A method and system for obtaining a power grid dispatching strategy

By generating probabilistic security domain maps offline, the problem of untimely response caused by the large amount of computation in existing power grid dispatching methods is solved. This enables the rapid acquisition of power grid dispatching strategies that meet transient security constraints, thereby improving the real-time performance and accuracy of power grid dispatching.

CN123163052APending Publication Date: 2026-11-24CHINA SOUTHERN POWER GRID COMPANY
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611304900.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-26
Publication Date
2026-11-24

AI Technical Summary

Technical Problem

Existing power grid dispatching methods require a large amount of computation when faced with high proportions of renewable energy integration and uncertainties, making it difficult to meet the minute-level response requirements of real-time dispatching and leading to the risk of dispatching scheme instability.

Method used

By generating probabilistic safety domain maps offline, grid verification and parameter calculation are completed in advance, and robust safety constraint parameters are pre-calculated offline. During the online phase, only the map needs to be queried to obtain the scheduling strategy, thus avoiding repeated verification operations.

Benefits of technology

It enables the rapid acquisition of power grid dispatching strategies that meet transient security constraints during the online phase, shortening the computation time and improving the response speed and accuracy of power grid dispatching.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123163052A_ABST
    Figure CN123163052A_ABST
Patent Text Reader

Abstract

The application discloses a kind of acquisition method and system of power grid dispatching strategy, belong to power grid dispatching technical field, method is: obtaining the several historical key operating variables of to-be-dispatched power grid, to determine the initial grid cell corresponding to each historical key operating variable and the center point of each initial grid cell;According to the data, obtain the robust security constraint parameter corresponding to each current grid cell;Through the data, construct offline probabilistic security domain map;Obtain the several real-time key operating variables of to-be-dispatched power grid, and according to the data, match query offline probabilistic security domain map, obtain corresponding robust security constraint parameter, to obtain the dispatching strategy of to-be-dispatched power grid according to corresponding robust security constraint parameter and several real-time key operating variables.The acquisition method of power grid dispatching strategy provided by the application can quickly obtain the power grid dispatching strategy meeting transient security constraint by only querying the offline map in online stage.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This invention relates to the field of power grid dispatching technology, and in particular to a method and system for obtaining power grid dispatching strategies. Background Technology

[0002] With the integration of a high proportion of renewable energy, uncertainties such as fluctuations in renewable energy output, load changes, and model parameter deviations may cause the actual operating point to deviate from the planned dispatch point, approaching or even exceeding the transient stability boundary, leading to the risk of instability in originally safe dispatch schemes. Therefore, it is necessary to maintain a certain margin between the operating point and the stability boundary, so that it can remain within the transient safety region under the influence of uncertain disturbances. Data-driven Transient Security Assessment (DTSA) models can learn the mapping relationship between the grid operating point and the transient safety state, and approximate the transient stability boundary. Therefore, they can be embedded in Transient Stability Constrained Optimal Power Flow (TSCOPF) to constrain the dispatch results within the transient safety region.

[0003] Existing research proposes a multi-step iterative scheme that combines probabilistic robust verification with online TSCOPF solution, gradually approximating the scheduling result that meets the safety margin requirements through local approximation and iterative updates.

[0004] Under the current technological background, the above-mentioned methods have significant drawbacks in practical engineering applications: First, the computational load is large, making it difficult to meet real-time scheduling requirements. Within the real-time scheduling window of the power grid with a period of 5 minutes, this method may require multiple executions of the most time-consuming probabilistic approximation calculations. Each approximation involves multiple sampling and optimization problem solving, while also requiring repeated solutions to the TSCOPF. Although existing technologies have reduced the amount of computation per operation to some extent through approximation methods, the iterative mechanism itself makes it difficult to control the total computation time, resulting in the inability to meet the strict minute-level real-time requirements. Summary of the Invention

[0005] This invention aims to provide a method and system for obtaining power grid dispatching strategies to solve the above-mentioned technical problems and avoid the untimely power grid dispatching response caused by placing the verification and iteration process in the online real-time dispatching stage in existing methods. By pre-generating a probabilistic security domain map offline, the power grid dispatching strategy that meets the transient security constraints can be quickly obtained by querying the offline map in the online stage.

[0006] To address the aforementioned technical problems, this invention provides a method for obtaining power grid dispatching strategies, comprising: The historical power grid operation samples of the power grid to be dispatched are obtained, and several historical key operation variables are extracted from the historical power grid operation samples. Based on the several historical key operation variables and the preset key operation variable space, the initial grid cell corresponding to each historical key operation variable and the center point of each initial grid cell are determined. Based on the center point of each initial mesh cell, a mesh verification process is performed on all initial mesh cells. If any initial mesh cell fails the verification, it is divided into several sub-mesh cells. These sub-mesh cells are then combined with other initial mesh cells as several current mesh cells to re-execute the mesh verification process until all current mesh cells pass the verification. The robust safety constraint parameters corresponding to each current mesh cell are then obtained. An offline probabilistic safety domain map is constructed using robust safety constraint parameters corresponding to several current grid cells; Several real-time key operating variables of the power grid to be dispatched are obtained, and the offline probabilistic security domain map is matched and queried based on the several real-time key operating variables to obtain the robust security constraint parameters corresponding to each real-time key operating variable. The dispatching strategy of the power grid to be dispatched is obtained based on the robust security constraint parameters corresponding to each real-time key operating variable and the several real-time key operating variables.

[0007] In the above scheme, by completing the grid verification of all current grid cells of the grid to be dispatched in the offline phase, the entire grid verification process can be moved offline and completed in advance, thus avoiding the delay in grid dispatch response caused by repeated verification operations in the online phase. Next, by encapsulating all robust security constraint parameters pre-calculated offline into a rapidly searchable offline probabilistic security domain map, the online dispatch phase only needs to directly retrieve the corresponding robust security constraint parameters based on several real-time key operating variables of the grid to be dispatched, shortening the online dispatch computation time. Finally, the dispatch strategy of the grid to be dispatched is obtained through the robust security constraint parameters corresponding to each real-time key operating variable and several real-time key operating variables, realizing the rapid acquisition of a grid dispatch strategy that satisfies transient security constraints.

[0008] Further, the step of obtaining historical power grid operation samples of the power grid to be dispatched, and extracting several historical key operation variables from the historical power grid operation samples, to determine the initial grid cell corresponding to each historical key operation variable and the center point of each initial grid cell based on the several historical key operation variables and a preset key operation variable space, includes: Obtain historical power grid operation samples of the power grid to be dispatched, and extract several historical candidate operation variables from the historical power grid operation samples; Based on preset scheduling rules, several historical candidate runtime variables are filtered to obtain several key historical runtime variables; Simulations were performed on several key historical operating variables to obtain the sensitivity limits for each key historical operating variable. The corresponding grid step size is calculated by the sensitivity limit value corresponding to each historical key operating variable, and the initial grid cell and the center point of each initial grid cell are obtained based on the grid step size corresponding to each historical key operating variable and the preset key operating variable space.

[0009] In the above scheme, by acquiring historical power grid operation samples of the power grid to be dispatched and filtering out all operational variables related to power grid stability, a foundation can be provided for subsequent screening of key historical operational variables. Next, by screening several candidate historical operational variables using preset dispatch rules, redundant operational variables with little impact on transient stability margin or low sensitivity can be eliminated, retaining only key historical operational variables highly related to power grid security. This reduces the data dimensionality of subsequent grid partitioning and simulation calculations, and decreases the overall offline computation load. Then, by simulating several key historical operational variables, the sensitivity of each key historical operational variable to power grid transient security can be quantified, obtaining the sensitivity limits corresponding to each key historical operational variable, providing a basis for accurately setting the grid density. Finally, by adaptively setting the grid density using the sensitivity limits corresponding to each key historical operational variable, it is ensured that the constraint parameters within the grid can adapt to the operating conditions of each region, thereby completely dividing the initial grid cells covering the entire operating space and determining the center point of each initial grid cell.

