Multi-power station photovoltaic power generation efficiency collaborative optimization method
By generating a set of parameters for the linkage of shadow shading between power plants and the propagation of cloud shadows, and combining it with the grid voltage coupling influence index, a collaborative optimization model is constructed. This solves the prediction deviation and safety issues between photovoltaic power plants, and realizes the optimization and adaptive adjustment of power generation efficiency.
Patent Information
- Application Number
- CN202611460170.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-09-20
- Publication Date
- 2026-11-24
AI Technical Summary
Existing technologies fail to adequately consider the dynamic shading linkage effect between adjacent photovoltaic power plants and the chain shading attenuation caused by cloud movement, resulting in photovoltaic power generation prediction errors and insufficient grid security. They also lack a global collaborative optimization mechanism, making it difficult to maintain optimal power generation efficiency in complex environments.
Through data acquisition and preprocessing, a set of characteristic parameters for the shadowing linkage effect between power stations and a set of response parameters for the cloud shadow propagation chain are generated. Combined with the voltage coupling influence index of power grid nodes, a collaborative optimization model is constructed, a collaborative output strategy is output, and the model parameters are iteratively corrected to adapt to changes in the actual environment.
It improves the accuracy of photovoltaic power generation forecasting, ensures the safety of power grid operation, and enables power generation efficiency optimization and adaptive adjustment in complex environments.
Smart Images

Figure CN123163076A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of photovoltaic power generation efficiency optimization technology, and more specifically to a method for collaborative optimization of photovoltaic power generation efficiency across multiple power plants. Background Technology
[0002] In the operation, management, and dispatch control of regional photovoltaic (PV) clusters, the relevant technologies typically rely on data acquisition and monitoring networks to obtain real-time operating status of each PV power station and surrounding meteorological information. They primarily depend on numerical weather prediction or historical irradiance data to establish power output prediction models for individual power stations or the overall region. In the control execution phase, a combination of centralized dispatch and local feedback is generally adopted. The grid dispatch center issues regional total power control commands, which are then distributed to the inverters and reactive power compensation devices of each power station through proportional allocation based on installed capacity or local feedback strategies based on the grid connection voltage of each power station. When dealing with external environmental fluctuations and grid security constraints, the operation strategy generally treats multiple power stations within the cluster as independent physical nodes. Each power station triggers independent power reduction or protection actions primarily based on local real-time irradiance and rated voltage limits to maintain the grid connection status and basic power output stability of a single station.
[0003] However, the aforementioned existing technologies typically treat multiple power plants within a regional cluster as independent physical entities. When forecasting output and assessing resources, they fail to fully consider the dynamic shading effects between adjacent power plants caused by the sun's trajectory and spatial location, as well as the cascading shading attenuation caused by cloud movement over time. This results in significant discrepancies between the predicted regional available power generation potential and the actual environment. During power control execution, existing technologies often rely on local feedback of the voltage at a single power plant's grid connection point for isolated adjustments, neglecting the strong voltage coupling effect between multiple power plant grid connection nodes. Reactive power regulation of a single power plant can easily trigger voltage overruns at adjacent power plants, making it difficult to ensure the safe operation of the entire cluster's power grid. Furthermore, existing technologies lack a global collaborative optimization mechanism that combines environmental mitigation constraints with electrical coupling safety constraints when allocating power commands. Their control models are mostly open-loop command issuance or fixed parameter calculations, failing to dynamically close the loop and correct the iterative optimization parameters based on actual operational deviations after strategy execution. This results in the region's overall power generation efficiency being difficult to optimize under complex and variable lighting conditions and grid operating conditions, and the strategy's adaptive adjustment capability is insufficient. Summary of the Invention
[0004] In order to overcome the above-mentioned defects of the prior art, the present invention provides a method for synergistic optimization of photovoltaic power generation efficiency of multiple power plants, so as to solve the problems existing in the background art.
[0005] This invention provides the following technical solution: a method for synergistic optimization of photovoltaic power generation efficiency across multiple power plants, comprising:
[0006] S1: Synchronously acquire spatial attribute data, operational data, and environmental data of multiple power stations within the target area through the data acquisition terminal, and preprocess the acquired spatial attribute data, operational data, and environmental data;
[0007] S2: Based on the preprocessed spatial attribute data and environmental data, combined with the solar trajectory model, calculate the dynamic shadow occlusion range between multiple power stations in the target area, and generate a set of characteristic parameters of the shadow occlusion linkage effect between power stations.
[0008] S3: Based on preprocessed environmental and spatial attribute data, predict the cloud movement trajectory, calculate the chain shading attenuation rate of multiple power stations in the target area in the time dimension, and generate a set of regional cloud shadow propagation chain response parameters.
[0009] S4: Based on the preprocessed operating data, analyze the voltage coupling effect of multiple power stations in the target area and obtain the voltage coupling influence index of each power station's grid node.
[0010] S5: Based on the preprocessed operating data, analyze the total output fluctuation status of multiple power stations in the target area and the power adjustment margin of each power station, and generate a set of target parameters for optimizing regional collaborative power generation efficiency.
[0011] S6: Input the characteristic parameter set of the shadow shading linkage effect between power stations, the response parameter set of the regional cloud shadow propagation chain, the voltage coupling influence index of each power station's grid node, and the target parameter set of regional collaborative power generation efficiency optimization into the preset collaborative optimization model, output the collaborative power output strategy of each power station in the target area, and send it to each power station for execution.
[0012] S7: Collect actual operating data of each power station in the target area after implementing the coordinated power output strategy, compare the actual operating data with the expected data of the coordinated power output strategy, and iteratively correct the internal parameters of the coordinated optimization model based on the comparison results to output the coordinated power output strategy for the next period.
[0013] Preferably, step S1 synchronously acquires spatial attribute data, operational data, and environmental data of multiple power stations within the target area through a data acquisition terminal, including:
[0014] The data acquisition terminal obtains operational data from the SCADA system, including real-time power data of each power station, voltage data of grid topology nodes, active and reactive power data of inverters, and state of charge data of energy storage system. It also obtains environmental data from meteorological monitoring equipment and meteorological service platform, including irradiance, temperature, and cloud map prediction information. Finally, it extracts spatial attribute data from the engineering configuration database, including spatial coordinate data of components of each power station.
