Robust model predictive and current stress coordinated control method for dual active bridge converter
By combining triple phase-shift modulation, adaptive super-spiral sliding mode observer, and model predictive control, the problem of output voltage tracking and current stress optimization of dual active bridge converters under complex operating conditions is solved, achieving efficient current stress suppression and parameter robustness, which is suitable for energy storage systems and DC microgrids.
Patent Information
- Application Number
- CN202611564989.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-10-10
- Publication Date
- 2026-11-24
AI Technical Summary
Existing dual active bridge DC-DC converters, under the conditions of TPS multi-degree-of-freedom modulation, parameter mismatch, and digital control delay, have difficulty in quickly determining the operating mode and phase shift combination that meet power constraints and have low current stress without changing the dynamic adjustment of the output voltage. This makes it difficult to optimize the output voltage tracking accuracy and current stress at the same time.
By employing triple phase-shift modulation combined with an adaptive superspiral sliding mode observer and model predictive control, and through piecewise gradient current stress optimization, the dependence on precise model parameters is reduced, thereby achieving coordinated control of dynamic adjustment of output voltage and current stress.
It improves output voltage tracking accuracy and parameter robustness under complex operating conditions, reduces current stress, and enhances the steady-state efficiency and real-time control capability of the converter. It is suitable for bidirectional energy conversion applications such as energy storage systems and DC microgrids.
Smart Images

Figure CN123163402A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of power electronic converter control technology, specifically to a robust model prediction and current stress co-optimization control method for a dual active bridge (DAB) DC-DC converter. Background Technology
[0002] Dual Active Bridge (DAB) DC-DC converters feature electrical isolation, bidirectional power transmission, high power density, and flexible modulation, making them promising for applications in bidirectional energy conversion such as energy storage systems and DC microgrids.
[0003] Existing DAB converters typically employ single-phase-shift (SPS) modulation, controlling power transmission by adjusting the phase shift between the primary and secondary full-bridge sides. While SPS modulation offers advantages such as simple control structure and ease of implementation, it only has a single degree of control freedom. Under light load conditions or input / output voltage mismatches, it is prone to problems such as high current stress, increased return current power, and limited soft-switching range. Triple-phase-shift (TPS) modulation, by introducing multiple phase-shift control variables, offers greater control freedom and provides more adjustment space for optimizing the current stress of the DAB converter.
[0004] However, under TPS modulation, there are usually multiple feasible shift ratio combinations for the same transmission power requirement. Different shift ratio combinations correspond to different current stresses, so it is necessary to further determine the optimal shift ratio combination with the smaller current stress from the feasible solutions. At the same time, TPS modulation has multiple operating modes and control variables, which makes the selection of the optimal operating mode and the online solution of the shift ratio more complex, placing higher demands on the computing power and real-time performance of the digital controller.
[0005] On the other hand, Model Predictive Control (MPC) has advantages such as fast dynamic response and ease of handling constraints, but its control performance is highly dependent on the accuracy of the predictive model parameters. In actual operation, parameters such as series inductance and output capacitance may deviate from their nominal values due to temperature changes, device deviations, and changes in operating conditions, causing model mismatch between the predictive model and the actual converter, which in turn affects the steady-state accuracy and dynamic performance of the output voltage.
[0006] A dual active bridge converter typically consists of an input DC power supply, a primary full-bridge, a high-frequency isolation transformer, a series equivalent inductor, a secondary full-bridge, and an output capacitor. The primary and secondary full-bridges each generate high-frequency square wave voltages. The phase relationship between these square wave voltages determines the voltage and current changes across the series inductor, thus determining the transmitted power. Single-phase-shift modulation only adjusts the external phase shift between the primary and secondary full-bridges; dual-phase and triple-phase-shift modulation add internal phase shifts to the full-bridge, allowing the same transmitted power to be achieved by combining multiple phase shifts. While multiple degrees of freedom provide room for reducing inductor current and return power, different voltage conversion ratios, power directions, and power ranges correspond to different operating modes and phase shift constraints. Therefore, the actual controller needs to simultaneously handle power point tracking and phase shift feasibility.
[0007] When the voltage conversion ratio deviates from the design value, the load changes, or the input voltage fluctuates, the slope of the series inductor current and the energy balance of the output capacitor will change with the operating conditions. If the controller uses a fixed parameter model, the deviation of the series inductor and output capacitor, unmodeled dynamics, and external disturbances will enter the output voltage prediction error. If the voltage error is used to directly drive the phase shift optimization, the current stress optimization may change the power transfer state that originally needed to be satisfied. Existing DAB control usually focuses on dynamic tracking, soft switching, current stress, or parameter compensation separately, making it difficult to coordinate parameter uncertainty compensation, digital control delay, output voltage prediction, and multi-mode current stress selection in a stable order within the same control cycle. Online traversal of all operating modes and phase shift combinations will also increase the computational burden of the digital controller, affecting real-time execution at a fixed switching frequency.
