A power system dispatching method and device considering virtual power plant resource characteristics

By constructing a security-constrained economic dispatch model and a virtual power plant lower-level optimization model, the problem of insufficient regulation of resource heterogeneity within the virtual power plant was solved, realizing efficient, flexible and economical resource dispatch of the power system, and improving market clearing efficiency and system security.

CN123163036APending Publication Date: 2026-11-24CHINA ELECTRIC POWER RESEARCH INSTITUTE CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202610988289.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-07-03
Publication Date
2026-11-24

AI Technical Summary

Technical Problem

Existing models for virtual power plants to participate in the electricity market do not fully consider the heterogeneity and differentiated regulation characteristics of internal resources, resulting in insufficient market clearing efficiency and resource response flexibility, making it difficult to efficiently integrate distributed energy resources in the power system.

Method used

A safety-constrained economic dispatch model is constructed, the dual multiplier is obtained, the node electrical energy and reserve price are determined, and the lower-level optimization model of the virtual power plant is combined to realize the coordinated dispatch of multiple types of resources and internal resource regulation. The market clearing result is optimized through a two-level iterative coordination mechanism.

Benefits of technology

It has improved the operating efficiency and economy of the power system, enhanced the transparency of market operations and the accuracy of price signals, realized the flexibility of resource utilization and the security of the system, shaving off peaks and filling valleys, and reduced electricity price fluctuations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123163036A_ABST
    Figure CN123163036A_ABST
Patent Text Reader

Abstract

This invention relates to the field of demand-side management technology, specifically providing a power system dispatching method and apparatus that considers the resource characteristics of virtual power plants. The method includes: solving a pre-constructed safety-constrained economic dispatching model to obtain the dual multipliers of the constraints in the pre-constructed model; determining the energy price and reserve price of each node based on the dual multipliers of the constraints; and substituting the energy price and reserve price of each node into a pre-constructed virtual power plant lower-level optimization model and solving it to obtain a power system dispatching scheme. The technical solution provided by this invention enables optimized internal resource regulation and reasonable pricing in the process of virtual power plants participating in the power market operation, providing unified methodological support for power market operation and internal resource regulation decision-making.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of demand-side management technology, specifically to a power system dispatching method and apparatus that takes into account the resource characteristics of virtual power plants. Background Technology Against the backdrop of global energy transition, the power system is facing profound changes. The traditional energy structure, dominated by centralized, fossil fuel-based systems, struggles to meet the demand for high-proportion renewable energy integration, while frequent extreme weather events further exacerbate the challenge of balancing power supply and demand. Simultaneously, distributed energy resources (such as rooftop solar PV, energy storage facilities, electric vehicles, and flexible loads) are growing rapidly, but their dispersed, intermittent, and uncoordinated nature places enormous pressure on grid operations. How to efficiently integrate these fragmented resources and improve the flexibility, reliability, and economy of the power system has become a key issue in the construction of new power systems. Virtual power plants are a new operating model based on the power system's operational architecture, relying on advanced information and communication technologies and energy management systems to aggregate and coordinate the control of various types of resources, including distributed power sources, energy storage systems, electric vehicles, and adjustable loads. Through unified internal resource regulation and optimization control, virtual power plants can transform dispersed resources into market entities with overall responsiveness, participating in power system operation regulation and market transactions, thereby improving resource utilization efficiency and system operational economy.

[0002] Currently, research on modeling and mechanisms for virtual power plants participating in the electricity market has yielded relatively systematic studies on the joint dispatch mechanism, pricing methods, and market coupling models of the energy market and ancillary service market, resulting in various optimization models and pricing strategies. Examples include clearing models based on joint optimization of energy and reserve capacity, and nodal pricing calculation methods incorporating Lagrange duality theory. However, existing research is largely based on traditional generation-side modeling frameworks or focuses on the design of the market mechanism itself, neglecting the heterogeneity and differentiated regulation characteristics of resources within virtual power plants. Particularly, there are shortcomings in the collaborative response modeling of generation and load resources, making it difficult to accurately reflect the actual operational characteristics of virtual power plants as aggregators participating in market transactions.

[0003] Furthermore, in terms of optimization and pricing methods for virtual power plants participating in the joint market for electricity and reserve capacity, existing models typically employ single-layer centralized optimization or simplified processing methods. These models fail to fully consider the hierarchical decision-making process of multiple resource types within the virtual power plant and its feedback impact on market clearing results. Consequently, in practical applications, these models struggle to balance market clearing efficiency with resource response flexibility. Therefore, with the continuous improvement of the electricity spot market and the large-scale participation of virtual power plants in market transactions, there is an urgent need to propose a method that comprehensively considers the resource characteristics within the virtual power plant, constructs a joint dispatch mechanism for electricity and reserve capacity, and combines hierarchical optimization to achieve market pricing. This approach aims to improve market operating efficiency and enhance the security and economy of the power system. Summary of the Invention

[0004] To overcome the above-mentioned shortcomings, this invention proposes a power system dispatching method and apparatus that considers the resource characteristics of virtual power plants.

[0005] Firstly, a power system dispatching method considering the resource characteristics of virtual power plants is provided, the power system dispatching method considering the resource characteristics of virtual power plants includes: Solve the pre-built safety-constrained economic scheduling model to obtain the dual multipliers of the constraints in the pre-built safety-constrained economic scheduling model; The energy price and reserve price of each node are determined based on the dual multiplier of the aforementioned constraints. The power system dispatch scheme is obtained by substituting the energy price and reserve price of each node into the pre-constructed virtual power plant lower-level optimization model and solving it.

[0006] Preferably, the power system dispatch scheme includes at least one of the following: generator power generation and start / stop status, standby capacity of generator sets and virtual power plant units, charging and discharging power and charging and discharging status of energy storage, charging and discharging power and charging and discharging status of electric vehicles, energy clearing power of equipment in virtual power plants, and clearing power of the standby market.

[0007] Preferably, the pre-constructed safety-constrained economic scheduling model includes: a first objective function aimed at minimizing the total operating cost of the system, and a first constraint and a second constraint.

[0008] Furthermore, the first objective function is as follows:

[0009] In the above formula, The value of the first objective function. The scheduling period is E, and the total number of generator sets is E. Let e ​​be the power generation cost quotation function for the e-th generator unit in time period t. Let be the bidding function of the e-th generator unit in the standby market during time period t, and C be the total number of thermal power units. The startup cost of the cth thermal power unit. This represents the total number of virtual power plant units for power generation. The quotation function for the generation of the i-th virtual power plant unit. Let J be the bidding function for the i-th virtual power plant unit (generator class) in the standby market, and J be the total number of virtual power plant units (load class). A quotation function for the electricity consumption of the j-th load class virtual power plant unit. Let be the bidding function for the j-th load class virtual power plant unit in the standby market.

[0010] Furthermore, the power generation cost quotation function for the e-th generator unit in time period t is as follows:

[0011] In the above formula, , , All are energy market price coefficients. Let e ​​be the power generation of the e-th generator unit during time period t. This represents the start-stop state of the e-th generator unit during time period t; The bidding function of the e-th generator set in the standby market during time period t is as follows:

[0012] In the above formula, , , All are standby market price coefficients. The reserve capacity provided by the winning bid for the e-th generator unit during time period t; The pricing function for the electricity consumption of the j-th load-type virtual power plant unit is as follows:

[0013] In the above formula, , , All of these are energy market quotation coefficients for electricity consumption by the j-th load category virtual power plant unit. The power consumption of the j-th load-type virtual power plant unit in time period t; The bidding function for the j-th load-type virtual power plant unit in the standby market is as follows:

[0014] In the above formula, , , All of these are the standby market price coefficients for the electricity consumption of the j-th load category virtual power plant unit. The reserve capacity provided by the winning bid for the j-th load class virtual power plant unit during time period t.