[0015] The preprocessing of the acquired spatial attribute data, operational data, and environmental data includes:
[0016] The aforementioned data types acquired synchronously are sequentially processed by imputing missing values, removing abnormal data, synchronizing and aligning timestamps, and normalizing.
[0017] Preferably, step S2 extracts the preprocessed spatial coordinate data of each power station component, constructs a time series to be calculated according to a preset time step, substitutes the spatial coordinate data of each power station component and the time series to be calculated into a preset solar trajectory model, and calculates the solar altitude angle and azimuth angle corresponding to each moment in the time series to be calculated.
[0018] Based on the solar altitude angle and azimuth angle, calculate the dynamic shadow projection polygon of the photovoltaic modules of each power station on the ground plane; perform spatial geometric intersection calculation with the spatial coordinate data of the modules of other power stations in the target area to calculate the dynamic shadow shading area and shading duration between power stations.
[0019] Based on the irradiance in the preprocessed environmental data, calculate the radiation attenuation corresponding to the dynamic shadow occlusion area;
[0020] The dynamic shadow occlusion area, occlusion duration, and radiation attenuation are combined according to the corresponding relationship between power stations to generate the characteristic parameter set of the shadow occlusion linkage effect between power stations.
[0021] Preferably, step S3 extracts cloud image prediction information from the preprocessed environmental data, calculates the displacement vector of cloud image pixel blocks at adjacent times using a preset image feature matching algorithm, and constructs a cloud motion vector field to predict the movement trajectory of the cloud over the target area.
[0022] Extract the preprocessed spatial coordinate data of each power station component, perform spatial intersection calculation between the moving trajectory and the spatial coordinate data of each power station component, and determine the time sequence of cloud cover reaching each power station and the duration of cloud cover at each power station location.
[0023] Based on the irradiance in the preprocessed environmental data, within the time window corresponding to the duration of each power station location, the irradiance reduction ratio of each power station during the cloud cover period is calculated as the chain shading attenuation rate.
[0024] The time sequence of cloud cover reaching each power station, the duration of cloud cover at each power station location, and the chain cover attenuation rate are combined according to the power station correspondence to generate the regional cloud shadow propagation chain response parameter set.
[0025] Preferably, step S4 extracts the grid topology node voltage data and inverter active and reactive power data from the preprocessed operating data, and obtains the grid impedance parameters and node voltage safety deviation limits for the target area.
[0026] Based on the grid impedance parameters and the active and reactive power data of the inverter, the voltage change at the point of common coupling caused by the active and reactive power injected into the grid by each power station is calculated; the electrical distance between the grid-connected nodes of each power station is determined according to the grid topology node voltage data, and the ratio of the voltage change to the electrical distance is used as the voltage sensitivity coefficient.
[0027] The voltage variation of other power stations within the target area is multiplied by the corresponding voltage sensitivity coefficient and summed to calculate the voltage coupling fluctuation value between each power station. The voltage coupling fluctuation value is normalized using the node voltage safety deviation limit to obtain the grid node voltage coupling influence index of each power station.
[0028] Preferably, step S5 extracts the active power output sequence of each power station in the target area within a preset time window from the preprocessed operating data, calculates the root mean square of the active power difference between adjacent sampling time nodes, and uses the root mean square as the total output fluctuation state index of the target area.
[0029] Extract the rated capacity and real-time active power of the inverters of each power station from the preprocessed operating data. Use the difference between the rated capacity and the real-time active power as the active power adjustment margin, and combine it with the real-time input capacity of the reactive power compensation device of each power station to determine the reactive power adjustment margin.
[0030] The optimization direction of the total output fluctuation state index is configured as minimization as the first optimization objective, and the optimization direction of the sum of the active power adjustment margin and reactive power adjustment margin of each power station is configured as maximization as the second optimization objective. Weight coefficients are assigned to the first optimization objective and the second optimization objective respectively, and the parameter set of the regional collaborative power generation efficiency optimization objective is generated by combination.
[0031] Preferably, in step S6, the characteristic parameter set of the shadow shading linkage effect between power stations and the response parameter set of the regional cloud shadow propagation chain are input into the preset collaborative optimization model, which is mapped to the environmental reduction constraint boundary of the active power output of each power station in the prediction period.
[0032] The voltage coupling influence index of each power station's grid node is input into the preset collaborative optimization model, and combined with the rated voltage limit of each power station's grid connection node, it is mapped to the voltage over-limit safety constraint condition in the model iterative solution process.
[0033] The target parameter set for optimizing regional collaborative power generation efficiency is input into the preset collaborative optimization model to construct the objective function. Under the constraints of the environmental reduction constraint boundary and voltage over-limit safety constraint conditions, the optimization iteration is carried out according to the preset solution algorithm, and the active power target command value and reactive power target command value of each power station in the target area for the next control cycle are output.
[0034] The active power target command value and the reactive power target command value are combined to generate the coordinated output strategy of each power station, and then sent to the inverters and reactive power compensation devices of the corresponding power stations for execution.
[0035] Preferably, S7 collects the actual active power output value and the actual grid connection point voltage value of each power station in the target area in the next control cycle after executing the coordinated power output strategy output by S6;
[0036] The active power output value is compared with the active power target command value corresponding to the collaborative output strategy to calculate the active power deviation rate. The actual grid connection point voltage value is compared with the rated voltage limit value on which the voltage over-limit safety constraint condition is based in S6 to calculate the voltage over-limit deviation rate. Weighting factors are assigned to the active power deviation rate and the voltage over-limit deviation rate respectively, and the weighted sum is calculated to generate the comprehensive execution deviation coefficient.
[0037] Determine whether the overall execution deviation coefficient exceeds the preset deviation threshold. If it does, dynamically correct the internal parameters controlling the optimization iteration step size and convergence accuracy of the preset solution algorithm in the preset collaborative optimization model based on the extent of the deviation.
[0038] The preset collaborative optimization model is updated using the corrected internal parameters, and the optimization iteration is performed again using the latest preprocessed data to output the collaborative output strategy of each power station in the target area in the next time period.