[0010] Further, the step of calculating the corresponding grid step size through the sensitivity limit value corresponding to each historical key operating variable, and obtaining the initial grid cell and the center point of each initial grid cell based on the grid step size corresponding to each historical key operating variable and the preset key operating variable space, includes: The corresponding grid step size is calculated by setting the preset step size limit, the preset grid division accuracy, and the sensitivity limit corresponding to each historical key operating variable. The space of the preset key operating variables is divided based on the grid step size corresponding to each historical key operating variable, and the initial grid cells corresponding to each historical key operating variable are obtained. The center point of each initial grid cell is obtained by using the initial grid cells corresponding to each historical key running variable.

[0011] In the above scheme, the grid step size is calculated by setting preset step size limits, preset grid division accuracy, and sensitivity limits corresponding to each historical key operating variable. This ensures that the robust safety constraint parameters obtained from subsequent offline calculations meet safety requirements within the grid. Next, the preset key operating variable space is divided using the grid step size corresponding to each historical key operating variable. This allows for the creation of independent calculation regions for subsequent grid-by-grid offline verification, resulting in initial grid cells corresponding to each historical key operating variable. Finally, the center point of each initial grid cell is obtained using these initial grid cells.

[0012] Furthermore, the process of performing mesh verification on all initial mesh cells based on the center point of each initial mesh cell includes: Power flow solutions are performed on each initial grid cell based on its center point to obtain the historical critical variable operating state of each initial grid cell. The transient stability margin of each historical critical variable operating state is then obtained based on the historical critical variable operating state of each initial grid cell. By constructing the corresponding transient safety linear mapping model based on the transient stability margin of each historical key variable's operating state, and solving the corresponding transient safety linear mapping model, the robust verification value corresponding to each initial grid cell is obtained. If the robust check value is less than the preset security threshold, it means that the initial mesh cell corresponding to the robust check value has failed the check. If the robust check value is greater than or equal to the preset security threshold, it means that the initial mesh cell corresponding to the robust check value has passed the check.

[0013] In the above scheme, power flow solutions are performed on each initial grid cell using its center point. This allows for the acquisition of the historical critical variable operating states of each initial grid cell and the quantification of their transient stability margins, providing a basis for subsequent verification of whether the grid meets safety requirements. Next, a corresponding transient safety linear mapping model is constructed using the transient stability margins of each historical critical variable operating state. Solving this model yields robustness verification values ​​for each initial grid cell, which can be used to assess whether each grid passes verification.

[0014] Further, the step of performing power flow solutions on each initial grid cell based on the center point of each initial grid cell to obtain the historical critical variable operating state of each initial grid cell, and obtaining the transient stability margin of each historical critical variable operating state based on the historical critical variable operating state of each initial grid cell, includes: Based on the center point of each initial grid cell, power flow solutions are performed on each initial grid cell to obtain the historical key variable operating status of each initial grid cell. Based on the historical key variable operating status of each initial grid cell and the preset historical key variable disturbance range, random samples of disturbance variables for the operating status of each historical key variable are generated. The transient stability margin of each historical key variable is obtained by evaluating the operating status of each historical key variable and the disturbance variable samples of the operating status of each historical key variable based on the preset data-driven transient security assessment model.

[0015] In the above scheme, power flow solutions are performed on each initial grid cell using its center point to obtain the historical operating states of key variables. This provides foundational data for simulating fluctuations and verifying the performance of each grid cell. Next, based on the historical operating states of key variables and preset historical key variable disturbance ranges, disturbance variable samples for each historical key variable are randomly generated. This simulates various uncertain disturbance conditions such as renewable energy output and load fluctuations, covering all possible fluctuation scenarios within the grid, ensuring the grid verification closely matches real-world power grid operation fluctuations. Finally, a preset data-driven transient security assessment model evaluates the historical key variable operating states and the disturbance variable samples for each historical key variable operating state. This yields the transient stability margin of each historical key variable operating state, providing reliable numerical data for determining whether the grid has passed verification.

[0016] Furthermore, the process involves constructing a corresponding transient safety linear mapping model based on the transient stability margins of each historical key variable's operating state, and solving the corresponding transient safety linear mapping model to obtain the robustness check value corresponding to each initial grid cell, including: By constructing the corresponding transient safety linear mapping model based on the transient stability margin of the operating states of each historical key variable, and solving the corresponding transient safety linear mapping model, we can obtain the robust coefficient vector and the corresponding robust approximation error corresponding to the operating states of each historical key variable. Based on the robust coefficient vector corresponding to the operating state of each historical key variable, determine the upper severe disturbance boundary and the corresponding lower severe disturbance boundary corresponding to the operating state of each historical key variable, and construct the severe disturbance vector corresponding to the operating state of each historical key variable through the upper severe disturbance boundary and the corresponding lower severe disturbance boundary corresponding to the operating state of each historical key variable. The robust verification value for each initial grid cell is calculated based on the robust coefficient vector, the robust approximation error, and the severe disturbance vector corresponding to the operating status of each historical key variable.

[0017] In the above scheme, a corresponding transient safety linear mapping model is constructed based on the transient stability margin of each historical key variable's operating state. Solving this model yields the robust coefficient vector and robust approximation error corresponding to each historical key variable's operating state, providing fundamental calculation parameters for subsequent grid verification. Next, the upper and lower severe disturbance boundaries corresponding to each historical key variable's operating state are determined using the robust coefficient vector, and integrated to form a severe disturbance vector representing the worst-case operating disturbance. This simulates the highest-risk power grid conditions, ensuring the grid verification results possess safety and conservatism. Finally, the robust verification value for each initial grid cell is calculated using the robust coefficient vector, robust approximation error, and severe disturbance vector corresponding to each historical key variable's operating state. This directly reflects the overall safety assurance capability of each initial grid cell under the worst-case disturbance, facilitating subsequent determination of whether the initial grid cell passes verification.

[0018] Further, the step of acquiring several real-time key operating variables of the power grid to be dispatched, and performing a matching query on the offline probabilistic security domain map based on the several real-time key operating variables to obtain robust security constraint parameters corresponding to each real-time key operating variable, so as to obtain the dispatching strategy of the power grid to be dispatched based on the robust security constraint parameters corresponding to each real-time key operating variable and the several real-time key operating variables, includes: The real-time power grid operation sample of the power grid to be dispatched is obtained, and several real-time key operation variables are extracted from the real-time power grid operation sample. The offline probabilistic security domain map is matched and queried based on the several real-time key operation variables to obtain several grid matching distances corresponding to each real-time key operation variable. Based on several grid matching distances and preset matching conditions corresponding to each real-time key operating variable, the current grid cell corresponding to each real-time key operating variable is obtained, so as to obtain the robust safety constraint parameters corresponding to each real-time key operating variable according to the current grid cell corresponding to each real-time key operating variable. The scheduling strategy of the power grid to be scheduled is obtained by using the robust safety constraint parameters corresponding to each real-time key operating variable and several real-time key operating variables.

[0019] In the above scheme, several real-time key operating variables are used to match and query the offline probabilistic security domain map to obtain several grid matching distances corresponding to each real-time key operating variable, which can provide a basis for selecting suitable grid cells. Next, according to preset matching conditions, the grid cell that best matches the current operating condition of the power grid to be scheduled is selected from all grid cells, and the robust security constraint parameters corresponding to that grid cell are retrieved. This avoids the need for time-consuming online probabilistic verification and iterative calculations, shortening the online scheduling computation time. Finally, since this invention only needs to complete real-time power flow optimization calculations based on several real-time key operating variables and corresponding robust security constraint parameters of the power grid to be scheduled during the online scheduling phase, it can shorten the online scheduling computation time, obtain the scheduling strategy of the power grid to be scheduled, and solve the problem of untimely scheduling response caused by online iterative calculations.