[0008] Therefore, the core technical problem that the existing technology needs to solve is: under the operating conditions of dual active bridge TPS multi-degree-of-freedom modulation, parameter mismatch and digital control one-step delay, how to use robust predictive control that can be implemented online to compensate for lumped disturbances without changing the transmission power required for dynamic adjustment of output voltage, and quickly determine the operating mode and triple shift ratio combination that meet power constraints and have low current stress, so as to simultaneously improve output voltage tracking, parameter robustness and current stress. Summary of the Invention
[0009] To address the challenge of existing dual active bridge converters simultaneously achieving dynamic output voltage response, parameter robustness, and current stress suppression under complex operating conditions, this invention provides a robust model prediction and current stress coordinated control method for dual active bridge converters. This method, based on triple phase-shift modulation, combines an adaptive superspiral sliding mode observer, model predictive control, and piecewise gradient current stress optimization. This reduces the controller's dependence on precise model parameters while achieving coordinated control of dynamic output voltage adjustment and current stress optimization.
[0010] To achieve the above objectives, the present invention adopts the following technical solution: a robust model prediction and current stress coordinated control method for a dual active bridge converter, wherein the dual active bridge converter includes a primary-side full bridge, a secondary-side full bridge, a high-frequency isolation transformer, a series inductor, an input-side capacitor, and an output-side capacitor, and employs a triple phase-shift modulation method for power regulation, wherein the inward shift ratio of the primary-side full bridge, the outward shift ratio between the primary and secondary full bridges, and the inward shift ratio of the secondary full bridge are respectively denoted as... , and .
[0011] The control method includes the following steps:
[0012] Step 1: Collect the operating status data of the dual active bridge converter
[0013] During each control cycle, the input voltage of the dual active bridge converter is acquired. Output voltage and load current ,in, This indicates the current discrete sampling time.
[0014] The current voltage conversion ratio is determined based on the input voltage and output voltage. ,in:
[0015] (1)
[0016] In the formula, This is the turns ratio of the high-frequency isolation transformer.
[0017] According to the voltage conversion ratio The power transmission direction determines the operating region under triple phase-shift modulation, providing operating status information for subsequent model predictive control and optimal operating mode selection.
[0018] Step 2: Establish a hyperlocal model under triple phase-shift modulation
[0019] Based on the current balance relationship of the output capacitors of the dual active bridge converter and the power transfer relationship under triple phase-shift modulation, the three phase-shift ratios are... , and The combined effect on the converter's transmitted power is characterized as an equivalent control quantity. .
[0020] Considering series inductor parameter mismatch, output capacitor parameter mismatch, unmodeled dynamics, and external disturbances, and incorporating these uncertainties into the lumped disturbance term, based on the nominal series inductor used internally by the controller... and nominal output capacitor The dynamic model of the output voltage of the dual active bridge converter is reconstructed as follows:
[0021] (2)
[0022] In the formula, ; This represents the lumped disturbance composed of parameter mismatch, unmodeled dynamics, and external disturbances. express rate of change, Its upper limit.
[0023] Input voltage When using real-time sampled values, the coefficients The time-varying coefficients are known. Equation (2) transforms the parameter uncertainties and external disturbances of the actual converter into lumped disturbances to be estimated, so that the model predictive controller does not have to rely entirely on the precise parameters of the actual series inductor and output capacitor.
[0024] Step 3: Estimate the output voltage and lumped disturbance using an adaptive superspiral sliding mode observer.
[0025] The output voltage observation error is defined as:
[0026] (3)
[0027] in, This is an estimate of the output voltage.
[0028] An adaptive superspiral sliding mode observer is established based on equation (2):
[0029] (4)
[0030] in, These are estimates of the output voltage and lumped disturbance. , This is the gain of the time-varying observer.
[0031] To enable the observer to adjust its convergence speed online according to actual disturbance changes, the gain of the time-varying observer is set as follows:
[0032] (5)
[0033] in, and The base gain is required to meet stability requirements; It is a time-varying enhancement factor.
[0034] The evolution law of observation error is identified online using a recursive least squares method with a forgetting factor, and the enhancement factor is updated based on the identified weight coefficients. Its discrete form is as follows:
[0035] (6)
[0036] in, and These are the weight coefficients obtained through online updating using recursive least squares with a forgetting factor.
[0037] By using equations (5) and (6), the observer gain is increased when the observation error is large or the disturbance changes rapidly, thereby accelerating the convergence speed of the output voltage and lumped disturbance estimation; when the observation error decreases and tends to stabilize, the observer gain is reduced to reduce noise amplification and sliding mode chattering.
[0038] Step 4: Establish an output voltage prediction model that considers digital control delay.
[0039] Considering the one-step control delay caused by state sampling, control calculation, and PWM update in a digital control system, at the current sampling time... The calculated control quantity is applied in the next control cycle, thus establishing... Output voltage prediction model at time t.
[0040] Assuming the input voltage changes little between two adjacent sampling periods, that is:
[0041] (7)
[0042] The load current obtained from the current sampling is used to approximate the load current in the next sampling period.