[0039] The technical effects and advantages of this invention are as follows:
[0040] (1) By combining the solar trajectory model with spatial attribute data, the dynamic shading range between multiple power stations is calculated, generating a set of characteristic parameters for the shading linkage effect; and by predicting the cloud movement trajectory, the chain shading attenuation rate in the time dimension is calculated, generating a set of cloud shadow propagation chain response parameters. This process breaks the limitations of isolated prediction, accurately quantifies the spatial shading linkage and the temporal cloud propagation effect, provides a constraint boundary that is highly consistent with the actual physical environment for subsequent models, and greatly improves the accuracy of predicting the available power generation potential of the region.
[0041] (2) By deeply analyzing the voltage coupling effect of multiple power station grid-connected nodes in the target area, the voltage coupling influence index of the grid nodes is extracted. This index directly quantifies the transmission influence of reactive power regulation of a single station on the voltage of adjacent power stations, providing an electrical safety constraint basis for global collaborative optimization, effectively avoiding the risk of chain exceeding limits caused by regulation of a single power station, and effectively ensuring the overall grid operation safety of the cluster.
[0042] (3) By generating a set of target parameters for regional collaborative power generation efficiency optimization, and by synchronously inputting environmental reduction constraints, electrical coupling safety constraints, and the set of target parameters into the collaborative optimization model, cross-dimensional joint modeling of meteorological environmental factors and electrical physical coupling is realized. Global optimization is carried out within the multi-dimensional constraint boundary, and collaborative power output strategy is output and issued, avoiding the power output limitation and efficiency loss caused by the simple proportional allocation or isolated control of existing technologies.
[0043] (4) By collecting actual operating data after the strategy is executed and comparing it with the expected data, the internal parameters of the collaborative optimization model are directly iteratively corrected based on the comparison results, and a complete closed loop of "prediction-optimization-execution-feedback-correction" is constructed, so that the model can evolve itself according to the complex and ever-changing lighting environment and actual working conditions, ensuring that the collaborative output strategy in the next period is more accurate, thereby maintaining the long-term optimal overall power generation efficiency of the region. Attached Figure Description
[0044] Figure 1 This is a diagram illustrating the method steps of the present invention. Detailed Implementation
[0045] The technical solutions of the present invention will be clearly and completely described below with reference to the accompanying drawings. In addition, the forms of the various structures described in the following embodiments are merely illustrative. The method for synergistic optimization of photovoltaic power generation efficiency of multiple power stations involved in the present invention is not limited to the structures described in the following embodiments. All other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.
[0046] like Figure 1 The embodiment shown provides a method for collaborative optimization of photovoltaic power generation efficiency across multiple power plants, including:
[0047] S1: Synchronously acquire spatial attribute data, operational data, and environmental data of multiple power stations within the target area through the data acquisition terminal, and preprocess the acquired spatial attribute data, operational data, and environmental data.
[0048] In this embodiment, S1 synchronously acquires spatial attribute data, operational data, and environmental data of multiple power stations within the target area through a data acquisition terminal, including:
[0049] The data acquisition terminal obtains operational data from the SCADA system, including real-time power data of each power station, voltage data of grid topology nodes, active and reactive power data of inverters, and state of charge data of energy storage system. It also obtains environmental data from meteorological monitoring equipment and meteorological service platform, including irradiance, temperature, and cloud map prediction information. Finally, it extracts spatial attribute data from the engineering configuration database, including spatial coordinate data of components of each power station.
[0050] The preprocessing of the acquired spatial attribute data, operational data, and environmental data includes:
[0051] The aforementioned data types acquired synchronously are sequentially processed by imputing missing values, removing abnormal data, synchronizing and aligning timestamps, and normalizing.
[0052] It needs to be specifically explained that a cross-system data synchronization acquisition and preprocessing mechanism is constructed through data acquisition terminals to provide a high-quality data foundation for subsequent collaborative optimization. Specifically, the data acquisition terminals acquire operational data from the SCADA system, including real-time power data of each power station, voltage data of grid topology nodes, active and reactive power data of inverters, and state of charge data of energy storage systems; environmental data, including irradiance, temperature, and cloud image prediction information, from meteorological monitoring equipment and meteorological service platforms; and spatial attribute data, including spatial coordinate data of components of each power station, from the engineering configuration database. Since the above data comes from different software and hardware systems and has different sampling frequencies and dimensions, the synchronously acquired data is then subjected to missing value imputation (e.g., using linear interpolation to fill short-term data gaps caused by network communication packet loss) and abnormal data removal (e.g., using 3D modeling). The criteria include identifying and eliminating sudden, out-of-range data points caused by sensor malfunctions, synchronizing and aligning timestamps (e.g., mapping high-frequency operational data and low-frequency meteorological forecast data to a standard time-resolution grid through time resampling), and normalization processing (e.g., using Min-Max normalization to linearly map data with different physical dimensions, such as megawatt-level power, kilovolt-level voltage, and latitude and longitude coordinates, to the dimensionless interval [0,1]), thereby eliminating scale differences between multi-dimensional data and ultimately generating a unified and continuous standard dataset.
[0053] S2: Based on the preprocessed spatial attribute data and environmental data, combined with the solar trajectory model, calculate the dynamic shadow occlusion range between multiple power stations in the target area, and generate a set of characteristic parameters of the shadow occlusion linkage effect between power stations.
[0054] In this embodiment, S2 extracts the preprocessed spatial coordinate data of each power station component, constructs the time series to be calculated according to the preset time step, substitutes the spatial coordinate data of each power station component and the time series to be calculated into the preset solar trajectory model, and calculates the solar altitude angle and azimuth angle corresponding to each moment in the time series to be calculated.
[0055] Based on the solar altitude angle and azimuth angle, calculate the dynamic shadow projection polygon of the photovoltaic modules of each power station on the ground plane; perform spatial geometric intersection calculation with the spatial coordinate data of the modules of other power stations in the target area to calculate the dynamic shadow shading area and shading duration between power stations.
[0056] Based on the irradiance in the preprocessed environmental data, calculate the radiation attenuation corresponding to the dynamic shadow occlusion area;
[0057] The dynamic shadow occlusion area, occlusion duration, and radiation attenuation are combined according to the corresponding relationship between power stations to generate the characteristic parameter set of the shadow occlusion linkage effect between power stations.
