A transformer operation parameter remote acquisition cloud platform system and implementation method
By acquiring real-time operating parameters of distribution transformers and wide-area power grid measurement data, the edge of power grid disturbances can be dynamically identified. Combined with power grid topology and cloud motion parameters, the output fluctuations of downstream power plants can be predicted in advance. This solves the problems of accuracy and prediction in monitoring the propagation characteristics of power grid disturbances in existing technologies, and improves the real-time performance and accuracy of power grid management.
Patent Information
- Application Number
- CN202611134437.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-07-29
- Publication Date
- 2026-11-24
AI Technical Summary
Existing technologies are insufficient to effectively monitor the propagation characteristics and parameter changes of power grid disturbances in distribution transformers, resulting in limited fitting accuracy, inability to predict parameter fluctuations in advance, lack of reasonable explanations for the sources and propagation paths of fluctuations, and difficulty in supporting refined and forward-looking power grid management.
By acquiring real-time operating parameters of multiple distribution transformers and wide-area power grid measurement data, the edge of power grid disturbances is identified, the benchmark transformer is dynamically adjusted, and the waveform change time is matched in real time by combining the power grid topology and cloud motion parameters. The downstream transformer sequence is locked, a fitted output curve is generated, and the relationship between the dynamic benchmark transformer and the downstream power station is adjusted through feedback to achieve early prediction of the output fluctuation of the downstream power station.
It improves the real-time performance and accuracy of operating parameter curve fitting, enhances the grid's response to distributed photovoltaic fluctuations, reduces the prediction error rate, and improves the accuracy and adaptability of identifying grid disturbances.
Smart Images

Figure CN123163206A_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the field of transformer condition monitoring and cloud platform technology, specifically a cloud platform system and implementation method for remote acquisition of transformer operating parameters. Background Technology
[0002] Distribution transformers are numerous and geographically dispersed, and their operating parameters are significantly affected by disturbances such as grid load fluctuations, voltage sags, and harmonic propagation. These fluctuations are rapid and widespread, placing considerable pressure on transformer condition monitoring, fault early warning, and the safe operation of the distribution network. Currently, the monitoring and fitting of distribution transformer operating parameters mostly rely on historical data from single stations, data from fixed monitoring points, and traditional prediction models, which fail to capture the continuous process of grid disturbances moving and propagating in space.
[0003] In actual operation, power grid disturbances often sweep across multiple distribution transformers in the target area sequentially in a certain direction and at a certain speed. The parameter fluctuations among the transformers exhibit obvious temporal and spatial correlations. However, existing methods rarely directly correlate the propagation characteristics of power grid disturbances with changes in transformer parameters, and they also rarely group transformers together based on the actual electrical connections of the power grid. Many schemes still use fixed sites as reference benchmarks. When the disturbance path and power grid operating conditions change, the representativeness of the benchmark site decreases rapidly, leading to a lag and increased bias in the overall fitting results.
[0004] Meanwhile, traditional operating parameter fitting methods cannot distinguish between upstream and downstream of the transformer, distance, or the order in which they are affected by the same disturbance, making it impossible to predict upcoming parameter fluctuations in advance. These methods not only have limited fitting accuracy but also lack a reasonable explanation of the source and propagation path of fluctuations, making it difficult to support the refined and forward-looking management of operation and maintenance organizations. Summary of the Invention
[0005] The purpose of this invention is to provide a cloud platform system and implementation method for remote acquisition of transformer operating parameters, so as to solve the problems mentioned in the background art.
[0006] A cloud platform system for remote acquisition of transformer operating parameters and its implementation method, comprising:
[0007] Acquire real-time operating parameter data of multiple distribution transformers within the target area, including oil temperature, load current, voltage, power factor, and wide-area power grid measurement data;
[0008] Based on the wide-area measurement data of the power grid, the motion parameters of the power grid disturbance edge, including voltage sag, load change, and harmonic distortion edge, are extracted. The motion parameters include motion speed and motion direction.
[0009] Based on real-time operating parameter data, including oil temperature, load current, voltage, and power factor, the waveform change time of each power station's output curve is extracted. The waveform change time is matched with the cloud passage time calculated from the motion parameters. Based on the matching results, the dynamic reference transformer is identified and dynamically adjusted in real time.
[0010] Based on the motion parameters and the upstream and downstream relationships of electrical connections in the power grid topology, starting from the dynamic reference transformer, the power stations affected by the same power grid disturbance edge, including voltage sag, load mutation, and harmonic distortion edge, are identified as downstream transformer sequences along the downstream direction of the electrical connection. The estimated arrival time of the power grid disturbance edge, including voltage sag, load mutation, and harmonic distortion edge, from the dynamic reference transformer to each downstream power station is calculated based on the motion speed.
[0011] Based on the waveform change amplitude in the real-time output curve of the dynamic reference transformer, and the expected arrival time of grid disturbance edges, including voltage dips, load surges, and harmonic distortion edges, to each downstream power station, the change amplitude and timing of the output curve of each downstream power station are calculated, and the fitted output curve of each downstream power station is generated.
[0012] The actual output curves of each downstream power station are collected, and the actual output curves are compared with the fitted output curves. Based on the comparison results, the correspondence between the dynamic reference transformer and the downstream power station is adjusted.
[0013] The present invention adopts the above-mentioned scheme, which establishes a spatiotemporal correspondence between cloud cover and power plant output changes by dynamically identifying the reference station and combining cloud motion parameters with the power grid topology. This enables early prediction of power output fluctuations of downstream power plants, improves the real-time performance and accuracy of operating parameter curve fitting, and enhances the grid dispatching response capability to distributed photovoltaic fluctuations.
[0014] In some possible implementations, before matching the waveform change time with the cloud elapse time calculated from the motion parameters, the method further includes:
[0015] Identify power plants located at the boundary of the target area as edge power plants;
[0016] The matching of the waveform change time with the cloud passage time calculated from the motion parameters specifically involves matching the waveform change time of the edge power station with the cloud passage time calculated from the motion parameters.
[0017] This invention, by prioritizing the identification of edge power stations and matching the waveform change time with the cloud passage time, can capture the initial impact of cloud entry into the region earlier, providing a reliable starting point for the subsequent identification of dynamic reference transformers and the construction of downstream transformer sequences.
[0018] In some possible implementations, matching the waveform change time of the edge power station with the cloud transit time calculated from the motion parameters includes the following steps:
[0019] Obtain the spatial distance between the dynamic reference transformer and the edge power station;
[0020] The width of the matching time window is determined by the spatial distance; the greater the spatial distance, the wider the matching time window.
[0021] When the waveform change falls within the matching time window determined before and after the cloud's passage time, the two are considered to be successfully matched.
[0022] This invention dynamically adjusts the width of the matching time window based on the spatial distance between the dynamic reference transformer and the edge power station, overcoming the problem of matching failure under different distances with a fixed window, and improving the accuracy and robustness of matching the waveform change time with the cloud passage time.
