A DCDC dynamic response optimization method and system suitable for high-multiple pulse load
By using a five-stage state determination and synchronous selection of control parameters, the current adjustment problem of DC-DC converters under high-rate pulse loads was solved, achieving stable control and rapid response of the bus voltage and avoiding voltage drops and overshoot.
Patent Information
- Application Number
- CN202611507706.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-09-28
- Publication Date
- 2026-11-24
AI Technical Summary
Existing DC-DC control schemes have difficulty adjusting the discharge current in a timely manner under high-rate pulse loads, which can lead to bus voltage drops or surges. Furthermore, the control parameters are not synchronized, which may result in undercompensation or overcompensation. Fast feedforward may exceed the allowable range and cause integral accumulation.
By collecting bus voltage and load current information, calculating the load current change rate, determining the five-stage state, and simultaneously selecting the bus voltage outer loop dynamic bandwidth, load current feedforward direction and current slope, the current command effective time is predicted, a synthetic current reference is formed and PWM control quantity is generated, so as to realize the rapid current addition, holding and removal.
Under high-rate pulse load, stable control of the bus voltage was achieved, the current gap and residual time were shortened, bus voltage drop and overshoot were avoided, and the stability and response speed of the DC-DC system were ensured.
Smart Images

Figure CN123163368A_ABST
Abstract
Description
Technical Field
[0001] This invention belongs to the field of power electronic conversion technology, and particularly relates to a DC-DC dynamic response optimization method and optimization system suitable for high-rate pulse loads. Background Technology
[0002] GPU servers in AI data centers exhibit pulsed power consumption characteristics characterized by high amplitude, rapid rise, and rapid fall. The main power supply typically handles steady-state or slowly varying power, while the battery backup unit (BBU) connects to the DC bus via a DC-DC converter, providing short-term support when the main power supply's dynamic response is insufficient or abnormal. DC-DC converters often employ a dual-loop structure with an outer voltage loop and an inner current loop. The outer voltage loop requests current based on the bus voltage deviation, while the inner current loop adjusts the PWM duty cycle of the power switch. When the load rises rapidly, the main power supply and DC-DC currents have not yet increased, and the bus capacitor initially bears the current difference, potentially causing a drop in bus voltage. Conversely, when the load falls rapidly, if the DC-DC converter maintains its original discharge current, a temporary current surplus will form on the bus, potentially causing a surge in bus voltage. Therefore, the DC-DC converter not only needs to rapidly increase current on the rising edge but also rapidly decrease the discharge current on the falling edge, maintaining continuous and stable control during the pulse hold and recovery phases.
[0003] Existing publicly available solutions may involve load current feedforward, staged bandwidth adjustment, energy buffering, and bidirectional power conversion. For example, CN109088561B discloses variable gain / switching feedforward between predicted load current and actual load current, determination of compensation start time, superposition of voltage control signals, current controller, and modulation; CN104660043A discloses determining multiple stages based on output voltage error and assigning different parameters to the PID; CN114204812A discloses converting the load current observation into a compensation current and using it as a current loop feedforward. However, the above scheme has the following limitations: First, when relying solely on the fixed-bandwidth outer loop of the bus voltage, the feedback must wait until the bus voltage has changed before generating the correction amount, making it difficult to increase the BBU discharge current in time when the rising edge of a high-rate-of-change load arrives; Second, when only load current feedforward is added without compensating for control link delay, the feedforward amount may be misaligned with the load state at the actual moment the PWM takes effect. When the load edge is very steep, even a deviation of several sampling cycles may cause undercompensation or overcompensation; Third, if the outer loop bandwidth, feedforward direction / coefficient, and current command slope are determined by different logic... The switching between pulses can lead to asynchronous control parameters during the pulse entry, hold, fall, and recovery phases. This can result in insufficient current application at the rising edge, fluctuations during the hold phase, untimely current withdrawal at the falling edge, or secondary disturbances during the recovery phase. Fourth, some controls primarily focus on the load rising edge, while the voltage outer loop continues to slowly reduce current after the load decreases, potentially causing the forward discharge current of the DC-DC converter to stagnate. Fifth, rapid feedforward and increased outer loop dynamic bandwidth may push the reference current beyond the allowable range of the DC-DC converter or BBU. If the outer loop integral continues to accumulate after current limiting, overshoot or slow stabilization may occur when the limit is lifted. Therefore, it is necessary to provide a control method and system that can estimate load changes before the current command actually takes effect and synchronously adapt the outer loop bandwidth, feedforward, and current slope with each pulse phase. Summary of the Invention
[0004] This invention provides a DC-DC dynamic response optimization method and system suitable for high-rate pulse loads. It aims to solve the problem that when a battery backup unit supports a GPU with a high-rate pulse load via DC-DC, the DC-DC discharge current cannot change in a timely and continuous manner with the rising edge, pulse hold, falling edge, and recovery phases of the load. Specifically, it aims to address how to estimate load changes before the actual effect of the current command when the absolute value of the equivalent current change rate on the load side reaches or exceeds the design's applicable boundary; how to synchronously adapt the dynamic bandwidth of the outer loop of the bus voltage, the load current feedforward, and the current command slope to the five-stage state; how to achieve rapid current addition at the rising edge, maintain support during the hold phase, rapidly withdraw current at the falling edge, and smoothly stabilize during the recovery phase; and how to avoid integral accumulation when current limiting and slope limiting occur.
[0005] The technical solution of this invention is implemented as follows: a dynamic response optimization method for DC-DC converters suitable for high-rate pulse loads, wherein the DC-DC converter is connected between a battery backup unit and a DC bus, the battery backup unit includes a battery and a battery management system, and the optimization method includes the following steps:
[0006] S101. Collect bus voltage, load-side equivalent current, DC-DC output current, and allowable current and control time base information of the battery backup unit and the DC-DC;
[0007] S102. Calculate the signed load current change rate r_I(k)=[I_L(k)-I_L(k-Nw)] / Tw within the observation window Tw consisting of Nw sampling periods, where Tw=Nw·Ts, Ts is the sampling period, and I_L(k) is the equivalent current on the load side.