[0015] Furthermore, the first constraint conditions include: power balance constraint, reserve capacity constraint, unit operation constraint, ramp rate constraint, minimum start-up and shutdown time constraint, network security constraint, and virtual power plant operation constraint.

[0016] Furthermore, the power balance constraints are as follows:

[0017] The standby capacity constraints are as follows:

[0018] The unit's operating constraints are as follows:

[0019] The slope rate constraint is as follows:

[0020] The minimum start-up and shutdown time constraints are as follows:

[0021] The network security constraints are as follows:

[0022] The virtual power plant's operational constraints are as follows:

[0023] In the above formula, This represents the total number of connecting lines. Let d be the power of the d-th tie line in time period t. The total load for time period t, Let be the power consumption of the i-th virtual power plant unit in time period t. Let x be the power consumption of the x-th conventional load unit in time period t. The system's unadjustable base load for time period t. This represents the total number of conventional load units. The reserve capacity provided by the winning bid for the i-th virtual power plant unit in time period t. The total reserve requirement for time period t. This is the lower limit of the power generation capacity of the e-th generator unit. This represents the upper limit of the power generation capacity of the e-th generator unit. This represents the winning bid status of the e-th generator unit in the energy market during time period t. This represents the status of the e-th generator unit in the standby capacity market during time period t. The downhill power limit for the e-th generator unit. Let e ​​be the power generation of the e-th generator unit in time period t-1. Let e ​​be the minimum continuous start-up time of the e-th generator unit. For the e-th generator unit in the start-stop state during time period f, For the e-th generator unit in the start-stop state during time period t-1, Let e ​​be the minimum continuous downtime of the e-th generator unit. For the line The power transmission limit of the current, , , , , These include electric generator sets, gas-fired generator sets, hydroelectric generator sets, nuclear power generator sets, and wind farms located at the corresponding nodes. The power transfer factor, , , , , The generating capacities of electric generator sets, gas-fired generator sets, hydroelectric generator sets, nuclear power generator sets, and wind farms, respectively, in terms of C, G, H, and N. nuc W represents the total number of electric generator sets, gas-fired generator sets, hydroelectric generator sets, nuclear power generator sets, and wind farms, respectively. For node p, pair of lines The power transfer factor, Let the load of node p be in time period t. For virtual power plants Run space functions, These are the upper limit of gas turbine power, the lower limit of gas turbine power, the upper limit of energy storage charging power, the upper limit of energy storage discharging power, the upper limit of electric vehicle charging power, and the upper limit of electric vehicle discharging power.

[0024] Furthermore, the second constraint includes: bidding constraints for power generation resources, bidding constraints for load resources, and unified bidding constraints.

[0025] Furthermore, the bidding constraints for the power generation resources are as follows:

[0026] The bidding constraints for load-related resources are as follows:

[0027] The unified bidding constraints are as follows:

[0028] In the above formula, For virtual power plants The price of electricity generated by new energy generating units in the k-th bid during time period t. For virtual power plants The lower limit of the price for power generation from new energy generating units. For virtual power plants The upper limit of the price for electricity generated by new energy generating units. For time-of-use gas pricing, The calorific value of natural gas. For the efficiency of gas turbine units, For virtual power plants The upper limit of the price for gas turbine power generation, For virtual power plants The price of gas turbine power generation quoted in the k-th time interval t. For virtual power plants The lower limit of the price for energy storage / electric vehicle discharge. For virtual power plants The price of energy storage / electric vehicle discharge at the k-th bid in time period t. For virtual power plants The upper limit of the price for energy storage / electric vehicle discharge. Subjective probability, For objective probability, For user rationality coefficient, For virtual power plants The perceived benefits of load participating in demand response during time period t. This represents the total number of virtual power plants. For virtual power plants Power interruption of electrical load during time period t For load interruption compensation price matrix, For virtual power plants The load interruption price coefficient for time period t For virtual power plants The upper limit of electrical load interruption power, For virtual power plants The k-th quote in time period t For virtual power plants The (k-1)th quote in time period t For virtual power plants The k-th price deviation in time period t For virtual power plants The load interruption price coefficient deviation in the k-th bid during time period t. This is the unit price adjustment coefficient for time period t. For virtual power plants During the (k-1)th bidding process in time period t, the generating power of the unit. For virtual power plants During the k-th bidding process in time period t, the generating power of the unit. For virtual power plants Maximum generating capacity of the unit For virtual power plants The load interruption price coefficient in the (k-1)th bid during time period t. For virtual power plants The load interruption price coefficient in the k-th bid during time period t.

[0029] Furthermore, when the number of bids k=1, the virtual power plant The price of electricity generated by new energy units in the first round of bidding as follows:

[0030] Virtual power plant The price of gas turbine power generation quoted in the first time period t. as follows:

[0031] Virtual power plant The first quoted price for energy storage / electric vehicle discharge in time period t. as follows:

[0032] In the above formula, For virtual power plants The initial quoted price for electricity generation from new energy generating units For virtual power plants The power generation capacity of the new energy generating units in the first round of bidding. For virtual power plants The upper limit of the power generation capacity of new energy units in the quotation. For virtual power plants The load interruption price coefficient in the first bid during time period t. For virtual power plants The power generation capacity of the gas turbine unit in the first bid during time period t. For virtual power plants The upper limit of the power generation capacity of gas turbine units, For virtual power plants The initial quote for energy storage / electric vehicle discharge price in time period t. For virtual power plants The energy storage / electric vehicle discharge power of the first quoted price in time period t. For virtual power plants The upper limit of energy storage / electric vehicle discharge power in the first quote during time period t.

[0033] Furthermore, the electricity price and reserve price of each node are as follows:

[0034] In the above formula, , Let $t$ be the electricity price and the reserve price for node $p$ in time period $t$. , These are the dual multipliers of the power balance constraint and the reserve capacity constraint in time period t, respectively. , These are the first and second dual multipliers of network security constraints, respectively.

[0035] Furthermore, the pre-constructed virtual power plant lower-level optimization model includes: a second objective function aimed at minimizing the operating cost of the virtual power plant, as well as a second constraint and a third constraint.

[0036] Furthermore, the second objective function is as follows:

[0037] In the above formula, The value of the second objective function. The total operating cost of the virtual power plant during time period t. This represents the total number of virtual power plant devices. Let be the price of electrical energy for device m at time t. Let m be the energy clearing power of device m at time t. Let m be the price of the spare capacity of equipment at time t. Let m be the clearing power of the standby market for device m at time t.

[0038] Furthermore, the third constraint includes: gas turbine output constraint, energy storage charging and discharging constraint, and electric vehicle charging demand constraint.

