A power distribution network active layered regulation method, system, device and medium

By constructing a comprehensive risk situation assessment system based on a hybrid beta distribution model and entropy weight algorithm, and combining hard constraint boundaries and a four-layer progressive control strategy, the problem of the separation between risk assessment and control in high-penetration photovoltaic grid integration is solved. This achieves refined allocation of flexible resources and optimal trade-off between regulation costs, thereby improving system security and renewable energy absorption capacity.

CN123163035APending Publication Date: 2026-11-24GUIZHOU POWER GRID CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202610976017.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-07-02
Publication Date
2026-11-24

AI Technical Summary

Technical Problem

In high-penetration distributed photovoltaic grid integration, existing technologies have a single risk assessment dimension, making it difficult to characterize critical change characteristics. The assessment and control are disconnected and lack closed-loop feedback. The control strategy is rigid and ignores the priority allocation of resources, making it impossible to achieve the optimal trade-off between system security and control costs.

Method used

A stochastic scenario model of photovoltaic power output based on hybrid beta distribution is constructed. An entropy weight algorithm is used for objective weighting. A comprehensive risk situation assessment system is established. Limit exceedance judgment is performed in combination with hard constraint safety boundary. A four-layer progressive control strategy is adaptively matched. A dual-objective optimization model is constructed and solved using a multi-objective optimization algorithm to obtain the optimal scheduling instruction.

Benefits of technology

It has achieved precise quantification of multi-dimensional risk indicators and comprehensive risk situation assessment, as well as the hierarchical and refined allocation of flexible resources, ensuring grid security, reducing control costs, and improving the level of new energy consumption.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123163035A_ABST
    Figure CN123163035A_ABST
Patent Text Reader

Abstract

This invention discloses a method, system, equipment, and medium for proactive hierarchical control of distribution networks, including: acquiring historical data of the distribution network, constructing a photovoltaic output scenario model, and establishing a comprehensive risk assessment system; collecting real-time status variables online and calculating the current comprehensive operational risk value based on the assessment system; matching a four-layer progressive control strategy according to the real-time photovoltaic penetration rate and risk level to determine the order of flexible resource allocation; and constructing a dual-objective optimization model aimed at minimizing comprehensive operational risk and control costs, solving for and issuing the optimal scheduling command. This invention achieves precise allocation and multi-objective optimized scheduling of flexible resources in the distribution network, effectively balancing system operation safety and control economy under high-proportion photovoltaic access.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of power distribution network operation control and optimized scheduling technology, and in particular to a method, system, equipment and medium for active hierarchical control of power distribution networks. Background Technology

[0002] To address the challenges posed by high-penetration distributed photovoltaic (PV) grid integration, existing technologies primarily focus on two dimensions: risk assessment of the main and distribution networks and proactive dispatch control strategies. In terms of risk assessment, current research often employs probabilistic power flow or interval power flow analysis methods, combined with physical-information coupling models, to construct an index system covering dimensions such as voltage deviation, main transformer load rate, and network losses, in order to quantify the impact of power source integration and identify local safety boundaries. Regarding proactive control, it mainly relies on flexible resources such as energy storage, reactive power compensation, and demand response, utilizing technologies such as deep reinforcement learning, multi-objective convex optimization, and soft-opening points to achieve coordinated control and multi-timescale dispatch of power sources, grid, load, and storage. The aim is to improve the operational stability of the distribution network through transmission and distribution coordinated optimization.

[0003] However, existing technologies still suffer from significant shortcomings, including a single risk assessment dimension, a lack of closed-loop management, and rigid strategies. On the one hand, traditional methods often employ linear indicators and subjective weighting, making it difficult to characterize the "exponential mutation" of risk when a system approaches its physical limits. Furthermore, assessment and control are disconnected, lacking a dynamic feedback mechanism. On the other hand, scheduling strategies often adopt a uniform "one-size-fits-all" optimization logic, ignoring the differences in resource priority allocation under different risk modes, and failing to achieve optimal trade-offs among system safety, renewable energy consumption, and regulation costs. Therefore, a new proactive regulation method is urgently needed that considers the objective quantification of multi-dimensional dynamic risks, progressive hierarchical management, and the synergistic optimization of safety and economic objectives. Summary of the Invention

[0004] In view of the aforementioned existing problems, the present invention is proposed.

[0005] Therefore, this invention provides a method, system, equipment, and medium for proactive hierarchical control of distribution networks to address the problems of single-dimensional risk assessment that makes it difficult to characterize critical change characteristics, the disconnect between assessment and control and the lack of closed-loop feedback, the rigid control strategy that ignores resource priority allocation, and the inability to achieve an optimal trade-off between system security and control costs under high-proportion photovoltaic access.

[0006] To solve the above-mentioned technical problems, the present invention provides the following technical solution: In a first aspect, the present invention provides a method for active hierarchical control of a distribution network, comprising: Historical operation data of the distribution network are obtained, a stochastic scenario model of photovoltaic output based on hybrid beta distribution is constructed, and an entropy weight algorithm is used to objectively assign weights to multidimensional risk indicators to establish a comprehensive risk situation assessment system. Real-time status data of the distribution network are collected online, and limit exceedance judgment is performed based on hard constraint safety boundaries. The comprehensive operational risk value of the current section is then assessed in conjunction with the comprehensive risk situation assessment system. The current real-time photovoltaic penetration rate and risk level are obtained. The basic control level is determined based on the real-time photovoltaic penetration rate. Within the basic control level, a preset four-layer progressive control strategy is adaptively matched according to the risk level to determine the order of call for flexible resources. A dual-objective optimization model is constructed with the goals of minimizing comprehensive operational risk and minimizing control cost. Under the constraint of the call order of the flexible resources, a multi-objective optimization algorithm is used to solve the dual-objective optimization model, obtain the optimal scheduling instruction, and issue it to the distribution network for execution.