[0023] In some possible implementations, when calculating the expected arrival time of grid disturbance edges, including voltage sags, load abrupt changes, and harmonic distortion edges, from the dynamic reference transformer to each downstream power station based on the movement speed, the following steps are included:
[0024] Obtain the electrical connection path between the dynamic reference transformer and downstream power plants in the power grid topology;
[0025] The electrical transmission distance is obtained by summing the lengths of each segment of the line along the electrical connection path;
[0026] Dividing the electrical transmission distance by the speed of movement yields the grid disturbance edge, including the estimated arrival time of voltage sags, load abrupt changes, and harmonic distortion edges to downstream power plants.
[0027] This invention calculates the estimated time for power grid disturbance edges, including voltage dips, load surges, and harmonic distortion edges, to reach downstream power plants by accumulating the line lengths along the electrical connection paths. This makes the time estimation more consistent with the actual structure of the power grid and avoids errors caused by relying solely on geographical distance.
[0028] In some possible implementations, calculating the variation range of the output curves of each downstream power station includes the following steps:
[0029] The amplitude of waveform change in the real-time output curve of the dynamic reference transformer is obtained as the reference change.
[0030] Based on the expected arrival time of grid disturbance edges, including voltage dips, load abrupt changes, and harmonic distortion edges, to downstream power plants, determine the attenuation rate of the change amplitude along the electrical transmission distance;
[0031] The output curve variation of the downstream power plant is calculated based on the baseline change and attenuation rate.
[0032] By adopting the above scheme, an attenuation model of the change amplitude along the electrical transmission distance is introduced, which makes the amplitude prediction of power fluctuation more consistent with the actual physical process and improves the authenticity and accuracy of the fitted curve.
[0033] In some possible implementations, when identifying power plants sequentially affected by the same grid disturbance edge, including voltage sags, load abrupt changes, and harmonic distortion edges, as downstream transformer sequences, the following steps are included:
[0034] Identify grid disturbance edges based on wide-area grid measurement data, including the dissipation boundaries of voltage sags, load abrupt changes, and harmonic distortion edges;
[0035] Starting with the dynamic reference transformer, candidate power stations are determined step by step along the direction of motion;
[0036] Determine whether the path from the dynamic reference transformer to the candidate power station crosses the dissipation boundary, including voltage sag, load abrupt change, and harmonic distortion edge.
[0037] If the path crosses the dissipation boundary, then the candidate power station and its subsequent power stations will no longer be included in the downstream transformer sequence.
[0038] This invention identifies and determines whether the propagation path crosses the boundary of disturbance attenuation, thereby avoiding the erroneous inclusion of power plants unaffected by clouds in the downstream sequence, and improving the effectiveness of downstream power plant screening and the accuracy of the prediction chain.
[0039] In some possible implementations, adjusting the correspondence between the dynamic reference transformer and the downstream power station based on the comparison results includes the following steps:
[0040] Compare the waveform change times in the actual output curve with the waveform change times in the fitted output curve;
[0041] When the actual change time is earlier than the fitted change time and the advance time exceeds the preset threshold, the power station corresponding to the actual change time will be changed to the new dynamic reference transformer.
[0042] Starting with the new dynamic reference transformer, along the downstream direction of the electrical connection in the power grid topology, the power stations affected by the same power grid disturbance edge, including voltage dips, load mutations, and harmonic distortion edges, are re-identified as the downstream transformer sequence based on the direction of movement.
[0043] This invention automatically identifies a more representative power station as a new benchmark station by comparing the actual waveform change time with the fitting time, ensuring that the benchmark station always follows the cloud movement front and improving the adaptive capability of the fitting system.
[0044] In some possible implementations, calculating the variation range of the output curves of each downstream power station includes the following steps:
[0045] The number of power supply paths for downstream power plants to receive power from the dynamic reference transformer is determined based on the power grid topology.
[0046] Obtain the power allocation ratio for each power supply path;
[0047] Based on the waveform variation amplitude and power distribution ratio in the real-time output curve of the dynamic reference transformer, calculate the variation component contributed by each power supply path.
[0048] The variation components of each power supply path are superimposed to obtain the variation amplitude of the output curve of the downstream power station.
[0049] This invention takes into account that there may be multiple power supply paths for downstream power plants. By decomposing the change amplitude through path diversion and power allocation ratio, the amplitude prediction is made to better match the actual output changes under complex power grid structures.
[0050] In some possible implementations, after calculating the grid disturbance edges based on the movement speed, including voltage sags, load abrupt changes, and harmonic distortion edges, the estimated arrival time from the dynamic reference transformer to each downstream power station is further included:
[0051] Collect the actual waveform change times of each intermediate power station along the route between the dynamic reference transformer and the downstream power station;
[0052] The actual waveform change times at each intermediate power station are compared with the estimated arrival times calculated based on the speed of motion, and the time deviation at each intermediate power station is calculated.
[0053] Based on the time deviation at each intermediate power station and the electrical transmission distance between it and the dynamic reference transformer, the correction value of the movement speed is calculated in reverse.
[0054] The estimated arrival time of the downstream power station is recalculated using the corrected velocity.
[0055] By adopting the above scheme, the actual waveform change time of the intermediate power station along the route is used to perform reverse closed-loop correction on the cloud movement speed, eliminating the prediction deviation caused by cloud image imaging error and sudden wind speed change, and improving the accuracy of the estimated arrival time.
[0056] In some possible implementations, when calculating the variation range of the output curves of each downstream power station, if there are multiple power supply paths for the downstream power station, the calculation may also include:
[0057] The number of power supply paths for downstream power plants to receive power from the dynamic reference transformer is determined based on the power grid topology, and the power allocation ratio of each path is obtained.
[0058] Based on the expected arrival time of grid disturbance edges, including voltage dips, load abrupt changes, and harmonic distortion edges, to downstream power plants, determine the attenuation rate of the change amplitude along the electrical transmission distance;
[0059] The amplitude of waveform change in the real-time output curve of the dynamic reference transformer is obtained as the reference change.
[0060] Based on the power allocation ratio and attenuation rate, the baseline change is decomposed into path diversion contribution component and cloud attenuation contribution component.
[0061] The output curve variation of the downstream power plant is obtained by superimposing the path diversion contribution component with the cloud attenuation contribution component.
[0062] This invention further improves the accuracy and interpretability of power output variation estimation in multi-path scenarios by separately quantifying the impact of electrical topology shunting and cloud attenuation on power output variation.
[0063] It also includes a cloud platform system for remotely acquiring transformer operating parameters, comprising:
[0064] The data acquisition module is used to acquire real-time operating parameter data of multiple distribution transformers and wide-area power grid measurement data within the target area;
[0065] The disturbance feature extraction module is used to extract the motion velocity and direction of motion of the power grid disturbance edge based on the power grid wide-area measurement data.