[0039] Furthermore, the output constraints of the gas turbine unit are as follows:

[0040] The energy storage charging and discharging constraints are as follows:

[0041] The electric vehicle charging demand constraints are as follows:

[0042] In the above formula, This refers to the operating state of the gas turbine unit during time period t. The output power of the gas turbine unit during time period t. This is the lower limit of the output power of the gas turbine unit. This is the upper limit of the output power of the gas turbine unit. The linearization coefficients of the model for time period t are... This refers to the start-up and shutdown status of the gas turbine unit during time period t. This represents the operating status of the gas turbine unit during time period t-1. This refers to the downhill ramp power of the gas turbine unit. The output power of the gas turbine unit during time period t-1 This refers to the uphill climbing power of the gas turbine unit. Let be the capacity of the electrical energy storage during time period t. The capacity of the electrical energy storage in time period t-1, The charging power of the energy storage during time period t. The charging efficiency of electrical energy storage, For time intervals, Let be the discharge power of the electrical energy storage during time period t. The discharge efficiency of electrical energy storage. This refers to the charging and discharging states of electrical energy storage. This is the upper limit of the charging power for electric energy storage. This is the upper limit of the discharge power of the electrical energy storage. , The capacity of energy storage at the beginning and end of the dispatch process. Let m be the battery capacity of the m-th electric vehicle in time period t-1. Let m be the battery capacity of the m-th electric vehicle during time period t; , Let m be the charging and discharging power of the m-th electric vehicle during time period t. , The upper limit for the charging and discharging power of electric vehicles. , To improve the charging and discharging efficiency of electric vehicles. This refers to the charging and discharging states of an electric vehicle. , Let m be the battery capacity at the beginning and end of the dispatching process for the m-th electric vehicle. The charging demand for the m-th electric vehicle. Let n be the charging and discharging efficiency of electric vehicles, and n be the total number of electric vehicles.

[0043] Secondly, a power system dispatching device considering the resource characteristics of virtual power plants is provided, the power system dispatching device considering the resource characteristics of virtual power plants includes: The first analysis module is used to solve the pre-built safety-constrained economic scheduling model and obtain the dual multipliers of the constraints in the pre-built safety-constrained economic scheduling model. The second analysis module is used to determine the electrical energy price and reserve price of each node based on the dual multiplier of the constraints. The third analysis module is used to substitute the electricity price and reserve price of each node into the pre-constructed virtual power plant lower-level optimization model and solve it to obtain the power system dispatch scheme.

[0044] Thirdly, a computer device is provided, comprising: one or more processors; The processor is used to execute one or more programs; When the one or more programs are executed by the one or more processors, the power system scheduling method that takes into account the characteristics of virtual power plant resources is implemented.

[0045] Fourthly, a computer-readable storage medium is provided having a computer program stored thereon, wherein when the computer program is executed, it implements the power system scheduling method considering the characteristics of virtual power plant resources.

[0046] The above-described technical solutions of the present invention have at least one or more of the following beneficial effects: This invention provides a power system dispatching method and apparatus considering the resource characteristics of virtual power plants, comprising: solving a pre-constructed safety-constrained economic dispatching model to obtain the dual multipliers of the constraints in the pre-constructed safety-constrained economic dispatching model; determining the energy price and reserve price of each node based on the dual multipliers of the constraints; substituting the energy price and reserve price of each node into a pre-constructed virtual power plant lower-level optimization model and solving it to obtain a power system dispatching scheme. The technical solution provided by this invention realizes optimized internal resource regulation and reasonable pricing in the process of virtual power plants participating in the power market operation, providing unified methodological support for power market operation and internal resource regulation decision-making. Specifically: This invention enables coordinated scheduling of multiple types of resources in a unified optimization model, avoiding the problem of unreasonable resource allocation caused by traditional phased clearing and improving the overall operating efficiency of the system. This invention constructs a method for calculating nodal electricity prices and reserve prices based on dual variables, which can reflect the marginal cost of the system and the impact of network constraints, keep price signals consistent with the system operating status, and enhance the economy and transparency of the price formation mechanism; This invention introduces a lower-level optimization model of a virtual power plant and a two-layer iterative coordination mechanism to achieve dynamic coupling between market clearing results and internal resource regulation of the virtual power plant, enabling the virtual power plant to optimize its response based on price signals and improve resource utilization efficiency and regulation flexibility. This invention guides energy storage, electric vehicles and adjustable loads to participate in absorbing electricity during low-price periods and releasing electricity during high-price periods through a joint market mechanism, thereby achieving peak shaving and valley filling, reducing the peak-valley difference in the system and smoothing out electricity price fluctuations. This invention features a unified modeling framework and a clear solution process, which can be directly applied to scenarios involving large-scale participation of virtual power plants in the spot market environment. It provides engineering support for electricity market clearing, internal resource regulation and operation, and settlement mechanisms, and helps to improve the economy and security of system operation. Attached Figure Description

[0047] Figure 1 This is a schematic flowchart of the main steps of the power system dispatching method considering the resource characteristics of virtual power plants according to an embodiment of the present invention. Detailed Implementation

[0048] The specific embodiments of the present invention will be further described in detail below with reference to the accompanying drawings.

[0049] To make the objectives, technical solutions, and advantages of the embodiments of the present invention clearer, the technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.

[0050] Example 1 See appendix Figure 1 , Figure 1 This is a schematic flowchart illustrating the main steps of a power system dispatching method considering the resource characteristics of virtual power plants, according to an embodiment of the present invention. Figure 1 As shown, the power system dispatching method considering the resource characteristics of virtual power plants in this embodiment of the invention mainly includes the following steps: Step S101: Solve the pre-built safety-constrained economic scheduling model to obtain the dual multipliers of the constraints in the pre-built safety-constrained economic scheduling model; Step S102: Determine the electrical energy price and reserve price of each node based on the dual multiplier of the constraints; Step S103: Substitute the energy price and reserve price of each node into the pre-constructed virtual power plant lower-level optimization model and solve it to obtain the power system dispatch scheme.

[0051] In this embodiment, the power system dispatch scheme includes at least one of the following: generator power generation and start / stop status, standby capacity of generator sets and virtual power plant units, charging and discharging power and charging and discharging status of energy storage, charging and discharging power and charging and discharging status of electric vehicles, energy clearing power of equipment in virtual power plants, and clearing power of the standby market.

[0052] In this embodiment, the pre-constructed safety-constrained economic scheduling model includes: a first objective function aimed at minimizing the total operating cost of the system, as well as a first constraint and a second constraint.

[0053] In one implementation, the first objective function is as follows:

[0054] In the above formula, The value of the first objective function. The scheduling period is E, and the total number of generator sets is E. Let e ​​be the power generation cost quotation function for the e-th generator unit in time period t. Let be the bidding function of the e-th generator unit in the standby market during time period t, and C be the total number of thermal power units. The startup cost of the cth thermal power unit. This represents the total number of virtual power plant units for power generation. The quotation function for the generation of the i-th virtual power plant unit. Let J be the bidding function for the i-th virtual power plant unit (generator class) in the standby market, and J be the total number of virtual power plant units (load class). A quotation function for the electricity consumption of the j-th load class virtual power plant unit. Let be the bidding function for the j-th load class virtual power plant unit in the standby market.

[0055] In this embodiment, the internal resources of the virtual power plant are divided into power generation resources and load resources. Power generation resources include new energy units, gas turbine units, etc., while load resources include interruptible loads, electric vehicles, etc.