[0007] As a preferred embodiment of the active hierarchical control method for distribution networks described in this invention, wherein: The construction of a photovoltaic power output stochastic scenario model based on a hybrid beta distribution includes: Collect historical power data of photovoltaic output and perform normalization processing; The expectation-maximization algorithm is used to estimate the parameters of the normalized historical power data to determine the weighting coefficients, shape parameters, and scale parameters of the mixed beta distribution model. A non-sequential Monte Carlo sampling algorithm is used to extract a large number of irradiance samples from the mixed beta distribution, generate photovoltaic power output under various scenarios, and perform power flow calculations to obtain system operation data.

[0008] As a preferred embodiment of the active hierarchical control method for distribution networks described in this invention, wherein: The method employs an entropy weight algorithm to objectively assign weights to multidimensional risk indicators and establish a comprehensive risk situation assessment system, including: Construct an initial risk index matrix that includes voltage over-limit risk, line power flow over-limit risk, and node voltage deviation risk; The initial risk indicator matrix is ​​standardized, and the information entropy value of each risk indicator is calculated. The difference coefficients of each risk indicator are calculated based on the information entropy value, and the normalized difference coefficients are used as the weights of each risk indicator in the comprehensive risk situation assessment system.

[0009] As a preferred embodiment of the active hierarchical control method for distribution networks described in this invention, wherein: The calculation of the comprehensive operational risk value of the current section using the normalized exponential risk function in the comprehensive risk situation assessment system includes: Obtain the real-time voltage amplitude of each node in the current section and the real-time power flow of the branch; The real-time voltage amplitude and real-time power flow are compared with the preset hard constraint safety boundary. If the boundary is exceeded, an over-limit judgment signal is triggered. If no limit-crossing judgment signal is triggered, the real-time voltage amplitude and real-time power flow are input into a preset normalized exponential risk function. The function outputs a zero value when the variable is less than the safety threshold and grows exponentially when the variable is greater than the safety threshold. By combining the weights in the comprehensive risk situation assessment system, the voltage risk value of each node and the power flow risk value of the branch are weighted and summed to obtain the comprehensive operational risk value of the current section.

[0010] The beneficial effect of this preferred technical solution is that by nonlinearly amplifying the degree of exceeding the limit through the normalized exponential risk function and combining it with objective weights for weighted summation, it can accurately quantify and keenly capture the sudden change characteristics of the risk of the distribution network when it approaches the safety bottom line, thereby providing a high-precision decision basis for subsequent active control.

[0011] As a preferred embodiment of the active hierarchical control method for distribution networks described in this invention, wherein: The process of determining the basic control level based on the real-time photovoltaic penetration rate, and adaptively matching a preset four-layer progressive control strategy within the basic control level according to the risk level to determine the order of access to flexible resources, includes: When the hard constraint over-limit judgment signal is triggered, the fourth-level emergency response strategy is directly matched, and the order of calling is curtailment control, demand response resources, energy storage system and static var generator; When no hard constraint over-limit judgment signal is triggered, the basic control level is determined based on the real-time photovoltaic transmittance. When the real-time photovoltaic penetration rate is in an energy balance state, if the risk level is low risk, the first-level monitoring strategy is matched to maintain normalized risk tracking of the distribution network and not trigger action commands; if the risk level is not low risk, the second-level flexible suppression strategy is matched, and the order of invocation is energy storage system and static var generator. When the real-time photovoltaic penetration rate is in an energy surplus state, if the risk level is low risk, the second-layer flexible suppression strategy is matched, and the order of invocation is energy storage system and static var generator. If the risk level is not low risk, then the third-layer collaborative absorption strategy is matched, and the order of invocation is demand response resources, energy storage system and static var generator.

[0012] The beneficial effects of this preferred technical solution are that, through the adaptive matching of a four-layer progressive control strategy based on the dual criteria of photovoltaic penetration rate and risk level, it realizes the differentiated and refined allocation of flexible resources, effectively avoids rigid regulation with a "one-size-fits-all" approach, and minimizes regulation costs and improves the level of new energy consumption while ensuring grid security.

[0013] As a preferred embodiment of the active hierarchical control method for distribution networks described in this invention, wherein: The construction of the dual-objective optimization model, which aims to minimize both comprehensive operational risk and control cost, includes: Establish a regulation cost sub-model with the objective of minimizing the sum of system network loss cost, energy storage operation and maintenance cost, and curtailment penalty cost; Establish a comprehensive operational risk sub-model with the goal of minimizing voltage deviation at key nodes and branch load rate; The regulation cost sub-model and the comprehensive operational risk sub-model are used as two independent but conflicting objective functions to jointly constitute the bi-objective optimization model.

[0014] As a preferred embodiment of the active hierarchical control method for distribution networks described in this invention, wherein: The step of solving the bi-objective optimization model using a multi-objective optimization algorithm to obtain the optimal scheduling instruction includes: A non-dominated sorting genetic algorithm with an elitist strategy is used to iteratively solve the bi-objective optimization model and generate a Pareto optimal solution set. The objective function values ​​of each solution are normalized, the Euclidean distances from each solution in the frontier solution set to the ideal point are calculated, and the solution with the smallest Euclidean distance is selected as the optimal compromise scheduling instruction and issued to the distribution network for execution.