[0066] The dynamic reference identification module is used to match the waveform change time of the transformer operating parameter curve with the disturbance passage time, and to identify and dynamically adjust the dynamic reference transformer in real time.
[0067] The downstream sequence locking module is used to lock the downstream transformer sequence affected by the same disturbance edge along the electrical connection downstream, starting from the dynamic reference transformer, and to calculate the estimated arrival time of the disturbance edge.
[0068] The parameter curve fitting module is used to generate fitted operating parameter curves for each downstream transformer based on the waveform change amplitude and expected arrival time of the dynamic reference transformer.
[0069] The feedback adjustment module is used to compare the actual and fitted operating parameter curves and adjust the correspondence between the dynamic reference transformer and the downstream transformer.
[0070] The technical solutions provided by the embodiments of this disclosure have at least the following beneficial effects:
[0071] This invention extracts segmented feature points and fits displacement vectors to the edges of power grid disturbances, including voltage sags, load abrupt changes, and harmonic distortion edges. This effectively suppresses abrupt changes in motion state caused by single-point noise, making the identification results of the motion speed and direction of the edges of power grid disturbances, including voltage sags, load abrupt changes, and harmonic distortion edges, more consistent with the actual physical motion laws. Compared with traditional pixel statistics methods, this improves the accuracy and stability of cloud motion description.
[0072] By using a dynamic time window that adaptively matches the spatial distance for waveform timing matching, the matching failure problem caused by the difference in cloud propagation delay at different distances can be overcome. This maintains the recognition accuracy in large-scale power distribution transformer scenarios and has stronger scenario adaptability compared to conventional fixed-window solutions.
[0073] This invention avoids overall prediction failure caused by anomalies in a single power station, local obstruction, or communication fluctuations by dynamically selecting and updating the dynamic reference transformer based on matching results.
[0074] This invention forms a downstream transformer sequence by jointly screening cloud movement paths and power grid electrical topology, rather than clustering based solely on geographical location. This avoids mistakenly including electrically unrelated power stations in the same prediction chain, making the output correlation analysis more consistent with the actual electrical transmission logic and reducing the prediction misjudgment rate.
[0075] This invention uses measured waveforms from intermediate power stations along the route to perform reverse closed-loop correction on the edge motion speed of power grid disturbances, including voltage dips, load surges, and harmonic distortion. This can eliminate prediction biases caused by external interferences such as cloud imagery errors and sudden wind speed changes, achieve mutual calibration between observation data and electrical operation data, and improve the accuracy of estimated arrival times. Attached Figure Description
[0076] Figure 1 This is a flowchart of the method of the present invention. Detailed Implementation
[0077] The technical solution of the present invention will be clearly and completely described below with reference to the embodiments. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the scope of protection of the present invention.
[0078] Please see Figure 1 This application provides a cloud platform system and implementation method for remote acquisition of transformer operating parameters, including:
[0079] Real-time operating parameter data for multiple distribution transformers within the target area is acquired, including oil temperature, load current, voltage, power factor, and grid wide-area measurement data. Specifically, the target area is defined based on the coverage of the medium-voltage distribution network feeders. Each area must contain at least 10 distribution transformers with a total installed capacity of at least 5 MW, and the overlap between the area boundary and adjacent areas should not exceed 5% to avoid duplicate inclusion of power plants in the analysis. Real-time operating parameter data, including oil temperature, load current, voltage, and power factor, are collected through the power plant's grid-connected monitoring and control devices. The collected data includes total active power, active power of each inverter branch, grid connection point line voltage, and current. Grid wide-area measurement data is obtained from ground-based meteorological radar stations or high-resolution satellite remote sensing data. Satellite remote sensing data undergoes geometric and atmospheric correction preprocessing to ensure that cloud positions match actual geographic coordinates. To ensure data synchronization, output data and cloud image data are aligned using a unified timestamp reference.
[0080] In practical applications, comprehensive photovoltaic data often originates from different platforms across multiple departments, such as marketing and development, leading to issues such as inconsistent record-keeping, diverse active power data retrieval methods, and significant discrepancies in the final summation results. To improve data quality and achieve unified management, after acquiring real-time operating parameter data, including oil temperature, load current, voltage, and power factor, the following data governance steps are also included:
[0081] The joint marketing department and development department collaborated to complete the verification of the basic ledger of distributed photovoltaic power and the governance of basic information, clarify the key information of historical photovoltaic power, define the statistical dimensions and mapping relationships between departments, standardize the information transmission method for future photovoltaic access, and unify the data of photovoltaic power export to the outside world.
[0082] Based on this, and considering the high dispersion, varying granularity, and inconsistent statistical standards of the basic data of photovoltaic power sources, an autonomous identification and alarm model for abnormal photovoltaic active power data is constructed. The basic data of the photovoltaic ledger and historical active power output data are classified and analyzed. Expert experience is summarized to construct an autonomous identification model for non-centrally dispatched photovoltaic active power data. The model is used to scan and identify data of individual stations in real time, so as to realize the normalized and timely alarm and closed-loop processing of abnormal results.
[0083] Furthermore, a module for real-time repair, fitting, and verification of single-station output curves is constructed. Based on a dynamic reference transformer, the module performs real-time identification, alarm, and near-real-time repair of abnormal points in the output curves of non-centrally regulated photovoltaic single stations. The repair results are then evaluated to achieve iterative optimization of the algorithm model.
[0084] Based on the wide-area measurement data of the power grid, the motion parameters of the power grid disturbance edges, including voltage sags, load abrupt changes, and harmonic distortion edges, are extracted. The motion parameters include the motion speed and direction of the power grid disturbance edges, including voltage sags, load abrupt changes, and harmonic distortion edges.
[0085] First, two consecutive frames of meteorological cloud images are preprocessed. An adaptive threshold segmentation algorithm is used to convert the cloud images into binary images, with the foreground being the cloud area and the background being the clear sky area.
[0086] Furthermore, edge detection operators are used to extract grid disturbance edges, including voltage sags, load abrupt changes, and harmonic distortion edge contours, thus preserving clear edge features while suppressing noise.
[0087] Multiple feature points are selected on the extracted edge contour. The feature points are evenly distributed and not located at the inflection points of the contour.
[0088] The displacement of corresponding feature points in two adjacent cloud images is determined by a feature point matching algorithm. The movement speed of the feature points is obtained by combining the time interval between the two cloud images. The average value is taken as the edge of the power grid disturbance, including the movement speed of voltage sag, load change, and harmonic distortion edges.
[0089] The movement direction of the edges of power grid disturbances, including voltage sags, load abrupt changes, and harmonic distortion edges, is determined by the azimuth of the displacement vector of the characteristic point. With true north as the reference, the displacement vector is fitted using the least squares method to ensure accurate direction identification.