[0056] In one implementation, the power generation cost quotation function of the e-th generator unit in time period t is as follows:

[0057] In the above formula, , , All are energy market price coefficients. Let e ​​be the power generation of the e-th generator unit during time period t. This represents the start-stop state of the e-th generator unit during time period t; The bidding function of the e-th generator set in the standby market during time period t is as follows:

[0058] In the above formula, , , All are standby market price coefficients. The reserve capacity provided by the winning bid for the e-th generator unit during time period t; The pricing function for the electricity consumption of the j-th load-type virtual power plant unit is as follows:

[0059] In the above formula, , , All of these are energy market quotation coefficients for electricity consumption by the j-th load category virtual power plant unit. The power consumption of the j-th load-type virtual power plant unit in time period t; The bidding function for the j-th load-type virtual power plant unit in the standby market is as follows:

[0060] In the above formula, , , All of these are the standby market price coefficients for the electricity consumption of the j-th load category virtual power plant unit. The reserve capacity provided by the winning bid for the j-th load class virtual power plant unit during time period t.

[0061] In one implementation, the first constraint includes: power balance constraint, reserve capacity constraint, unit operation constraint, ramp rate constraint, minimum start-up and shutdown time constraint, network security constraint, and virtual power plant operation constraint.

[0062] In one implementation, the power balance constraint is as follows:

[0063] The standby capacity constraints are as follows:

[0064] The unit's operating constraints are as follows:

[0065] The slope rate constraint is as follows:

[0066] The minimum start-up and shutdown time constraints are as follows:

[0067] The network security constraints are as follows:

[0068] The virtual power plant's operational constraints are as follows:

[0069] In the above formula, This represents the total number of connecting lines. Let d be the power of the d-th tie line in time period t. The total load for time period t, Let be the power consumption of the i-th virtual power plant unit in time period t. Let x be the power consumption of the x-th conventional load unit in time period t. The system's unadjustable base load for time period t. This represents the total number of conventional load units. The reserve capacity provided by the winning bid for the i-th virtual power plant unit in time period t. The total reserve requirement for time period t. This is the lower limit of the power generation capacity of the e-th generator unit. This represents the upper limit of the power generation capacity of the e-th generator unit. This represents the winning bid status of the e-th generator unit in the energy market during time period t. This represents the status of the e-th generator unit in the standby capacity market during time period t. The downhill power limit for the e-th generator unit. Let e ​​be the power generation of the e-th generator unit in time period t-1. Let e ​​be the minimum continuous start-up time of the e-th generator unit. For the e-th generator unit in the start-stop state during time period f, For the e-th generator unit in the start-stop state during time period t-1, Let e ​​be the minimum continuous downtime of the e-th generator unit. For the line The power transmission limit of the current, , , , , These include electric generator sets, gas-fired generator sets, hydroelectric generator sets, nuclear power generator sets, and wind farms located at the corresponding nodes. The power transfer factor, , , , , The generating capacities of electric generator sets, gas-fired generator sets, hydroelectric generator sets, nuclear power generator sets, and wind farms, respectively, in terms of C, G, H, and N. nuc W represents the total number of electric generator sets, gas-fired generator sets, hydroelectric generator sets, nuclear power generator sets, and wind farms, respectively. For node p, pair of lines The power transfer factor, Let the load of node p be in time period t. For virtual power plants Run space functions, These are the upper limit of gas turbine power, the lower limit of gas turbine power, the upper limit of energy storage charging power, the upper limit of energy storage discharging power, the upper limit of electric vehicle charging power, and the upper limit of electric vehicle discharging power.

[0070] In one implementation, the second constraint includes: bidding constraints for power generation resources, bidding constraints for load resources, and unified bidding constraints.

[0071] In one implementation, the bidding constraints for power generation resources are as follows:

[0072] The bidding constraints for load-related resources are as follows:

[0073] The unified bidding constraints are as follows:

[0074] In the above formula, For virtual power plants The price of electricity generated by new energy generating units in the k-th bid during time period t. For virtual power plants The lower limit of the price for power generation from new energy generating units. For virtual power plants The upper limit of the price for electricity generated by new energy generating units. For time-of-use gas pricing, The calorific value of natural gas. For the efficiency of gas turbine units, For virtual power plants The upper limit of the price for gas turbine power generation, For virtual power plants The price of gas turbine power generation quoted in the k-th time interval t. For virtual power plants The lower limit of the price for energy storage / electric vehicle discharge. For virtual power plants The price of energy storage / electric vehicle discharge at the k-th bid in time period t. For virtual power plants The upper limit of the price for energy storage / electric vehicle discharge. Subjective probability, For objective probability, For user rationality coefficient, For virtual power plants The perceived benefits of load participating in demand response during time period t. This represents the total number of virtual power plants. For virtual power plants Power interruption of electrical load during time period t For load interruption compensation price matrix, For virtual power plants The load interruption price coefficient for time period t For virtual power plants The upper limit of electrical load interruption power, For virtual power plants The k-th quote in time period t For virtual power plants The (k-1)th quote in time period t For virtual power plants The k-th price deviation in time period t For virtual power plants The load interruption price coefficient deviation in the k-th bid during time period t. This is the unit price adjustment coefficient for time period t. For virtual power plants During the (k-1)th bidding process in time period t, the generating power of the unit. For virtual power plants During the k-th bidding process in time period t, the generating power of the unit. For virtual power plants Maximum generating capacity of the unit For virtual power plants The load interruption price coefficient in the (k-1)th bid during time period t. For virtual power plants The load interruption price coefficient in the k-th bid during time period t.

[0075] In one implementation, when the number of bids k=1, the virtual power plant The price of electricity generated by new energy units in the first round of bidding as follows:

[0076] Virtual power plant The price of gas turbine power generation quoted in the first time period t. as follows:

[0077] Virtual power plant The first quoted price for energy storage / electric vehicle discharge in time period t. as follows:

[0078] In the above formula, For virtual power plants The initial quoted price for electricity generation from new energy generating units For virtual power plants The power generation capacity of the new energy generating units in the first round of bidding. For virtual power plants The upper limit of the power generation capacity of new energy units in the quotation. For virtual power plants The load interruption price coefficient in the first bid during time period t. For virtual power plants The power generation capacity of the gas turbine unit in the first bid during time period t. For virtual power plants The upper limit of the power generation capacity of gas turbine units, For virtual power plants The initial quote for energy storage / electric vehicle discharge price in time period t. For virtual power plants The energy storage / electric vehicle discharge power of the first quoted price in time period t. For virtual power plants The upper limit of energy storage / electric vehicle discharge power in the first quote during time period t.

[0079] In one implementation, the electricity price and reserve price of each node are as follows:

[0080] In the above formula, , Let $t$ be the electricity price and the reserve price for node $p$ in time period $t$. , These are the dual multipliers of the power balance constraint and the reserve capacity constraint in time period t, respectively. , These are the first and second dual multipliers of network security constraints, respectively.

[0081] In one implementation, the pre-built virtual power plant lower-level optimization model includes: a second objective function aimed at minimizing the operating cost of the virtual power plant, as well as a second constraint and a third constraint.

[0082] In one implementation, the second objective function is as follows:

[0083] In the above formula, The value of the second objective function. The total operating cost of the virtual power plant during time period t. This represents the total number of virtual power plant devices. Let be the price of electrical energy for device m at time t. Let m be the energy clearing power of device m at time t. Let m be the price of the spare capacity of equipment at time t. Let m be the clearing power of the standby market for device m at time t.