[0043] Using the output voltage estimate obtained in step 3 and lumped disturbance estimate Establish a two-step output voltage prediction model based on observations:
[0044] (8)
[0045] in, The controller sampling period, The equivalent control quantity to be obtained for the next control week.
[0046] By incorporating the lumped disturbance estimate into the prediction model, online compensation is provided for model prediction errors caused by parameter mismatch, unmodeled dynamics, and external disturbances.
[0047] Step 5: Use model predictive control to obtain the optimal equivalent control quantity.
[0048] With the output voltage reference value and Using the error between the predicted output voltages at any given time as the optimization objective, a quadratic cost function is established:
[0049] (9)
[0050] in, This is the reference value for the output voltage.
[0051] Substitute equation (8) into equation (9), and use... For the control variable to be optimized, let the cost function... about The partial derivative is zero, thus yielding the optimal equivalent control quantity for the next control cycle:
[0052] (10)
[0053] The optimal equivalent control quantity Used to determine the power transfer state required to meet the output voltage tracking requirements in the next control cycle.
[0054] Among them, the lumped disturbance compensation term in equation (10) enables the controller to correct the predictive control output when parameters such as series inductance and output capacitance are deviated or when there are unmodeled disturbances, thereby reducing the controller's dependence on precise parameters.
[0055] Step 6: Establish a piecewise optimization model for current stress under triple phase-shift modulation
[0056] Under triple phase-shift modulation conditions, for a given transmission power, there are multiple sets of... , and They can meet the same power transmission requirements, but the peak current of the series inductor corresponding to different shift ratios is different.
[0057] Per-unit value of current stress under triple phase-shift modulation To optimize the objective, a current stress optimization problem is established, conditioned on transmission power constraints and the feasible region constraints of shift ratio under different operating modes:
[0058] (11)
[0059] in, This represents the per-unit value of the transmission power under TPS modulation. The target transmission power per unit value corresponding to the optimal equivalent control quantity obtained in step 5; Let m be the feasible region for the shift comparison corresponding to the m-th TPS working mode.
[0060] Segmented optimization is performed for different operating modes. When the minimum current stress point is located within the feasible region of the corresponding operating mode, the power isosurface and the current stress isosurface are tangent at that optimal point, i.e., the following condition is met:
[0061] (12)
[0062] in, This is the gradient scaling factor.
[0063] The internal stationary point under the corresponding working mode is obtained according to equation (12), and it is determined whether the internal stationary point satisfies the shift ratio constraint of the working mode.
[0064] When an internal stationary point satisfies the feasible region constraint of the corresponding working mode, the internal stationary point is taken as a candidate optimum. When the internal stationary point does not satisfy the feasible region constraint, the candidate solutions on the corresponding feasible region boundary are calculated respectively, and the current stresses corresponding to the internal candidate points and the boundary candidate points are compared to obtain the minimum current stress and the corresponding shift ratio combination under the working mode.
[0065] Further comparisons are made of the minimum current stress corresponding to different operating modes that can meet the same transmission power requirements, so as to obtain the globally optimal operating mode and the optimal shift ratio combination under different voltage conversion ratios and transmission power ranges.
[0066] For forward power transfer, the optimal operating mode is determined from mode D and mode E based on the comparison of minimum current stress in each operating mode; for reverse power transfer, the optimal operating mode is determined from mode H and mode J.
[0067] Based on the above results, a voltage conversion ratio is pre-established. Transmission power per unit value Optimal working mode and optimal migration comparison , and The segmented parsing mapping relationship between them.
[0068] Step 7: Map the optimal equivalent control quantity to a minimum current stress shift ratio combination
[0069] Based on the optimal equivalent control quantity obtained in step 5 Determine the target transmission power corresponding to the next control cycle.
[0070] Based on the current voltage conversion ratio The optimal operating mode corresponding to the current operating point is determined by determining the power transmission direction and the range of the target transmission power, and calling the segmented parsing mapping relationship pre-established in step S6.
[0071] Under the condition that the power transmission requirements corresponding to the optimal equivalent control quantity obtained in step 5 are met, the triple phase-shift control parameters that minimize the peak current of the series inductor are further determined: .
[0072] The model predictive control (MMC) loop determines the equivalent control quantity that satisfies the dynamic tracking requirement of the output voltage. The piecewise gradient optimization loop does not independently change the power demand determined by the MMC loop, but rather selects the combination with the minimum current stress from multiple feasible shift ratio combinations that satisfy the power demand. This forms a two-layer collaborative control structure of "dynamic adjustment - current stress optimization".
[0073] Compared with the prior art, the present invention has the following beneficial effects:
[0074] (1) This invention achieves hierarchical coordination between robust model predictive control and current stress optimization under triple phase-shift modulation. First, model predictive control is used to determine the equivalent control quantity that meets the dynamic tracking requirements of the output voltage. Then, under the condition that the transmission power requirement corresponding to the equivalent control quantity is met, the combination with the minimum current stress is selected from multiple feasible phase-shift combinations, thereby achieving coordination between dynamic control of output voltage and current stress optimization.