[0008] S103. Based on the marked load current change rate, load current plateau, bus voltage trend, debouncing result and the previous state, a five-stage determination is made to determine the current state as M0 steady state, M1 load rising edge, M2 pulse hold, M3 load falling edge or M4 recovery.
[0009] S104. Select the bus voltage outer loop dynamic bandwidth parameters, load current feedforward direction and coefficient, and DC-DC current rise and fall slopes synchronously according to the current status.
[0010] S105. Determine the total control delay τd consisting of sampling, filtering, calculation, PWM update and driving, and associate it with the target effective time of the current command;
[0011] S106. Based on the signed load current change rate and the total control delay, predict the load current I_L,p(k) = I_L(k) + r_I(k)·τd at the target effective time and its increment ΔI_L,p(k) relative to the baseline.
[0012] S107. The outer loop of the bus voltage, which adopts the outer loop dynamic bandwidth parameters corresponding to the current state, forms a feedback current component I_v(k) based on the error between the target bus voltage and the measured bus voltage.
[0013] S108. Based on the feedforward direction and coefficient of the current state and the increment ΔI_L,p(k) of the relative baseline, form the load current feedforward component I_ff(k);
[0014] S109. At the same current reference interface, the feedback current component and the load current feedforward component are combined into a reference current I_ref(k)=I_v(k)+K_ff,M(k)·ΔI_L,p(k), where K_ff,M(k) is determined by the current state M0 to M4;
[0015] S110. Based on the allowable current of the battery backup unit and the DC-DC converter, as well as the rising and falling slopes corresponding to the current state, the reference current is limited to the current command I_cmd(k), and anti-integral saturation processing is performed when the reference current is limited;
[0016] S111. The current command is tracked by the inner current loop with a bandwidth higher than the dynamic bandwidth of the outer current loop of the bus voltage, and a PWM control quantity is generated to drive the DC-DC converter to increase, maintain or decrease the positive discharge current of the battery backup unit to the DC bus.
[0017] S112. Update the current state and executed current commands, and smoothly restore the steady-state parameters of M0 from M4 when the recovery conditions are met. Reduce or turn off the feedforward and degrade to feedback control when the signal is abnormal, the capability is insufficient or the tracking is abnormal.
[0018] In some embodiments, in step S103, the five-stage determination includes: entering M1 when the positive rate of change meets the rising edge condition; entering M2 when the rising edge ends and the load is at a high plateau; entering M3 when the negative rate of change meets the falling edge condition; entering M4 after rapid current withdrawal; and returning to M0 from M4 when the feedforward attenuation is completed, the outer loop parameters are restored, and the bus stability condition is met. The equivalent current on the load side is the equivalent current of the GPU aggregated load access point or the equivalent current of the equivalent load side bus, and the absolute value of the rate of change of the equivalent current on the load side reaches or exceeds 30A / μs as the design applicable boundary.
[0019] In some embodiments, in step S104, the synchronization selection includes: M0 selecting the steady-state outer loop bandwidth parameter, the feedforward coefficient being zero or only retaining small-signal compensation, and using the steady-state current rising slope and steady-state current falling slope corresponding to M0; M1 selecting the outer loop parameter that satisfies the stability margin and enhances the dynamic response, the positive feedforward direction and rising edge feedforward coefficient, and a first allowable rising slope greater than the steady-state current rising slope; M2 selecting the outer loop bandwidth parameter adapted to the load platform, maintaining the feedforward amount adapted to the predicted load increment and corrected by the bus error, and using the holding slope; M3 selecting to suppress bus voltage surge. The outer loop parameters, the negative feedforward direction that reduces the synthesized reference current, and the second allowable falling slope that is greater than the steady-state current falling slope; M4 causes the feedforward coefficient to gradually decrease at a set slope, the outer loop bandwidth parameters to continuously recover to the steady-state value, and the current slope to smoothly return to the steady-state current rising slope and the steady-state current falling slope; the bus voltage outer loop dynamic bandwidth parameters, the load current feedforward direction and coefficient, and the DC-DC current rising slope and falling slope have the same status identifier and parameter version, and take effect within the same control cycle to avoid one channel having entered the falling edge while another channel is still using the rising edge parameter.
[0020] In some embodiments, in step S105, the total control delay τd at least covers load and bus sampling, filtering, control algorithm calculation, PWM register update and power device drive, and is obtained by any one of calibrated fixed delay, sum of separately measured delays or online update value, and the communication delay is also included when the remote load signal is input via communication.
[0021] In step S106, a physical range and reliability check are set for the result at the time when the predicted target takes effect. When the rate of change is distorted, the sampling timeout occurs, or the total control delay has no effective value, the feedforward is turned off or reduced and control continues by voltage feedback and safety limits.
[0022] In some embodiments, in step S110, the current command approaches the reference current with an upward or downward slope corresponding to the current state, and is constrained by the lower and upper limits of the current allowable current; when the battery backup unit discharges unidirectionally to the DC bus in the forward direction, the lower limit is zero or not less than zero; only when the DC-DC converter supports bidirectional conversion, the battery management system allows charging, and the bus side allows energy feedback, the lower limit is less than zero for a limited time, so that the DC-DC converter absorbs the remaining energy of the DC bus in the reverse direction for a short time.
[0023] The current command I_cmd(k) = sat_[Imin,Imax]{I_cmd(k-1)+clip[I_ref(k)-I_cmd(k-1),-S_down,M·Tc,S_up,M·Tc]}, where Imin and Imax are the lower and upper limits of the current allowed current, S_up,M and S_down,M are the rising and falling slopes corresponding to the current state, and Tc is the control period; when the battery backup unit discharges unidirectionally to the DC bus in the forward direction, Imin is zero or not less than zero; only when the DC-DC converter supports bidirectional conversion, the battery management system allows charging, and the bus side allows energy feedback, Imin is less than zero within a limited time, causing the DC-DC converter to absorb the remaining energy of the DC bus in the reverse direction for a short time.
[0024] In some embodiments, in step S110, when the reference current is not executed by the current command due to current limiting or slope limitation, the outer loop of the bus voltage stops accumulating integrals in the restricted direction, or calculates and tracks the integral state based on the difference between the reference value and the actual command, so that the integral state is continuously connected with the currently executable command when the restriction is lifted and M4 is entered; in step S108, when the voltage or current dimensions on both sides of the DC-DC converter are different, the feedforward component is converted to the reference side of the inner current loop according to the turns ratio, efficiency model or power conservation.