[0084] In one implementation, the third constraint includes: gas turbine output constraint, energy storage charging and discharging constraint, and electric vehicle charging demand constraint.

[0085] In one embodiment, the output constraint of the gas turbine unit is as follows:

[0086] The energy storage charging and discharging constraints are as follows:

[0087] The electric vehicle charging demand constraints are as follows:

[0088] In the above formula, This refers to the operating state of the gas turbine unit during time period t. The output power of the gas turbine unit during time period t. This is the lower limit of the output power of the gas turbine unit. This is the upper limit of the output power of the gas turbine unit. The linearization coefficients of the model for time period t are... This refers to the start-up and shutdown status of the gas turbine unit during time period t. This represents the operating status of the gas turbine unit during time period t-1. This refers to the downhill ramp power of the gas turbine unit. The output power of the gas turbine unit during time period t-1 This refers to the uphill climbing power of the gas turbine unit. Let be the capacity of the electrical energy storage during time period t. The capacity of the electrical energy storage in time period t-1, The charging power of the energy storage during time period t. The charging efficiency of electrical energy storage, For time intervals, Let be the discharge power of the electrical energy storage during time period t. The discharge efficiency of electrical energy storage. This refers to the charging and discharging states of electrical energy storage. This is the upper limit of the charging power for electric energy storage. This is the upper limit of the discharge power of the electrical energy storage. , The capacity of energy storage at the beginning and end of the dispatch process. Let m be the battery capacity of the m-th electric vehicle in time period t-1. Let m be the battery capacity of the m-th electric vehicle during time period t; , Let m be the charging and discharging power of the m-th electric vehicle during time period t. , The upper limit for the charging and discharging power of electric vehicles. , To improve the charging and discharging efficiency of electric vehicles. This refers to the charging and discharging states of an electric vehicle. , Let m be the battery capacity at the beginning and end of the dispatching process for the m-th electric vehicle. The charging demand for the m-th electric vehicle. Let n be the charging and discharging efficiency of electric vehicles, and n be the total number of electric vehicles.

[0089] Example 2 Based on the same inventive concept, the present invention also provides a power system dispatching device that considers the resource characteristics of virtual power plants, the power system dispatching device considering the resource characteristics of virtual power plants comprising: The first analysis module is used to solve the pre-built safety-constrained economic scheduling model and obtain the dual multipliers of the constraints in the pre-built safety-constrained economic scheduling model. The second analysis module is used to determine the electrical energy price and reserve price of each node based on the dual multiplier of the constraints. The third analysis module is used to substitute the electricity price and reserve price of each node into the pre-constructed virtual power plant lower-level optimization model and solve it to obtain the power system dispatch scheme.

[0090] Preferably, the power system dispatch scheme includes at least one of the following: generator power generation and start / stop status, standby capacity of generator sets and virtual power plant units, charging and discharging power and charging and discharging status of energy storage, charging and discharging power and charging and discharging status of electric vehicles, energy clearing power of equipment in virtual power plants, and clearing power of the standby market.

[0091] Preferably, the pre-constructed safety-constrained economic scheduling model includes: a first objective function aimed at minimizing the total operating cost of the system, and a first constraint and a second constraint.

[0092] Furthermore, the first objective function is as follows:

[0093] In the above formula, The value of the first objective function. The scheduling period is E, and the total number of generator sets is E. Let e ​​be the power generation cost quotation function for the e-th generator unit in time period t. Let be the bidding function of the e-th generator unit in the standby market during time period t, and C be the total number of thermal power units. The startup cost of the cth thermal power unit. This represents the total number of virtual power plant units for power generation. The quotation function for the generation of the i-th virtual power plant unit. Let J be the bidding function for the i-th virtual power plant unit (generator class) in the standby market, and J be the total number of virtual power plant units (load class). A quotation function for the electricity consumption of the j-th load class virtual power plant unit. Let be the bidding function for the j-th load class virtual power plant unit in the standby market.

[0094] Furthermore, the power generation cost quotation function for the e-th generator unit in time period t is as follows:

[0095] In the above formula, , , All are energy market price coefficients. Let e ​​be the power generation of the e-th generator unit during time period t. This represents the start-stop state of the e-th generator unit during time period t; The bidding function of the e-th generator set in the standby market during time period t is as follows:

[0096] In the above formula, , , All are standby market price coefficients. The reserve capacity provided by the winning bid for the e-th generator unit during time period t; The pricing function for the electricity consumption of the j-th load-type virtual power plant unit is as follows:

[0097] In the above formula, , , All of these are energy market quotation coefficients for electricity consumption by the j-th load category virtual power plant unit. The power consumption of the j-th load-type virtual power plant unit in time period t; The bidding function for the j-th load-type virtual power plant unit in the standby market is as follows:

[0098] In the above formula, , , All of these are the standby market price coefficients for the electricity consumption of the j-th load category virtual power plant unit. The reserve capacity provided by the winning bid for the j-th load class virtual power plant unit during time period t.

[0099] Furthermore, the first constraint conditions include: power balance constraint, reserve capacity constraint, unit operation constraint, ramp rate constraint, minimum start-up and shutdown time constraint, network security constraint, and virtual power plant operation constraint.

[0100] Furthermore, the power balance constraints are as follows:

[0101] The standby capacity constraints are as follows:

[0102] The unit's operating constraints are as follows:

[0103] The slope rate constraint is as follows:

[0104] The minimum start-up and shutdown time constraints are as follows:

[0105] The network security constraints are as follows:

[0106] The virtual power plant's operational constraints are as follows:

[0107] In the above formula, This represents the total number of connecting lines. Let d be the power of the d-th tie line in time period t. The total load for time period t, Let be the power consumption of the i-th virtual power plant unit in time period t. Let x be the power consumption of the x-th conventional load unit in time period t. The system's unadjustable base load for time period t. This represents the total number of conventional load units. The reserve capacity provided by the winning bid for the i-th virtual power plant unit in time period t. The total reserve requirement for time period t. This is the lower limit of the power generation capacity of the e-th generator unit. This represents the upper limit of the power generation capacity of the e-th generator unit. This represents the winning bid status of the e-th generator unit in the energy market during time period t. This represents the status of the e-th generator unit in the standby capacity market during time period t. The downhill power limit for the e-th generator unit. Let e ​​be the power generation of the e-th generator unit in time period t-1. Let e ​​be the minimum continuous start-up time of the e-th generator unit. For the e-th generator unit in the start-stop state during time period f, For the e-th generator unit in the start-stop state during time period t-1, Let e ​​be the minimum continuous downtime of the e-th generator unit. For the line The power transmission limit of the current, , , , , These include electric generator sets, gas-fired generator sets, hydroelectric generator sets, nuclear power generator sets, and wind farms located at the corresponding nodes. The power transfer factor, , , , , The generating capacities of electric generator sets, gas-fired generator sets, hydroelectric generator sets, nuclear power generator sets, and wind farms, respectively, in terms of C, G, H, and N. nuc W represents the total number of electric generator sets, gas-fired generator sets, hydroelectric generator sets, nuclear power generator sets, and wind farms, respectively. For node p, pair of lines The power transfer factor, Let the load of node p be in time period t. For virtual power plants Run space functions, These are the upper limit of gas turbine power, the lower limit of gas turbine power, the upper limit of energy storage charging power, the upper limit of energy storage discharging power, the upper limit of electric vehicle charging power, and the upper limit of electric vehicle discharging power.