[0020] This invention provides a system for obtaining power grid dispatching strategies, including a grid partitioning module, an offline grid verification module, an offline map construction module, and a query dispatching decision module, specifically: The grid partitioning module is used to obtain historical power grid operation samples of the power grid to be dispatched, and extract several historical key operation variables through the historical power grid operation samples, so as to determine the initial grid cell corresponding to each historical key operation variable and the center point of each initial grid cell based on the several historical key operation variables and the preset key operation variable space. The offline mesh verification module is used to perform a mesh verification process on all initial mesh units based on the center point of each initial mesh unit. If it is determined that an initial mesh unit fails the verification, the initial mesh unit is divided into several sub-mesh units. The sub-mesh units and other initial mesh units are used as several current mesh units to re-execute the mesh verification process until all current mesh units pass the verification. The robust safety constraint parameters corresponding to each current mesh unit are then obtained. The offline map construction module is used to construct an offline probabilistic safety domain map using robust safety constraint parameters corresponding to several current grid cells; The query scheduling decision module is used to obtain several real-time key operating variables of the power grid to be scheduled, and to perform matching queries on the offline probabilistic security domain map based on the several real-time key operating variables to obtain the robust security constraint parameters corresponding to each real-time key operating variable, so as to obtain the scheduling strategy of the power grid to be scheduled based on the robust security constraint parameters corresponding to each real-time key operating variable and the several real-time key operating variables.

[0021] This invention provides a system for obtaining power grid dispatching strategies. In practical applications, only an offline grid verification module is needed. By completing the grid verification of all current grid cells of the power grid to be dispatched in the offline phase, the entire grid verification process can be moved offline and completed in advance, thus avoiding the delays in power grid dispatching response caused by repeated verification operations in the online phase. Next, an offline map construction module is used. By uniformly encapsulating all robust security constraint parameters pre-calculated offline into a quickly searchable offline probabilistic security domain map, the online dispatching phase only requires querying the dispatching decision module to directly retrieve the corresponding robust security constraint parameters based on several real-time key operating variables of the power grid to be dispatched, shortening the online dispatching computation time. Finally, the dispatching strategy of the power grid to be dispatched is obtained through the robust security constraint parameters corresponding to each real-time key operating variable and several real-time key operating variables, realizing the rapid acquisition of a power grid dispatching strategy that satisfies transient security constraints.

[0022] Furthermore, the grid partitioning module is used to acquire historical power grid operation samples of the power grid to be dispatched, and extract several historical key operation variables from the historical power grid operation samples, so as to determine the initial grid cell corresponding to each historical key operation variable and the center point of each initial grid cell based on the several historical key operation variables and the preset key operation variable space, including: Obtain historical power grid operation samples of the power grid to be dispatched, and extract several historical candidate operation variables from the historical power grid operation samples; Based on preset scheduling rules, several historical candidate runtime variables are filtered to obtain several key historical runtime variables; Simulations were performed on several key historical operating variables to obtain the sensitivity limits for each key historical operating variable. The corresponding grid step size is calculated by the sensitivity limit value corresponding to each historical key operating variable, and the initial grid cell and the center point of each initial grid cell are obtained based on the grid step size corresponding to each historical key operating variable and the preset key operating variable space.

[0023] In the above scheme, by acquiring historical power grid operation samples of the power grid to be dispatched and filtering out all operational variables related to power grid stability, a foundation can be provided for subsequent screening of key historical operational variables. Next, by screening several candidate historical operational variables using preset dispatch rules, redundant operational variables with little impact on transient stability margin or low sensitivity can be eliminated, retaining only key historical operational variables highly related to power grid security. This reduces the data dimensionality of subsequent grid partitioning and simulation calculations, and decreases the overall offline computation load. Then, by simulating several key historical operational variables, the sensitivity of each key historical operational variable to power grid transient security can be quantified, obtaining the sensitivity limits corresponding to each key historical operational variable, providing a basis for accurately setting the grid density. Finally, by adaptively setting the grid density using the sensitivity limits corresponding to each key historical operational variable, it is ensured that the constraint parameters within the grid can adapt to the operating conditions of each region, thereby completely dividing the initial grid cells covering the entire operating space and determining the center point of each initial grid cell.

[0024] Further, the step of calculating the corresponding grid step size through the sensitivity limit value corresponding to each historical key operating variable, and obtaining the initial grid cell and the center point of each initial grid cell based on the grid step size corresponding to each historical key operating variable and the preset key operating variable space, includes: The corresponding grid step size is calculated by setting the preset step size limit, the preset grid division accuracy, and the sensitivity limit corresponding to each historical key operating variable. The space of the preset key operating variables is divided based on the grid step size corresponding to each historical key operating variable, and the initial grid cells corresponding to each historical key operating variable are obtained. The center point of each initial grid cell is obtained by using the initial grid cells corresponding to each historical key running variable.

[0025] In the above scheme, the grid step size is calculated by setting preset step size limits, preset grid division accuracy, and sensitivity limits corresponding to each historical key operating variable. This ensures that the robust safety constraint parameters obtained from subsequent offline calculations meet safety requirements within the grid. Next, the preset key operating variable space is divided using the grid step size corresponding to each historical key operating variable. This allows for the creation of independent calculation regions for subsequent grid-by-grid offline verification, resulting in initial grid cells corresponding to each historical key operating variable. Finally, the center point of each initial grid cell is obtained using these initial grid cells. Attached Figure Description

[0026] To more clearly illustrate the technical solution of this application, the drawings used in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this application. For those skilled in the art, other drawings can be obtained from these drawings without creative effort.

[0027] Figure 1 A flowchart illustrating a method for obtaining a power grid dispatching strategy according to an embodiment of the present invention; Figure 2 This is an architecture diagram of a power grid dispatching strategy acquisition system provided in an embodiment of the present invention. Detailed Implementation

[0028] To make the objectives, technical solutions, and advantages of this application clearer, the technical solutions of this application will be clearly and completely described below with reference to the accompanying drawings of the embodiments. Obviously, the described embodiments are only some embodiments of this application, not all embodiments. Based on the embodiments of this application, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of this application.

[0029] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this application pertains; the terminology used herein is for the purpose of describing particular embodiments only and is not intended to limit the application; the terms “comprising” and “having”, and any variations thereof, in the specification, claims, and foregoing description of the drawings are intended to cover non-exclusive inclusion.

[0030] In the description of the embodiments of this application, technical terms such as "first" and "second" are used only to distinguish different objects and should not be construed as indicating or implying relative importance or implicitly specifying the number, specific order, or primary and secondary relationship of the indicated technical features. In the description of the embodiments of this application, "multiple" means two or more, unless otherwise explicitly defined.

[0031] In this document, the term "embodiment" means that a particular feature, structure, or characteristic described in connection with an embodiment may be included in at least one embodiment of this application. The appearance of this phrase in various places throughout the specification does not necessarily refer to the same embodiment, nor is it a separate or alternative embodiment mutually exclusive with other embodiments. It will be explicitly and implicitly understood by those skilled in the art that the embodiments described herein can be combined with other embodiments.

[0032] In the description of the embodiments in this application, the term "and / or" is merely a description of the relationship between related objects, indicating that three relationships can exist. For example, A and / or B can represent: A existing alone, A and B existing simultaneously, and B existing alone. Additionally, the character " / " in this document generally indicates that the preceding and following related objects have an "or" relationship.

[0033] In the description of the embodiments of this application, the term "multiple" refers to two or more (including two), similarly, "multiple sets" refers to two or more (including two sets), and "multiple pieces" refers to two or more (including two pieces).