[0090] By extracting segmented feature points and fitting the overall vector of the edges of power grid disturbances, including voltage sags, load abrupt changes, and harmonic distortion edges, we can avoid abrupt changes in speed and direction caused by single-point noise. This makes the description of cloud motion more consistent with the actual physical motion laws, rather than simple pixel-level statistics, and improves the physical consistency of subsequent power output fluctuation prediction.
[0091] Based on real-time operating parameter data, including oil temperature, load current, voltage, and power factor, the waveform change times of the output curves of each power station are extracted.
[0092] Power stations located at the boundary of the target area are identified as edge power stations. Specifically, based on the geographical boundary of the target area, the latitude and longitude coordinates of all distribution transformers within the area are traversed. Power stations whose distance from the area boundary is less than a set distance threshold of 500m are identified as boundary power stations and uniformly marked as edge power stations. When clouds enter the target area, they will first reach the edge power stations, and the output changes of the edge power stations can reflect the start time of cloud obstruction earliest.
[0093] The waveform change time of the edge power station is matched with the cloud transit time calculated from the motion parameters.
[0094] Obtain the spatial distance between the dynamic reference transformer and the edge power station. Specifically, read the latitude and longitude coordinates of the dynamic reference transformer and the edge power station, and calculate the straight-line distance between them using a spatial distance calculation method. This distance is used to characterize the degree of spatial correlation between the edge power station and the dynamic reference transformer.
[0095] The width of the matching time window is determined based on spatial distance; the greater the spatial distance, the wider the matching time window. The matching time window provides a reasonable time fluctuation range for cloud transit times; the greater the spatial distance, the higher the uncertainty in cloud propagation. The matching time window width is determined using a linear mapping method: Matching time window width = spatial distance × 0.1s / m, with an upper limit of 10s and a lower limit of 1s. This coefficient corresponds to the empirical tolerance at a reference wind speed of 10m / s, and the system can be initialized based on the historical average wind speed of the region.
[0096] A successful match is determined when the waveform change falls within a matching time window defined before and after the cloud's passage time. A time interval is formed by extending half the width of the matching time window forward and backward from the cloud's passage time. If the waveform change of the peripheral power station falls within this time interval, the waveform change time is considered a successful match with the cloud's passage time. This method avoids false positives and false negatives caused by fixed time windows, improving the reliability of the matching results.
[0097] By adopting a time window that adapts to spatial distance rather than a fixed window, the matching failure problem caused by the difference in cloud propagation delay at different distances can be overcome, and a high matching accuracy can still be maintained in large-scale distributed power station scenarios.
[0098] The dynamic reference transformer is identified and dynamically adjusted in real time based on the matching results.
[0099] The real-time active power data of each power station were preprocessed, and a moving average filter window was used to remove high-frequency noise. The filter window length was set to 10 sampling points.
[0100] A threshold for judging power output fluctuations is set. When the absolute value of the power output difference between adjacent moments exceeds 12% of the power station's rated power, the next moment is marked as the waveform change moment of the power output curve. The aforementioned 12% threshold is determined based on historical data signal-to-noise ratio analysis. Specifically, it is the minimum value that can cover three standard deviations of the noise floor, while ensuring that the detection sensitivity is not less than 90%. To avoid false marking, the power output change trend of multiple consecutive sampling moments is verified. Only when the fluctuation direction is consistent and the cumulative fluctuation amplitude exceeds 15% of the rated power is the waveform change moment confirmed as valid.
[0101] Based on the edge of the power grid disturbance, including voltage sags, load surges, harmonic distortion edge motion parameters and the geographical location of each power station, the theoretical elapsed time of the edge of the power grid disturbance, including voltage sags, load surges, and harmonic distortion edges, to reach each power station is calculated. The calculation method is: theoretical elapsed time = spatial distance between the power station and the current edge of the cloud ÷ the movement speed of the edge of the power grid disturbance, including voltage sags, load surges, and harmonic distortion edges.
[0102] The effective waveform change time of each power station is compared with the theoretical elapsed time. When the time difference does not exceed 4 seconds, it is determined that the waveform change of the power station is successfully matched with the cloud passage.
[0103] The number of successful matches for each power station within the last 60 seconds is counted. The power station with the most successful matches, the smallest matching error, and a data integrity rate of no less than 98% is selected as the dynamic reference transformer. To adapt to changes in cloud movement, the dynamic reference transformer is re-identified every 30 seconds. If the current reference station's matching results are below the regional average for three consecutive times, a reference station switching process is triggered, and a new dynamic reference transformer is selected.
[0104] The matching error threshold and advance time threshold (e.g., 2 seconds) involved in the handover determination are both related to the system sampling period (1Hz) and are set to be no less than 2 sampling periods in order to balance response speed and anti-jitter performance.
[0105] By dynamically selecting a reference station instead of a fixed one, the problem of overall prediction failure caused by single device malfunction, local obstruction, or communication fluctuations can be avoided.
[0106] As a supplement to the above-mentioned dynamic reference transformer identification method, when the accuracy of the wide-area power grid measurement data is insufficient or the update frequency is low, the dynamic rolling calculation method of the reference station cluster can be used to select the reference station.
[0107] The specific steps are as follows:
[0108] The range of candidate benchmark curves is determined by taking the historical output curves of each power station within the most recent 15 days as the candidate range of benchmark curves;
[0109] Based on the total daily output data of the selected station, the difference between the output and other benchmark curves is calculated and accumulated to the rolling output value over the entire period, i.e., for each output time... Calculated periodic rolling output value ,in The periodic rolling output value before time t. Let be the output value of other benchmark curves at time t. This represents the output value of the selected benchmark curve at time t on that day. This cluster rolling calculation method can maintain the effectiveness and representativeness of the base station even when real-time cloud maps are unavailable or the cloud map recognition is ineffective.
[0110] Based on the motion parameters and the upstream and downstream relationships of electrical connections in the power grid topology, starting from the dynamic reference transformer, the power stations affected by the same power grid disturbance edge, including voltage sag, load abrupt change, and harmonic distortion edge, are identified as downstream transformer sequences along the downstream direction of the electrical connection. The estimated arrival time of the power grid disturbance edge, including voltage sag, load abrupt change, and harmonic distortion edge, from the dynamic reference transformer to each downstream power station is calculated based on the motion speed of the power grid disturbance edge, including voltage sag, load abrupt change, and harmonic distortion edge.
[0111] The power grid topology data is obtained from the power grid dispatch automation system to identify the access nodes, feeders, and connection relationships of each distribution transformer, and to determine the upstream and downstream directions of electrical connections, with the side closer to the substation busbar being upstream and the side closer to the load being downstream.