[0015] Secondly, the present invention provides an active hierarchical control system for a distribution network, comprising: The comprehensive risk situation assessment modeling module is used to acquire historical operation data of the distribution network, construct a photovoltaic output stochastic scenario model based on hybrid beta distribution, and use the entropy weight algorithm to objectively assign weights to multi-dimensional risk indicators to establish a comprehensive risk situation assessment system. The limit-crossing judgment module is used to collect real-time status data of the distribution network online, perform limit-crossing judgment based on hard constraint safety boundaries, and evaluate the comprehensive operational risk value of the current section in conjunction with the comprehensive risk situation assessment system. An adaptive hierarchical strategy matching module is used to obtain the current real-time photovoltaic penetration rate and risk level, determine the basic control level based on the real-time photovoltaic penetration rate, and adaptively match a preset four-layer progressive control strategy within the basic control level according to the risk level to determine the order of calling flexible resources. The dual-objective collaborative optimization scheduling module constructs a dual-objective optimization model with the goals of minimizing comprehensive operational risk and minimizing control cost. Under the constraint of the calling order of the flexible resources, a multi-objective optimization algorithm is used to solve the dual-objective optimization model to obtain the optimal scheduling instruction and issue it to the distribution network for execution.

[0016] Thirdly, the present invention provides an electronic device, comprising: Memory, used to store programs; A processor is configured to execute the computer-executable instructions, which, when executed by the processor, implement the steps of the active hierarchical control method for the power distribution network.

[0017] Fourthly, the present invention provides a computer-readable storage medium, comprising: when the program is executed by a processor, the steps of implementing the active hierarchical control method for the power distribution network.

[0018] The beneficial effects of this invention are as follows: By constructing a photovoltaic output stochastic scenario model based on a hybrid beta distribution and employing an entropy weight algorithm for objective weighting, this invention achieves accurate quantification of multi-dimensional risk indicators and scientific assessment of the comprehensive risk situation. By utilizing a normalized exponential risk function combined with hard-constraint safety boundaries for limit-crossing judgment, this invention enables the keen capture and high-precision quantification of the abrupt changes in distribution network operation risks when approaching the safety baseline. By employing a four-layer progressive control strategy based on real-time photovoltaic penetration rate and risk level adaptive matching, this invention achieves layered and graded refined allocation of flexible resources, effectively avoiding rigid "one-size-fits-all" regulation, minimizing regulation costs and improving the level of new energy consumption while ensuring grid safety. Attached Figure Description

[0019] To more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings used in the following description of the embodiments will be briefly introduced. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort. Wherein: Figure 1 This is a basic flowchart illustrating an active hierarchical control method for a power distribution network according to an embodiment of the present invention. Figure 2 A flowchart of a four-layer progressive control strategy based on risk assessment for an active hierarchical control method for distribution networks, provided as an embodiment of the present invention; Figure 3 A flowchart illustrating the optimization process of a four-layer progressive control strategy based on an improved genetic algorithm for an active hierarchical control method of a distribution network, as provided in one embodiment of the present invention. Detailed Implementation

[0020] To make the above-mentioned objects, features, and advantages of the present invention more apparent and understandable, specific embodiments of the present invention will be described in detail below with reference to the accompanying drawings. Obviously, the described embodiments are only a part of the embodiments of the present invention, and not all of them. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort should fall within the protection scope of the present invention.

[0021] Example 1, referring to Figure 1 As an embodiment of the present invention, a method for active hierarchical control of a distribution network is provided, comprising: S100: Obtain historical operation data of the distribution network, construct a photovoltaic output stochastic scenario model based on hybrid beta distribution, and use the entropy weight algorithm to objectively assign weights to multi-dimensional risk indicators to establish a comprehensive risk situation assessment system; S200: Collects real-time status data of the distribution network online, performs limit exceedance analysis based on hard constraint safety boundaries, and assesses the comprehensive operational risk value of the current section in conjunction with the comprehensive risk situation assessment system. S300: Obtain the current real-time photovoltaic penetration rate and risk level, determine the basic control level based on the real-time photovoltaic penetration rate, and adaptively match a preset four-layer progressive control strategy within the basic control level according to the risk level to determine the order of calling flexible resources; S400: Construct a dual-objective optimization model with the goals of minimizing comprehensive operational risk and minimizing control cost. Under the constraint of the call order of the flexible resources, use a multi-objective optimization algorithm to solve the dual-objective optimization model, obtain the optimal scheduling instruction, and issue it to the distribution network for execution.

[0022] It should be noted that during the operation of distribution networks with a high proportion of photovoltaic (PV) integration, the strong randomness and volatility of PV output cause drastic changes in the system's operating state, leading to frequent approaches to safety boundaries for key parameters such as node voltage and branch power flow. The critical abrupt changes in operating state make it difficult for traditional linear risk assessment methods to accurately characterize the nonlinear risk evolution, resulting in often delayed risk warnings. Furthermore, existing risk assessment and dispatch control are disconnected, lacking a dynamic closed-loop feedback mechanism, leading to slow responses from control strategies to real-time risks. In addition, due to significant physical differences under different PV penetration rates and risk levels, a uniform "one-size-fits-all" control logic cannot achieve the sequential allocation of flexible resources, resulting in resource waste or control failure. Therefore, proactive hierarchical prevention and control of distribution network operating risks and collaborative optimization scheduling are also crucial.