[0058] It should be specifically explained that, assuming the target area includes power station A and power station B, the preprocessed three-dimensional spatial coordinate data of the photovoltaic modules of power stations A and B are first extracted, and a preset time step of 5 minutes is set to construct a time series to be calculated from 8:00 to 16:00. Then, the above spatial coordinate data and time series are input into a solar trajectory model based on astronomical algorithms to calculate the solar altitude angle of 30 degrees and the azimuth angle of 120 degrees at 8:00. Next, using spatial projection geometry, the three-dimensional module outline of power station A is projected onto the ground plane based on the altitude and azimuth angles, obtaining the dynamic shadow projection polygon of power station A at 8:00. This polygon is then subjected to spatial geometric intersection calculation with the planar coordinate range of the module of power station B. If there is an overlapping area, the area of this overlapping area is calculated as the dynamic shadow shading area of power station A on power station B. Simultaneously, the start and end times of the overlapping state are recorded as the time series progresses to obtain the shading duration. Further, the irradiance value at 8:00 AM (e.g., 800 W / m²) is extracted from the preprocessed environmental data, and this irradiance is multiplied by the aforementioned dynamic shadow shading area to calculate the radiation attenuation lost by power station B due to shading. Finally, the dynamic shadow shading area, shading duration, and radiation attenuation are bound to the identifier of power station B and summarized. This process is repeated for each time step and for calculating the shading data between power stations, ultimately generating a set of characteristic parameters for the inter-power station shadow shading linkage effect, which includes the spatial correlation and temporal evolution characteristics of multiple power stations. This S2 addresses the physical shading problem caused by terrain and buildings, which has deterministic and static periodicity.
[0059] S3: Based on preprocessed environmental and spatial attribute data, predict the cloud movement trajectory, calculate the chain shading attenuation rate of multiple power stations in the target area in the time dimension, and generate a set of response parameters for the regional cloud shadow propagation chain.
[0060] In this embodiment, S3 extracts cloud map prediction information from the preprocessed environmental data, calculates the displacement vector of cloud map pixel blocks at adjacent times using a preset image feature matching algorithm, and constructs a cloud motion vector field to predict the movement trajectory of the cloud over the target area.
[0061] Extract the preprocessed spatial coordinate data of each power station component, perform spatial intersection calculation between the moving trajectory and the spatial coordinate data of each power station component, and determine the time sequence of cloud cover reaching each power station and the duration of cloud cover at each power station location.
[0062] Based on the irradiance in the preprocessed environmental data, within the time window corresponding to the duration of each power station location, the irradiance reduction ratio of each power station during the cloud cover period is calculated as the chain shading attenuation rate.
[0063] The time sequence of cloud cover reaching each power station, the duration of cloud cover at each power station location, and the chain cover attenuation rate are combined according to the power station correspondence to generate the regional cloud shadow propagation chain response parameter set.
[0064] It should be specifically noted that, assuming the target area includes power stations C and D arranged sequentially by geographical location, the system first extracts satellite cloud image prediction information at 10-minute intervals from the preprocessed environmental data. A pre-defined image feature matching algorithm is used to identify and calculate the planar displacement vector of the same cloud cluster pixel block in two adjacent cloud images, thereby constructing the cloud cluster motion vector field and predicting the trajectory of the cloud cluster moving northeast at a speed of 15 kilometers per hour. Subsequently, the spatial coordinate data of the components of power stations C and D are extracted. The predicted cloud cluster movement trajectory is then spatially intersected with the aforementioned coordinate data within the geographic information system plane. It is determined that the cloud cluster's projected polygon overlaps with the coordinate boundary of power station C at 14:00 and remains at that position until 14:20. Then, at 14:30, it moves to power station D and remains there until 14:50. Therefore, the time sequence of the cloud cluster's occlusion reaching power stations C and D sequentially is determined as 1. At 4:00 and 14:30, the duration of each power station location is 20 minutes. Further, based on measured or predicted irradiance data from environmental data, the baseline irradiance (e.g., 800 W / m²) under unshaded conditions and the real-time irradiance (e.g., 200 W / m²) under complete shading are extracted within the time window of 14:00 to 14:20 for power station C. The irradiance reduction rate is calculated to be 75%. Similarly, the irradiance reduction rate is calculated within the time window of 14:30 to 14:50 for power station D, and these are used as their respective chain shading attenuation rates. Finally, the arrival time series (14:00, 14:30), duration (20 minutes), and corresponding chain shading attenuation rates (75%, etc.) are bound and combined with the identifiers of power stations C and D to generate a regional cloud shadow propagation chain response parameter set containing the temporal and spatial chain shading evolution relationships of each power station. This S3 addresses the dynamic shading problem caused by meteorological clouds, characterized by suddenness, spatiotemporal randomness, and chain propagation. S2 and S3 differ fundamentally in their time scale and prediction mechanism, together constituting a dual environmental disturbance term for photovoltaic power output.
[0065] S4: Based on the preprocessed operating data, analyze the voltage coupling effect of multiple power station grid-connected nodes in the target area and obtain the voltage coupling influence index of each power station's grid node.
[0066] In this embodiment, S4 extracts the grid topology node voltage data and inverter active and reactive power data from the preprocessed operating data, and obtains the grid impedance parameters and node voltage safety deviation limits for the target area.
[0067] Based on the grid impedance parameters and the active and reactive power data of the inverter, the voltage change at the point of common coupling caused by the active and reactive power injected into the grid by each power station is calculated; the electrical distance between the grid-connected nodes of each power station is determined according to the grid topology node voltage data, and the ratio of the voltage change to the electrical distance is used as the voltage sensitivity coefficient.
[0068] The voltage variation of other power stations within the target area is multiplied by the corresponding voltage sensitivity coefficient and summed to calculate the voltage coupling fluctuation value between each power station. The voltage coupling fluctuation value is normalized using the node voltage safety deviation limit to obtain the grid node voltage coupling influence index of each power station.