[0112] Starting from the dynamic reference transformer, the power stations along the downstream direction of current transmission are traversed to select the power stations that meet the following conditions as candidate downstream power stations: first, they are located on the same feeder segment as the dynamic reference transformer and the electrical distance does not exceed 5km; second, their geographical location is located at the edge of grid disturbances, including the coverage of voltage dips, load abrupt changes, and harmonic distortion edge movement paths.
[0113] When identifying power plants sequentially affected by the same grid disturbance edge, including voltage dips, load abrupt changes, and harmonic distortion edges, as downstream transformer sequences, the following steps are included:
[0114] Based on wide-area power grid measurement data, the dissipation boundaries of power grid disturbances, including voltage sags, load abrupt changes, and harmonic distortion edges, are identified. Using pre-processed binary meteorological cloud images, the grayscale distribution characteristics of cloud regions are analyzed. Regions with grayscale values below a set threshold of 60 are identified as dissipation boundaries. These boundaries characterize the areas where clouds gradually dissipate during movement and fail to provide effective shielding. Identifying dissipation boundaries accurately delineates the effective cloud cover area, preventing power plants exceeding the cloud's influence capacity from being included in the downstream sequence.
[0115] Starting with the dynamic reference transformer, candidate power stations are determined step by step along the direction of cloud movement. Based on the superposition direction of the cloud movement direction and the downstream direction of the power grid electrical topology, starting from the dynamic reference transformer, power stations with increasing electrical distances are selected as candidate power stations to ensure that the order of the candidate power stations is consistent with the actual order in which the clouds sweep across the grid.
[0116] Determine whether the paths from the dynamic reference transformer to the candidate power station, including voltage sags, load abrupt changes, and harmonic distortion edges, cross dissipation boundaries. Plot the spatial propagation paths of these edges from the dynamic reference transformer to the candidate power station. Perform spatial overlay analysis on these paths and the identified dissipation boundaries to determine if the paths intersect with the dissipation boundaries.
[0117] If the propagation path crosses the dissipation boundary, the candidate power station and its subsequent power stations are no longer included in the downstream transformer sequence. If the propagation path is determined to cross the dissipation boundary, it means that the cloud has dissipated by the time it reaches the candidate power station and cannot generate effective power output; therefore, the candidate power station and its downstream power stations are no longer included in the downstream transformer sequence. If the path does not cross the dissipation boundary, the candidate power station is included in the downstream transformer sequence, and the next candidate power station is evaluated. This method can accurately screen power station clusters continuously affected by the same grid disturbance edge, including voltage dips, load abrupt changes, and harmonic distortion edges, ensuring the effectiveness and specificity of the downstream sequence.
[0118] The selected candidate downstream power plants are sorted from closest to furthest from the dynamic reference transformer to form a downstream transformer sequence.
[0119] By jointly screening cloud movement paths with the electrical topology of the power grid, rather than relying solely on geographical location clustering, we can avoid mistakenly including electrically unrelated power plants that are only spatially close into the same prediction sequence, thereby improving the accuracy of output correlation analysis.
[0120] It should be noted that the aforementioned waveform change timing matching stage uses spatial distance to quickly establish a preliminary correspondence between the physical movement of clouds and the power station; while the electrical transmission distance is used in the estimated arrival time calculation in this step to accurately describe the propagation timing of power changes in the power grid topology. The two are applicable to different technical aspects and together constitute the complete mapping logic of this invention.
[0121] Based on the edge movement speed of grid disturbances, including voltage sags, load abrupt changes, and harmonic distortion edges, the estimated arrival time of the edges from the dynamic reference transformer to each downstream power station is calculated, including the following steps:
[0122] Obtain the electrical connection path between the dynamic reference transformer and downstream power plants in the power grid topology. Retrieve the complete electrical link from the dynamic reference transformer access node to the downstream power plant access node from the power grid topology database, and identify key information such as line segments, switching equipment, and branch nodes included in the link to ensure the completeness and accuracy of the electrical connection path.
[0123] The electrical transmission distance is obtained by summing the lengths of each line segment along the electrical connection path. The actual length parameters of each distribution line segment in the electrical connection path are read segment by segment, and the lengths of all line segments are summed sequentially according to the path direction. Finally, the total electrical transmission distance between the dynamic reference transformer and the downstream power station is obtained. This distance can truly reflect the path length at the power grid topology level.
[0124] Dividing the electrical transmission distance by the speed of the grid disturbance edge (including voltage sags, load abrupt changes, and harmonic distortion edge movement) yields the estimated arrival time of the grid disturbance edge (including voltage sags, load abrupt changes, and harmonic distortion edge movement) to the downstream power station. Using the electrical transmission distance as a path reference for cloud propagation, and combining it with the extracted grid disturbance edge (including voltage sags, load abrupt changes, and harmonic distortion edge movement speed), the estimated arrival time is calculated as: Estimated Arrival Time = Electrical Transmission Distance ÷ Grid Disturbance Edge (including voltage sags, load abrupt changes, and harmonic distortion edge movement speed). A ±1-second error buffer time is also set to account for minor fluctuations in the speed of the grid disturbance edge (including voltage sags, load abrupt changes, and harmonic distortion edge movement speed).
[0125] Based on the calculation of the grid disturbance edge, including voltage sags, load abrupt changes, and harmonic distortion edge movement speed, after considering the estimated arrival time of the voltage sag, load abrupt changes, and harmonic distortion edges from the dynamic reference transformer to each downstream power station, the following is also included:
[0126] The actual waveform change times of each intermediate power station along the route between the dynamic reference transformer and the downstream power station are collected. Along the electrical transmission path between the dynamic reference transformer and each downstream power station, intermediate power stations within the cloud cover area are selected, and the output data of each intermediate power station is collected in real time, with the corresponding actual waveform change times extracted.
[0127] The actual waveform change times at each intermediate power station are compared with the estimated arrival times calculated based on the movement speeds of grid disturbance edges, including voltage sags, load abrupt changes, and harmonic distortion edges, to calculate the time deviation at each intermediate power station. The formula for calculating the time deviation is: Time Deviation = Actual Waveform Change Time - Estimated Arrival Time. The absolute value of the time deviation is used to characterize the degree of deviation between the movement speeds of the current grid disturbance edges, including voltage sags, load abrupt changes, and harmonic distortion edges, and the actual cloud movement speed. The sign of the time deviation is used to characterize the direction of the actual cloud movement speed.
[0128] Based on the time deviation at each intermediate substation and the electrical transmission distance between it and the dynamic reference transformer, the correction values for the movement speed of the grid disturbance edge, including voltage sags, load abrupt changes, and harmonic distortion edges, are calculated in reverse. Using the electrical transmission distance at each intermediate substation as the independent variable and the time deviation as the dependent variable, a least squares method is used for linear fitting to obtain the fitting slope. The reciprocal of the fitting slope is used as the speed correction coefficient. The formula for calculating the movement speed of the corrected grid disturbance edge, including voltage sags, load abrupt changes, and harmonic distortion edges, is: Corrected grid disturbance edge movement speed, including voltage sags, load abrupt changes, and harmonic distortion edges = Original grid disturbance edge movement speed, including voltage sags, load abrupt changes, and harmonic distortion edges × Speed correction coefficient.