[0108] Furthermore, the second constraint includes: bidding constraints for power generation resources, bidding constraints for load resources, and unified bidding constraints.

[0109] Furthermore, the bidding constraints for the power generation resources are as follows:

[0110] The bidding constraints for load-related resources are as follows:

[0111] The unified bidding constraints are as follows:

[0112] In the above formula, For virtual power plants The price of electricity generated by new energy generating units in the k-th bid during time period t. For virtual power plants The lower limit of the price for power generation from new energy generating units. For virtual power plants The upper limit of the price for electricity generated by new energy generating units. For time-of-use gas pricing, The calorific value of natural gas. For the efficiency of gas turbine units, For virtual power plants The upper limit of the price for gas turbine power generation, For virtual power plants The price of gas turbine power generation quoted in the k-th time interval t. For virtual power plants The lower limit of the price for energy storage / electric vehicle discharge. For virtual power plants The price of energy storage / electric vehicle discharge at the k-th bid in time period t. For virtual power plants The upper limit of the price for energy storage / electric vehicle discharge. Subjective probability, For objective probability, For user rationality coefficient, For virtual power plants The perceived benefits of load participating in demand response during time period t. This represents the total number of virtual power plants. For virtual power plants Power interruption of electrical load during time period t For load interruption compensation price matrix, For virtual power plants The load interruption price coefficient for time period t For virtual power plants The upper limit of electrical load interruption power, For virtual power plants The k-th quote in time period t For virtual power plants The (k-1)th quote in time period t For virtual power plants The k-th price deviation in time period t For virtual power plants The load interruption price coefficient deviation in the k-th bid during time period t. This is the unit price adjustment coefficient for time period t. For virtual power plants During the (k-1)th bidding process in time period t, the generating power of the unit. For virtual power plants During the k-th bidding process in time period t, the generating power of the unit. For virtual power plants Maximum generating capacity of the unit For virtual power plants The load interruption price coefficient in the (k-1)th bid during time period t. For virtual power plants The load interruption price coefficient in the k-th bid during time period t.

[0113] Furthermore, when the number of bids k=1, the virtual power plant The price of electricity generated by new energy units in the first round of bidding as follows:

[0114] Virtual power plant The price of gas turbine power generation quoted in the first time period t. as follows:

[0115] Virtual power plant The first quoted price for energy storage / electric vehicle discharge in time period t. as follows:

[0116] In the above formula, For virtual power plants The initial quoted price for electricity generation from new energy generating units For virtual power plants The power generation capacity of the new energy generating units in the first round of bidding. For virtual power plants The upper limit of the power generation capacity of new energy units in the quotation. For virtual power plants The load interruption price coefficient in the first bid during time period t. For virtual power plants The power generation capacity of the gas turbine unit in the first bid during time period t. For virtual power plants The upper limit of the power generation capacity of gas turbine units, For virtual power plants The initial quote for energy storage / electric vehicle discharge price in time period t. For virtual power plants The energy storage / electric vehicle discharge power of the first quoted price in time period t. For virtual power plants The upper limit of energy storage / electric vehicle discharge power in the first quote during time period t.

[0117] Furthermore, the electricity price and reserve price of each node are as follows:

[0118] In the above formula, , Let $t$ be the electricity price and the reserve price for node $p$ in time period $t$. , These are the dual multipliers of the power balance constraint and the reserve capacity constraint in time period t, respectively. , These are the first and second dual multipliers of network security constraints, respectively.

[0119] Furthermore, the pre-constructed virtual power plant lower-level optimization model includes: a second objective function aimed at minimizing the operating cost of the virtual power plant, as well as a second constraint and a third constraint.

[0120] Furthermore, the second objective function is as follows:

[0121] In the above formula, The value of the second objective function. The total operating cost of the virtual power plant during time period t. This represents the total number of virtual power plant devices. Let be the price of electrical energy for device m at time t. Let m be the energy clearing power of device m at time t. Let m be the price of the spare capacity of equipment at time t. Let m be the clearing power of the standby market for device m at time t.

[0122] Furthermore, the third constraint includes: gas turbine output constraint, energy storage charging and discharging constraint, and electric vehicle charging demand constraint.

[0123] Furthermore, the output constraints of the gas turbine unit are as follows:

[0124] The energy storage charging and discharging constraints are as follows:

[0125] The electric vehicle charging demand constraints are as follows:

[0126] In the above formula, This refers to the operating state of the gas turbine unit during time period t. The output power of the gas turbine unit during time period t. This is the lower limit of the output power of the gas turbine unit. This is the upper limit of the output power of the gas turbine unit. The linearization coefficients of the model for time period t are... This refers to the start-up and shutdown status of the gas turbine unit during time period t. This represents the operating status of the gas turbine unit during time period t-1. This refers to the downhill ramp power of the gas turbine unit. The output power of the gas turbine unit during time period t-1 This refers to the uphill climbing power of the gas turbine unit. Let be the capacity of the electrical energy storage during time period t. The capacity of the electrical energy storage in time period t-1, The charging power of the energy storage during time period t. The charging efficiency of electrical energy storage, For time intervals, Let be the discharge power of the electrical energy storage during time period t. The discharge efficiency of electrical energy storage. This refers to the charging and discharging states of electrical energy storage. This is the upper limit of the charging power for electric energy storage. This is the upper limit of the discharge power of the electrical energy storage. , The capacity of energy storage at the beginning and end of the dispatch process. Let m be the battery capacity of the m-th electric vehicle in time period t-1. Let m be the battery capacity of the m-th electric vehicle during time period t; , Let m be the charging and discharging power of the m-th electric vehicle during time period t. , The upper limit for the charging and discharging power of electric vehicles. , To improve the charging and discharging efficiency of electric vehicles. This refers to the charging and discharging states of an electric vehicle. , Let m be the battery capacity at the beginning and end of the dispatching process for the m-th electric vehicle. The charging demand for the m-th electric vehicle. Let n be the charging and discharging efficiency of electric vehicles, and n be the total number of electric vehicles.

[0127] Example 3 Based on the same inventive concept, this invention also provides a computer device, which includes a processor and a memory. The memory stores a computer program, which includes program instructions. The processor executes the program instructions stored in the computer storage medium. The processor may be a Central Processing Unit (CPU), or other general-purpose processors, digital signal processors (DSPs), application-specific integrated circuits (ASICs), field-programmable gate arrays (FPGAs), or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. It is the computing and control core of the terminal, suitable for implementing one or more instructions, specifically suitable for loading and executing one or more instructions in the computer storage medium to implement corresponding method flows or corresponding functions, thereby realizing the steps of a power system dispatching method considering the resource characteristics of a virtual power plant in the above embodiments.