[0069] It should be specifically noted that, in actual implementation scenarios, taking a target area containing three adjacent photovoltaic power stations (A, B, and C) as an example, the process of analyzing the grid-connected node voltage coupling effect is as follows: First, extract the current grid topology node voltage data of the three power stations (A, B, and C) and the real-time active and reactive power output data of their respective inverters from the pre-processed operating data. Simultaneously, retrieve the line impedance parameters connecting each power station in the area from the pre-set grid basic parameter library, and obtain the node voltage safety deviation limits (e.g., ±5% fluctuation range of rated voltage) clearly stipulated in the local grid safety operation regulations. Then, based on the extracted line impedance parameters and the active and reactive power data of each power station's inverters, according to... Based on the principles of power flow calculation, the voltage changes at their respective points of common coupling (PCCs) when power plants A, B, and C inject power into the grid under their current output conditions are calculated. Next, based on the extracted grid topology node voltage data, the electrical distance between the three power plant grid-connected nodes in the region is analyzed. Specifically, since the grid topology node voltage data includes the voltage amplitude and phase angle of each node, the voltage phase angle difference between two adjacent power plant grid-connected nodes is used as a characteristic quantity reflecting the line's power transmission capacity and the tightness of its electrical connection. The voltage phase angle difference between any two nodes (e.g., power plant A and power plant B) is extracted and, combined with pre-acquired connecting line reactance parameters, the voltage phase angle difference is divided by the line reactance parameters to calculate... The equivalent electrical distance between two nodes is obtained, and the electrical distance parameters between nodes A and B, A and C, and B and C are obtained by analogy. After determining the electrical distance, the voltage change of a single power station calculated above is divided by the corresponding electrical distance to obtain the voltage sensitivity coefficient reflecting the degree of attenuation of voltage interference of a power station's power fluctuation to other power station nodes. For example, the sensitivity coefficient of the output fluctuation of power station A to the node voltage of power stations B and C is calculated. Based on this, the voltage coupling fluctuation value between multiple power stations is calculated. Taking power station B as an example, the voltage change of power station A is multiplied by the voltage sensitivity coefficient of A to B, and the voltage change of power station C is multiplied by the voltage sensitivity coefficient of C to B. The above multiplication results are then summed to summarize the surrounding voltage fluctuation values. The comprehensive impact of power output fluctuations at power station A on the grid connection node of power station B is analyzed, resulting in the voltage coupling fluctuation value faced by power station B. Since this fluctuation value is significantly affected by grid load and power station scale, its magnitude can be greatly varied. Directly incorporating it into subsequent model optimization would lead to an imbalance in the magnitude of different constraint parameters. Therefore, a pre-obtained node voltage safety deviation limit is used as a benchmark to normalize the calculated voltage coupling fluctuation value. This involves dividing the voltage coupling fluctuation value by the node voltage safety deviation limit and calculating its proportion of the safety margin, thus converting it into a dimensionless relative value within the zero-to-one range. Finally, the grid node voltage coupling impact index of power stations A, B, and C is obtained, thereby completing the quantitative analysis of the voltage coupling effect.
[0070] S5: Based on the preprocessed operating data, analyze the total output fluctuation status of multiple power stations in the target area and the power adjustment margin of each power station, and generate a target parameter set for optimizing regional collaborative power generation efficiency.
[0071] In this embodiment, step S5 extracts the active power output sequence of each power station in the target area within a preset time window from the preprocessed operating data, calculates the root mean square of the active power difference between adjacent sampling time nodes, and uses the root mean square as the total output fluctuation state index of the target area.
[0072] Extract the rated capacity and real-time active power of the inverters of each power station from the preprocessed operating data. Use the difference between the rated capacity and the real-time active power as the active power adjustment margin, and combine it with the real-time input capacity of the reactive power compensation device of each power station to determine the reactive power adjustment margin.
[0073] The optimization direction of the total output fluctuation state index is configured as minimization as the first optimization objective, and the optimization direction of the sum of the active power adjustment margin and reactive power adjustment margin of each power station is configured as maximization as the second optimization objective. Weight coefficients are assigned to the first optimization objective and the second optimization objective respectively, and the parameter set of the regional collaborative power generation efficiency optimization objective is generated by combination.
[0074] It should be specifically explained that, taking a target area containing three photovoltaic power plants (A, B, and C) as an example, the specific execution process for generating the target parameter set for optimizing regional collaborative power generation efficiency is as follows: First, the active power output sequence of the inverters of the three power plants (A, B, and C) within a preset time window (e.g., the past fifteen minutes) is extracted from the preprocessed operating data. For each power plant, the root mean square (RMS) of the active power difference between adjacent sampling time nodes is calculated. This RMS value directly reflects the degree of drastic fluctuation in the power output of the power plant on the time axis. Then, the RMS values calculated for the three power plants (A, B, and C) are summed. Alternatively, the average value can be calculated and used as the total output fluctuation state index for the target area. Next, the rated capacity and real-time active power of the inverters at power stations A, B, and C are extracted. Since the output power of the inverters cannot exceed the rated capacity on the equipment nameplate during operation, the rated capacity is directly subtracted from the real-time active power to obtain the current active power adjustable margin for each power station. Simultaneously, the real-time operational capacity of the reactive power compensation devices (such as SVG or SVC) at each power station is read, and the rated total capacity of the reactive power compensation devices is subtracted from the current actual operational capacity to obtain the reactive power adjustable margin. This clarifies that each power station can maintain its operational capacity within the physical limits of its equipment. The question asks how much more active and reactive power output can be increased or decreased below the limit. After obtaining the above index and margin data, a combination of multi-objective optimization parameters is constructed. The optimization direction of the total output fluctuation state index is configured as minimizing as the first optimization objective, which means that the power output of each power station should be smoothed as much as possible to reduce the value of the index when generating subsequent strategies. The optimization direction of summing the active and reactive power adjustable margins of power stations A, B, and C is configured as maximizing as the second optimization objective, which means that each power station should be kept from operating at full load as much as possible when generating subsequent strategies to ensure... Sufficient reserve adjustment space is reserved, and corresponding weight coefficients are configured for the first optimization target and the second optimization target respectively. The proportion of the weight coefficients is dynamically adjusted according to the current emphasis of the regional power grid on safe and stable operation and maximizing the consumption of photovoltaic power. The total output fluctuation state index, active power adjustable margin, reactive power adjustable margin, and the weight coefficients of the first optimization target and the second optimization target are packaged and encapsulated according to the preset data structure format, and combined to generate a set of regional collaborative power generation efficiency optimization target parameters and output them, thereby completing the data preparation for the regional collaborative power generation efficiency optimization benchmark.