[0023] Therefore, addressing the aforementioned issues of high-proportion photovoltaic (PV) grid integration, such as the single-dimensional risk assessment of the distribution network, difficulty in characterizing critical abrupt changes, the disconnect between assessment and control lacking closed-loop feedback, rigid control strategies neglecting resource priority allocation, and the inability to achieve an optimal trade-off between system security and control costs, this paper addresses these problems through steps S100-S400. By constructing a risk quantification model based on hybrid beta distribution and entropy weighting, combined with a hard-constraint boundary verification mechanism, it achieves accurate assessment of distribution network operation risks and keen capture of abrupt change characteristics. Furthermore, by utilizing a four-layer progressive control strategy that adaptively matches real-time PV penetration rate with risk level, it enables tiered and refined allocation of flexible resources, effectively improving the level of new energy consumption and reducing control costs while ensuring system security.

[0024] Example 2, refer to Figures 2-3 As an embodiment of the present invention, based on the previous embodiment, a method for active hierarchical control of a distribution network is provided, comprising: like Figure 2 As shown, the system calculates risk indicators in real time and performs hard constraint verification through the normal monitoring module. Once an anomaly or limit violation is detected, the strategy layering logic is triggered, and the corresponding control level is adaptively matched according to the severity of the risk: for minor risks, active and reactive power regulation is used first to suppress the risk; for medium risks, source-load-storage coordination and demand response are initiated to absorb the surplus; and in extreme emergency situations, energy storage discharge or curtailment of solar power is directly called for emergency response, thereby achieving precise defense based on grade and category.

[0025] like Figure 3 As shown, the process initializes the population and inputs parameters, then enters a genetic evolution cycle: In each generation iteration, the feasibility of individuals is first evaluated through power flow simulation and constraint verification, and the fitness of the two objective functions of safety quality and adjustment cost is calculated; non-dominated sorting and crowding calculation are used to perform selection, crossover, and mutation operations on the population, and elite individuals are retained to maintain population diversity; when the maximum number of iterations is reached, the best compromise solution is selected from the Pareto optimal solution set as the optimal scheduling instruction output through the knee decision screening method.

[0026] In this embodiment of the application, step S100, which involves constructing a stochastic photovoltaic power output model based on a hybrid beta distribution, includes: Collect historical power data of photovoltaic output and perform normalization processing; The expectation-maximization algorithm is used to estimate the parameters of the normalized historical power data to determine the weighting coefficients, shape parameters, and scale parameters of the mixed beta distribution model. The hybrid beta distribution model is a weighted combination of Beta distributions under three typical meteorological conditions: sunny, cloudy, and overcast. The probability density function of a single Beta distribution is: in, For gamma function, and For shape parameters, Photovoltaic power output coefficient; The probability density function of the mixed beta distribution is: In the formula, , and Let represent the probabilities of sunny, cloudy, and overcast days, respectively, and satisfy the following conditions: ; , , These are the shape parameters under the corresponding meteorological conditions, obtained by fitting historical irradiance data; The specific process of the maximum expectation algorithm is as follows: initial values ​​are assigned to each parameter of the mixed beta distribution model; the iterative calculation process is entered, and in the expectation step (E step), the posterior probability of each historical power data sample belonging to the three components of sunny, cloudy, and overcast is calculated based on the current parameters; in the maximization step (M step), the weight coefficients, shape parameters, and scale parameters of the model are updated using the calculated posterior probability through the principle of maximum likelihood estimation; the expectation step and the maximization step are continuously executed alternately until the model parameters converge to stable values, thereby determining the final model parameters.

[0027] A non-sequential Monte Carlo sampling algorithm is employed to extract a large number of irradiance intensity samples from a mixed beta distribution, generating photovoltaic power output under various scenarios. Power flow calculations are then performed to obtain system operation data for subsequent risk assessment system construction. Here, "non-sequential" means that the continuity of the time series is not considered, focusing only on the probability distribution of states. A large number of independent operating scenarios are generated through random sampling to simulate the random fluctuation characteristics of photovoltaic power output.

[0028] In this embodiment of the application, the process of generating photovoltaic output for each scenario further includes: calculating the corresponding photovoltaic output coefficient from the extracted irradiance intensity samples based on the mapping relationship between photovoltaic output and irradiance. Then the photovoltaic output coefficient Multiply by the rated capacity of the photovoltaic system at each node to obtain the actual photovoltaic output value under each scenario, and then perform subsequent power flow calculations and risk assessments.

[0029] In an optional implementation, the photovoltaic power output stochastic scenario modeling method in step S100 can also directly collect massive historical photovoltaic power output data, use the K-means clustering algorithm to divide it into several typical scenarios and calculate the probability of occurrence of each scenario, and then directly perform subsequent power flow calculation and risk assessment based on these typical scenarios and their probabilities.

[0030] In an optional implementation, the photovoltaic output stochastic scenario modeling method in step S100 can also use the Copula function to construct a joint probability distribution model of the output of multiple photovoltaic power plants to characterize spatial correlation, and then extract samples based on the joint distribution model to generate photovoltaic output under each scenario and perform power flow calculation.

[0031] In this embodiment of the application, step S100 uses an entropy weight algorithm to objectively assign weights to multi-dimensional risk indicators and establish a comprehensive risk situation assessment system, including: Construct an initial risk index matrix that includes voltage over-limit risk, line power flow over-limit risk, and node voltage deviation risk; The initial risk indicator matrix is ​​standardized, and the information entropy value of each risk indicator is calculated. The difference coefficients of each risk indicator are calculated based on the information entropy value. The normalized calculation formula for the difference coefficients is as follows: In the formula, For the first Objective weights of risk indicators For the first Difference coefficients of risk indicators The total number of risk indicators; this formula is used to convert the difference coefficient of each risk indicator into a weight, so that risk indicators that fluctuate drastically in historical or sampling scenarios and are prone to exceeding limits will automatically receive a higher weight, guiding subsequent optimization strategies to focus on the weakest link of the system. The final calculation As the weight of each risk indicator in the comprehensive risk situation assessment system.