[0128] Example 4 Based on the same inventive concept, this invention also provides a storage medium, specifically a computer-readable storage medium (Memory), which is a memory device in a computer device used to store programs and data. It is understood that the computer-readable storage medium here can include both the built-in storage medium in the computer device and extended storage media supported by the computer device. The computer-readable storage medium provides storage space that stores the terminal's operating system. Furthermore, this storage space also stores one or more instructions suitable for loading and execution by a processor. These instructions can be one or more computer programs (including program code). It should be noted that the computer-readable storage medium here can be high-speed RAM or non-volatile memory, such as at least one disk storage device. The processor can load and execute one or more instructions stored in the computer-readable storage medium to implement the steps of a power system dispatching method considering the resource characteristics of a virtual power plant in the above embodiments.

[0129] Those skilled in the art will understand that embodiments of the present invention can be provided as methods, systems, or computer program products. Therefore, the present invention can take the form of a completely hardware embodiment, a completely software embodiment, or an embodiment combining software and hardware aspects. Furthermore, the present invention can take the form of a computer program product embodied on one or more computer-usable storage media (including, but not limited to, disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.

[0130] This invention is described with reference to flowchart illustrations and / or block diagrams of methods, apparatus (systems), and computer program products according to embodiments of the invention. It will be understood that each block of the flowchart illustrations and / or block diagrams, and combinations of blocks in the flowchart illustrations and / or block diagrams, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, special-purpose computer, embedded processor, or other programmable data processing apparatus to produce a machine, such that the instructions, which execute via the processor of the computer or other programmable data processing apparatus, generate instructions for implementing the flowchart illustrations and / or block diagrams. Figure 1 One or more processes and / or boxes Figure 1 A device that provides the functions specified in one or more boxes.

[0131] These computer program instructions may also be stored in a computer-readable storage medium that can direct a computer or other programmable data processing device to function in a particular manner, such that the instructions stored in the computer-readable storage medium produce an article of manufacture including instruction means, which are implemented in a process Figure 1 One or more processes and / or boxes Figure 1 The function specified in one or more boxes.

[0132] These computer program instructions may also be loaded onto a computer or other programmable data processing equipment to cause a series of operational steps to be performed on the computer or other programmable equipment to produce a computer-implemented process, thereby providing instructions that execute on the computer or other programmable equipment for implementing the process. Figure 1 One or more processes and / or boxes Figure 1 The steps of the function specified in one or more boxes.

[0133] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention and not to limit it. Although the present invention has been described in detail with reference to the above embodiments, those skilled in the art should understand that modifications or equivalent substitutions can still be made to the specific implementation of the present invention. Any modifications or equivalent substitutions that do not depart from the spirit and scope of the present invention should be covered within the scope of protection of the claims of the present invention.

Claims

1. A power system dispatching method considering the resource characteristics of virtual power plants, characterized in that, The method includes: Solve the pre-built safety-constrained economic scheduling model to obtain the dual multipliers of the constraints in the pre-built safety-constrained economic scheduling model; The energy price and reserve price of each node are determined based on the dual multiplier of the aforementioned constraints. The power system dispatch scheme is obtained by substituting the energy price and reserve price of each node into the pre-constructed virtual power plant lower-level optimization model and solving it.

2. The method as described in claim 1, characterized in that, The power system dispatch scheme includes at least one of the following: generator power generation and start / stop status, standby capacity of generator sets and virtual power plant units, charging and discharging power and charging and discharging status of energy storage, charging and discharging power and charging and discharging status of electric vehicles, energy clearing power of equipment in virtual power plants, and clearing power of the standby market.

3. The method as described in claim 1, characterized in that, The pre-constructed safety-constrained economic scheduling model includes: a first objective function with the goal of minimizing the total operating cost of the system, as well as a first constraint and a second constraint.

4. The method as described in claim 3, characterized in that, The first objective function is as follows: In the above formula, The value of the first objective function. The scheduling period is E, and the total number of generator sets is E. Let e ​​be the power generation cost quotation function for the e-th generator unit in time period t. Let be the bidding function of the e-th generator unit in the standby market during time period t, and C be the total number of thermal power units. The startup cost of the cth thermal power unit. This represents the total number of virtual power plant units for power generation. The quotation function for the generation of the i-th virtual power plant unit. Let J be the bidding function for the i-th virtual power plant unit (generator class) in the standby market, and J be the total number of virtual power plant units (load class). A quotation function for the electricity consumption of the j-th load class virtual power plant unit. Let be the bidding function for the j-th load class virtual power plant unit in the standby market.

5. The method as described in claim 4, characterized in that, The power generation cost quotation function for the e-th generator unit in time period t is as follows: In the above formula, , , All are energy market price coefficients. Let e ​​be the power generation of the e-th generator unit during time period t. This represents the start-stop state of the e-th generator unit during time period t; The bidding function of the e-th generator set in the standby market during time period t is as follows: In the above formula, , , All are standby market price coefficients. The reserve capacity provided by the winning bid for the e-th generator unit during time period t; The pricing function for the electricity consumption of the j-th load-type virtual power plant unit is as follows: In the above formula, , , All of these are energy market quotation coefficients for electricity consumption by the j-th load category virtual power plant unit. The power consumption of the j-th load-type virtual power plant unit in time period t; The bidding function for the j-th load-type virtual power plant unit in the standby market is as follows: In the above formula, , , All of these are the standby market price coefficients for the electricity consumption of the j-th load category virtual power plant unit. The reserve capacity provided by the winning bid for the j-th load class virtual power plant unit during time period t.

6. The method as described in claim 5, characterized in that, The first set of constraints includes: power balance constraints, reserve capacity constraints, unit operation constraints, ramp rate constraints, minimum start-up and shutdown time constraints, network security constraints, and virtual power plant operation constraints.

7. The method as described in claim 6, characterized in that, The power balance constraints are as follows: The standby capacity constraints are as follows: The unit's operating constraints are as follows: The slope rate constraint is as follows: The minimum start-up and shutdown time constraints are as follows: The network security constraints are as follows: The virtual power plant's operational constraints are as follows: In the above formula, This represents the total number of connecting lines. Let d be the power of the d-th tie line in time period t. The total load for time period t, Let be the power consumption of the i-th virtual power plant unit in time period t. Let x be the power consumption of the x-th conventional load unit in time period t. The system's unadjustable base load for time period t. This represents the total number of conventional load units. The reserve capacity provided by the winning bid for the i-th virtual power plant unit in time period t. The total reserve requirement for time period t. This is the lower limit of the power generation capacity of the e-th generator unit. This represents the upper limit of the power generation capacity of the e-th generator unit. This represents the winning bid status of the e-th generator unit in the energy market during time period t. This represents the status of the e-th generator unit in the standby capacity market during time period t. The downhill power limit for the e-th generator unit. Let e ​​be the power generation of the e-th generator unit in time period t-1. Let e ​​be the minimum continuous start-up time of the e-th generator unit. For the e-th generator unit in the start-stop state during time period f, For the e-th generator unit in the start-stop state during time period t-1, Let e ​​be the minimum continuous downtime of the e-th generator unit. For the line The power transmission limit of the current, , , , , These include thermal power generator sets, gas-fired power generator sets, hydropower generator sets, nuclear power generator sets, and wind farms located at the corresponding nodes. The power transfer factor, , , , , These represent the power generation capacity of thermal power generator sets, gas-fired power generator sets, hydropower generator sets, nuclear power generator sets, and wind farms, respectively, in terms of C, G, H, and N. nuc W represents the total number of thermal power generating units, gas-fired power generating units, hydropower generating units, nuclear power generating units, and wind farms, respectively. For node p, pair of lines The power transfer factor, Let the load of node p be in time period t. For virtual power plants Run space functions, These are the upper limit of gas turbine power, the lower limit of gas turbine power, the upper limit of energy storage charging power, the upper limit of energy storage discharging power, the upper limit of electric vehicle charging power, and the upper limit of electric vehicle discharging power.