[0129] The estimated arrival times of downstream power stations are recalculated using the corrected grid disturbance edges, including voltage sags, load abrupt changes, and harmonic distortion edge movement velocities. By employing the corrected grid disturbance edges, including voltage sags, load abrupt changes, and harmonic distortion edge movement velocities, and combining them with the determined electrical transmission distance, the estimated arrival times of the grid disturbance edges, including voltage sags, load abrupt changes, and harmonic distortion edges, to each downstream power station are recalculated, ensuring that the estimated arrival times are consistent with the actual cloud movement.
[0130] By using measured data from intermediate power stations along the route to correct cloud movement speed in a reverse closed loop, prediction biases caused by cloud imagery errors and sudden wind speed changes can be eliminated, enabling iterative optimization from "field observation prediction" to "electrical data feedback calibration".
[0131] Based on the waveform change amplitude in the real-time output curve of the dynamic reference transformer, and the expected arrival time of grid disturbance edges, including voltage dips, load surges, and harmonic distortion edges, to downstream power stations, the change amplitude and timing of the output curve of each downstream power station are calculated, and the fitted output curve of each downstream power station is generated.
[0132] When calculating the output curve variation of each downstream power station, if there are multiple power supply paths for the downstream power station, the following should also be included:
[0133] The number of power supply paths from which downstream power plants receive power from the dynamic reference transformer is determined based on the power grid topology, and the power allocation ratio of each path is obtained. Based on the power grid topology connections, all electrical paths that can achieve power transmission between the dynamic reference transformer and downstream power plants are identified, the number of effective power supply paths is counted, and the power allocation ratio of each path is determined according to line impedance, switch status, and dispatching strategy. The sum of the power allocation ratios of all paths is 1.
[0134] Based on the estimated arrival time of grid disturbance edges, including voltage sags, load abrupt changes, and harmonic distortion edges, to downstream power plants, the attenuation rate of the amplitude of these disturbances along the electrical transmission distance is determined. The estimated arrival time is converted to the corresponding electrical transmission distance, and the attenuation rate is calculated using a linear attenuation model: Attenuation rate = 1 - Electrical transmission distance ÷ Set maximum effective transmission distance. The set maximum effective transmission distance is 5 km, and the attenuation rate is limited to a range of 0.6 to 1.0, with a value of 0.6 used when the attenuation rate is below 0.6.
[0135] The amplitude of waveform change in the real-time output curve of the dynamic reference transformer is obtained as the reference change. The stable output values of 5 sampling points before and after the waveform change moment of the dynamic reference transformer are extracted, the average value is taken, and the absolute value of the difference between the two is calculated to obtain the reference change.
[0136] Based on the power allocation ratio and attenuation rate, the baseline change is decomposed into a path shunting contribution component and a cloud attenuation contribution component. The path shunting contribution component of a single power supply path = baseline change × power allocation ratio of that path; the cloud attenuation contribution component is the component of each path shunting contribution component after spatial attenuation, and the cloud attenuation contribution component of a single path = path shunting contribution component × attenuation rate.
[0137] The output curve variation of the downstream power station is obtained by superimposing the path shunting contribution component and the cloud attenuation contribution component. The path shunting contribution component and the cloud attenuation contribution component are calculated separately for each power supply path. The corresponding components of all paths are then summed to obtain the final output curve variation of the downstream power station.
[0138] By decoupling the calculation of power allocation across multiple power supply paths from cloud spatial attenuation, the impact of electrical topology allocation and meteorological attenuation on power output changes can be quantified separately, enabling more precise amplitude prediction rather than simple empirical fitting.
[0139] The timing of the output curve changes of the downstream power station is obtained by superimposing the timing of the waveform changes of the dynamic reference transformer with the estimated arrival time of the cloud layer at the power station.
[0140] In one implementation, based on the calculated change time and change magnitude, and combined with the stable output level of the downstream power station before the change, a piecewise linear interpolation algorithm is used to generate a fitted output curve.
[0141] In another approach, a neural network model can be used to smooth and optimize the fitted curve, thereby improving the continuity and fit of the curve.
[0142] The fitted output curve and real-time operating parameter data, including oil temperature, load current, voltage, and power factor, maintain the same time resolution to ensure smooth transition of data points without abrupt jumps.
[0143] After generating the fitted output curves for each downstream power station, the process also includes a step of fitted and aggregated active power for individual distributed photovoltaic (PV) units. Specifically, centered on the dynamic reference transformer and considering its geographical location, the target area is divided into multiple distributed PV fitting regions centered on the reference station. The fitted clusters are then aggregated based on the power generation addresses of the distributed PV units, achieving dynamic fitting of the distributed PV curves.
[0144] Based on this, a distributed photovoltaic single-household active power fitting module is constructed. The fitted distributed photovoltaic single-household active power curve data is dynamically observed through GIS maps and visualization. At the same time, it is classified and aggregated according to scenarios such as voltage level and county-level region, providing different dimensions of split and aggregated curve observation services for different users.
[0145] Furthermore, in accordance with the county-level aggregation requirements of the superior dispatching agency (such as the East China Branch), the measured active power of individual distributed photovoltaic users is aggregated to the 220 kV substation, and accurate and complete basic information of distributed photovoltaic ledgers is provided regularly. Based on the aggregation information of hierarchical and zoned topology nodes, the aggregated measured active power of individual distributed photovoltaic users is completed.
[0146] Meanwhile, the above-mentioned aggregation results can provide benchmark cluster support for provincial dispatch and other higher-level units to fit the photovoltaic data of the low-voltage 0.4 kV section, realizing complete data connectivity for photovoltaic data from individual households to substations and from low voltage to high voltage.
[0147] The actual output curves of each downstream power station are collected, and compared with the fitted output curves. Based on the comparison results, the correspondence between the dynamic reference transformer and the downstream power station is adjusted. Real-time operating parameter data of each downstream power station, including oil temperature, load current, voltage, and power factor, are collected simultaneously. After filtering and preprocessing, the actual output curves are obtained.
[0148] When adjusting the correspondence between the dynamic reference transformer and the downstream power station based on the comparison results, the following steps are included:
[0149] The waveform change times in the actual output curve are compared with those in the fitted output curve. The actual and fitted output curves of the same power station are aligned time-by-time, the corresponding waveform change times are extracted, and the time difference between the two is calculated.