[0032] In an optional implementation, the risk indicator weight determination method in step S100 can also construct a risk indicator hierarchical structure model, construct a judgment matrix by comparing and scoring the importance of each indicator pairwise through expert experience, and then calculate the feature vector to obtain the subjective weight of each risk indicator.

[0033] In an optional implementation, the method for determining the weight of risk indicators in step S100 can also take into account the CRITIC method, which considers the volatility (comparison strength) of each risk indicator and the correlation (conflict) between indicators, and then calculate the objective weight of each risk indicator.

[0034] In this embodiment of the application, a comprehensive operational risk value is calculated based on the aforementioned specific risk indicators and objective weights. The calculation formula is: In the formula, For the first Risk values ​​for risk indicators (such as the aforementioned branch power flow risk, main transformer overload risk, reverse power flow risk, or node voltage risk). For the corresponding objective weights, The formula represents the total number of risk indicators. By using a weighted summation method, it integrates multi-dimensional local risks into a single comprehensive risk value that characterizes the overall safety status of the current cross-section.

[0035] In this embodiment of the application, each specific risk indicator in the comprehensive risk situation assessment system is quantitatively calculated based on the aforementioned normalized index risk function, specifically including: The normalized exponential risk function The calculation formula is: In this embodiment, the normalized exponential risk function has nonlinear amplification characteristics; when the normalized deviation exceeds the limit... At that time, risk value When the normalization exceeds the limit, the deviation is... At that time, risk value This exponential characteristic causes the risk of the system to increase dramatically when it approaches the physical limit, thus accurately characterizing the critical change features of the operating state.

[0036] In this embodiment of the application, for a one-way limit-crossing indicator where risk only arises when the state variable exceeds a certain upper limit, its normalized limit-crossing deviation is... The general calculation formula is: in, As the warning threshold, To ensure a safety baseline, and to meet the following requirements The branch power flow risk, main transformer overload risk, and reverse power flow risk are all quantitatively calculated based on this unidirectional over-limit deviation formula.

[0037] Branch road current risk The calculation formula is: in, This represents the number of branches in the distribution network. branch road Load rate; Main transformer overload risk The calculation formula is: in, The load rate of the main transformer; Reverse current risk The calculation formula is: in, It is the ratio of the backfeed power at the gate to the rated capacity of the main transformer.

[0038] Node voltage risk The calculation formula is: in, This represents the number of nodes in the distribution network. For nodes The voltage value; due to the dual risks of overvoltage and undervoltage at the node voltage, its deviation... Take overpressure deviation Deviation from undervoltage The maximum value, that is: Among them, overpressure deviation The calculation formula is: In the formula, The node voltage overvoltage warning threshold. This serves as the safety baseline for node voltage overvoltage. Undervoltage deviation The calculation formula is: In the formula, This is the node voltage undervoltage warning threshold. This serves as the safety baseline for node voltage undervoltage.

[0039] In this embodiment of the application, step S200, which involves online acquisition of real-time status quantities of the distribution network, specifically includes: high-frequency synchronous acquisition of real-time status quantities through measuring devices deployed at each node and boundary of the distribution network. The measuring devices include smart meters, feeder terminal units (FTUs), distribution terminal units (DTUs), or phasor measurement units (PMUs). The acquired real-time status quantities specifically cover the per-unit voltage amplitude of each node, the apparent power and current of each branch, the active power at the boundary, the reactive power at the boundary, the real-time output of distributed photovoltaic power, and the load power of each node.

[0040] In this embodiment of the application, step S200 uses the normalized exponential risk function in the comprehensive risk situation assessment system to calculate the comprehensive operational risk value of the current section, including: Obtain the real-time voltage amplitude of each node in the current section and the real-time power flow of the branch; The real-time voltage amplitude and real-time power flow are compared with the preset hard constraint safety boundary. If the boundary is exceeded, an over-limit judgment signal is triggered and the state is directly determined to be an emergency risk state. If no limit-crossing judgment signal is triggered, the real-time voltage amplitude and real-time power flow are input into a preset normalized exponential risk function. The function outputs a zero value when the variable is less than the safety threshold and grows exponentially when the variable is greater than the safety threshold. By combining the weights in the comprehensive risk situation assessment system, the voltage risk value of each node and the power flow risk value of the branch are weighted and summed to obtain the comprehensive operational risk value of the current section.

[0041] In this embodiment of the application, step S200 is based on the hard constraint safety boundary to determine the limit violation, which specifically includes: setting three hard constraint violation criteria: node voltage limit violation, branch power flow limit violation, and power flow numerical instability; as long as any one of the criteria is met, the system is determined to have triggered a risk limit violation signal and the control program is activated; if it is not triggered, normal risk tracking is maintained.

[0042] In this embodiment of the application, the specific criteria for determining the violation of the three hard constraints are as follows: 1. Node voltage over-limit criterion: any node voltage per unit value exceeding the safety limit. 2. Branch circuit load limit violation criterion: any branch circuit load rate exceeding the safety threshold. 3. Power flow numerical instability criterion, i.e., the AC power flow calculation program does not converge; If any of the above criteria are met, the system will immediately generate a risk exceeding the limit trigger signal and activate the control program; if the real-time section does not trigger any of the above criteria, the system is determined to be within the safety margin, maintains normalized risk tracking, and does not trigger optimized control.

[0043] In this embodiment of the application, the risk level described in step S300 is based on the comprehensive operational risk value calculated in step S200. The classification is based on the following criteria: when the system meets any one of the hard constraint violations criteria—node voltage exceeding limit, branch power flow exceeding limit, or power flow numerical instability—it is considered an emergency risk. For cases where no hard constraint exceedance is triggered, the classification can be based on... The numerical range is divided into low risk and non-low risk (such as medium and high risk), and the specific numerical threshold can be set according to the actual operation requirements of the distribution network.

