with user permission and meeting restoration conditions. The smart converged terminal predicts the impact of each action on the target node and other nodes, and checks the energy storage state of charge, load holding conditions, and reactive power capacity. When energy storage is close to its upper limit of state of charge, its available charging capacity decreases; reactive power actions with clearly defined phases and verifiable restoration paths can be given higher priority. Loads that do not meet restoration permission cannot be forcibly put into operation simply because they can reduce voltage.
[0204] By sorting the executable candidate instructions that already meet the constraints, voltage improvement, action cost, and identification information supplementation are all taken into account, and selection is not only based on the magnitude of the action.
[0205] The intelligent fusion terminal maintains a global instruction execution status and separately maintains resource control disabling flags, phase execution permissions, and branch execution permissions for each resource. The global instruction execution status indicates whether there are any instructions that have not yet been completed or whose recovery results have not been confirmed; the resource control disabling flag indicates whether a resource is temporarily prohibited from re-entering the candidate selection. When the global execution status is not idle, all phase and branch candidate instructions wait; when the global execution status is idle, the corresponding phase and branch permissions must still be satisfied simultaneously. When the master station only forwards instructions, the execution status is still maintained by the intelligent fusion terminal; during local direct control, the terminal writes the actual set values to the resource controller.
[0206] Each instruction saves its pre-execution settings before issuance: continuous resources save their active or reactive power settings, discrete resources save their load status, and loads save their on / off status. The instruction frame also includes a resource identifier, action direction, action magnitude, instruction sequence number, instruction issuance timestamp, confirmation time limit, and verification fields. The acknowledgment frame returned by the resource side includes the resource identifier, instruction sequence number, execution status, acknowledgment timestamp, and verification result. If there is no automatic recovery capability but a confirmed local or manual recovery process, the action cost can be increased in the corresponding execution mode; instructions without an available recovery path must not enter this automatic mutual exclusion execution process.
[0207] The global command execution state transitions according to the following conditions: Upon obtaining a unique command issuance permission during idle time, execution occupation is first registered; after command issuance is completed, the state enters a waiting-for-execution confirmation phase; after both the execution receipt and voltage effect are confirmed as valid, the state enters a confirmed state and the current occupation ends. If the receipt times out, a valid rejection receipt is received, verification fails, or the effect is abnormal, the resource is suspended from participating in subsequent control. If it has been verified that the original command was not executed and the device remains in its pre-execution state, the current abnormal occupation can be directly ended. If the command has already been executed or the execution result is unclear, the state enters setpoint recovery processing or result pending verification. Issuing a recovery command does not signify completion of recovery; occupation only ends after a valid receipt and necessary status quantities confirm the recovery result. If the recovery or original execution result is still unclear, the result remains pending verification, and no other candidate commands are issued. Resource disabling / cancellation is handled separately according to the resource status review of the next event cycle and is not the sole condition for the global state to return to idle.
[0208] ; ;
[0209] Among them, the instruction issuance license mark It can be 0 or 1, with 1 indicating a candidate instruction. During the regulatory cycle Obtain and issue a license; Candidate instruction set Index of candidate instructions; global instruction execution status This includes idle, execution occupied, waiting for execution confirmation, confirmed, setpoint restoration processing, and result pending verification. Resource control disabled flag. Indicates candidate instructions The corresponding resources during the adjustment cycle The disabled state is represented by a value of 0 or 1. A value of 1 indicates that the corresponding resource is not currently participating in regulation, while a value of 0 indicates that it has not been excluded by the disabled condition. Its value does not directly represent the global state but is related to the global instruction execution state. Maintain separately. Issue instruction for license flag. In the calculation formula, when all three indicator functions are simultaneously 1 Only when it is 1, that is, the global instruction execution status. The idle and resource control flags are disabled. =0 and candidate instruction index Equal to selected index At that time, candidate instructions Obtain a license, in which the selected index is selected. Taken from the following set of executable candidates The corresponding candidate instructions have met the screening criteria such as phase permission and branch permission; resource regulation is disabled. When the value is 1, even if the global instruction execution state is idle, candidate instructions... Nor will it receive a license. Executable candidate set From candidate instruction sets Once selected, members must meet the following requirements: resources are not disabled, different permissions are granted, branch permissions are granted, pre-execution settings and recovery paths are verifiable, and they must pass the pre-deployment review in the current state.