[0025] In some embodiments, in step S111, the inner current loop also provides the actual current, tracking error, and current limiting status to the state determination for M2 maintenance, M4 exit, and abnormal degradation. When load sampling timeout, rate of change exceeding the limit and unreliable, delay parameter invalid, allowable current value expired, DC-DC tracking error continuously too large, or hardware protection is triggered, the load current feedforward is reduced or turned off, the outer loop parameters are frozen or smoothly restored, and a conservative current upper limit and slope are adopted. After abnormal recovery, it enters M4 and then returns to M0 after continuous and effective judgment.
[0026] This invention also provides a DC-DC dynamic response optimization system suitable for high-rate pulse loads, comprising:
[0027] The battery backup unit (BBU) includes the battery pack and the battery management system.
[0028] The DC-DC converter is connected to the battery backup power unit on the energy storage side and to the DC bus on the bus side.
[0029] The main power supply and GPU pulse load are connected to the DC bus;
[0030] Load current sampling is used to detect the equivalent current of the GPU pulse load;
[0031] Bus voltage sampling is used to detect the voltage of the DC bus and the optional DC-DC output current;
[0032] A DC-DC controller is used to receive the sampled values of the load current sample and the bus voltage sample, the allowable discharge information and control time base of the battery management system, and output PWM control quantity to the DC-DC controller.
[0033] The DC-DC controller is configured to perform the aforementioned DC-DC dynamic response optimization method suitable for high-rate pulse loads. In some embodiments, the DC-DC controller includes:
[0034] The acquisition and timing module is used to obtain the equivalent current on the load side according to the sampling period and provide a control timing base;
[0035] The rate of change calculation module is used to calculate the signed rate of change of load current within the observation window;
[0036] The five-stage determination module is used to determine M0 steady state, M1 load rising edge, M2 pulse hold, M3 load falling edge, and M4 recovery.
[0037] The synchronous parameter selection module is used to synchronously output the bus voltage outer loop dynamic bandwidth parameters, load current feedforward direction and coefficient, and current rise / fall slope for each state.
[0038] The delay compensation and prediction module is used to determine the total control delay and predict the load current at the moment the target takes effect.
[0039] The voltage feedback module is used to generate the feedback current component;
[0040] Load current feedforward module, used to generate load current feedforward component;
[0041] The synthesis and safety processing module is used to synthesize a reference current and perform current limiting, slope limiting, and anti-integral saturation.
[0042] A high-bandwidth current inner loop and state management module are used to generate PWM control quantities and update the state.
[0043] The battery management system provides the controller with at least one of the following: allowable discharge current, terminal voltage, state of charge, temperature, and fault state. The controller constrains the reference current based on the allowable discharge current and the allowable current of the DC-DC converter.
[0044] Compared with the prior art, the technical solution of the present invention has the following advantages:
[0045] This scheme utilizes load current feedforward to form a DC-DC current adjustment trend before significant changes in bus voltage. By predicting the target time including the complete control link delay, it improves the consistency between the feedforward timing and the actual PWM activation time, which helps to shorten the duration of the rising edge current gap and the falling edge current remainder. By synchronously selecting the outer loop dynamic bandwidth parameters, feedforward direction / coefficient, and current command slope in the same state from M0 to M4, the controller can rapidly add current at the rising edge, maintain support during the pulse hold phase, rapidly withdraw current at the falling edge, and continuously stabilize during the recovery phase, which helps to simultaneously suppress bus voltage drops and overshoots. The falling edge main scheme only requires rapidly reducing the forward discharge current to zero, which is suitable for battery backup unit systems without reverse energy absorption capability. Bidirectional reverse absorption is an optional enhancement method, which does not reduce the applicability of the main scheme. Attached Figure Description
[0046] To more clearly illustrate the technical solutions in the embodiments of this application or the prior art, the drawings used in the description of the embodiments or the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of this application. For those skilled in the art, other drawings can be obtained based on these drawings without creative effort.
[0047] Figure 1 A flowchart illustrating a DC-DC dynamic response optimization method suitable for high-rate pulse loads, provided in an embodiment of the present invention.
[0048] Figure 2 This is a schematic diagram of the structure of a DC-DC dynamic response optimization system suitable for high-rate pulse loads, provided in an embodiment of the present invention.
[0049] Figure 3 A control block diagram of a DC-DC controller and a five-stage state synchronization selection provided in an embodiment of the present invention; Detailed Implementation
[0050] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative effort are within the scope of protection of the present invention.
[0051] In this application, unless otherwise expressly specified and limited, the terms "installation," "connection," "joining," and "fixing," etc., should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral part; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium; they can refer to the internal communication of two components or the interaction between two components, unless otherwise expressly limited. Those skilled in the art can understand the specific meaning of the above terms in this application according to the specific circumstances.
[0052] Furthermore, if the embodiments of this invention involve descriptions such as "first" or "second," these descriptions are for descriptive purposes only and should not be construed as indicating or implying their relative importance or implicitly specifying the number of technical features indicated. Therefore, a feature defined with "first" or "second" may explicitly or implicitly include at least one of those features. Additionally, the technical solutions of the various embodiments can be combined with each other, but this must be based on the ability of those skilled in the art to implement them. If the combination of technical solutions is contradictory or impossible to implement, it should be considered that such a combination of technical solutions does not exist and is not within the scope of protection claimed by this invention.
[0053] Currently, existing DC-DC dynamic response control schemes have the following drawbacks: relying solely on the fixed-bandwidth bus voltage outer loop results in feedback lag, making it difficult to promptly increase the discharge current at the rising edge of a high-rate-of-change load; when only load current feedforward is added without compensating for control link delay, the feedforward amount may be misaligned with the load state at the actual moment the PWM takes effect; if the outer loop bandwidth, feedforward direction / coefficient, and current slope are switched separately by different logics, control parameters may become asynchronous during pulse entry, hold, descent, and recovery; some schemes only focus on the load rising edge, and after the load decreases, the voltage outer loop still slowly reduces the current, causing the forward discharge current to stagnate; rapid feedforward and increasing the outer loop dynamic bandwidth may also push the reference current beyond the allowable range and cause integral accumulation. To solve the above technical problems, this invention proposes a DC-DC dynamic response optimization method and its optimization system suitable for high-rate pulse loads.