[0044] The real-time photovoltaic transmittance Defined as the ratio of the total output of distributed photovoltaic power at the current cross-section to the total load demand. When When the system is in a state of energy balance, it is determined that the system is in a state of energy equilibrium; when At that time, the system is determined to be in an energy surplus state.

[0045] In this embodiment of the application, step S300, which involves determining the basic control level based on the real-time photovoltaic transmittance and adaptively matching a preset four-layer progressive control strategy within the basic control level according to the risk level to determine the order of access to flexible resources, includes: When a hard constraint over-limit judgment signal is triggered (i.e., it is determined to be an emergency risk), the fourth-level emergency response strategy is directly matched, and the order of calling flexible resources is as follows: curtailment control, demand response resources, energy storage system and static var generator. When no hard constraint over-limit judgment signal is triggered, based on the real-time photovoltaic transmittance... Determine the basic control levels; When the real-time photovoltaic transmittance is in an energy balance state ( If the risk level is low, the first-level monitoring strategy is matched to maintain routine risk tracking of the distribution network and no action command is triggered. If the risk level is not low risk, then the second-layer flexible suppression strategy is matched, and the order of calling flexible resources is: energy storage system and static var generator. When the real-time photovoltaic penetration rate is in an energy surplus state ( When the risk level is low, the second-layer flexible suppression strategy is matched, and the order of calling flexible resources is: energy storage system and static var generator. If the risk level is not low risk, then the third-layer collaborative absorption strategy is matched, and the order of calling flexible resources is as follows: demand response resources, energy storage system and static var generator.

[0046] In a specific 10kV distribution network embodiment, the comprehensive operational risk value can be... A value in the range [0, 0.3) is considered low risk, while a value in the range [0.3, 1.0] is considered non-low risk; the warning threshold for node voltage. It can be set to 1.05 times the rated voltage, the safety baseline. It can be set to 1.10 times the rated voltage. The above values ​​are only examples. In actual applications, they should be adjusted according to the specific power distribution network dispatching procedures and equipment parameters.

[0047] In this embodiment of the application, step S400 involves constructing a dual-objective optimization model aimed at minimizing both overall operational risk and control cost, including: Define a set of decision variables including energy storage action, reactive power compensation, grid interaction, demand response, and active curtailment of solar power, and express its mathematical expression as follows: In the formula, For the energy storage system's operational quantity, This refers to the reactive power compensation amount of the Static Var Generator (SVG). Mainnet interaction volume For demand response volume, The amount of light to be actively forfeited; the calling status and feasible domain range of each element in the decision variable set are strictly controlled by the real-time photovoltaic transmittance and the corresponding hierarchical calling order determined in step S300; Establish a regulation cost sub-model with the objective of minimizing the sum of system network loss cost, energy storage operation and maintenance cost, and curtailment penalty cost; A comprehensive operational risk sub-model is established with the goal of minimizing voltage deviation at key nodes and branch load rate; the specific calculation formula for the comprehensive operational risk sub-model is as follows: In the formula, The aforementioned comprehensive operational risk value, This is the threshold power factor risk value. and Let be the weight coefficient, and satisfy... The weighting coefficients are determined by the risk preferences of the regulatory entity. The smaller the value, the higher the safety level of the power distribution network; The specific calculation formula for the regulation cost sub-model is as follows: In the formula, , , , , These correspond to the costs of energy storage operations, demand response compensation, grid interaction, reactive power compensation, and active curtailment penalties, respectively; the specific coefficients for each cost can be set according to the actual system. The smaller the value, the better the economic efficiency of the regulation process; The regulation cost sub-model and the comprehensive operational risk sub-model are used as two independent but conflicting objective functions to jointly constitute the bi-objective optimization model.

[0048] In this embodiment of the application, the bi-objective optimization model also needs to meet basic constraints during the solution process, specifically including: meeting the power flow constraints of the distribution network and meeting the physical constraints of each flexibility resource, that is, ensuring that the output of each device is within the specified range.

[0049] In this embodiment of the application, step S400 employs a multi-objective optimization algorithm to solve the bi-objective optimization model to obtain the optimal scheduling instruction, including: A non-dominated sorting genetic algorithm with an elitist strategy is used to iteratively solve the bi-objective optimization model and generate a Pareto optimal solution set. The objective function values ​​of each solution are normalized, the Euclidean distances from each solution in the frontier solution set to the ideal point are calculated, and the solution with the smallest Euclidean distance is selected as the optimal compromise scheduling instruction and issued to the distribution network for execution.

[0050] In an alternative implementation, the multi-objective optimization algorithm in step S400 can also generate a Pareto optimal solution set by guiding the particle to update its velocity and position based on its own historical best position and the leader in the global best archive.

[0051] In an optional implementation, the multi-objective optimization algorithm in step S400 can also decompose the multi-objective optimization problem into a set of single-objective sub-problems and use the cooperative information between adjacent sub-problems for joint optimization, thereby iteratively solving to generate a Pareto optimal solution set.

[0052] In an optional implementation, the compromise decision method for the Pareto optimal solution set in step S400 can also construct a membership function for each objective function to map the objective value to the [0,1] interval, and then calculate the sum of the normalized membership degrees of each solution in the frontier solution set, and select the solution with the largest sum as the optimal compromise scheduling instruction.