[0034] In the description of the embodiments of this application, unless otherwise expressly specified and limited, technical terms such as "installation," "connection," "joining," and "fixing" should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral part; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium; they can refer to the internal communication of two components or the interaction between two components. For those skilled in the art, the specific meaning of the above terms in the embodiments of this application can be understood according to the specific circumstances.

[0035] See Figure 1 To avoid untimely grid dispatch response caused by placing the verification and iteration process in the online real-time dispatch phase in existing methods, this embodiment provides a method for obtaining grid dispatch strategies that meet transient security constraints by pre-generating a probabilistic security domain map offline. This allows for quick acquisition of grid dispatch strategies that meet transient security constraints simply by querying the offline map during the online phase. The flowchart of this method can be found in [link to flowchart]. Figure 1 ,include: Step S1: Obtain historical power grid operation samples of the power grid to be dispatched, and extract several historical key operation variables from the historical power grid operation samples, so as to determine the initial grid cell corresponding to each historical key operation variable and the center point of each initial grid cell based on the several historical key operation variables and the preset key operation variable space. Step S2: Perform a mesh verification process on all initial mesh cells based on the center point of each initial mesh cell. If an initial mesh cell fails the verification, it is divided into several sub-mesh cells. These sub-mesh cells and other initial mesh cells are then used as current mesh cells to re-execute the mesh verification process until all current mesh cells pass the verification. The robust safety constraint parameters corresponding to each current mesh cell are then obtained. Step S3: Construct an offline probabilistic safety domain map using robust safety constraint parameters corresponding to several current grid cells; Step S4: Obtain several real-time key operating variables of the power grid to be dispatched, and perform matching queries on the offline probabilistic security domain map based on the several real-time key operating variables to obtain the robust security constraint parameters corresponding to each real-time key operating variable, so as to obtain the dispatching strategy of the power grid to be dispatched based on the robust security constraint parameters corresponding to each real-time key operating variable and the several real-time key operating variables.

[0036] In this embodiment, by completing the grid verification of all current grid cells of the grid to be scheduled during the offline phase, the entire grid verification process can be moved offline and completed in advance, thereby avoiding the untimely grid dispatch response caused by repeated verification operations during the online phase. Next, by uniformly encapsulating all robust security constraint parameters pre-calculated offline into a rapidly searchable offline probabilistic security domain map, the online dispatch phase only needs to directly retrieve the corresponding robust security constraint parameters based on several real-time key operating variables of the grid to be scheduled, shortening the online dispatch computation time. Finally, the dispatch strategy of the grid to be scheduled is obtained through the robust security constraint parameters corresponding to each real-time key operating variable and several real-time key operating variables, realizing the rapid acquisition of a grid dispatch strategy that satisfies transient security constraints.

[0037] Further, the step of obtaining historical power grid operation samples of the power grid to be dispatched, and extracting several historical key operation variables from the historical power grid operation samples, to determine the initial grid cell corresponding to each historical key operation variable and the center point of each initial grid cell based on the several historical key operation variables and a preset key operation variable space, includes: Obtain historical power grid operation samples of the power grid to be dispatched, and extract several historical candidate operation variables from the historical power grid operation samples; Based on preset scheduling rules, several historical candidate runtime variables are filtered to obtain several key historical runtime variables; Simulations were performed on several key historical operating variables to obtain the sensitivity limits for each key historical operating variable. The corresponding grid step size is calculated by the sensitivity limit value corresponding to each historical key operating variable, and the initial grid cell and the center point of each initial grid cell are obtained based on the grid step size corresponding to each historical key operating variable and the preset key operating variable space.

[0038] In this embodiment, historical power grid operation samples of the power grid to be dispatched are obtained, and all operational variables related to power grid stability are selected from them. Specifically: Where s is the complete state vector of the power grid contained in the historical power grid operation samples, For feature extraction function, The system establishes a set of historical candidate operating variables, containing several historical candidate operating variables, which provides a foundation for subsequent screening of key historical operating variables. Next, by using preset scheduling rules, these candidate operating variables are screened to eliminate redundant operating variables with little impact on transient stability margin or low sensitivity, retaining only key historical operating variables highly relevant to grid security. This reduces the data dimensionality of subsequent grid partitioning and simulation calculations, and decreases the overall offline computation load. The preset scheduling rules include preset empirical scheduling rules obtained from historical sensitivity tests, correlation analysis tests, or DTSA output disturbance tests. The key historical operating variables include total grid load, regional total load, total grid wind power output, total grid photovoltaic power output, power flow at key sections, and power of important tie lines. Then, by simulating all key historical operating variables, the sensitivity of each key historical operating variable to grid transient security can be quantified, obtaining the sensitivity limits corresponding to each key historical operating variable, providing a basis for accurately setting the grid density. Finally, by adaptively setting the mesh density by the sensitivity limit values ​​corresponding to each historical key operating variable, it is possible to ensure that the constraint parameters within the mesh can adapt to the working conditions of each region, thereby enabling the complete division of the initial mesh cells covering the entire operating space and the determination of the center point of each initial mesh cell.

[0039] Further, the step of calculating the corresponding grid step size through the sensitivity limit value corresponding to each historical key operating variable, and obtaining the initial grid cell and the center point of each initial grid cell based on the grid step size corresponding to each historical key operating variable and the preset key operating variable space, includes: The corresponding grid step size is calculated by setting the preset step size limit, the preset grid division accuracy, and the sensitivity limit corresponding to each historical key operating variable. The space of the preset key operating variables is divided based on the grid step size corresponding to each historical key operating variable, and the initial grid cells corresponding to each historical key operating variable are obtained. The center point of each initial grid cell is obtained by using the initial grid cells corresponding to each historical key running variable.

[0040] In this embodiment, the corresponding grid step size is calculated by using a preset step size limit, a preset grid division accuracy, and sensitivity limits corresponding to each historical key operating variable. Specifically: in, Let j be the grid step size corresponding to the j-th historical key runtime variable. The preset step size limit can be set based on engineering experience; Preset grid division precision; Let j be the sensitivity limit corresponding to the j-th historical key runtime variable. The preset positive numbers are used to avoid division by zero. The above process ensures that the robust safety constraint parameters obtained from subsequent offline calculations meet safety requirements within the mesh. Next, the preset key operating variable space is divided using the mesh step size corresponding to each historical key operating variable. This allows for the creation of independent computational regions for subsequent grid-by-grid offline verification, resulting in initial mesh cells corresponding to each historical key operating variable. Then, the center point of each initial mesh cell is obtained using these initial mesh cells.

[0041] Furthermore, the process of performing mesh verification on all initial mesh cells based on the center point of each initial mesh cell includes: Power flow solutions are performed on each initial grid cell based on its center point to obtain the historical critical variable operating state of each initial grid cell. The transient stability margin of each historical critical variable operating state is then obtained based on the historical critical variable operating state of each initial grid cell. By constructing the corresponding transient safety linear mapping model based on the transient stability margin of each historical key variable's operating state, and solving the corresponding transient safety linear mapping model, the robust verification value corresponding to each initial grid cell is obtained. If the robust check value is less than the preset security threshold, it means that the initial mesh cell corresponding to the robust check value has failed the check. If the robust check value is greater than or equal to the preset security threshold, it means that the initial mesh cell corresponding to the robust check value has passed the check.

[0042] In this embodiment, power flow solutions are performed on each initial grid cell using its center point. This allows for the acquisition of the historical critical variable operating states of each initial grid cell and the quantification of their transient stability margins, providing a basis for subsequent verification of whether the grid meets safety requirements. The power flow solution is implemented using existing AC OPF (Optimal Power Flow), DC OPF, existing economic scheduling power flow solvers, or safety-constrained power flow solvers. Next, a corresponding transient safety linear mapping model is constructed using the transient stability margins of each historical critical variable operating state. Solving this model yields robustness verification values ​​for each initial grid cell, which can be used to assess whether each grid passes the verification.