[0054] Example
[0055] like Figure 1 As shown, this embodiment provides a DC-DC dynamic response optimization method suitable for high-rate pulse loads. The DC-DC converter is connected between a battery backup unit and a DC bus. The battery backup unit includes a battery and a battery management system. The optimization method includes the following steps:
[0056] S101. Collect bus voltage, load-side equivalent current, DC-DC output current, and allowable current and control time base information of the battery backup unit and the DC-DC;
[0057] S102. Calculate the signed load current change rate r_I(k)=[I_L(k)-I_L(k-Nw)] / Tw within the observation window Tw consisting of Nw sampling periods, where Tw=Nw·Ts, Ts is the sampling period, and I_L(k) is the equivalent current on the load side.
[0058] S103. Based on the marked load current change rate, load current plateau, bus voltage trend, debouncing result and the previous state, a five-stage determination is made to determine the current state as M0 steady state, M1 load rising edge, M2 pulse hold, M3 load falling edge or M4 recovery.
[0059] S104. Select the bus voltage outer loop dynamic bandwidth parameters, load current feedforward direction and coefficient, and DC-DC current rise and fall slopes synchronously according to the current status.
[0060] S105. Determine the total control delay τd consisting of sampling, filtering, calculation, PWM update and driving, and associate it with the target effective time of the current command;
[0061] S106. Based on the signed load current change rate and the total control delay, predict the load current I_L,p(k) = I_L(k) + r_I(k)·τd at the target effective time and its increment ΔI_L,p(k) relative to the baseline.
[0062] S107. The outer loop of the bus voltage, which adopts the outer loop dynamic bandwidth parameters corresponding to the current state, forms a feedback current component I_v(k) based on the error between the target bus voltage and the measured bus voltage.
[0063] S108. Based on the feedforward direction and coefficient of the current state and the increment ΔI_L,p(k) of the relative baseline, form the load current feedforward component I_ff(k);
[0064] S109. At the same current reference interface, the feedback current component and the load current feedforward component are combined into a reference current I_ref(k)=I_v(k)+K_ff,M(k)·ΔI_L,p(k), where K_ff,M(k) is determined by the current state M0 to M4;
[0065] S110. Based on the allowable current of the battery backup unit and the DC-DC converter, as well as the rising and falling slopes corresponding to the current state, the reference current is limited to the current command I_cmd(k), and anti-integral saturation processing is performed when the reference current is limited;
[0066] S111. The current command is tracked by the inner current loop with a bandwidth higher than the dynamic bandwidth of the outer current loop of the bus voltage, and a PWM control quantity is generated to drive the DC-DC converter to increase, maintain or decrease the positive discharge current of the battery backup unit to the DC bus.
[0067] S112. Update the current state and executed current commands, and smoothly restore the steady-state parameters of M0 from M4 when the recovery conditions are met. Reduce or turn off the feedforward and degrade to feedback control when the signal is abnormal, the capability is insufficient or the tracking is abnormal.
[0068] In some embodiments, as shown in Table 1, the five-stage determination in step S103 includes: entering M1 when the positive rate of change meets the rising edge condition; entering M2 when the rising edge ends and the load is at a high plateau; entering M3 when the negative rate of change meets the falling edge condition; entering M4 after rapid current withdrawal; and returning to M0 from M4 when the feedforward attenuation is completed, the outer loop parameters are restored, and the bus stability condition is met. The equivalent current on the load side is the equivalent current of the GPU aggregated load access point or the equivalent current of the equivalent load side bus, and the absolute value of the rate of change of the equivalent current on the load side reaches or exceeds 30A / μs as the design applicable boundary.
[0069] Table 1. Relevant changes in control target, outer loop dynamic bandwidth, feedforward direction / coefficient, and current slope in the five-stage determination.
[0070] state Control Target Outer ring dynamic bandwidth Feedforward direction / coefficient Current slope MO steady state Stable bus / standby steady-state parameters Zero or small signal steady-state upward / downward slope M1 rising edge Forward feedforward fast flow Dynamic enhancement Positive / rising edge coefficient rapid rise M2 remains Maintain BBU support Platform adaptation Maintain and be corrected by feedback Maintain slope M3 falling edge Negative feedforward fast withdrawal Suppressing upward surge Reduce reference current Rapidly dropped to zero M4 recovery Gradually receding and stabilizing Continuous recovery Smooth decay to zero Smooth recovery
[0071] In some embodiments, in step S104, the synchronization selection includes: M0 selecting the steady-state outer loop bandwidth parameter, the feedforward coefficient being zero or only retaining small-signal compensation, and using the steady-state current rising slope and steady-state current falling slope corresponding to M0; M1 selecting the outer loop parameter that satisfies the stability margin and enhances the dynamic response, the positive feedforward direction and rising edge feedforward coefficient, and a first allowable rising slope greater than the steady-state current rising slope; M2 selecting the outer loop bandwidth parameter adapted to the load platform, maintaining the feedforward amount adapted to the predicted load increment and corrected by the bus error, and using the holding slope; M3 selecting to suppress bus voltage surge. The outer loop parameters, the negative feedforward direction that reduces the synthesized reference current, and the second allowable falling slope that is greater than the steady-state current falling slope; M4 causes the feedforward coefficient to gradually decrease at a set slope, the outer loop bandwidth parameters to continuously recover to the steady-state value, and the current slope to smoothly return to the steady-state current rising slope and the steady-state current falling slope; the bus voltage outer loop dynamic bandwidth parameters, the load current feedforward direction and coefficient, and the DC-DC current rising slope and falling slope have the same status identifier and parameter version, and take effect within the same control cycle to avoid one channel having entered the falling edge while another channel is still using the rising edge parameter.
[0072] In some embodiments, in step S105, the total control delay τd at least covers load and bus sampling, filtering, control algorithm calculation, PWM register update and power device drive, and is obtained by any one of calibrated fixed delay, sum of separately measured delays or online update value, and the communication delay is also included when the remote load signal is input via communication.