[0150] When the actual change time is earlier than the fitted change time and the lead time exceeds a preset threshold, the power station corresponding to the actual change time is changed to the new dynamic reference transformer. The preset threshold is set to 2 seconds. An earlier actual change time indicates that the power station was affected by grid disturbance edges earlier than the original dynamic reference transformer, including voltage sags, load abrupt changes, and harmonic distortion edges, making it more suitable as the new reference point. When the lead time exceeds the preset threshold, the original dynamic reference transformer is deemed no longer representative, and the power station is updated to the new dynamic reference transformer.
[0151] Starting with the new dynamic reference transformer, and following the downstream direction of the electrical connections in the power grid topology, the power stations successively affected by the same grid disturbance edge, including voltage sags, load abrupt changes, and harmonic distortion edges, are re-identified as the downstream transformer sequence based on the direction of motion. After updating the dynamic reference transformer, the downstream power stations are re-selected, starting with the new reference station and combining the disturbance attenuation boundary with the direction of motion, in accordance with the previous method of identifying the downstream transformer sequence. This allows the entire fitting system to adaptively match the real-time motion state of the cloud layer.
[0152] By dynamically switching the base station based on the actual waveform time, it can automatically track the true starting point of cloud obstruction, overcoming the shortcomings of traditional fixed base stations that cannot adapt to cloud path offset, and has strong scene adaptability.
[0153] The actual output curve is compared with the fitted output curve point by point, and the relative error is calculated. The formula for calculating the relative error is: Relative error = |actual output - fitted output| ÷ rated power × 100%.
[0154] An error judgment standard is set: when the relative error of a single point exceeds 18%, or the average relative error of 10 consecutive sampling points exceeds 13%, the fitting result of the downstream power station is deemed invalid.
[0155] For downstream power plants that fail to fit the data, analyze the cause of the failure. If it is due to the deviation of the cloud movement path, disconnect it from the current dynamic reference transformer and rejoin the reference station matching. If the power plant's own equipment failure causes abnormal output, mark it as an abnormal power plant and temporarily remove it from the downstream transformer sequence.
[0156] If three or more power stations in the region fail to fit their data simultaneously, and this is not due to equipment failure, then the grid disturbance edges, including voltage sags, load surges, and harmonic distortion edge motion parameters, should be re-extracted to ensure the accuracy of the grid disturbance edges, including voltage sags, load surges, and harmonic distortion edge motion speeds.
[0157] Meanwhile, the downstream transformer sequence is adjusted based on the comparison results. For power stations with relatively stable fitting errors, the correlation between them and the benchmark station is maintained. For power stations with errors in the critical range, the magnitude correction coefficient is appropriately adjusted to improve the subsequent fitting accuracy.
[0158] Regularly analyze the fitting error distribution of each downstream power station. When the proportion of failed power stations reaches 30%, trigger the dynamic reference transformer re-screening process and check the edge of grid disturbances, including voltage sags, load abrupt changes, and harmonic distortion edge motion parameter extraction accuracy. If necessary, re-extract the parameters.
[0159] By using error distribution statistics to achieve automatic back-checking and correction of the global strategy, the system can maintain stability under extreme conditions such as sudden changes in cloud morphology and topology, rather than relying on manual intervention.
[0160] This invention extracts feature points and fits motion vectors to the edges of power grid disturbances, including voltage sags, load abrupt changes, and harmonic distortion edges. It then combines these with the power grid electrical topology to jointly determine the sequence of affected power plants. Furthermore, it relies on dynamic benchmark transformers for optimal selection and closed-loop correction of cloud motion parameters based on measured data. This allows the invention to accurately reflect the intrinsic relationship between cloud motion and distributed photovoltaic power output changes, making the power output prediction results more consistent with the actual operating conditions. At the same time, it enhances the system's adaptability and operational stability under complex weather and topology scenarios.
[0161] It also includes a cloud platform system for remotely acquiring transformer operating parameters, comprising:
[0162] The data acquisition module is used to acquire real-time operating parameter data of multiple distribution transformers and wide-area power grid measurement data within the target area;
[0163] The disturbance feature extraction module is used to extract the motion velocity and direction of motion of the power grid disturbance edge based on the power grid wide-area measurement data.
[0164] The dynamic reference identification module is used to match the waveform change time of the transformer operating parameter curve with the disturbance passage time, and to identify and dynamically adjust the dynamic reference transformer in real time.
[0165] The downstream sequence locking module is used to lock the downstream transformer sequence affected by the same disturbance edge along the electrical connection downstream, starting from the dynamic reference transformer, and to calculate the estimated arrival time of the disturbance edge.
[0166] The parameter curve fitting module is used to generate fitted operating parameter curves for each downstream transformer based on the waveform change amplitude and expected arrival time of the dynamic reference transformer.
[0167] The feedback adjustment module is used to compare the actual and fitted operating parameter curves and adjust the correspondence between the dynamic reference transformer and the downstream transformer.
[0168] The above description is merely a specific embodiment of this application, but the scope of protection of this application is not limited thereto. Any variations or substitutions that can be easily conceived by those skilled in the art within the scope of the technology disclosed in this application should be included within the scope of protection of this application. Therefore, the scope of protection of this application should be determined by the scope of the claims.
Claims
1. A method for implementing a cloud platform for remote acquisition of transformer operating parameters, characterized in that, Includes the following steps: Acquire real-time operating parameter data of multiple distribution transformers within the target area, including oil temperature, load current, voltage, power factor, and wide-area power grid measurement data; Based on the wide-area measurement data of the power grid, the motion parameters of the power grid disturbance edge, including voltage sag, load change, and harmonic distortion edge, are extracted. The motion parameters include motion speed and motion direction. Based on real-time operating parameter data, including oil temperature, load current, voltage, and power factor, the waveform change time of each power station's output curve is extracted. The waveform change time is matched with the cloud passage time calculated from the motion parameters. Based on the matching results, the dynamic reference transformer is identified and dynamically adjusted in real time. Based on the motion parameters and the upstream and downstream relationships of electrical connections in the power grid topology, starting from the dynamic reference transformer, the power stations affected by the same power grid disturbance edge, including voltage sag, load mutation, and harmonic distortion edge, are identified as downstream transformer sequences along the downstream direction of the electrical connection. The estimated arrival time of the power grid disturbance edge, including voltage sag, load mutation, and harmonic distortion edge, from the dynamic reference transformer to each downstream power station is calculated based on the motion speed. Based on the waveform change amplitude in the real-time output curve of the dynamic reference transformer, and the expected arrival time of grid disturbance edges, including voltage dips, load surges, and harmonic distortion edges, to each downstream power station, the change amplitude and timing of the output curve of each downstream power station are calculated, and the fitted output curve of each downstream power station is generated. The actual output curves of each downstream power station are collected, and the actual output curves are compared with the fitted output curves. Based on the comparison results, the correspondence between the dynamic reference transformer and the downstream power station is adjusted.