8. The method as described in claim 7, characterized in that, The second set of constraints includes: bidding constraints for power generation resources, bidding constraints for load resources, and unified bidding constraints.

9. The method as described in claim 8, characterized in that, The bidding constraints for power generation resources are as follows: The bidding constraints for load-related resources are as follows: The unified bidding constraints are as follows: In the above formula, For virtual power plants The price of electricity generated by new energy generating units in the k-th bid during time period t. For virtual power plants The lower limit of the price for power generation from new energy generating units. For virtual power plants The upper limit of the price for electricity generated by new energy generating units. For time-of-use gas pricing, The calorific value of natural gas. For the efficiency of gas turbine units, For virtual power plants The upper limit of the price for gas turbine power generation, For virtual power plants The price of gas turbine power generation quoted in the k-th time interval t. For virtual power plants The lower limit of the price for energy storage / electric vehicle discharge. For virtual power plants The price of energy storage / electric vehicle discharge at the k-th bid in time period t. For virtual power plants The upper limit of the price for energy storage / electric vehicle discharge. Subjective probability, For objective probability, For user rationality coefficient, For virtual power plants The perceived benefits of load participating in demand response during time period t. This represents the total number of virtual power plants. For virtual power plants Power interruption of electrical load during time period t For load interruption compensation price matrix, For virtual power plants The load interruption price coefficient for time period t For virtual power plants The upper limit of electrical load interruption power, For virtual power plants The k-th quote in time period t For virtual power plants The (k-1)th quote in time period t For virtual power plants The k-th price deviation in time period t For virtual power plants The load interruption price coefficient deviation in the k-th bid during time period t. This is the unit price adjustment coefficient for time period t. For virtual power plants During the (k-1)th bidding process in time period t, the generating power of the unit. For virtual power plants During the k-th bidding process in time period t, the generating power of the unit. For virtual power plants Maximum generating capacity of the unit For virtual power plants The load interruption price coefficient in the (k-1)th bid during time period t. For virtual power plants The load interruption price coefficient in the k-th bid during time period t.

10. The method as described in claim 9, characterized in that, When the number of bids k=1, the virtual power plant The price of electricity generated by new energy units in the first round of bidding as follows: Virtual power plant The price of gas turbine power generation quoted in the first time period t. as follows: Virtual power plant The first quoted price for energy storage / electric vehicle discharge in time period t. as follows: In the above formula, For virtual power plants The initial quoted price for electricity generation from new energy generating units For virtual power plants The power generation capacity of the new energy generating units in the first round of bidding. For virtual power plants The upper limit of the power generation capacity of new energy units in the quotation. For virtual power plants The load interruption price coefficient in the first bid during time period t. For virtual power plants The power generation capacity of the gas turbine unit in the first bid during time period t. For virtual power plants The upper limit of the power generation capacity of gas turbine units, For virtual power plants The initial quote for energy storage / electric vehicle discharge price in time period t. For virtual power plants The energy storage / electric vehicle discharge power of the first quoted price in time period t. For virtual power plants The upper limit of energy storage / electric vehicle discharge power in the first quote during time period t.

11. The method as described in claim 10, characterized in that, The electricity price and reserve price for each node are as follows: In the above formula, , Let $t$ be the electricity price and the reserve price for node $p$ in time period $t$. , These are the dual multipliers of the power balance constraint and the reserve capacity constraint in time period t, respectively. , These are the first and second dual multipliers of network security constraints, respectively.

12. The method as described in claim 11, characterized in that, The pre-built virtual power plant lower-level optimization model includes: a second objective function with the goal of minimizing the operating cost of the virtual power plant, as well as a second and third constraint condition.

13. The method as described in claim 12, characterized in that, The second objective function is as follows: In the above formula, The value of the second objective function. The total operating cost of the virtual power plant during time period t. This represents the total number of virtual power plant devices. Let be the price of electrical energy for device m at time t. Let m be the energy clearing power of device m at time t. Let m be the price of the spare capacity of equipment at time t. Let m be the clearing power of the standby market for device m at time t.

14. The method as described in claim 13, characterized in that, The third constraint includes: gas turbine output constraint, energy storage charging and discharging constraint, and electric vehicle charging demand constraint.

15. The method as described in claim 14, characterized in that, The output constraints of the gas turbine unit are as follows: The energy storage charging and discharging constraints are as follows: The electric vehicle charging demand constraints are as follows: In the above formula, This refers to the operating state of the gas turbine unit during time period t. The output power of the gas turbine unit during time period t. This is the lower limit of the output power of the gas turbine unit. This is the upper limit of the output power of the gas turbine unit. The linearization coefficients of the model for time period t are... This refers to the start-up and shutdown status of the gas turbine unit during time period t. This represents the operating status of the gas turbine unit during time period t-1. This refers to the downhill ramp power of the gas turbine unit. The output power of the gas turbine unit during time period t-1 This refers to the uphill climbing power of the gas turbine unit. Let be the capacity of the electrical energy storage during time period t. The capacity of the electrical energy storage in time period t-1, The charging power of the energy storage during time period t. The charging efficiency of electrical energy storage, For time intervals, Let be the discharge power of the electrical energy storage during time period t. The discharge efficiency of electrical energy storage. This refers to the charging and discharging states of electrical energy storage. This is the upper limit of the charging power for electric energy storage. This is the upper limit of the discharge power of the electrical energy storage. , The capacity of energy storage at the beginning and end of the dispatch process. Let m be the battery capacity of the m-th electric vehicle in time period t-1. Let m be the battery capacity of the m-th electric vehicle during time period t; , Let m be the charging and discharging power of the m-th electric vehicle during time period t. , The upper limit for the charging and discharging power of electric vehicles. , To improve the charging and discharging efficiency of electric vehicles. This refers to the charging and discharging states of an electric vehicle. , Let m be the battery capacity at the beginning and end of the dispatching process for the m-th electric vehicle. The charging demand for the m-th electric vehicle. Let n be the charging and discharging efficiency of electric vehicles, and n be the total number of electric vehicles.

16. An apparatus for a power system dispatching method considering the resource characteristics of virtual power plants as described in any one of claims 1-15, characterized in that, The device includes: The first analysis module is used to solve the pre-built safety-constrained economic scheduling model and obtain the dual multipliers of the constraints in the pre-built safety-constrained economic scheduling model. The second analysis module is used to determine the electrical energy price and reserve price of each node based on the dual multiplier of the constraints. The third analysis module is used to substitute the electricity price and reserve price of each node into the pre-constructed virtual power plant lower-level optimization model and solve it to obtain the power system dispatch scheme.

17. A computer device, characterized in that, include: One or more processors; The processor is used to execute one or more programs; When the one or more programs are executed by the one or more processors, the power system scheduling method considering the characteristics of virtual power plant resources as described in any one of claims 1 to 15 is implemented.

18. A computer-readable storage medium, characterized in that, It contains a computer program, which, when executed, implements the power system dispatching method considering the characteristics of virtual power plant resources as described in any one of claims 1 to 15.