[0073] In step S106, a physical range and reliability check are set for the result at the time when the predicted target takes effect. When the rate of change is distorted, the sampling timeout occurs, or the total control delay has no effective value, the feedforward is turned off or reduced and control continues by voltage feedback and safety limits.
[0074] In some embodiments, in step S110, the current command approaches the reference current with an upward or downward slope corresponding to the current state, and is constrained by the lower and upper limits of the current allowable current; when the battery backup unit discharges unidirectionally to the DC bus in the forward direction, the lower limit is zero or not less than zero; only when the DC-DC converter supports bidirectional conversion, the battery management system allows charging, and the bus side allows energy feedback, the lower limit is less than zero for a limited time, so that the DC-DC converter absorbs the remaining energy of the DC bus in the reverse direction for a short time. The current command I_cmd(k) = sat_[Imin,Imax]{I_cmd(k-1)+clip[I_ref(k)-I_cmd(k-1),-S_down,M·Tc,S_up,M·Tc]}, where Imin and Imax are the lower and upper limits of the current allowed current, S_up,M and S_down,M are the rising and falling slopes corresponding to the current state, and Tc is the control period; when the battery backup unit discharges unidirectionally to the DC bus in the forward direction, Imin is zero or not less than zero; only when the DC-DC converter supports bidirectional conversion, the battery management system allows charging, and the bus side allows energy feedback, Imin is less than zero within a limited time, causing the DC-DC converter to absorb the remaining energy of the DC bus in the reverse direction for a short time.
[0075] In some embodiments, in step S110, when the reference current is not executed by the current command due to current limiting or slope limitation, the outer loop of the bus voltage stops accumulating integrals in the restricted direction, or calculates and tracks the integral state based on the difference between the reference value and the actual command, so that the integral state is continuously connected with the currently executable command when the restriction is lifted and M4 is entered; in step S108, when the voltage or current dimensions on both sides of the DC-DC converter are different, the feedforward component is converted to the reference side of the inner current loop according to the turns ratio, efficiency model or power conservation.
[0076] In some embodiments, in step S111, the inner current loop also provides the actual current, tracking error, and current limiting status to the state determination for M2 maintenance, M4 exit, and abnormal degradation. When load sampling timeout, rate of change exceeding the limit and unreliable, delay parameter invalid, allowable current value expired, DC-DC tracking error continuously too large, or hardware protection is triggered, the load current feedforward is reduced or turned off, the outer loop parameters are frozen or smoothly restored, and a conservative current upper limit and slope are adopted. After abnormal recovery, it enters M4 and then returns to M0 after continuous and effective judgment.
[0077] In some of these embodiments, such as Figure 2 As shown, this embodiment of the invention also provides a DC-DC dynamic response optimization system suitable for high-rate pulse loads, comprising:
[0078] The battery backup power unit (BBU) 110 includes a battery pack 111 and a battery management system 112;
[0079] The DC-DC 120 has its energy storage side connected to the battery backup power unit and its bus side connected to the DC bus.
[0080] The main power supply 140 and the GPU pulse load 150 are connected to the DC bus 130;
[0081] Load current sampling 160 is used to detect the equivalent current of the GPU pulse load 150;
[0082] Bus voltage sampling 170 is used to detect the voltage of the DC bus 130 and the optional DC-DC 120 output current;
[0083] The DC-DC controller 180 is used to receive the sampled values of the load current sample 160 and the bus voltage sample 170, the allowable discharge information and control time base of the battery management system 112, and output PWM control quantity to the DC-DC 120;
[0084] The DC-DC controller is configured to execute the aforementioned DC-DC dynamic response optimization method applicable to high-rate pulse loads.
[0085] Specifically, the battery pack 111 of BBU 110 provides forward discharge current to DC bus 130 via DCDC 120, and BMS 112 of BBU 110 provides allowable discharge current, terminal voltage, state of charge, temperature, and fault status to DCDC controller 180; bus voltage sampling 170 collects the voltage at the GPU input / bus remote voltage measurement point and provides it to DCDC controller 180. DCDC controller 180 executes S101 to S112. The system is primarily unidirectional support, and the lower limit of the current command is not less than zero. In M0, the main power supply 140 handles the steady-state GPU pulse load 150, and DCDC 120 is in standby or low-current support state. In M1, the load current sampling 160 detects a positive fast edge, and DCDC controller 180 simultaneously increases the outer loop dynamic response parameters, enables positive feedforward, and selects a fast rise slope; the inner current loop then increases the BBU discharge current. In M2, the feedforward maintains load platform support, and the outer loop corrects for differences caused by bus deviation and main power supply takeover. In M3, negative feedforward and a rapid descent slope quickly reduce the forward discharge current to zero. In M4, feedforward and dynamic parameters gradually decrease, the integral state tracks and executes commands, and returns to M0 after the recovery condition is met. This embodiment can cover the entire process of rising edge, holding, falling edge, and recovery under unidirectional discharge conditions, which is beneficial for suppressing bus drop and overshoot.
[0086] In some of these embodiments, such as Figure 3 As shown, the DC-DC controller 180 includes: a data acquisition and time base module 181, a rate of change calculation module 182, a five-stage judgment module 183, a synchronization parameter selection module 184, a delay compensation and prediction module 185, a voltage feedback module 186, a load current feedforward module 187, a synthesis and safety processing module 188, and a high-bandwidth current inner loop and state management module 189.
[0087] The acquisition and timing module 181 is used to obtain the equivalent current on the load side according to the sampling period and provide a control timing base;
[0088] The rate of change calculation module 182 is used to calculate the signed rate of change of load current within the observation window;
[0089] The five-stage determination module 183 is used to determine M0 steady state, M1 load rising edge, M2 pulse hold, M3 load falling edge, and M4 recovery.
[0090] The synchronous parameter selection module 184 is used to synchronously output the outer loop dynamic bandwidth parameters of the bus voltage, the feedforward direction and coefficient of the load current, and the current rise / fall slope for each state.