[0075] (2) Based on the hyperlocal model, this invention integrates the series inductor parameter mismatch, output capacitor parameter mismatch, unmodeled dynamics and external disturbances into the lumped disturbance term, and uses an adaptive super-spiral sliding mode observer for online estimation and compensation, thereby reducing the dependence of the model predictive controller on the precise physical parameters of the dual active bridge converter and improving the output voltage tracking accuracy and control robustness under parameter perturbation conditions.
[0076] (3) The present invention uses the recursive least squares method with forgetting factor to adjust the time-varying gain of the super-spiral sliding mode observer online, so that the observer can automatically adjust the convergence capability according to the change of observation error, improve the disturbance estimation speed when the disturbance is large, and reduce the gain when the system tends to be stable, thereby taking into account both the speed and smoothness of disturbance estimation.
[0077] (4) This invention utilizes the multi-degree-of-freedom characteristics of triple phase-shift modulation, and obtains the internal extreme points and boundary candidate points in the feasible domain of different working modes through piecewise gradient optimization, and further compares the current stress between different working modes, thereby obtaining the optimal phase-shift combination with smaller current stress in the full power range.
[0078] (5) The present invention pre-establishes a segmented analytical mapping relationship between voltage conversion ratio, transmission power, operating mode and optimal phase shift ratio, so that there is no need to perform a global traversal search or multiple iterations of optimization for all operating modes and phase shift ratio combinations during online control, thereby reducing the computational complexity of online optimization of triple phase shift modulation current stress and improving the feasibility of real-time implementation of digital controller.
[0079] (6) This invention considers the one-step control delay in the digital control system. By establishing a two-step output voltage prediction model, the control quantity calculated in the current cycle is matched with the actual control action in the next cycle. The prediction model is compensated in real time by combining the lumped disturbance estimate, which is beneficial to improving the dynamic tracking performance of the output voltage.
[0080] (7) The present invention can take into account the dynamic response of output voltage, parameter robustness and current stress suppression under operating conditions such as load change, output voltage setpoint change and model parameter perturbation. It is suitable for energy storage interface, DC microgrid and other applications that use dual active bridge converters for bidirectional power conversion. Attached Figure Description
[0081] Figure 1 This is a schematic diagram of the applicable dual active bridge converter topology provided in the embodiments of the present invention.
[0082] Figure 2 This is a schematic diagram of the driving signal and typical operating waveform of the dual active bridge converter provided in this embodiment of the invention when using triple phase-shift modulation.
[0083] Figure 3 This is a schematic diagram showing the relationship between the power isosurface, the current stress isosurface, and the feasible region of the shift ratio during the piecewise gradient current stress optimization process provided in this embodiment of the invention.
[0084] Figure 4 This is a schematic diagram of the collaborative control structure of dual active bridge converters based on adaptive superspiral sliding mode observer model predictive control and piecewise gradient optimization provided in an embodiment of the present invention.
[0085] Figure 5 This is a single-cycle control flowchart of the robust model prediction and current stress co-optimization control method for dual active bridge converters provided in this embodiment of the invention.
[0086] Figure 6 This is a comparison of experimental waveforms of inductor current under different voltage conversion ratios provided in the embodiments of the present invention, using single-phase-shift modulation and triple-phase-shift current stress optimization control employed in the present invention. Figure 6 (a) shows the experimental waveform when the voltage conversion ratio K = 1.2. Figure 6 (b) shows the experimental waveform when the voltage conversion ratio K = 1.5. Figure 6 (c) shows the experimental waveform when the voltage conversion ratio K=2.
[0087] Figure 7 These are experimental waveform comparisons of the dynamic performance of different control methods under parameter mismatch conditions provided in this embodiment of the invention. Figure 7 (a) is the experimental waveform under the condition of 30% series inductor parameter mismatch and sudden load change. Figure 7(b) is the experimental waveform when the output voltage setpoint changes abruptly under the condition of 30% mismatch of series inductor parameters. Detailed Implementation
[0088] To make the objectives, technical solutions, and advantages of this invention clearer, the invention will be further described in detail below with reference to embodiments. It should be understood that the specific embodiments described herein are merely illustrative and not intended to limit the invention.
[0089] This invention proposes a robust model prediction and current stress co-optimization control method for dual active bridge (DAB) converters. The core idea is to introduce a hyperlocal model, adaptive super-helical sliding mode disturbance observation, model predictive control considering digital control delay, and current stress optimization on the basis of traditional triple phase shift (TPS) control, so as to achieve high-precision voltage control and low current stress operation of the dual active bridge converter under conditions of parameter uncertainty, load disturbance and bidirectional power transmission.