[0075] S6: Input the characteristic parameter set of the shadow shading linkage effect between power stations, the response parameter set of the regional cloud shadow propagation chain, the voltage coupling influence index of each power station's grid node, and the target parameter set of regional collaborative power generation efficiency optimization into the preset collaborative optimization model, output the collaborative power output strategy of each power station in the target area, and send it to each power station for execution.
[0076] In this embodiment, S6 inputs the characteristic parameter set of the shadow shading linkage effect between power stations and the response parameter set of the regional cloud shadow propagation chain into the preset collaborative optimization model, and maps them as the environmental reduction constraint boundary of the active power output of each power station in the prediction period.
[0077] The voltage coupling influence index of each power station's grid node is input into the preset collaborative optimization model, and combined with the rated voltage limit of each power station's grid connection node, it is mapped to the voltage over-limit safety constraint condition in the model iterative solution process.
[0078] The target parameter set for optimizing regional collaborative power generation efficiency is input into the preset collaborative optimization model to construct the objective function. Under the constraints of the environmental reduction constraint boundary and voltage over-limit safety constraint conditions, the optimization iteration is carried out according to the preset solution algorithm, and the active power target command value and reactive power target command value of each power station in the target area for the next control cycle are output.
[0079] The active power target command value and the reactive power target command value are combined to generate the coordinated output strategy of each power station, and then sent to the inverters and reactive power compensation devices of the corresponding power stations for execution.
[0080] It should be specifically noted that, taking a region containing three photovoltaic power stations (A, B, and C) and employing a heuristic particle swarm optimization algorithm as the preset solution algorithm as an example, the specific analysis and calculation process for generating and issuing the collaborative power output strategy is as follows: First, the characteristic parameter set of the shading linkage effect between power stations and the response parameter set of the regional cloud propagation chain are input into the collaborative optimization model. These two parameter sets include the shading ratio of adjacent power station components caused by changes in the solar altitude angle during the future prediction period (e.g., the next fifteen minutes), as well as the order in which clouds pass over each power station and the percentage of shading attenuation. The model directly maps these data into environmental reduction constraint boundaries, that is, it limits the theoretical maximum active power output of the three power stations (A, B, and C) during the corresponding prediction period to not exceed the upper limit of available power after reduction due to shading and cloud shading during the optimization iteration, thereby ensuring the output... The active power command is physically executable. Simultaneously, the voltage coupling influence index of each power station's grid node is input into the model. Combined with the pre-set allowable voltage fluctuation range limit of each power station's grid connection point (e.g., ±5% of the rated voltage), this is mapped to a voltage over-limit safety constraint. This coupling influence index is used to quantify the sensitivity coefficient of a power station's reactive power output change to the voltage of adjacent power station's grid connection point. This ensures that, in the iterative solution, the reactive power adjustment command of any single power station, after being superimposed with the entire network coupling effect, will not cause the voltage of other adjacent power station's grid connection point to exceed the limit. Subsequently, the target parameter set for optimizing regional collaborative power generation efficiency is input into the model to construct a comprehensive objective function. This comprehensive objective function is a linear combination of the total output fluctuation state index and the sum of the active and reactive power adjustable margins, multiplied by their respective weighting coefficients.The model employs a heuristic particle swarm optimization algorithm for iterative optimization. The active and reactive power target values for power plants A, B, and C in the next control cycle are encoded as particle position vectors. A swarm of random particles is initialized, and multiple iterations are performed within a multi-dimensional feasible solution space comprised of environmental reduction constraints and voltage over-limit safety constraints. In each iteration, the flight velocity of each particle is updated based on preset inertia weights, self-cognitive acceleration constants, and social cognitive acceleration constants. This flight velocity represents the adjustment direction and magnitude of the active and reactive power commands for each power plant in the next iteration step. The current position of the particle is updated by combining its historical optimal position (i.e., the power plant power command combination that optimizes the comprehensive objective function value calculated by the particle in previous iterations) and the global optimal position of the swarm (i.e., the power plant power command combination that optimizes the comprehensive objective function value found by the entire particle swarm so far). The updated particle position is then substituted into the comprehensive objective function to calculate the position of each particle. The fitness value corresponding to each particle is compared and retained, along with the position corresponding to the historical best fitness of each particle and the position corresponding to the global best fitness in the entire population. When the number of iterations reaches a preset maximum or the change in the global best fitness over several consecutive generations is less than a preset convergence accuracy threshold, optimization convergence is determined. The active power target value and reactive power target value of power stations A, B, and C, decoded by the global best particle in the population at this time, are extracted as the active power target command value and reactive power target command value for the next control cycle. Finally, the calculated active power target command value and reactive power target command value are packaged and combined according to the power station code to generate a complete coordinated output strategy. This strategy is then sent through the regional communication network to the inverters corresponding to power stations A, B, and C to execute active power load reduction or increase actions, and to the reactive power compensation devices corresponding to each power station to execute inductive or capacitive reactive power compensation actions, thereby completing the coordinated closed-loop control of the photovoltaic power generation efficiency of the entire region.
[0081] S7: Collect actual operating data of each power station in the target area after implementing the coordinated power output strategy, compare the actual operating data with the expected data of the coordinated power output strategy, and iteratively correct the internal parameters of the coordinated optimization model based on the comparison results to output the coordinated power output strategy for the next period.
[0082] In this embodiment, S7 collects the actual active power output value and the actual grid connection point voltage value of each power station in the target area in the next control cycle after executing the coordinated power output strategy output by S6.
[0083] The active power output value is compared with the active power target command value corresponding to the collaborative output strategy to calculate the active power deviation rate. The actual grid connection point voltage value is compared with the rated voltage limit value on which the voltage over-limit safety constraint condition is based in S6 to calculate the voltage over-limit deviation rate. Weighting factors are assigned to the active power deviation rate and the voltage over-limit deviation rate respectively, and the weighted sum is calculated to generate the comprehensive execution deviation coefficient.