[0091] The delay compensation and prediction module 185 is used to determine the total control delay and predict the load current at the time when the target takes effect;
[0092] Voltage feedback module 186 is used to generate feedback current components;
[0093] Load current feedforward module 187 is used to generate load current feedforward components;
[0094] Synthesis and safety processing module 188 is used to synthesize a reference current and perform current limiting, slope limiting and anti-integral saturation;
[0095] The high-bandwidth current inner loop and state management module 189 are used to generate PWM control quantities and update the state.
[0096] The battery management system provides the controller with at least one of the following: allowable discharge current, terminal voltage, state of charge, temperature, and fault state. The controller constrains the reference current based on the allowable discharge current and the allowable current of the DC-DC converter.
[0097] The functions and connections of each module in the DC-DC controller 180 are as follows:
[0098] The acquisition and timing module 181 acquires the load-side equivalent current I_L(k) output by the load sampling 160, the bus voltage output by the bus sampling 170, and the optional DC-DC 120 output current according to the sampling period Ts, and receives the allowable discharge information from the BMS 112, providing a control timing base for each step from S101 to S112.
[0099] The rate of change calculation module 182 calculates the signed load current rate of change r_I(k) within the observation window Tw consisting of Nw sampling periods, and sends the calculation result to the five-stage judgment module 183.
[0100] The five-stage determination module 183 combines r_I, load current platform, bus voltage trend, debouncing result and previous state to determine the current state as M0 steady state, M1 load rising edge, M2 pulse hold, M3 load falling edge or M4 recovery, and sends the state flag to the synchronization parameter selection module 184.
[0101] The synchronous parameter selection module 184 synchronously outputs the outer loop dynamic bandwidth parameter, load current feedforward direction and coefficient, and current rise / fall slope for each state. The three types of parameters have the same state identifier and parameter version and take effect in the same control cycle. The bandwidth parameter is sent to the voltage feedback module 186, the feedforward direction and coefficient are sent to the load current feedforward module 187, the rise / fall slope is sent to the synthesis and safety processing module 188, and the current state is also provided to the delay compensation and prediction module 185.
[0102] The delay compensation and prediction module 185 establishes the total control delay τd, and combines the load current I_L,p(k) at the effective time of the target with the signed rate of change and its relative baseline increment ΔI_L,p(k), and sends the prediction increment to the load current feedforward module 187.
[0103] The voltage feedback module 186 generates a feedback current component I_v(k) based on the error between the target bus voltage and the measured bus voltage obtained by the bus sampling 170 according to the outer loop dynamic bandwidth parameters of the current state, and sends it to the synthesis and safety processing module 188.
[0104] The load current feedforward module 187 generates the load current feedforward component I_ff(k) based on the feedforward direction, coefficient and predicted increment ΔI_L,p(k), and sends it to the synthesis and safety processing module 188.
[0105] The synthesis and safety processing module 188 synthesizes the feedback current component I_v(k) and the feedforward current component I_ff(k) into a reference current I_ref(k) at the same current reference interface. Based on the allowable current of BMS 112 and DCDC 120 and the rising / falling slope of the current state, it forms a current command I_cmd(k) and performs current limiting, slope limiting and anti-integral saturation. Then, it sends I_cmd(k) to the high-bandwidth current inner loop and state management module 189.
[0106] The high-bandwidth current inner loop and state management module 189 targets I_cmd(k), collects the actual current of the DC-DC converter 120, and generates PWM or equivalent modulation to drive the DC-DC converter 120. This allows the forward discharge current output by the BBU 110 to the DC bus 130 via the DC-DC converter 120 to be increased, maintained, or reduced as needed. The actual current, tracking error, and current limiting status are fed back to the five-stage judgment module 183 for M2 maintenance, M4 exit, and abnormal degradation.
[0107] This embodiment provides a structural basis for synchronous parameter selection and high-bandwidth current inner loop execution in the five-stage state through the above-mentioned module division and signal flow. With the selection of parameters and slope corresponding to each state, it can realize rapid current addition on the rising edge, pulse holding support, rapid current withdrawal on the falling edge, and smooth recovery and stabilization.
[0108] In some embodiments, the total control delay τd can be measured and summed separately during the development phase for sample-and-hold, sensor and digital filter group delays, processor computation time, PWM update wait time, and isolation drive delay. Alternatively, it can be calibrated through time-scaled testing between the input edge and the DC-DC current response. During operation, the DC-DC controller 180 predicts the load current at the target activation time based on the current τd. If the PWM uses periodic boundary updates, the target time also includes the wait time from the completion of the current calculation to the next valid update boundary. If the delay varies with the operating mode, different calibration values can be saved for different modes and switched along with the state version. This embodiment ensures that the feedforward timing is consistent with the actual PWM activation time, avoiding undercompensation or overcompensation caused by deviations of several sampling periods at steep edges.
[0109] In some embodiments, when the equivalent current on the load side increases rapidly within the observation window, the feedforward increment of M1 first increases the reference current I_ref, and the high-bandwidth inner current loop rapidly increases the forward discharge current of the DC-DC converter. The outer loop bandwidth parameter switches simultaneously, allowing for rapid correction of any bus voltage deviation that occurs. After the load enters the platform, M2 no longer uses the rapid increment of the rising edge, but maintains a feedforward amount adapted to the platform. As the main power supply 140 gradually increases its output, the bus voltage trend reduces the feedback component, and the DC-DC discharge current decreases smoothly accordingly, thereby maintaining the dynamic coordination of the two power supplies.
[0110] In some embodiments, when the equivalent current on the load side drops rapidly, M3 causes the feedforward coefficient K_ff,M to act in the direction of reducing the reference current and calls a faster descent slope S_down,M. Even if the bus voltage has not yet significantly surged, the current command can decrease first, and the high-bandwidth current inner loop accordingly reduces the BBU discharge current. The unidirectional main scheme limits the current command I_cmd to a minimum of zero. If the DC-DC 120 supports bidirectional conversion, the BMS 112 allows charging, the bus side allows feedback, and the reverse capability information is valid, then Imin can be less than zero within a limited time, allowing the DC-DC to absorb the remaining energy of the bus for a short time; crossing zero is prohibited if any condition is not met. This embodiment illustrates that bidirectional reverse absorption is only an optional enhancement method, and the main scheme does not require it as a necessary prerequisite.