[0090] In the specific operation, the input voltage, output voltage, and load current of the dual active bridge converter are first collected in real time through voltage and current sampling circuits. The current voltage conversion ratio is then calculated based on the input voltage, output voltage, and the turns ratio of the high-frequency isolation transformer. Simultaneously, considering the power transmission direction and the range of the voltage conversion ratio, the operating region corresponding to the triple phase-shift modulation is determined, thereby identifying the applicable range for combined optimization of the phase shift ratios. Since the transmission power of the dual active bridge converter is jointly determined by the internal phase shift ratio of the primary side full bridge, the external phase shift ratio between the primary and secondary side full bridges, and the internal phase shift ratio of the secondary side full bridge, the combined effect of these three phase shift ratios is equivalent to a unified control variable. This achieves the mapping from the target transmission power to the equivalent control quantity, reducing the computational complexity in the multivariable control process.
[0091] Subsequently, a dynamic model of the output voltage is established based on the current balance relationship of the output capacitors of the dual active bridge. Considering factors such as changes in series inductor parameters, output capacitor deviations, non-ideal characteristics of switching devices, and external load disturbances during actual operation, dynamic influences that cannot be accurately modeled are uniformly grouped into lumped disturbances, and the system dynamics are reconstructed using a hyperlocal model. In this model, the output voltage variation can be described using only the system input and output information, without relying on a precise converter mathematical model, thereby improving the adaptability of the control method to parameter mismatch and unknown disturbances.
[0092] To accurately acquire unknown disturbances within the system, this invention further designs an adaptive superspiral sliding mode observer. This observer uses the output voltage observation error as feedback input, simultaneously estimating the output voltage state and lumped disturbance information. Unlike fixed-gain sliding mode observers, this method utilizes a recursive least squares algorithm with a forgetting factor to analyze the observation error change trend online, dynamically adjusting the observer gain based on the disturbance change rate and error convergence state. When the system experiences sudden load changes or input disturbances, the observation gain is increased to enhance disturbance tracking capability; when the system is running stably, the gain is decreased to reduce high-frequency chattering, improving observation accuracy and control stability.
[0093] After obtaining the output voltage estimate and the lumped disturbance estimate, a two-step output voltage prediction model considering the influence of digital control delay is further established. Because the digital control system involves sampling, calculation, and PWM register updates, the actual control action is delayed by one control cycle relative to the sampling time. Therefore, traditional one-step prediction models cannot accurately describe the actual output response in the next cycle. This invention introduces a one-step control delay compensation mechanism, uses current state information to predict the output voltage change trend for the next two sampling cycles, and constructs a quadratic cost function with the output voltage reference value and the predicted output voltage error as the objective. Through optimization, the optimal equivalent control quantity that meets the voltage tracking requirements is obtained.
[0094] Furthermore, under the condition that the target transmission power of the model predictive control output remains unchanged, current stress optimization is performed on different operating modes in triple phase-shift modulation. Analytical expressions for current stress are established for each operating mode. Using the target transmission power as a constraint, the internal stagnation points and boundary candidate points are solved within the allowable range of the phase shift ratio, and the corresponding current stress magnitudes are calculated. When the internal stagnation point satisfies the phase shift ratio constraint, it is used as a candidate optimization result; when the internal stagnation point exceeds the feasible range, the boundary optimal solution is searched. By comparing the minimum current stress under different operating modes, the optimal operating mode and the corresponding triple phase shift ratio combination under the current operating state are finally determined.
[0095] Since solving all operating modes and shift ratio combinations online in real time increases the computational burden on the controller, this invention pre-establishes a segmented analytical mapping relationship based on the voltage conversion ratio, power transmission direction, target power range, and the optimized triple shift ratio result before the controller runs, and stores this relationship in the digital controller. During online operation, the corresponding mapping relationship is directly invoked according to the current operating region to quickly convert the equivalent control quantity obtained from model predictive control into specific shift ratio parameters for the primary and secondary full-bridge circuits, and further generates the corresponding PWM drive timing sequence to achieve precise control of the power switching devices.
[0096] Ultimately, through the aforementioned control process, the dual active bridge converter can maintain a stable output voltage under complex operating conditions such as input / output voltage variations, load disturbances, and inaccurate model parameters. Simultaneously, it reduces current stress in the transformer and power switching devices, improving system efficiency and reliability. This method balances robust control performance, rapid predictive control response, and efficiency optimization under TPS modulation, making it suitable for bidirectional isolated DC-DC conversion scenarios requiring high dynamic performance and high efficiency, such as bidirectional charging of new energy vehicles, battery energy storage systems, and DC microgrids.
[0097] like Figure 1 As shown, this embodiment of the invention uses a dual active bridge DC-DC converter as the controlled object. The dual active bridge converter includes a primary-side full-bridge HB1, a secondary-side full-bridge HB2, a high-frequency isolation transformer T, and a series equivalent inductor. Input side capacitor Output capacitor and load. The primary-side full-bridge HB1 consists of switching devices. , , and The secondary-side full-bridge HB2 is composed of switching devices. , , and Composition; the turns ratio of a high-frequency isolation transformer is denoted as... Series equivalent inductance This is the equivalent value of the external series inductance and the transformer leakage inductance.