[0043] Further, the step of performing power flow solutions on each initial grid cell based on the center point of each initial grid cell to obtain the historical critical variable operating state of each initial grid cell, and obtaining the transient stability margin of each historical critical variable operating state based on the historical critical variable operating state of each initial grid cell, includes: Based on the center point of each initial grid cell, power flow solutions are performed on each initial grid cell to obtain the historical key variable operating status of each initial grid cell. Based on the historical key variable operating status of each initial grid cell and the preset historical key variable disturbance range, random samples of disturbance variables for the operating status of each historical key variable are generated. The transient stability margin of each historical key variable is obtained by evaluating the operating status of each historical key variable and the disturbance variable samples of the operating status of each historical key variable based on the preset data-driven transient security assessment model.

[0044] In this embodiment, power flow solutions are performed on each initial grid cell using its center point to obtain the historical critical variable operating states of each initial grid cell. This provides foundational data for subsequent simulation of fluctuations and for verifying the pass / fail status of each grid cell. Next, based on the historical critical variable operating states of each initial grid cell and a preset historical critical variable disturbance range, disturbance variable samples for each historical critical variable operating state are randomly generated. This simulates various uncertain disturbance conditions such as renewable energy output and load fluctuations, covering all possible fluctuation scenarios under the grid, ensuring that grid verification closely matches the actual fluctuation scenarios of the power grid. Then, a preset data-driven transient security assessment model is used to evaluate the historical critical variable operating states and the disturbance variable samples for each historical critical variable operating state. This yields the transient stability margin of each historical critical variable operating state, providing reliable numerical data for subsequent determination of grid pass / fail status.

[0045] Furthermore, the process involves constructing a corresponding transient safety linear mapping model based on the transient stability margins of each historical key variable's operating state, and solving the corresponding transient safety linear mapping model to obtain the robustness check value corresponding to each initial grid cell, including: By constructing the corresponding transient safety linear mapping model based on the transient stability margin of the operating states of each historical key variable, and solving the corresponding transient safety linear mapping model, we can obtain the robust coefficient vector and the corresponding robust approximation error corresponding to the operating states of each historical key variable. Based on the robust coefficient vector corresponding to the operating state of each historical key variable, determine the upper severe disturbance boundary and the corresponding lower severe disturbance boundary corresponding to the operating state of each historical key variable, and construct the severe disturbance vector corresponding to the operating state of each historical key variable through the upper severe disturbance boundary and the corresponding lower severe disturbance boundary corresponding to the operating state of each historical key variable. The robust verification value for each initial grid cell is calculated based on the robust coefficient vector, the robust approximation error, and the severe disturbance vector corresponding to the operating status of each historical key variable.

[0046] In this embodiment, a corresponding transient safety linear mapping model is constructed based on the transient stability margin of each historical key variable's operating state. Solving this model yields the robust coefficient vector and corresponding robust approximation error for each historical key variable's operating state, providing fundamental calculation parameters for subsequent grid verification. The robust coefficient vector corresponding to the i-th historical key variable's operating state is as follows: ,in, For constant bias terms, For the sensitivity coefficient vector of deterministic operating variables, Let be the sensitivity coefficient vector of the uncertain variables, and let be the robust approximation error corresponding to the running state of the i-th historical key variable. .

[0047] Next, the upper and lower severe disturbance boundaries corresponding to the operating states of each historical key variable are determined by the robust coefficient vectors corresponding to the operating states of each historical key variable. For example, the total network load... The corresponding upper severe disturbance boundary is 2000MW and the corresponding lower severe disturbance boundary is 1000MW. Therefore, the integrated severe disturbance vector representing the worst-case operating disturbance is [1000MW, 2000MW]; Total wind power output of the entire grid. The corresponding upper severe disturbance boundary is 500MW and the corresponding lower severe disturbance boundary is 0MW. Therefore, the integrated severe disturbance vector representing the worst-case operating disturbance is [0MW, 500MW]. This can simulate the highest-risk operating conditions of the power grid, ensuring the grid verification results are safe and conservative. Then, the robust verification value corresponding to each initial grid cell is calculated using the robust coefficient vector corresponding to the operating state of each historical key variable, the corresponding robust approximation error, and the corresponding severe disturbance vector. Specifically: ,in, Represents the i-th historical key variable. Let be the severe disturbance vector corresponding to the operating state of the i-th historical key variable. Let be the robust check value corresponding to the i-th initial grid cell. The robust check values ​​obtained for each initial grid cell can intuitively reflect the overall security assurance capability of each initial grid cell under the worst disturbance, so as to determine whether the initial grid cell passes the check.

[0048] Further, the step of acquiring several real-time key operating variables of the power grid to be dispatched, and performing a matching query on the offline probabilistic security domain map based on the several real-time key operating variables to obtain robust security constraint parameters corresponding to each real-time key operating variable, so as to obtain the dispatching strategy of the power grid to be dispatched based on the robust security constraint parameters corresponding to each real-time key operating variable and the several real-time key operating variables, includes: The real-time power grid operation sample of the power grid to be dispatched is obtained, and several real-time key operation variables are extracted from the real-time power grid operation sample. The offline probabilistic security domain map is matched and queried based on the several real-time key operation variables to obtain several grid matching distances corresponding to each real-time key operation variable. Based on several grid matching distances and preset matching conditions corresponding to each real-time key operating variable, the current grid cell corresponding to each real-time key operating variable is obtained, so as to obtain the robust safety constraint parameters corresponding to each real-time key operating variable according to the current grid cell corresponding to each real-time key operating variable. The scheduling strategy of the power grid to be scheduled is obtained by using the robust safety constraint parameters corresponding to each real-time key operating variable and several real-time key operating variables.

[0049] In this embodiment, the process of obtaining real-time power grid operation samples of the power grid to be dispatched and extracting several real-time key operation variables from these samples is consistent with the offline phase. Matching queries are performed on the offline probabilistic security domain map using these real-time key operation variables to obtain several grid matching distances corresponding to each real-time key operation variable, providing a basis for selecting suitable grid cells. The matching query can employ KD-tree search or nearest neighbor interpolation. Next, the grid cell that best matches the current operating condition of the power grid to be dispatched is selected from all grid cells according to preset matching conditions, specifically as follows: ,in, To determine the grid matching distance between the i-th current grid cell and a certain real-time key runtime variable, A preset weight matrix is ​​used to adjust the importance of different real-time key runtime variables in the calculation; For the j-th real-time key runtime variable, Let be the center point of the i-th current grid cell. The preset matching conditions are as follows: if the j-th real-time critical operating variable falls within the boundary range of the current grid cell, then the robust safety constraint parameter of the current grid cell is preferentially used as the constraint of the j-th real-time critical operating variable; if the j-th real-time critical operating variable is located at the boundary of the current grid cell or is close to multiple current grid cells, then the more conservative robust safety constraint parameter among these current grid cells is selected as the constraint of the j-th real-time critical operating variable; if the j-th real-time critical operating variable exceeds the coverage of the offline map or falls into the area requiring online verification, then online verification is triggered or a preset conservative scheduling strategy is adopted. The above process can avoid repeating time-consuming probability verification and iterative calculations online, shortening the online scheduling calculation time. Finally, since this embodiment only needs to complete the real-time power flow optimization calculation based on several real-time critical operating variables of the power grid to be scheduled and the corresponding robust safety constraint parameters during the online scheduling stage, specifically: in, This indicates a preset real-time scheduling objective function, typically consisting of generation cost, wind and solar curtailment cost, load reduction cost, regulation deviation penalty, or a weighted sum thereof, with the goal of making scheduling decisions based on optimal economic efficiency. This represents the j-th real-time key runtime variable in real-time power flow optimization calculation; This indicates that the power flow balance constraint is satisfied; and Let represent the lower and upper severe disturbance boundaries of the j-th real-time critical runtime variable, respectively; For the constant bias term of the i-th current grid cell obtained by matching the j-th real-time key runtime variable, Let be the sensitivity coefficient vector of the deterministic operating variable of the i-th current grid cell obtained by matching the j-th real-time key operating variable. Let be the sensitivity coefficient vector of the uncertainty variable of the i-th current grid cell obtained by matching the j-th real-time key operational variable. Let be the robust approximation error corresponding to the i-th current grid cell obtained by matching the j-th real-time key runtime variable; if ,but ,in, The preset fluctuation radius; if ,but The above process can shorten the online scheduling computation time, obtain the scheduling strategy of the power grid to be scheduled, and solve the problem of untimely scheduling response caused by online iterative calculation.