[0111] In some embodiments, in the preferred 48V BBU / GPU scenario, BBU 110 is connected to the nominal 48V bus 130 via DCDC 120, and the GPU load 150 forms a high-rate pulse. The equivalent current at the GPU aggregated load access point or the equivalent load-side busbar is taken as I_L, and the absolute value of the load-side equivalent current change rate reaching or exceeding 30A / μs is used as the design boundary. This value is used for the design and verification of sensor bandwidth, sampling period, control delay, outer loop dynamic parameters, feedforward coefficient, and inner loop capability; it is not a prototype measurement conclusion, nor does it limit the implementation at other voltage levels. It is recommended to construct rising edge, hold, falling edge, and recovery conditions separately, and simultaneously record I_L, r_I, predicted current, I_v, feedforward component, I_ref, I_cmd, actual DCDC current, bus voltage, states M0 to M4, current limiting flag, and BMS allowable current. Before testing, the measurement points, bandwidth, probe delay, and time alignment method should be clearly defined to avoid mistaking measurement link errors for control effects.
[0112] In some embodiments, if load sampling times out, rate of change exceeds limits and is unreliable, delay parameters are invalid, BMS allowable values expire, DC-DC tracking errors remain excessive, or hardware protection is triggered, controller 180 reduces or shuts down load feedforward, freezes or smoothly restores outer loop parameters, and adopts conservative current upper limits and slopes. Anti-integral saturation continues to allow the outer loop internal state to track executable commands. After abnormal recovery, continuous and valid judgments are required before entering M4 and returning to M0; it does not jump directly from the abnormal state to fast M1 or M3. This embodiment ensures that the system can still operate safely and continuously when the signal is abnormal or the capacity is insufficient.
[0113] In some embodiments, the five-stage decision can be implemented by a state machine, lookup table, rule logic, or equivalent classifier; the outer loop can be a proportional-integral (PI) converter, a proportional-integral-derivative (PI-DE) converter, state feedback, or a digital compensator; the feedforward coefficient can be corrected by a state table, load amplitude, input / output voltage, and efficiency; the inner current loop can control the inductor current, the DC-DC bus current, or the equivalent current converted by the turns ratio. As long as the outer loop dynamic bandwidth parameters, load feedforward direction / coefficient, and current slope are selected synchronously for the same five-stage state, and the high-bandwidth current inner loop completes current addition on the rising edge, maintains support, removes current on the falling edge, and recovers stabilization through complete delay compensation, it can be used as an equivalent implementation of this application.
[0114] In summary, the embodiments of the present invention, through the synchronous selection of outer loop dynamic bandwidth parameters, load current feedforward direction and coefficient, and current command slope in the same five-stage state, and combined with target time prediction including complete control link delay and high-bandwidth current inner loop, achieve rapid current addition on the rising edge, sustained support during the pulse hold phase, rapid current withdrawal on the falling edge, and smooth stabilization during the recovery phase, which is beneficial for suppressing bus voltage drops and overshoots. The above-mentioned controller and system, in conjunction with the corresponding methods, can be flexibly implemented under unidirectional support, bidirectional reverse absorption, different voltage levels, and different topologies and implementation forms, all of which can achieve the above-mentioned beneficial effects.
[0115] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, and improvements made within the spirit and principles of the present invention should be included within the protection scope of the present invention.
Claims
1. A method for optimizing the dynamic response of a DC-DC converter suitable for high-rate pulsed loads, wherein the DC-DC converter is connected between a battery backup unit and a DC bus, and the battery backup unit includes a battery and a battery management system, characterized in that: The optimization method includes the following steps: S101. Collect bus voltage, load-side equivalent current, DC-DC output current, and allowable current and control time base information of the battery backup unit and the DC-DC; S102. Calculate the signed rate of change of load current within an observation window consisting of multiple sampling periods; S103. Based on the marked load current change rate, load current plateau, bus voltage trend, debouncing result and the previous state, a five-stage determination is made to determine the current state as M0 steady state, M1 load rising edge, M2 pulse hold, M3 load falling edge or M4 recovery. S104. Select the bus voltage outer loop dynamic bandwidth parameters, load current feedforward direction and coefficient, and DC-DC current rise and fall slopes synchronously according to the current status. S105. Determine the total control delay consisting of sampling, filtering, calculation, PWM update and driving, and associate it with the target effective time of the current command; S106. Based on the signed load current change rate and the total control delay, predict the load current at the target activation time and its increment relative to the baseline; S107. The outer loop of the bus voltage, which adopts the outer loop dynamic bandwidth parameters corresponding to the current state, forms a feedback current component based on the error between the target bus voltage and the measured bus voltage. S108. Based on the current state's feedforward direction and coefficients and the increment of the relative baseline, form the load current feedforward component; S109. Combine the feedback current component and the load current feedforward component into a reference current at the same current reference interface; S110. Based on the allowable current of the battery backup unit and the DC-DC converter, as well as the rising and falling slopes corresponding to the current state, the reference current is limited to a current command, and anti-integral saturation processing is performed when the reference current is limited; S111. The current command is tracked by the inner current loop with a bandwidth higher than the dynamic bandwidth of the outer current loop of the bus voltage, and a PWM control quantity is generated to drive the DC-DC converter to increase, maintain or decrease the positive discharge current of the battery backup unit to the DC bus. S112. Update the current state and executed current commands, and smoothly restore the steady-state parameters of M0 from M4 when the recovery conditions are met. Reduce or turn off the feedforward and degrade to feedback control when the signal is abnormal, the capability is insufficient or the tracking is abnormal.
2. The DC-DC dynamic response optimization method for high-rate pulse loads according to claim 1, characterized in that: In step S103, the five-stage determination includes: entering M1 when the positive rate of change meets the rising edge condition; entering M2 when the rising edge ends and the load is at a high plateau; entering M3 when the negative rate of change meets the falling edge condition; entering M4 after rapid current withdrawal; and returning to M0 from M4 when the feedforward attenuation is completed, the outer loop parameters are restored, and the bus stability condition is met. The equivalent current on the load side is the equivalent current of the GPU aggregated load access point or the equivalent current of the equivalent load side bus, and the absolute value of the rate of change of the equivalent current on the load side reaches or exceeds 30A / μs as the design applicable boundary.