[0210] Candidate Instruction Index Iterate through the set of executable candidates; For the set of executable candidates Candidate instructions During the regulatory cycle Instruction priority scoring, i.e., scoring according to the aforementioned instruction priority. The computational relationship will take the candidate instruction index as The obtained value; Indicates the set of executable candidates Internal selection Largest candidate instruction index; This is the unique selected index for the highest priority candidate instruction. When the highest scores are the same, the integrity of the pre-execution settings and recovery path are compared first; if still tied, the instruction is selected based on the fixed resource identifier and instruction sequence number. When the executable candidate set is empty, no selected index is defined, and all instruction issuance permission flags are 0. The indicator function outputs 1 if the listed conditions are true, otherwise it outputs 0.
[0211] Checking global idle time, selecting instructions, and registering execution occupancy constitute a single, indivisible execution license operation. After successful registration, subsequent candidate instructions remain pending and cannot obtain licenses repeatedly in the same idle time check. Before issuing each candidate instruction, the model version used, current measurements, and resource status are re-verified, and expired candidate instructions are recalculated.
[0212] For example, when the voltage is low in the evening, a reactive power support command is sent to an inverter, and the global status changes from idle to waiting for execution confirmation; even if the energy storage command score subsequently increases, it can only wait. After the inverter returns a valid acceptance receipt, the voltage change still needs to be observed within the confirmation time limit. If a valid rejection receipt is received and it has been verified that the device has not acted, the resource can be suspended from participating in regulation and the current occupation can be ended; if it is only a receipt verification failure or a communication timeout, it cannot be concluded that the device has not executed, and verification should continue or setpoint restoration should be performed. If the result is unclear, the next command should not be released.
[0213] After a candidate instruction is executed, the execution receipt is used to verify whether the resource has accepted and executed the corresponding settings. The measured voltage change before and after the action is used to judge the control effect. Effect confirmation only proceeds if the resource identifier, instruction number, execution status, and verification fields all match, and the receipt and necessary voltage measurements are obtained within the confirmation time limit. Action confirmation requires that the target voltage deviation be reduced by at least a preset threshold, the predicted and measured change directions meet the consistency criteria, and the monitoring node and resource status meet the specified boundaries. Receipt timeout, verification failure, resource rejection, reverse effect, or excessive expansion all enter the exception handling phase; the setpoint recovery result is verified according to the independent recovery confirmation conditions.
[0214] The preferred confirmation relationship is: direction consistency indicator. Generated based on the consistency of the directions of predicted voltage changes and observed voltage changes:
[0215]
[0216] Among them, the direction consistency mark It is either 0 or 1; Candidate resource action vector The power adjustment increment for this instruction; voltage vector before execution. Observed voltage vector after execution Use the same valid nodes and phase order; According to the voltage sensitivity matrix The predicted voltage increment for this instruction is calculated; This represents the measured voltage increment. It is the inner product of the two. Direction determination threshold. A positive number is used, and the dot product with the voltage increment is scaled to exclude zero or minimal changes. When the dot product of the predicted voltage increment and the measured voltage increment is not less than this threshold, the overall direction is consistent, marked as 1. This dot product criterion does not replace the item-by-item check of the voltage boundaries at each node.
[0217]
[0218]
[0219] Among them, the action confirmation mark 0 or 1; valid receipt indicator The value is 1 if the resource identifier, instruction sequence number, verification field, and successful execution status all match; otherwise, it is 0. Receipt time. This refers to the time from issuing the instruction to receiving the matching response; necessary measurements are needed to obtain the time elapsed. The time from issuing the instruction to obtaining the necessary events for confirmation, and both the measurement and the time taken, shall not exceed the maximum confirmation time limit. If a receipt or necessary measurement is missing, the corresponding condition cannot be made true, and an exception will be triggered after a timeout. The amount of deviation reduction... It is the difference between the sum of absolute deviations relative to the target voltage before and after execution.