[0084] Determine whether the overall execution deviation coefficient exceeds the preset deviation threshold. If it does, dynamically correct the internal parameters controlling the optimization iteration step size and convergence accuracy of the preset solution algorithm in the preset collaborative optimization model based on the extent of the deviation.
[0085] The preset collaborative optimization model is updated using the corrected internal parameters, and the optimization iteration is performed again using the latest preprocessed data to output the collaborative output strategy of each power station in the target area in the next time period.
[0086] It should be specifically explained that, taking an area containing three photovoltaic power stations (A, B, and C) as an example, the specific analysis and calculation process for closed-loop feedback correction is as follows: After the three power stations (A, B, and C) execute the coordinated output strategy of S6 and complete one control cycle (e.g., five minutes), the actual active power output value and the actual grid connection point voltage value of the three power stations are synchronously collected through the data acquisition terminal during this cycle; then, the actual active power output value is compared with the corresponding active power target command value in the coordinated output strategy, the absolute value of the difference between the two is calculated, and divided by the active power target command value to obtain the active power deviation rate (e.g., for power station A). If the instruction is 5000 kW and the actual output is 4800 kW, then the active power deviation rate is 4%. Simultaneously, the actual grid-connected voltage value is compared with the rated voltage limit (e.g., the upper limit of the rated voltage) used when mapping the voltage over-limit safety constraint in S6. The amplitude of the actual voltage exceeding this limit is calculated and divided by the rated voltage to obtain the voltage over-limit deviation rate (if the voltage does not exceed the limit, this deviation rate is recorded as zero). Then, weighting factors are assigned to the active power deviation rate and the voltage over-limit deviation rate (e.g., the active power deviation rate weight is set to 0.7, and the voltage over-limit deviation rate weight is set to 0.3), and they are weighted and summed to calculate the output. A comprehensive execution deviation coefficient is generated (e.g., a comprehensive coefficient of 0.028); a preset deviation threshold is built in (e.g., 0.05), and it is determined whether the comprehensive execution deviation coefficient exceeds the threshold. If it does not exceed the threshold, it is determined that the current parameters of the model do not need to be adjusted and the model waits for the next cycle of data. If it exceeds the threshold, the internal parameters controlling the optimization iteration step size and convergence accuracy of the preset co-optimization model are dynamically corrected based on the extent of the excess of the comprehensive execution deviation coefficient (e.g., the excess extent is the absolute value of 0.028 minus 0.05 or calculated proportionally). Specifically, this is manifested in adjusting the solution algorithm (e.g., particle swarm optimization). The iteration step size parameter of the method is reduced proportionally to the excess amplitude to enhance the local search accuracy, while the convergence accuracy judgment threshold is tightened accordingly. Finally, the preset collaborative optimization model is updated using the corrected iteration step size and convergence accuracy and other internal parameters, and the model is re-input into the model with the latest round of preprocessed spatial, operational and environmental data for optimization iteration. The model outputs more accurate active power and reactive power target command values for power plants A, B and C in the next control cycle, thereby generating the collaborative output strategy for the next period and issuing it for execution. This completes the closed-loop adaptive feedback control of the collaborative optimization of photovoltaic power generation efficiency of the entire multi-power plant.
[0087] In conclusion, the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc., made within the spirit and principles of the present invention should be included within the protection scope of the present invention.
[0088] The above description is merely a specific embodiment of this application, but the scope of protection of this application is not limited thereto. Any variations or substitutions that can be easily conceived by those skilled in the art within the scope of the technology disclosed in this application should be included within the scope of protection of this application. Therefore, the scope of protection of this application should be determined by the scope of the claims.
Claims
1. A method for synergistic optimization of photovoltaic power generation efficiency across multiple power plants, characterized in that, include: S1: Synchronously acquire spatial attribute data, operational data, and environmental data of multiple power stations within the target area through the data acquisition terminal, and preprocess the acquired spatial attribute data, operational data, and environmental data; S2: Based on the preprocessed spatial attribute data and environmental data, combined with the solar trajectory model, calculate the dynamic shadow occlusion range between multiple power stations in the target area, and generate a set of characteristic parameters of the shadow occlusion linkage effect between power stations. S3: Based on preprocessed environmental and spatial attribute data, predict the cloud movement trajectory, calculate the chain shading attenuation rate of multiple power stations in the target area in the time dimension, and generate a set of regional cloud shadow propagation chain response parameters. S4: Based on the preprocessed operating data, analyze the voltage coupling effect of multiple power stations in the target area and obtain the voltage coupling influence index of each power station's grid node. S5: Based on the preprocessed operating data, analyze the total output fluctuation status of multiple power stations in the target area and the power adjustment margin of each power station, and generate a set of target parameters for optimizing regional collaborative power generation efficiency. S6: Input the characteristic parameter set of the shadow shading linkage effect between power stations, the response parameter set of the regional cloud shadow propagation chain, the voltage coupling influence index of each power station's grid node, and the target parameter set of regional collaborative power generation efficiency optimization into the preset collaborative optimization model, output the collaborative power output strategy of each power station in the target area, and send it to each power station for execution. S7: Collect actual operating data of each power station in the target area after implementing the coordinated power output strategy, compare the actual operating data with the expected data of the coordinated power output strategy, and iteratively correct the internal parameters of the coordinated optimization model based on the comparison results to output the coordinated power output strategy for the next period.
2. The method for synergistic optimization of photovoltaic power generation efficiency across multiple power plants according to claim 1, characterized in that, The S1 synchronously acquires spatial attribute data, operational data, and environmental data of multiple power stations within the target area through a data acquisition terminal, including: The data acquisition terminal obtains operational data from the SCADA system, including real-time power data of each power station, voltage data of grid topology nodes, active and reactive power data of inverters, and state of charge data of energy storage system. It also obtains environmental data from meteorological monitoring equipment and meteorological service platform, including irradiance, temperature, and cloud map prediction information. Finally, it extracts spatial attribute data from the engineering configuration database, including spatial coordinate data of components of each power station. The preprocessing of the acquired spatial attribute data, operational data, and environmental data includes: The aforementioned data types acquired synchronously are sequentially processed by imputing missing values, removing abnormal data, synchronizing and aligning timestamps, and normalizing.