[0050] This embodiment provides a system for obtaining power grid dispatching strategies. Please refer to [link to relevant documentation]. Figure 2 It includes a grid partitioning module 201, an offline grid verification module 202, an offline map construction module 203, and a query scheduling decision module 204, specifically as follows: The grid division module 201 is used to obtain historical power grid operation samples of the power grid to be dispatched, and extract several historical key operation variables through the historical power grid operation samples, so as to determine the initial grid cell corresponding to each historical key operation variable and the center point of each initial grid cell based on the several historical key operation variables and the preset key operation variable space. The offline mesh verification module 202 is used to perform a mesh verification process on all initial mesh units according to the center point of each initial mesh unit. If it is determined that an initial mesh unit fails the verification, the initial mesh unit is divided into several sub-mesh units. The several sub-mesh units and other initial mesh units are used as several current mesh units to re-execute the mesh verification process until all current mesh units pass the verification. The robust safety constraint parameters corresponding to each current mesh unit are obtained. The offline map construction module 203 is used to construct an offline probabilistic safety domain map using robust safety constraint parameters corresponding to several current grid cells; The query scheduling decision module 204 is used to obtain several real-time key operating variables of the power grid to be scheduled, and to perform matching queries on the offline probabilistic security domain map based on the several real-time key operating variables to obtain the robust security constraint parameters corresponding to each real-time key operating variable, so as to obtain the scheduling strategy of the power grid to be scheduled based on the robust security constraint parameters corresponding to each real-time key operating variable and the several real-time key operating variables.

[0051] This embodiment provides a system for obtaining power grid dispatching strategies. In practical applications, only an offline grid verification module 202 is needed. By completing the grid verification of all current grid cells of the power grid to be dispatched in the offline stage, the entire grid verification process can be moved offline and completed in advance, thereby avoiding repeated verification operations in the online stage that would cause untimely power grid dispatching response. Next, an offline map construction module 203 is used. By uniformly encapsulating all robust security constraint parameters pre-calculated offline into a quickly searchable offline probabilistic security domain map, the online dispatching stage only needs to use the query dispatching decision module 204 to directly retrieve the corresponding robust security constraint parameters based on several real-time key operating variables of the power grid to be dispatched, shortening the online dispatching calculation time. Finally, the dispatching strategy of the power grid to be dispatched is obtained through the robust security constraint parameters corresponding to each real-time key operating variable and several real-time key operating variables, realizing the rapid acquisition of a power grid dispatching strategy that satisfies transient security constraints.

[0052] Further, the grid partitioning module 201 is used to acquire historical power grid operation samples of the power grid to be dispatched, and extract several historical key operation variables from the historical power grid operation samples, so as to determine the initial grid cell corresponding to each historical key operation variable and the center point of each initial grid cell according to the several historical key operation variables and the preset key operation variable space, including: Obtain historical power grid operation samples of the power grid to be dispatched, and extract several historical candidate operation variables from the historical power grid operation samples; Based on preset scheduling rules, several historical candidate runtime variables are filtered to obtain several key historical runtime variables; Simulations were performed on several key historical operating variables to obtain the sensitivity limits for each key historical operating variable. The corresponding grid step size is calculated by the sensitivity limit value corresponding to each historical key operating variable, and the initial grid cell and the center point of each initial grid cell are obtained based on the grid step size corresponding to each historical key operating variable and the preset key operating variable space.

[0053] In this embodiment, by acquiring historical power grid operation samples of the power grid to be scheduled and filtering out all operational variables related to power grid stability, a foundation can be provided for subsequent screening of key historical operational variables. Next, by filtering several historical candidate operational variables using preset scheduling rules, redundant operational variables with little impact on transient stability margin or low sensitivity can be eliminated, retaining only key historical operational variables highly related to power grid security. This reduces the data dimension of subsequent grid partitioning and simulation calculations, and decreases the overall offline computation load. Then, by simulating several key historical operational variables, the sensitivity of each key historical operational variable to power grid transient security can be quantified, obtaining the sensitivity limits corresponding to each key historical operational variable, providing a basis for accurately setting the grid density. Finally, by adaptively setting the grid density using the sensitivity limits corresponding to each key historical operational variable, it can be ensured that the constraint parameters within the grid can adapt to the operating conditions of each region, thereby completely dividing the initial grid cells covering the entire operating space and determining the center point of each initial grid cell.

[0054] Further, the step of calculating the corresponding grid step size through the sensitivity limit value corresponding to each historical key operating variable, and obtaining the initial grid cell and the center point of each initial grid cell based on the grid step size corresponding to each historical key operating variable and the preset key operating variable space, includes: The corresponding grid step size is calculated by setting the preset step size limit, the preset grid division accuracy, and the sensitivity limit corresponding to each historical key operating variable. The space of the preset key operating variables is divided based on the grid step size corresponding to each historical key operating variable, and the initial grid cells corresponding to each historical key operating variable are obtained. The center point of each initial grid cell is obtained by using the initial grid cells corresponding to each historical key running variable.

[0055] In this embodiment, the grid step size is calculated by setting a preset step size limit, a preset grid partitioning accuracy, and sensitivity limits corresponding to each historical key operating variable. This ensures that the robust safety constraint parameters obtained from subsequent offline calculations meet safety requirements within the grid. Next, the preset key operating variable space is partitioned using the grid step size corresponding to each historical key operating variable. This allows for the creation of independent calculation regions for subsequent grid-by-grid offline verification, resulting in initial grid cells corresponding to each historical key operating variable. Finally, the center point of each initial grid cell is obtained using these initial grid cells.

[0056] Furthermore, in the offline mesh verification module 202, the process of performing mesh verification on all initial mesh cells based on the center point of each initial mesh cell includes: Power flow solutions are performed on each initial grid cell based on its center point to obtain the historical critical variable operating state of each initial grid cell. The transient stability margin of each historical critical variable operating state is then obtained based on the historical critical variable operating state of each initial grid cell. By constructing the corresponding transient safety linear mapping model based on the transient stability margin of each historical key variable's operating state, and solving the corresponding transient safety linear mapping model, the robust verification value corresponding to each initial grid cell is obtained. If the robust check value is less than the preset security threshold, it means that the initial mesh cell corresponding to the robust check value has failed the check. If the robust check value is greater than or equal to the preset security threshold, it means that the initial mesh cell corresponding to the robust check value has passed the check.

[0057] In this embodiment, power flow solutions are performed on each initial grid cell using its center point. This allows for the acquisition of the historical critical variable operating states of each initial grid cell and the quantification of their transient stability margins, providing a basis for subsequent verification of whether the grid meets safety requirements. Next, a corresponding transient safety linear mapping model is constructed using the transient stability margins of each historical critical variable operating state. Solving this model yields robustness verification values ​​for each initial grid cell, which can be used to assess whether each grid passes verification.