3. The DC-DC dynamic response optimization method for high-rate pulse loads according to claim 1, characterized in that: In step S104, the synchronization selection includes: M0 selecting the steady-state outer loop bandwidth parameter, the feedforward coefficient being zero or only retaining small-signal compensation, and using the steady-state current rising slope and steady-state current falling slope corresponding to M0; M1 selecting the outer loop parameter that satisfies the stability margin and enhances the dynamic response, the positive feedforward direction and rising edge feedforward coefficient, and a first allowable rising slope greater than the steady-state current rising slope; M2 selecting the outer loop bandwidth parameter adapted to the load platform, maintaining the feedforward amount adapted to the predicted load increment and corrected by the bus error, and using the holding slope; M3 selecting the outer loop parameter that suppresses the bus voltage surge. The feedforward direction that reduces the synthesized reference current, and the second allowable falling slope that is greater than the falling slope of the steady-state current; M4 causes the feedforward coefficient to gradually decrease according to the set slope, the outer loop bandwidth parameter to continuously recover to the steady-state value, and the current slope to smoothly return to the rising slope and the falling slope of the steady-state current; the outer loop dynamic bandwidth parameter of the bus voltage, the feedforward direction and coefficient of the load current, and the rising and falling slopes of the DC-DC current have the same status identifier and parameter version, and take effect within the same control cycle, so as to avoid one channel having entered the falling edge while another channel is still using the rising edge parameter.
4. The DC-DC dynamic response optimization method for high-rate pulse loads according to claim 1, characterized in that: In step S105, the total control delay at least covers load and bus sampling, filtering, control algorithm calculation, PWM register update and power device drive, and is obtained by any one of the following: calibrated fixed delay, sum of delays measured separately, or online update value. When the remote load signal is input via communication, the communication delay is also included. In step S106, a physical range and reliability check are set for the result at the time when the predicted target takes effect. When the rate of change is distorted, the sampling timeout occurs, or the total control delay has no effective value, the feedforward is turned off or reduced and control continues by voltage feedback and safety limits.
5. The DC-DC dynamic response optimization method for high-rate pulse loads according to claim 1, characterized in that: In step S110, the current command approaches the reference current with the rising or falling slope corresponding to the current state, and is constrained by the lower and upper limits of the current allowable current. When the battery backup unit discharges unidirectionally to the DC bus, the lower limit is zero or not less than zero. Only when the DC-DC converter supports bidirectional conversion, the battery management system allows charging, and the bus side allows energy feedback, the lower limit is less than zero for a limited time, so that the DC-DC converter absorbs the remaining energy of the DC bus in reverse for a short time.
6. The DC-DC dynamic response optimization method for high-rate pulse loads according to claim 1, characterized in that: In step S110, when the reference current is not executed by the current command due to current limiting or slope limitation, the outer loop of the bus voltage stops accumulating integrals in the restricted direction, or calculates and tracks the integral state based on the difference between the reference value and the actual command, so that the integral state is continuously connected with the currently executable command when the restriction is lifted and M4 is entered; in step S108, when the voltage or current dimensions on both sides of the DC-DC converter are different, the feedforward component is converted to the reference side of the inner current loop according to the turns ratio, efficiency model or power conservation.
7. The DC-DC dynamic response optimization method for high-rate pulse loads according to claim 1, characterized in that: In step S111, the inner current loop also provides the actual current, tracking error, and current limiting status to the state determination, which are used for M2 maintenance, M4 exit, and abnormal degradation. When load sampling timeout, rate of change exceeding the limit and unreliable, delay parameter invalid, allowable current value expired, DC-DC tracking error continues to be too large, or hardware protection is triggered, the load current feedforward is reduced or turned off, the outer loop parameters are frozen or smoothly restored, and a conservative current upper limit and slope are adopted. After abnormal recovery, it enters M4 and then returns to M0 after continuous and effective judgment.
8. A DC-DC dynamic response optimization system suitable for high-rate pulse loads, characterized in that: include: The battery backup unit (BBU) includes the battery pack and the battery management system. The DC-DC converter is connected to the battery backup power unit on the energy storage side and to the DC bus on the bus side. The main power supply and GPU pulse load are connected to the DC bus; Load current sampling is used to detect the equivalent current of the GPU pulse load; Bus voltage sampling is used to detect the voltage of the DC bus and the optional DC-DC output current; A DC-DC controller is used to receive the sampled values of the load current sample and the bus voltage sample, the allowable discharge information and control time base of the battery management system, and output PWM control quantity to the DC-DC controller. The DC-DC controller is configured to perform the DC-DC dynamic response optimization method for high-rate pulse loads as described in any one of claims 1-7.
9. The DC-DC dynamic response optimization system for high-rate pulse loads according to claim 8, characterized in that: The DC-DC controller includes: The acquisition and timing module is used to obtain the equivalent current on the load side according to the sampling period and provide a control timing base; The rate of change calculation module is used to calculate the signed rate of change of load current within the observation window; The five-stage determination module is used to determine M0 steady state, M1 load rising edge, M2 pulse hold, M3 load falling edge, and M4 recovery. The synchronous parameter selection module is used to synchronously output the outer loop dynamic bandwidth parameters of the bus voltage, the feedforward direction and coefficient of the load current, and the current rise / fall slope for each state. The delay compensation and prediction module is used to determine the total control delay and predict the load current at the moment the target takes effect. The voltage feedback module is used to generate the feedback current component; Load current feedforward module, used to generate load current feedforward component; The synthesis and safety processing module is used to synthesize a reference current and perform current limiting, slope limiting, and anti-integral saturation. A high-bandwidth current inner loop and state management module are used to generate PWM control quantities and update the state.
10. The DC-DC dynamic response optimization system for high-rate pulse loads according to claim 9, characterized in that: The battery management system provides the controller with at least one of the following: allowable discharge current, terminal voltage, state of charge, temperature, and fault state. The controller constrains the reference current based on the allowable discharge current and the allowable current of the DC-DC converter.
Citation Information
Patent Citations
Four-section self-adaptive PID control method for digital DC / DC converter
CN104660043A
A load current prediction feedforward control method
CN109088561B
Voltage fluctuation processing method and device of DC / DC converter, medium and terminal
CN114204812A