3. The method for synergistic optimization of photovoltaic power generation efficiency across multiple power plants according to claim 2, characterized in that, The S2 extracts the preprocessed spatial coordinate data of each power station component, constructs the time series to be calculated according to the preset time step, substitutes the spatial coordinate data of each power station component and the time series to be calculated into the preset solar trajectory model, and calculates the solar altitude angle and azimuth angle corresponding to each moment in the time series to be calculated. Based on the solar altitude angle and azimuth angle, calculate the dynamic shadow projection polygon of the photovoltaic modules of each power station on the ground plane; perform spatial geometric intersection calculation with the spatial coordinate data of the modules of other power stations in the target area to calculate the dynamic shadow shading area and shading duration between power stations. Based on the irradiance in the preprocessed environmental data, calculate the radiation attenuation corresponding to the dynamic shadow occlusion area; The dynamic shadow occlusion area, occlusion duration, and radiation attenuation are combined according to the corresponding relationship between power stations to generate the characteristic parameter set of the shadow occlusion linkage effect between power stations.
4. The method for synergistic optimization of photovoltaic power generation efficiency across multiple power plants according to claim 3, characterized in that, S3 extracts cloud map prediction information from the preprocessed environmental data, calculates the displacement vector of cloud map pixel blocks at adjacent times using a preset image feature matching algorithm, and constructs a cloud motion vector field to predict the movement trajectory of the cloud over the target area. Extract the preprocessed spatial coordinate data of each power station component, perform spatial intersection calculation between the moving trajectory and the spatial coordinate data of each power station component, and determine the time sequence of cloud cover reaching each power station and the duration of cloud cover at each power station location. Based on the irradiance in the preprocessed environmental data, within the time window corresponding to the duration of each power station location, the irradiance reduction ratio of each power station during the cloud cover period is calculated as the chain shading attenuation rate. The time sequence of cloud cover reaching each power station, the duration of cloud cover at each power station location, and the chain cover attenuation rate are combined according to the power station correspondence to generate the regional cloud shadow propagation chain response parameter set.
5. The method for synergistic optimization of photovoltaic power generation efficiency across multiple power plants according to claim 4, characterized in that, S4 extracts the grid topology node voltage data and inverter active and reactive power data from the preprocessed operating data, and obtains the grid impedance parameters and node voltage safety deviation limits for the target area. Based on the grid impedance parameters and the active and reactive power data of the inverter, the voltage change at the point of common coupling caused by the active and reactive power injected into the grid by each power station is calculated. The electrical distance between each power station's grid connection node is determined based on the grid topology node voltage data, and the ratio of voltage change to electrical distance is used as the voltage sensitivity coefficient. The voltage variation of other power stations within the target area is multiplied by the corresponding voltage sensitivity coefficient and summed to calculate the voltage coupling fluctuation value between each power station. The voltage coupling fluctuation value is normalized using the node voltage safety deviation limit to obtain the grid node voltage coupling influence index of each power station.
6. The method for synergistic optimization of photovoltaic power generation efficiency across multiple power plants according to claim 5, characterized in that, S5 extracts the active power output sequence of each power station in the target area within a preset time window from the preprocessed operating data, calculates the root mean square of the active power difference between adjacent sampling time nodes, and uses the root mean square as the total output fluctuation state index of the target area. Extract the rated capacity and real-time active power of the inverters of each power station from the preprocessed operating data. Use the difference between the rated capacity and the real-time active power as the active power adjustment margin. Combine this with the real-time input capacity of the reactive power compensation device of each power station to determine the reactive power adjustment margin. The optimization direction of the total output fluctuation state index is configured as minimization as the first optimization objective, and the optimization direction of the sum of the active power adjustment margin and reactive power adjustment margin of each power station is configured as maximization as the second optimization objective. Weight coefficients are assigned to the first optimization objective and the second optimization objective respectively, and the parameter set of the regional collaborative power generation efficiency optimization objective is generated by combination.
7. The method for synergistic optimization of photovoltaic power generation efficiency across multiple power plants according to claim 6, characterized in that, The S6 inputs the characteristic parameter set of the shadow shading linkage effect between power stations and the response parameter set of the regional cloud shadow propagation chain into the preset collaborative optimization model, and maps it to the environmental reduction constraint boundary of the active power output of each power station in the prediction period. The voltage coupling influence index of each power station's grid node is input into the preset collaborative optimization model, and combined with the rated voltage limit of each power station's grid connection node, it is mapped to the voltage over-limit safety constraint condition in the model iterative solution process. The target parameter set for optimizing regional collaborative power generation efficiency is input into the preset collaborative optimization model to construct the objective function. Under the constraints of the environmental reduction constraint boundary and voltage over-limit safety constraint conditions, the optimization iteration is carried out according to the preset solution algorithm, and the active power target command value and reactive power target command value of each power station in the target area for the next control cycle are output. The active power target command value and the reactive power target command value are combined to generate the coordinated output strategy of each power station, and then sent to the inverters and reactive power compensation devices of the corresponding power stations for execution.
8. The method for synergistic optimization of photovoltaic power generation efficiency across multiple power plants according to claim 7, characterized in that, The S7 collects the actual active power output value and actual grid connection point voltage value of each power station in the target area in the next control cycle after the implementation of the coordinated power output strategy output by S6. The active power output value is compared with the active power target command value in the coordinated output strategy to calculate the active power deviation rate. The actual grid connection point voltage value is compared with the rated voltage limit value on which the voltage over-limit safety constraint condition is based in S6 to calculate the voltage over-limit deviation rate. Weighting factors are assigned to the active power deviation rate and the voltage over-limit deviation rate respectively, and the weighted sum is calculated to generate the comprehensive execution deviation coefficient. Determine whether the overall execution deviation coefficient exceeds the preset deviation threshold. If it does, dynamically correct the internal parameters controlling the optimization iteration step size and convergence accuracy of the preset solution algorithm in the preset collaborative optimization model based on the extent of the deviation. The preset collaborative optimization model is updated using the corrected internal parameters, and the optimization iteration is performed again using the latest preprocessed data to output the collaborative output strategy of each power station in the target area in the next time period.