[0220] Voltage deviation reduction threshold Take a positive number and use the same scale as the reduction in voltage deviation. Boundary check passed. The value is 1 when the voltage and resource status of each necessary monitoring node meet the specified boundaries; otherwise, it is 0. Direction consistency flag. Following the previous definition, the voltage vector before execution... Latch before issuing, observe voltage vector after execution. Target voltage vector taken from the same confirmation window It remained unchanged during this confirmation period.
[0221] Action confirmation mark When the value is 1, the current instruction occupation ends and the confirmed control action feedback event is registered; when the value is 0 and the confirmation condition has failed or timed out, the pre-execution setpoint recovery process is initiated based on the actual equipment status, and the resource regulation disable flag is set to 1. Whether the setpoint recovery is complete depends on whether the pre-execution setpoint or status of the equipment has been restored; it is not required that the recovery action also improve the voltage deviation in the original adjustment direction. Only after the recovery result is verified is the corresponding confirmed setpoint recovery event registered; if the recovery times out or the status is unclear, the result is retained for verification and an alarm is triggered.
[0222] Control action feedback events include event number, resource identifier, instruction sequence number, disturbance source flag, actual power measurements before and after the event and their timestamps, and voltage vector before execution. Observation of voltage vector after execution Candidate resource action vectors Receipt time Action confirmation mark Resource regulation prohibition sign Setpoint recovery processing flag and phase flag Candidate action quantities are only used for comparison with measured results and cannot replace actual power increments. The original command action and the subsequent setpoint recovery action are numbered and recorded separately before and after the measurement to avoid being mistakenly identified as no response after two opposite actions cancel each other out.
[0223] Step 1: After receiving the control action feedback event, locate the event window based on the actual action time or the command issuance time with corresponding quality markers, and pair the actual measurement timestamp before the action occurs with the actual measurement timestamp after the action response. The command issuance timestamp is not directly used as the measurement timestamp before the event. If the actual power change has not been verified, or if necessary measurements before or after the event are missing, only the anomaly record is retained and not used as a valid identification sample.
[0224] Resource regulation and control prohibition sign The termination is determined jointly by the event cycle switch, verification of execution or recovery results, and resource status review. Upon entering the subsequent event cycle, the resource status vector is read. If the corresponding resource communication is available, not locked, meets the hold time and recovery interval, and step three confirms that its allowed actions meet the resource constraints, the disable flag can be set to 0. If the resource continues to experience acknowledgment timeouts, verification failures, or abnormal effects, it remains disabled and will not automatically regain its control eligibility even if the global execution state is idle.
[0225] For example, if a reactive power compensation device receives a valid response to its gear setting command, but the node voltage fails to reach the preset improvement amount or a reverse response occurs, the issuance of adjustment commands to the device is stopped, and a gear setting restoration process is performed before execution. The original gear setting change event retains its power and voltage measurements before and after the event; after confirming the restored gear setting, an independent feedback event is established for the restoration action. Both events undergo data integrity and time condition checks in step one. Measured responses that meet the conditions can be used in step two to calculate the candidate matrix or adjust the model's confidence score. "Restore command issued" is not considered as having obtained the restoration response data.
[0226] The execution mode can adopt local direct control, master station forwarding, or semi-automatic strategy confirmation. In local direct control, resource settings are written via serial bus, Ethernet, or local control interface. In master station forwarding, the master station forwards instructions with instruction sequence numbers and confirmation time limits; the acknowledgment is still verified and the execution status is updated by the intelligent fusion terminal. In semi-automatic strategy confirmation, after manual confirmation, the same instruction mutual exclusion process is still followed. When master station communication is interrupted but local resource interfaces and necessary measurements are still available, the system enters local autonomous control mode, adopts preset conservative control rules, and no longer waits for master station permission; this mode does not indicate that the distribution area is disconnected from the power grid. When communication is restored, incomplete instructions and disabled resource status are checked first to prevent the master station from re-issuing and executing local instructions repeatedly.