[0053] In an optional implementation, the compromise decision method for the Pareto optimal solution set in step S400 can also calculate the distances from each solution in the Pareto front solution set to the positive ideal solution and the negative ideal solution, and then sort the solutions according to their relative proximity to the positive ideal solution, and select the solution with the largest relative proximity as the optimal compromise scheduling instruction.

[0054] In this embodiment, the system module is further encapsulated and online closed-loop control is performed: The methods described in S100 to S400 above are encapsulated into an integrated software system module, which interfaces with the power distribution network automation system through a standardized interface; The system modules are automatically triggered according to a preset cycle, loading the latest data on the operation sections of the distribution network, and sequentially executing the risk assessment, strategy matching, and optimization solution process. Generate optimal control instructions and control performance evaluation reports that include the action quantities of source, grid, load and storage resources, and push the instructions and reports to the decision support platform to assist in scheduling decisions and issue them for execution, thus completing online closed-loop prevention and control from data perception to instruction execution.

[0055] Example 3 is an embodiment of the present invention. This embodiment differs from the first embodiment in that it provides an active hierarchical control system for a distribution network.

[0056] It should be noted that the technical solution of the active hierarchical control system for distribution networks is based on the same concept as the technical solution of the active hierarchical control method for distribution networks described above. For details not described in detail in the technical solution of the active hierarchical control system for distribution networks in this embodiment, please refer to the description of the technical solution of the active hierarchical control method for distribution networks described above.

[0057] This embodiment of a distribution network active hierarchical control system includes: The comprehensive risk situation assessment modeling module is used to acquire historical operation data of the distribution network, construct a photovoltaic output stochastic scenario model based on hybrid beta distribution, and use the entropy weight algorithm to objectively assign weights to multi-dimensional risk indicators to establish a comprehensive risk situation assessment system. The limit-crossing judgment module is used to collect real-time status data of the distribution network online, perform limit-crossing judgment based on hard constraint safety boundaries, and evaluate the comprehensive operational risk value of the current section in conjunction with the comprehensive risk situation assessment system. An adaptive hierarchical strategy matching module is used to obtain the current real-time photovoltaic penetration rate and risk level, determine the basic control level based on the real-time photovoltaic penetration rate, and adaptively match a preset four-layer progressive control strategy within the basic control level according to the risk level to determine the order of calling flexible resources. The dual-objective collaborative optimization scheduling module constructs a dual-objective optimization model with the goals of minimizing comprehensive operational risk and minimizing control cost. Under the constraint of the calling order of the flexible resources, a multi-objective optimization algorithm is used to solve the dual-objective optimization model to obtain the optimal scheduling instruction and issue it to the distribution network for execution.

[0058] This embodiment also provides an electronic device applicable to a distribution network active hierarchical control method, including: The system includes a memory and a processor. The memory stores computer-executable instructions, and the processor executes these instructions to implement a method for active hierarchical control of a power distribution network as described in the above embodiments.

[0059] This embodiment also provides a storage medium storing a computer program that, when executed by a processor, implements a method for active hierarchical control of a power distribution network as proposed in the above embodiments.

[0060] The storage medium proposed in this embodiment and the method for implementing active hierarchical control of a distribution network proposed in the above embodiments belong to the same inventive concept. Technical details not described in detail in this embodiment can be found in the above embodiments, and this embodiment has the same beneficial effects as the above embodiments.

[0061] Based on the above description of the implementation methods, those skilled in the art can clearly understand that the present invention can be implemented using software and necessary general-purpose hardware, and of course, it can also be implemented using hardware, but in many cases the former is a better implementation method. Based on this understanding, the technical solution of the present invention, or the part that contributes to the prior art, can be embodied in the form of a software product. This computer software product can be stored in a computer-readable storage medium, such as a computer floppy disk, read-only memory (ROM), random access memory (RAM), flash memory, hard disk, or optical disk, etc., including several instructions to cause a computer device (which may be a personal computer, server, or network device, etc.) to execute the methods of the various embodiments of the present invention.

[0062] It should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention and not to limit it. Although the present invention has been described in detail with reference to preferred embodiments, those skilled in the art should understand that modifications or equivalent substitutions can be made to the technical solutions of the present invention without departing from the spirit and scope of the technical solutions of the present invention, and all such modifications or substitutions should be covered within the scope of the claims of the present invention.

Claims

1. A power distribution network active hierarchical regulation method, characterized in that, include: Historical operation data of the distribution network are obtained, a stochastic scenario model of photovoltaic output based on hybrid beta distribution is constructed, and an entropy weight algorithm is used to objectively assign weights to multidimensional risk indicators to establish a comprehensive risk situation assessment system. Real-time status data of the distribution network are collected online, and limit exceedance judgment is performed based on hard constraint safety boundaries. The comprehensive operational risk value of the current section is then assessed in conjunction with the comprehensive risk situation assessment system. The current real-time photovoltaic penetration rate and risk level are obtained. The basic control level is determined based on the real-time photovoltaic penetration rate. Within the basic control level, a preset four-layer progressive control strategy is adaptively matched according to the risk level to determine the order of call for flexible resources. A dual-objective optimization model is constructed with the goals of minimizing comprehensive operational risk and minimizing control cost. Under the constraint of the call order of the flexible resources, a multi-objective optimization algorithm is used to solve the dual-objective optimization model, obtain the optimal scheduling instruction, and issue it to the distribution network for execution.

2. The power distribution network active layered regulation method of claim 1, wherein: The construction of a photovoltaic power output stochastic scenario model based on a hybrid beta distribution includes: Collect historical power data of photovoltaic output and perform normalization processing; The expectation-maximization algorithm is used to estimate the parameters of the normalized historical power data to determine the weighting coefficients, shape parameters, and scale parameters of the mixed beta distribution model. A non-sequential Monte Carlo sampling algorithm is used to extract a large number of irradiance samples from the mixed beta distribution, generate photovoltaic power output under various scenarios, and perform power flow calculations to obtain system operation data.