2. The method for implementing a remote acquisition cloud platform for transformer operating parameters according to claim 1, characterized in that, Before matching the waveform change time with the cloud elapse time calculated from the motion parameters, the process also includes: Identify power plants located at the boundary of the target area as edge power plants; The matching of the waveform change time with the cloud passage time calculated from the motion parameters specifically involves matching the waveform change time of the edge power station with the cloud passage time calculated from the motion parameters.
3. The cloud platform system and implementation method for remote acquisition of transformer operating parameters according to claim 2, characterized in that, Matching the waveform change time of the edge power station with the cloud transit time calculated from the motion parameters includes the following steps: Obtain the spatial distance between the dynamic reference transformer and the edge power station; The width of the matching time window is determined by the spatial distance; the greater the spatial distance, the wider the matching time window. When the waveform change falls within the matching time window determined before and after the cloud's passage time, the two are considered to be successfully matched.
4. The method for implementing a remote acquisition cloud platform for transformer operating parameters according to claim 1, characterized in that, Calculating the estimated arrival time of grid disturbance edges, including voltage sags, load abrupt changes, and harmonic distortion edges, from the dynamic reference transformer to each downstream power station based on the movement speed includes the following steps: Obtain the electrical connection path between the dynamic reference transformer and downstream power plants in the power grid topology; The electrical transmission distance is obtained by summing the lengths of each segment of the line along the electrical connection path; Dividing the electrical transmission distance by the speed of movement yields the grid disturbance edge, including the estimated arrival time of voltage sags, load abrupt changes, and harmonic distortion edges to downstream power plants.
5. The method for implementing a remote acquisition cloud platform for transformer operating parameters according to claim 1, characterized in that, When calculating the variation range of the output curves of each downstream power station, the following steps are included: The amplitude of waveform change in the real-time output curve of the dynamic reference transformer is obtained as the reference change. Based on the expected arrival time of grid disturbance edges, including voltage dips, load abrupt changes, and harmonic distortion edges, to downstream power plants, determine the attenuation rate of the change amplitude along the electrical transmission distance; Calculate the variation range of the output curve of the downstream power plant based on the baseline change and attenuation rate. When calculating the output curve variation of each downstream power station, if there are multiple power supply paths for the downstream power station, the following should also be included: The number of power supply paths for downstream power plants to receive power from the dynamic reference transformer is determined based on the power grid topology, and the power allocation ratio of each path is obtained. Based on the expected arrival time of grid disturbance edges, including voltage dips, load abrupt changes, and harmonic distortion edges, to downstream power plants, determine the attenuation rate of the change amplitude along the electrical transmission distance; The amplitude of waveform change in the real-time output curve of the dynamic reference transformer is obtained as the reference change. Based on the power allocation ratio and attenuation rate, the baseline change is decomposed into path diversion contribution component and cloud attenuation contribution component. The output curve variation of the downstream power plant is obtained by superimposing the path diversion contribution component with the cloud attenuation contribution component.
6. The method for implementing a remote acquisition cloud platform for transformer operating parameters according to claim 1, characterized in that, When identifying power plants sequentially affected by the same grid disturbance edge, including voltage dips, load abrupt changes, and harmonic distortion edges, as downstream transformer sequences, the following steps are included: Identify grid disturbance edges based on wide-area grid measurement data, including the dissipation boundaries of voltage sags, load abrupt changes, and harmonic distortion edges; Starting with the dynamic reference transformer, candidate power stations are determined step by step along the direction of motion; Determine whether the path from the dynamic reference transformer to the candidate power station crosses the dissipation boundary, including voltage sag, load abrupt change, and harmonic distortion edge. If the path crosses the dissipation boundary, then the candidate power station and its subsequent power stations will no longer be included in the downstream transformer sequence.
7. The method for implementing a remote acquisition cloud platform for transformer operating parameters according to claim 1, characterized in that, When adjusting the correspondence between the dynamic reference transformer and the downstream power station based on the comparison results, the following steps are included: Compare the waveform change times in the actual output curve with the waveform change times in the fitted output curve; When the actual change time is earlier than the fitted change time and the advance time exceeds the preset threshold, the power station corresponding to the actual change time will be changed to the new dynamic reference transformer. Starting with the new dynamic reference transformer, along the downstream direction of the electrical connection in the power grid topology, the power stations affected by the same power grid disturbance edge, including voltage dips, load mutations, and harmonic distortion edges, are re-identified as the downstream transformer sequence based on the direction of movement.
8. The method for implementing a remote acquisition cloud platform for transformer operating parameters according to claim 1, characterized in that, When calculating the variation range of the output curves of each downstream power station, the following steps are included: The number of power supply paths for downstream power plants to receive power from the dynamic reference transformer is determined based on the power grid topology. Obtain the power allocation ratio for each power supply path; Based on the waveform variation amplitude and power distribution ratio in the real-time output curve of the dynamic reference transformer, calculate the variation component contributed by each power supply path. The variation components of each power supply path are superimposed to obtain the variation amplitude of the output curve of the downstream power station.
9. The method for implementing a remote acquisition cloud platform for transformer operating parameters according to claim 4, characterized in that, Based on the calculation of grid disturbance edges according to the movement speed, including voltage sags, load abrupt changes, and harmonic distortion edges, after the estimated arrival time from the dynamic reference transformer to each downstream power station, it also includes: Collect the actual waveform change times of each intermediate power station along the route between the dynamic reference transformer and the downstream power station; The actual waveform change times at each intermediate power station are compared with the estimated arrival times calculated based on the speed of motion, and the time deviation at each intermediate power station is calculated. Based on the time deviation at each intermediate power station and the electrical transmission distance between it and the dynamic reference transformer, the correction value of the movement speed is calculated in reverse. The estimated arrival time of the downstream power station is recalculated using the corrected velocity.
10. A cloud platform system for remote acquisition of transformer operating parameters, applicable to the implementation method of the cloud platform for remote acquisition of transformer operating parameters as described in any one of claims 1 to 9, characterized in that, include: The data acquisition module is used to acquire real-time operating parameter data of multiple distribution transformers and wide-area power grid measurement data within the target area; The disturbance feature extraction module is used to extract the motion velocity and direction of motion of the power grid disturbance edge based on the power grid wide-area measurement data. The dynamic reference identification module is used to match the waveform change time of the transformer operating parameter curve with the disturbance passage time, and to identify and dynamically adjust the dynamic reference transformer in real time. The downstream sequence locking module is used to lock the downstream transformer sequence affected by the same disturbance edge along the electrical connection downstream, starting from the dynamic reference transformer, and to calculate the estimated arrival time of the disturbance edge. The parameter curve fitting module is used to generate fitted operating parameter curves for each downstream transformer based on the waveform change amplitude and expected arrival time of the dynamic reference transformer. The feedback adjustment module is used to compare the actual and fitted operating parameter curves and adjust the correspondence between the dynamic reference transformer and the downstream transformer.