[0098] The voltage conversion ratio of a dual active bridge converter is defined as:
[0099] (13)
[0100] In the formula, The input DC voltage, This is the output DC voltage. This is the turns ratio of the high-frequency isolation transformer. When... When the input voltage is higher than the calculated output voltage; when At that time, the input voltage is lower than or equal to the converted output voltage.
[0101] like Figure 2 As shown, this embodiment uses triple phase-shift modulation to control the dual active bridge converter. Triple phase-shift modulation includes three independent phase shifts, wherein... This indicates that the original side of the entire bridge has shifted internally compared to the previous side. This indicates the difference between the outward movement of the original side full bridge and the secondary side full bridge. This represents the shift ratio within the secondary side of the full-bridge. The three shift ratios together determine the timing relationship of the output square wave voltage of the primary and secondary side full-bridge, as well as the converter's transmission power and series inductor current.
[0102] This embodiment uses, as follows: Figure 4 The diagram illustrates a two-layer collaborative control structure of "dynamic adjustment-current stress optimization". The upper-layer control consists of an adaptive superspiral sliding mode observer and a model predictive controller, used to calculate the optimal equivalent control quantity that meets the output voltage control requirements based on the output voltage tracking error and the lumped disturbance estimate. The lower-level control consists of a piecewise gradient optimization module. Under the condition of satisfying the power transmission requirements corresponding to the equivalent control quantity, it determines the optimal TPS operating mode and the corresponding three shift ratios based on the voltage conversion ratio and the transmission power. , and .
[0103] The specific control process is as follows:
[0104] At the beginning of each control cycle, the input voltage is acquired through voltage and current sampling circuits. Output voltage and load current And calculate the current voltage conversion ratio according to equation (13). .
[0105] Based on the current balance relationship of the output capacitors of the dual active bridge converter, the three shift ratios under TPS modulation are... , and The combined effect on transmission power is defined as the equivalent control quantity. Considering the perturbations of series inductor parameters, output capacitor parameters, unmodeled dynamics, and external disturbances, the nominal series inductor inside the controller is used. and nominal output capacitor The output voltage dynamic model is reconstructed into the hyperlocal model shown in equation (2) above, that is:
[0106] (14)
[0107] in, ; The switching frequency; This represents the lumped disturbance resulting from parameter mismatch, unmodeled dynamics, and external disturbances; when the input voltage uses a real-time sampled value, Updated online based on the current input voltage.
[0108] To obtain lumped disturbance Based on the real-time estimated value, an adaptive superspiral sliding mode observer is established. The output voltage observation error is defined as:
[0109] (15)
[0110] In the formula, The estimated output voltage at the current moment
[0111] The adaptive superspiral sliding mode observer employs a time-varying observer gain. and The components are the base gain and the time-varying enhancement factor, respectively. Multiplying them together, we get:
[0112] (16)
[0113] To adjust the enhancement factor online based on changes in observation error, a recursive least squares algorithm with a forgetting factor is used to identify the error evolution pattern online. The information vector and parameter estimation vector are defined as follows:
[0114] (17)
[0115] The recursive least squares update process with forgetting factor is as follows:
[0116] (18)
[0117] in, ; For prediction error, This is the recursive least squares gain vector. Let covariance matrix be the variance matrix. This is the forgetting factor. As a specific implementation method, the forgetting factor can be... .
[0118] Based on the updated weighting coefficients, the current control cycle enhancement factor is calculated as follows:
[0119] (19)
[0120] When the output voltage observation error increases, the enhancement factor and observer gain are adjusted accordingly through equations (18) and (19) to improve the convergence speed of the lumped disturbance estimation; when the output voltage observation error decreases and tends to stabilize, the observer gain is reduced accordingly to reduce noise amplification and sliding mode chattering.
[0121] Discretizing the adaptive superspiral sliding mode observer using the forward Euler method yields:
[0122] (20)
[0123] This yields the estimated output voltage value at the next sampling time. and lumped disturbance estimate .
[0124] Considering the one-step control delay caused by state sampling, algorithm calculation, and PWM register update in the digital controller, the aforementioned equation (8) is used to establish... Two-step prediction model for output voltage at time:
[0125] (twenty one)
[0126] In this case, it is assumed that the input voltage changes little within two adjacent control cycles, i.e. and using the current load current Approximate load current for the next cycle.
[0127] With output voltage reference value Using the error between the two-step predicted output voltage as the control objective, a cost function is constructed:
[0128] (twenty two)
[0129] Formula (22) regarding the equivalent control quantity for the next cycle The partial derivative is zero, thus yielding the optimal equivalent control quantity:
[0130] (twenty three)
[0131] As can be seen from equation (23), the lumped disturbance estimate is directly fed into the predictive control calculation process. Therefore, when the actual series inductance, output capacitance, or other unmodeled factors change, the observer can... Compensate for the predictive control input.