[0227] Identification Information Supplemental Scoring It can serve as an auxiliary item in the candidate instruction ranking, allowing small actions that can supplement insufficient excitation directions to receive appropriate priority, provided that voltage and equipment constraints are met. Information supplementation cannot replace voltage improvement confirmation conditions, nor can it be used to release active disturbances that have not yet passed safety review.
[0228] By using instruction priority scoring, unique instruction issuance permission, and independent resource control disabling flags, other candidate instructions issued by this method are not superimposed within the same execution confirmation window. When there are natural load changes or independent equipment actions, mixed source information is registered simultaneously, and mutually exclusive execution is not equated with the complete elimination of external disturbances.
[0229] The effectiveness of actions is confirmed through a combination of verification of receipt validity, confirmation time limits, improvement in measured voltage deviation, directional consistency, and boundary checks, avoiding the assumption of effective control solely based on equipment receiving instructions. Closed-loop event logs are linked by event number to identify samples, matrix versions, voltage constraint feasible domain versions, candidate instructions, global instruction execution status, receipt results, pre-execution settings, and feedback events; they also record confirmed actions, confirmed recovery, and results pending verification. The maintenance interface displays instruction sorting, model reliability score, reasons for resource disabling, and recovery progress. Implementation evaluation can track receipt timeouts, abnormal effects, recovery confirmations, resource disabling removals, and the number of valid feedback samples, without pre-setting performance improvement values for untested cases.
[0230] The above description is merely a specific embodiment of this application, but the scope of protection of this application is not limited thereto. Any variations or substitutions that can be easily conceived by those skilled in the art within the scope of the technology disclosed in this application should be included within the scope of protection of this application. Therefore, the scope of protection of this application should be determined by the scope of the claims.
Claims
1. A method for autonomous control of power grid-source-load-storage edge based on intelligent fusion terminals, characterized in that: The intelligent fusion terminal performs the following steps: collect node voltage, resource power and resource status, and construct weighted identification samples before and after power disturbance events according to the upper limit of the pairing time interval; The candidate voltage sensitivity matrix is recursively calculated. If both the excitation sufficiency test and the sign consistency test pass, the matrix is updated. Otherwise, the previous matrix is retained, and the model confidence score is updated. Based on the matrix and the score, a voltage-constrained feasible region is constructed. Combined with resource state constraints and a solution path is selected according to the computational resource budget to generate a candidate instruction set. Based on the matrix, score, and action cost sorting, each instruction is reviewed and issued sequentially using mutual exclusion control; the effect is confirmed by combining execution receipts and measured voltage changes; in case of anomalies, the pre-execution set value is restored and the corresponding resources are suspended from participating in regulation; the verified action response is fed back to the sample construction step.
2. The autonomous regulation method for the source-grid-load-storage edge of a transformer substation according to claim 1, characterized in that: Power disturbance events include natural power fluctuation events, control action feedback events, and limiting active power disturbance events; sample weights are determined based on the source of the disturbance, the measurement time interval before and after the event, the integrity of the measurement data, and the deviation relative to the middle value of the sliding window. When the necessary measurements for incremental calculation exist and the pairing is successful, the acceptance flag of the corresponding identified sample is set to 1. When necessary measurements before or after an event are missing, the corresponding increment is not calculated and the missing measurement data flag is retained, but 0 is not used to replace the missing measurement.
3. The autonomous regulation method at the edge of the power grid, source, load, and storage area according to claim 2, characterized in that: The sufficiency of incentives is tested based on the regression vector and information matrix of the weighted identification samples, and incentive pass flags are generated. The symbol constraint element set is determined based on the resource type, phase identifier, and access location identifier. The corresponding elements of the candidate voltage sensitivity matrix are checked for symbol consistency, and a symbol pass flag is generated. When both flags are 1, confirm the candidate voltage sensitivity matrix and the corresponding recursive auxiliary matrix; otherwise, retain the previously confirmed result.