3. The power distribution network active layered regulation method of claim 1 or 2, wherein: The method employs an entropy weight algorithm to objectively assign weights to multidimensional risk indicators and establishes a comprehensive risk situation assessment system, including: Construct an initial risk index matrix that includes voltage over-limit risk, line power flow over-limit risk, and node voltage deviation risk; The initial risk indicator matrix is ​​standardized, and the information entropy value of each risk indicator is calculated. The difference coefficients of each risk indicator are calculated based on the information entropy value, and the normalized difference coefficients are used as the weights of each risk indicator in the comprehensive risk situation assessment system.

4. The power distribution network active layered regulation method of claim 3, wherein: The assessment of exceeding limits based on hard constraint safety boundaries, combined with the comprehensive risk situation assessment system, includes evaluating the overall operational risk value of the current section, including: Obtain the real-time voltage amplitude of each node in the current section and the real-time power flow of the branch; The real-time voltage amplitude and real-time power flow are compared with the preset hard constraint safety boundary. If the boundary is exceeded, an over-limit judgment signal is triggered, and the state is directly judged as an emergency risk state. In response to the absence of an over-limit assessment signal, the real-time voltage amplitude and real-time power flow are input into a preset normalized exponential risk function. The function outputs a zero value when the variable is less than the safety threshold and grows exponentially when the variable is greater than the safety threshold. By combining the weights in the comprehensive risk situation assessment system, the voltage risk value of each node and the power flow risk value of the branch are weighted and summed to obtain the comprehensive operational risk value of the current section.

5. The power distribution network active layered regulation method of claim 4, wherein: The process of determining the basic control level based on the real-time photovoltaic penetration rate, and adaptively matching a preset four-layer progressive control strategy within the basic control level according to the risk level to determine the order of access to flexible resources, includes: In response to the trigger signal of hard constraint over-limit judgment, the fourth-level emergency response strategy is directly matched, and the order of invocation is curtailment control, demand response resources, energy storage system and static var generator; In response to the absence of a hard constraint over-limit judgment signal, the basic control level is determined based on the real-time photovoltaic transmittance. In response to the real-time photovoltaic penetration rate being in an energy balance state and the risk level being low, the first-level monitoring strategy is matched to maintain routine risk tracking of the distribution network without triggering action commands. In response to the risk level being non-low risk, a second-layer flexible suppression strategy is matched, with the energy storage system and static var generator being invoked in the order of invocation. In response to the real-time photovoltaic penetration rate being in an energy surplus state and the risk level being low risk, a second-layer flexible suppression strategy is matched, and the call sequence is energy storage system and static var generator; In response to the risk level being non-low risk, a third-layer collaborative absorption strategy is matched, with the order of invocation being demand response resources, energy storage systems, and static var generators.

6. The power distribution network active layered regulation method of claim 5, wherein: The construction of the dual-objective optimization model, which aims to minimize both comprehensive operational risk and control cost, includes: Establish a regulation cost sub-model with the objective of minimizing the sum of system network loss cost, energy storage operation and maintenance cost, and curtailment penalty cost; Establish a comprehensive operational risk sub-model with the goal of minimizing voltage deviation at key nodes and branch load rate; The regulation cost sub-model and the comprehensive operational risk sub-model are used as two independent but conflicting objective functions to jointly constitute the bi-objective optimization model.

7. The power distribution network active layered regulation method of claim 6, wherein: The step of solving the bi-objective optimization model using a multi-objective optimization algorithm to obtain the optimal scheduling instruction includes: A non-dominated sorting genetic algorithm with an elitist strategy is used to iteratively solve the bi-objective optimization model and generate a Pareto optimal solution set. The objective function values ​​of each solution are normalized, the Euclidean distances from each solution in the frontier solution set to the ideal point are calculated, and the solution with the smallest Euclidean distance is selected as the optimal compromise scheduling instruction and issued to the distribution network for execution.

8. A power distribution network active hierarchical regulation system, applying the method of any one of claims 1-7, characterized in that, include: The comprehensive risk situation assessment modeling module is used to acquire historical operation data of the distribution network, construct a photovoltaic output stochastic scenario model based on hybrid beta distribution, and use the entropy weight algorithm to objectively assign weights to multi-dimensional risk indicators to establish a comprehensive risk situation assessment system. The limit-crossing judgment module is used to collect real-time status data of the distribution network online, perform limit-crossing judgment based on hard constraint safety boundaries, and evaluate the comprehensive operational risk value of the current section in conjunction with the comprehensive risk situation assessment system. An adaptive hierarchical strategy matching module is used to obtain the current real-time photovoltaic penetration rate and risk level, determine the basic control level based on the real-time photovoltaic penetration rate, and adaptively match a preset four-layer progressive control strategy within the basic control level according to the risk level to determine the order of calling flexible resources. The dual-objective collaborative optimization scheduling module constructs a dual-objective optimization model with the objectives of minimizing comprehensive operational risk and minimizing control cost. Under the constraint of the calling order of the flexible resources, a multi-objective optimization algorithm is used to solve the dual-objective optimization model, obtain the optimal scheduling instruction, and issue it to the distribution network for execution.

9. An electronic device, comprising: include: Memory, used to store programs; A processor for loading the program to perform the steps of the method as claimed in any one of claims 1-7.

10. A computer-readable storage medium storing a program, characterized in that, When the program is executed by a processor, it implements the steps of the method as described in any one of claims 1-7.