[0132] To obtain the optimal equivalent control quantity Then, the piecewise gradient optimization module is used to calculate the shift ratio combination that minimizes current stress.
[0133] like Figure 3 As shown, for a given voltage conversion ratio and transmission power, there are multiple sets of power constraints under TPS modulation. , and Combination. If the minimum current stress point is located within the feasible region of a certain TPS operating mode, then the power isosurface and the current stress isosurface are tangent at the optimal point; if the internal stagnation point does not satisfy the corresponding operating mode constraint, then the optimal point is located at the boundary of the feasible region.
[0134] Therefore, the internal stagnation points are first solved within the feasible region corresponding to each TPS operating mode. Then, the internal stagnation points are compared with the candidate points on the boundary of the feasible region to obtain the minimum current stress corresponding to each operating mode. Furthermore, different operating modes with the same transmission power range are compared to determine the operating mode and shift ratio corresponding to the global minimum current stress.
[0135] For forward power transfer, only the optimal mode selection between mode D and mode E is required; for reverse power transfer, only the optimal mode selection between mode H and mode J is required.
[0136] Taking forward power transmission as an example, when And the per-unit value of transmission power satisfies:
[0137] (twenty four)
[0138] When mode E is selected, its optimal shift ratio can be expressed as:
[0139] (25)
[0140] The corresponding minimum current stress per unit value at this time is:
[0141] (26)
[0142] when ,and:
[0143] (27)
[0144] When mode D is selected, its optimal shift ratio is:
[0145] (28)
[0146] The corresponding minimum current stress per unit value is:
[0147] (29)
[0148] when ,and
[0149] (30)
[0150] When mode D is selected, its optimal shift ratio is:
[0151] (31)
[0152] For reverse power transfer, based on the symmetry of the DAB converter's operating modes, the forward power transfer optimization relationship is optimized as follows: Replace with And determine the corresponding optimal working mode and optimal shift ratio combination from mode H and mode J.
[0153] The aforementioned piecewise optimization results are obtained analytically before the controller runs and stored in the controller in the form of piecewise functions, conditional statements, or lookup tables. Therefore, in actual online control, it is not necessary to traverse all operating modes of the TPS, nor is it necessary to... , and Multi-step iterative optimization only requires considering the current voltage conversion ratio. By selecting the appropriate analytical mapping relationship based on the power direction and the range of the target transmission power, the desired result can be obtained. , and .
[0154] like Figure 5 As shown, the execution flow of a complete control cycle is as follows: First, data is collected. , and Subsequently, the FFRLS parameters, enhancement factor, and adaptive superspiral sliding mode observer were updated to obtain... and ; Analytical calculation based on the two-step prediction model and cost function Then, based on the voltage conversion ratio, power direction, and PGO segmentation analysis results, the optimal operating mode is determined. , and Finally, the three optimal shift ratios are converted into the PWM timings corresponding to the power switching devices of the primary and secondary full-bridge circuits, and the PWM registers are updated to complete one control cycle.
[0155] Among them, the upper-layer ASTSMO-MPC is only responsible for determining the equivalent control quantity required for dynamic adjustment of the output voltage. The lower-layer PGO does not independently change the power requirement determined by the upper-layer controller. Instead, it further selects the combination with smaller current stress from multiple shift ratio combinations that meet the power requirements corresponding to the equivalent control quantity, thereby realizing the coordinated control of dynamic adjustment of output voltage, parameter disturbance compensation and current stress optimization.
[0156] To verify the feasibility of the above control method, this embodiment uses a dual active bridge converter experimental platform based on a digital signal processor. The experimental platform includes a DAB main power circuit, a voltage sampling circuit, a current sampling circuit, an isolation drive circuit, a digital controller, and a host computer. The digital controller uses a TMS320F28335 DSP. The ADC module is used to collect input voltage, output voltage, and current status variables in real time. After the control algorithm is calculated, a TPS phase-shifted PWM signal is generated through the EPWM module, which controls the power switching devices of the primary and secondary full-bridge circuits after passing through the isolation drive circuit.
[0157] As a specific experimental parameter setting, the input voltage is set to 72 V, the output voltage operating range is 48–60 V, the input side capacitor is 20 μF, the output side capacitor is 360 μF, the series equivalent inductance is 51 μH, the load resistance is 10 Ω or 15 Ω, the high-frequency isolation transformer turns ratio is 1:1, the switching frequency is 20 kHz, and the dead time is 500 ns.
[0158] To verify the optimization effect of this invention on current stress, under the input voltage... Load resistance Under these conditions, the output voltage was set to 60 V, 48 V, and 36 V respectively, corresponding to voltage conversion ratios of... 1.5 and 2.
[0159] like Figure 6 As shown, an experimental comparison is made between SPS modulation and TPS modulation optimized using the PGO of this invention. When When the SPS modulation is applied, the peak inductor current is 5.834 A, while the peak inductor current corresponding to this invention is 5.666 A, resulting in a current stress reduction of approximately 2.9%. At that time, the peak inductor current decreased from 7.166 A to 6.5 A, a decrease of approximately 9.3%; when At that time, the peak inductor current decreased from 9.332 A to 6.334 A, a reduction of approximately 32.1%. This indicates that as the voltage conversion ratio gradually deviates from 1, the current stress suppression effect obtained by this invention based on TPS multi-degree-of-freedom and PGO segmented optimization becomes more significant.