4. The autonomous regulation method at the edge of the power grid, source, load, and storage area according to claim 3, characterized in that: The reliability score of the updated model is determined by the sample weights, the results of the two identification and verification steps, and the normalized voltage prediction residual. The voltage constraint feasible region is then constructed based on the score, the voltage margin benchmark vector, the node voltage upper and lower limits, and the voltage sensitivity matrix. When other risk factors remain unchanged, a decrease in the score increases the voltage safety margin, while a recovery in the score decreases the voltage safety margin according to the established calculation relationship, while retaining the basic safety margin.
5. The autonomous regulation method for the source-grid-load-storage edge of the transformer substation according to claim 4, characterized in that: Candidate voltage sensitivity matrices are generated by employing at least one of the following: recursive least squares identifier, Kalman filter identifier, sliding window minimum absolute deviation regression identifier, and neural network identifier with sign constraints. Each identifier output undergoes excitation sufficiency verification and sign consistency verification. If both checks fail, the previous voltage sensitivity matrix is not replaced.
6. The autonomous regulation method for the source-grid-load-storage edge of a transformer substation according to claim 1, characterized in that: Outside of the global instruction execution state, separate phase execution permission, branch execution permission, and resource control disabling flags are maintained. A candidate instruction is allowed to be issued only when the global instruction execution state is idle, the corresponding phase and branch are allowed to execute, and the corresponding resources are not disabled. Other candidate instructions remain in a waiting state until the execution result or set value restoration result of the previous instruction has been verified. The resource disabling state is maintained independently of the global instruction execution state.
7. The autonomous regulation method for the source-grid-load-storage edge of a transformer substation according to claim 6, characterized in that: First, determine the model's credibility score; if the score drops to the lower limit or the continuous identification verification fails, a preset conservative control rule is adopted. In other cases, if the calculated resource budget meets the constraint optimization solution conditions, constraint optimization solution is performed; otherwise, resource-by-resource upper and lower limit amplitude and voltage constraint verification is performed. Voltage and resource state constraints are retained for each path. If a candidate instruction that passes the verification cannot be obtained, no new control action is added.
8. The autonomous regulation method for the source-grid-load-storage edge of a transformer substation according to claim 7, characterized in that: The operation and maintenance interface displays the candidate instruction sorting, global instruction execution status, resource control disabled status, setpoint restoration reason, control action feedback event number, and model credibility rating. When both the execution receipt and the measured voltage change meet the confirmation conditions, the corresponding instruction will be marked as confirmed. When a receipt times out or the confirmation is invalid, the corresponding resource identifier is displayed, and the status is distinguished as follows: the setting value restoration command has been issued, the setting value restoration has been confirmed, and the setting value restoration result is pending verification.
9. The autonomous regulation method at the edge of the power grid, source, load, and storage area according to claim 8, characterized in that: Each candidate instruction is encapsulated into an instruction frame, which includes a resource identifier, action direction, action range, instruction sequence number, instruction issuance timestamp, confirmation time limit, pre-execution set value, and verification field. The acknowledgment frame returned by the resource includes a resource identifier, instruction sequence number, execution status, acknowledgment timestamp, and verification result. After matching the acknowledgment with the corresponding instruction and performing a validity check, the execution effect is judged in conjunction with the measured voltage change obtained within the confirmation time limit.
10. The autonomous regulation method for the source-grid-load-storage edge of a transformer substation according to claim 9, characterized in that: Generate a closed-loop event log, and associate the identified sample, voltage sensitivity matrix version, voltage constraint feasible region version, candidate instruction set, global instruction execution status, acknowledgment result, pre-execution set value, and control action feedback event by event number; record the action confirmation result and set value recovery result respectively; retain abnormal records for power changes that have not been verified or responses that lack necessary measurements, and do not write them as valid identification samples.
Citation Information
Patent Citations
Power grid area side source grid load storage coordinated regulation and control method and regulation and control system
CN116526574A