[0058] Further, the step of performing power flow solutions on each initial grid cell based on the center point of each initial grid cell to obtain the historical critical variable operating state of each initial grid cell, and obtaining the transient stability margin of each historical critical variable operating state based on the historical critical variable operating state of each initial grid cell, includes: Based on the center point of each initial grid cell, power flow solutions are performed on each initial grid cell to obtain the historical key variable operating status of each initial grid cell. Based on the historical key variable operating status of each initial grid cell and the preset historical key variable disturbance range, random samples of disturbance variables for the operating status of each historical key variable are generated. The transient stability margin of each historical key variable is obtained by evaluating the operating status of each historical key variable and the disturbance variable samples of the operating status of each historical key variable based on the preset data-driven transient security assessment model.

[0059] In this embodiment, power flow solutions are performed on each initial grid cell using its center point to obtain the historical critical variable operating states of each initial grid cell. This provides foundational data for subsequent simulation of fluctuations and for verifying the pass / fail status of each grid cell. Next, based on the historical critical variable operating states of each initial grid cell and a preset historical critical variable disturbance range, disturbance variable samples for each historical critical variable operating state are randomly generated. This simulates various uncertain disturbance conditions such as renewable energy output and load fluctuations, covering all possible fluctuation scenarios under the grid, ensuring that grid verification closely matches the actual fluctuation scenarios of the power grid. Then, a preset data-driven transient security assessment model is used to evaluate the historical critical variable operating states and the disturbance variable samples for each historical critical variable operating state. This yields the transient stability margin of each historical critical variable operating state, providing reliable numerical data for subsequent determination of grid pass / fail status.

[0060] Furthermore, the process involves constructing a corresponding transient safety linear mapping model based on the transient stability margins of each historical key variable's operating state, and solving the corresponding transient safety linear mapping model to obtain the robustness check value corresponding to each initial grid cell, including: By constructing the corresponding transient safety linear mapping model based on the transient stability margin of the operating states of each historical key variable, and solving the corresponding transient safety linear mapping model, we can obtain the robust coefficient vector and the corresponding robust approximation error corresponding to the operating states of each historical key variable. Based on the robust coefficient vector corresponding to the operating state of each historical key variable, determine the upper severe disturbance boundary and the corresponding lower severe disturbance boundary corresponding to the operating state of each historical key variable, and construct the severe disturbance vector corresponding to the operating state of each historical key variable through the upper severe disturbance boundary and the corresponding lower severe disturbance boundary corresponding to the operating state of each historical key variable. The robust verification value for each initial grid cell is calculated based on the robust coefficient vector, the robust approximation error, and the severe disturbance vector corresponding to the operating status of each historical key variable.

[0061] In this embodiment, a corresponding transient safety linear mapping model is constructed using the transient stability margins of the operating states of each historical key variable. Solving this model yields robust coefficient vectors and robust approximation errors for each historical key variable's operating state, providing fundamental calculation parameters for subsequent grid verification. Next, the upper and lower severe disturbance boundaries for each historical key variable's operating state are determined using the robust coefficient vectors, and these are integrated to form a severe disturbance vector representing the worst-case operating disturbance. This vector simulates the highest-risk power grid conditions, ensuring the grid verification results possess safety and conservatism. Then, the robust verification value for each initial grid cell is calculated using the robust coefficient vectors, robust approximation errors, and severe disturbance vectors for each historical key variable's operating state. This visually reflects the overall safety assurance capability of each initial grid cell under the worst-case disturbance, facilitating subsequent determination of whether the initial grid cell passes verification.

[0062] Further, the query scheduling decision module 204 is used to obtain several real-time key operating variables of the power grid to be scheduled, and to perform a matching query on the offline probabilistic security domain map based on the several real-time key operating variables to obtain robust security constraint parameters corresponding to each real-time key operating variable, so as to obtain the scheduling strategy of the power grid to be scheduled based on the robust security constraint parameters corresponding to each real-time key operating variable and the several real-time key operating variables, including: The real-time power grid operation sample of the power grid to be dispatched is obtained, and several real-time key operation variables are extracted from the real-time power grid operation sample. The offline probabilistic security domain map is matched and queried based on the several real-time key operation variables to obtain several grid matching distances corresponding to each real-time key operation variable. Based on several grid matching distances and preset matching conditions corresponding to each real-time key operating variable, the current grid cell corresponding to each real-time key operating variable is obtained, so as to obtain the robust safety constraint parameters corresponding to each real-time key operating variable according to the current grid cell corresponding to each real-time key operating variable. The scheduling strategy of the power grid to be scheduled is obtained by using the robust safety constraint parameters corresponding to each real-time key operating variable and several real-time key operating variables.

[0063] In this embodiment, several real-time key operating variables are used to match and query the offline probabilistic security domain map to obtain several grid matching distances corresponding to each real-time key operating variable, which can provide a basis for selecting suitable grid cells. Next, according to preset matching conditions, the grid cell that best matches the current operating condition of the power grid to be scheduled is selected from all grid cells, and the robust security constraint parameters corresponding to that grid cell are retrieved. This avoids the need for time-consuming online probabilistic verification and iterative calculations, shortening the online scheduling computation time. Finally, since this invention only needs to complete real-time power flow optimization calculations based on several real-time key operating variables and corresponding robust security constraint parameters of the power grid to be scheduled during the online scheduling phase, it can shorten the online scheduling computation time, obtain the scheduling strategy of the power grid to be scheduled, and solve the problem of untimely scheduling response caused by online iterative calculations.

[0064] This embodiment also provides a non-transitory computer-readable storage medium storing a computer program thereon, which, when executed by a processor, implements the functions of the system as described above.

[0065] It is understood that the above system item embodiments correspond to the method item embodiments of the present invention, and can implement the above method item embodiments of the present invention to provide a method for obtaining power grid dispatching strategies.

[0066] It should be noted that the system embodiments described above are merely illustrative, and some or all of the modules can be selected to achieve the purpose of this embodiment according to actual needs. Those skilled in the art can understand and implement this without any creative effort.

[0067] The above description represents the preferred embodiments of the present invention. It should be noted that those skilled in the art can make various improvements and modifications without departing from the principles of the present invention, and these improvements and modifications are also considered to be within the scope of protection of the present invention.

Claims

1. A method for obtaining a power grid dispatching strategy, characterized in that, include: The historical power grid operation samples of the power grid to be dispatched are obtained, and several historical key operation variables are extracted from the historical power grid operation samples. Based on the several historical key operation variables and the preset key operation variable space, the initial grid cell corresponding to each historical key operation variable and the center point of each initial grid cell are determined. Based on the center point of each initial mesh cell, a mesh verification process is performed on all initial mesh cells. If any initial mesh cell fails the verification, it is divided into several sub-mesh cells. These sub-mesh cells are then combined with other initial mesh cells as several current mesh cells to re-execute the mesh verification process until all current mesh cells pass the verification. The robust safety constraint parameters corresponding to each current mesh cell are then obtained. An offline probabilistic safety domain map is constructed using robust safety constraint parameters corresponding to several current grid cells; Several real-time key operating variables of the power grid to be dispatched are obtained, and the offline probabilistic security domain map is matched and queried based on the several real-time key operating variables to obtain the robust security constraint parameters corresponding to each real-time key operating variable. The dispatching strategy of the power grid to be dispatched is obtained based on the robust security constraint parameters corresponding to each real-time key operating variable and the several real-time key operating variables.

2. The method for obtaining a power grid dispatching strategy according to claim 1, characterized in that, The process of obtaining historical power grid operation samples of the power grid to be dispatched, and extracting several historical key operation variables from these samples, to determine the initial grid cell corresponding to each historical key operation variable and the center point of each initial grid cell based on these historical key operation variables and a preset key operation variable space, includes: Obtain historical power grid operation samples of the power grid to be dispatched, and extract several historical candidate operation variables from the historical power grid operation samples; Based on preset scheduling rules, several historical candidate runtime variables are filtered to obtain several key historical runtime variables; Simulations were performed on several key historical operating variables to obtain the sensitivity limits for each key historical operating variable. The corresponding grid step size is calculated by the sensitivity limit value corresponding to each historical key operating variable, and the initial grid cell and the center point of each initial grid cell are obtained based on the grid step size corresponding to each historical key operating variable and the preset key operating variable space.

3. The method for obtaining a power grid dispatching strategy according to claim 2, characterized in that, The step of calculating the corresponding grid step size based on the sensitivity limit value corresponding to each historical key operating variable, and obtaining the initial grid cell and the center point of each initial grid cell based on the grid step size corresponding to each historical key operating variable and the preset key operating variable space, includes: The corresponding grid step size is calculated by setting the preset step size limit, the preset grid division accuracy, and the sensitivity limit corresponding to each historical key operating variable. The space of the preset key operating variables is divided based on the grid step size corresponding to each historical key operating variable, and the initial grid cells corresponding to each historical key operating variable are obtained. The center point of each initial grid cell is obtained by using the initial grid cells corresponding to each historical key running variable.

4. The method for obtaining a power grid dispatching strategy according to claim 1, characterized in that, The process of performing mesh verification on all initial mesh cells based on the center point of each initial mesh cell includes: Power flow solutions are performed on each initial grid cell based on its center point to obtain the historical critical variable operating state of each initial grid cell. The transient stability margin of each historical critical variable operating state is then obtained based on the historical critical variable operating state of each initial grid cell. By constructing the corresponding transient safety linear mapping model based on the transient stability margin of each historical key variable's operating state, and solving the corresponding transient safety linear mapping model, the robust verification value corresponding to each initial grid cell is obtained. If the robust check value is less than the preset security threshold, it means that the initial mesh cell corresponding to the robust check value has failed the check. If the robust check value is greater than or equal to the preset security threshold, it means that the initial mesh cell corresponding to the robust check value has passed the check.

5. The method for obtaining a power grid dispatching strategy according to claim 4, characterized in that, The process of solving the power flow problem for each initial grid cell based on its center point to obtain the historical critical variable operating state of each initial grid cell, and obtaining the transient stability margin of each historical critical variable operating state based on the historical critical variable operating state of each initial grid cell, includes: Based on the center point of each initial grid cell, power flow solutions are performed on each initial grid cell to obtain the historical key variable operating status of each initial grid cell. Based on the historical key variable operating status of each initial grid cell and the preset historical key variable disturbance range, random samples of disturbance variables for the operating status of each historical key variable are generated. The transient stability margin of each historical key variable is obtained by evaluating the operating status of each historical key variable and the disturbance variable samples of the operating status of each historical key variable based on the preset data-driven transient security assessment model.

6. The method for obtaining a power grid dispatching strategy according to claim 4, characterized in that, The process involves constructing a corresponding transient safety linear mapping model based on the transient stability margins of each historical key variable's operating state, and solving the corresponding transient safety linear mapping model to obtain the robustness check value corresponding to each initial grid cell, including: By constructing the corresponding transient safety linear mapping model based on the transient stability margin of the operating states of each historical key variable, and solving the corresponding transient safety linear mapping model, we can obtain the robust coefficient vector and the corresponding robust approximation error corresponding to the operating states of each historical key variable. Based on the robust coefficient vector corresponding to the operating state of each historical key variable, determine the upper severe disturbance boundary and the corresponding lower severe disturbance boundary corresponding to the operating state of each historical key variable, and construct the severe disturbance vector corresponding to the operating state of each historical key variable through the upper severe disturbance boundary and the corresponding lower severe disturbance boundary corresponding to the operating state of each historical key variable. The robust verification value for each initial grid cell is calculated based on the robust coefficient vector, the robust approximation error, and the severe disturbance vector corresponding to the operating status of each historical key variable.

7. The method for obtaining a power grid dispatching strategy according to claim 1, characterized in that, The process of acquiring several real-time key operating variables of the power grid to be dispatched, and performing a matching query on an offline probabilistic security domain map based on these real-time key operating variables to obtain robust security constraint parameters corresponding to each real-time key operating variable, and then obtaining the dispatch strategy of the power grid to be dispatched based on the robust security constraint parameters corresponding to each real-time key operating variable and the several real-time key operating variables, includes: The real-time power grid operation sample of the power grid to be dispatched is obtained, and several real-time key operation variables are extracted from the real-time power grid operation sample. The offline probabilistic security domain map is matched and queried based on the several real-time key operation variables to obtain several grid matching distances corresponding to each real-time key operation variable. Based on several grid matching distances and preset matching conditions corresponding to each real-time key operating variable, the current grid cell corresponding to each real-time key operating variable is obtained, so as to obtain the robust safety constraint parameters corresponding to each real-time key operating variable according to the current grid cell corresponding to each real-time key operating variable. The scheduling strategy of the power grid to be scheduled is obtained by using the robust safety constraint parameters corresponding to each real-time key operating variable and several real-time key operating variables.

8. A system for acquiring power grid dispatching strategies, characterized in that, It includes a grid partitioning module, an offline grid verification module, an offline map construction module, and a query scheduling decision module, specifically: The grid partitioning module is used to obtain historical power grid operation samples of the power grid to be dispatched, and extract several historical key operation variables through the historical power grid operation samples, so as to determine the initial grid cell corresponding to each historical key operation variable and the center point of each initial grid cell based on the several historical key operation variables and the preset key operation variable space. The offline mesh verification module is used to perform a mesh verification process on all initial mesh units based on the center point of each initial mesh unit. If it is determined that an initial mesh unit fails the verification, the initial mesh unit is divided into several sub-mesh units. The sub-mesh units and other initial mesh units are used as several current mesh units to re-execute the mesh verification process until all current mesh units pass the verification. The robust safety constraint parameters corresponding to each current mesh unit are then obtained. The offline map construction module is used to construct an offline probabilistic safety domain map using robust safety constraint parameters corresponding to several current grid cells; The query scheduling decision module is used to obtain several real-time key operating variables of the power grid to be scheduled, and to perform matching queries on the offline probabilistic security domain map based on the several real-time key operating variables to obtain the robust security constraint parameters corresponding to each real-time key operating variable, so as to obtain the scheduling strategy of the power grid to be scheduled based on the robust security constraint parameters corresponding to each real-time key operating variable and the several real-time key operating variables.

9. The power grid dispatching strategy acquisition system according to claim 8, characterized in that, The grid partitioning module is used to acquire historical power grid operation samples of the power grid to be dispatched, and extract several historical key operation variables from the historical power grid operation samples. Based on these historical key operation variables and a preset key operation variable space, the module determines the initial grid cell corresponding to each historical key operation variable and the center point of each initial grid cell, including: Obtain historical power grid operation samples of the power grid to be dispatched, and extract several historical candidate operation variables from the historical power grid operation samples; Based on preset scheduling rules, several historical candidate runtime variables are filtered to obtain several key historical runtime variables; Simulations were performed on several key historical operating variables to obtain the sensitivity limits for each key historical operating variable. The corresponding grid step size is calculated by the sensitivity limit value corresponding to each historical key operating variable, and the initial grid cell and the center point of each initial grid cell are obtained based on the grid step size corresponding to each historical key operating variable and the preset key operating variable space.

10. The power grid dispatching strategy acquisition system according to claim 9, characterized in that, The step of calculating the corresponding grid step size based on the sensitivity limit value corresponding to each historical key operating variable, and obtaining the initial grid cell and the center point of each initial grid cell based on the grid step size corresponding to each historical key operating variable and the preset key operating variable space, includes: The corresponding grid step size is calculated by setting the preset step size limit, the preset grid division accuracy, and the sensitivity limit corresponding to each historical key operating variable. The space of the preset key operating variables is divided based on the grid step size corresponding to each historical key operating variable, and the initial grid cells corresponding to each historical key operating variable are obtained. The center point of each initial grid cell is obtained by using the initial grid cells corresponding to each historical key running variable.