[0160] The converter's conversion efficiency was further tested under the aforementioned experimental conditions. When the output voltage is 60 V and the output power is 240 W, the SPS modulation efficiency is 87.1%, and the efficiency after TPS current stress optimization using this invention is 91.2%; when When the output voltage is 48 V and the output power is 153.6 W, the conversion efficiency increases from 82.3% to 88.5%; when When the output voltage is 36 V and the output power is 86.4 W, the conversion efficiency increases from 75.4% to 84.3%. Experimental results show that reducing the peak current of the series inductor can simultaneously reduce the current stress on power devices and magnetic components, and is beneficial to improving the steady-state operating efficiency of the converter.
[0161] To verify the control robustness of the present invention under parameter mismatch conditions, the load resistance was reduced from 15 Ω to 10 Ω, the output voltage reference value was kept at 60 V, and the operating condition with a series inductor parameter mismatch of 30% was set.
[0162] like Figure 7 As shown in (a), during load loading, the traditional MPC+PGO control exhibits a steady-state output voltage error of approximately 0.7–1 V under parameter mismatch conditions. However, when using the ASTSMO-MPC+PGO control of this invention, no significant output voltage drop occurs, and the output voltage is stabilized near the 60 V reference value with a steady-state error of 0. This demonstrates that the adaptive super-spiral sliding mode observer can estimate the lumped disturbance caused by series inductor parameter mismatch online and compensate for the predictive control quantity using equation (23).
[0163] Further adjust the output voltage reference value by changing it abruptly from 48 V to 60 V, setting the load resistance to 10 Ω, and maintaining a 30% mismatch in the series inductor parameters. For example... Figure 7 As shown in (b), the output voltage overshoot of PI+PGO control is about 3 V, and the rise time is about 15 ms; the traditional MPC+PGO control has no obvious overshoot and the rise time is about 4 ms, but there is a steady-state error of about 0.6 to 1 V; when using the ASTSMO-MPC+PGO control of the present invention, there is no obvious output voltage overshoot, the rise time is about 4 ms, and the above-mentioned steady-state error can be eliminated.
[0164] In summary, this embodiment uses an adaptive super-spiral sliding mode observer to estimate and compensate for the lumped disturbances caused by parameter mismatch, unmodeled dynamics, and external disturbances in the dual active bridge converter online. It then uses model predictive control to calculate the optimal equivalent control quantity that meets the dynamic tracking requirements of the output voltage. Based on this, it uses piecewise gradient optimization to determine the triple phase-shifting operating mode and phase-shifting combination that meet the power transmission requirements corresponding to the equivalent control quantity and have low current stress, thereby achieving coordinated control of dynamic output voltage adjustment, parameter robustness, and current stress optimization.
[0165] The above description is merely a specific embodiment of the present invention, used to illustrate the technical solution of the present invention, and not intended to limit the scope of protection of the present invention. Equivalent substitutions, modifications, or transformations made by those skilled in the art to the control parameters, implementation forms, controller types, and specific application scenarios described in the present invention without departing from the technical concept of the present invention shall all fall within the scope of protection of the present invention.
Claims
1. A robust model prediction and current stress coordinated control method for a dual active bridge converter, characterized in that, include: The input voltage, output voltage, and load current of the dual active bridge converter are collected, and the voltage conversion ratio and current operating range are determined based on the input voltage, output voltage, transformer turns ratio, and power transmission direction. According to the ratio of the primary side full bridge inward shift under triple phase-shift modulation Compared to the outward movement of the original secondary side bridge... Compared with the inward shift of the entire secondary side bridge Determine the equivalent control quantity based on the combined effect of transmission power. ; A superlocal output voltage model is established based on the current balance relationship of the output side of the dual active bridge converter, and the series inductor parameter mismatch, output capacitor parameter mismatch, unmodeled dynamics and external disturbances are unified into lumped disturbances. The output voltage and the lumped disturbance are estimated by an adaptive superspiral sliding mode observer, and the observer gain is adjusted online according to the evolution of the observation error. Considering the one-step control delay caused by state sampling, control operation and PWM update, a two-step output voltage prediction model is established using the output voltage estimate and the lumped disturbance estimate. The cost function is constructed using the error between the output voltage reference value and the two-step predicted output voltage. The optimal equivalent control quantity that satisfies the output voltage tracking requirement in the next control cycle is then obtained. Without changing the target transmission power corresponding to the optimal equivalent control quantity, for each triple phase-shifting operating mode, the internal stagnation point and boundary candidate solution are obtained in the feasible region of the phase shifting ratio and the current stress is compared. Furthermore, the minimum current stress of different operating modes is compared to determine the optimal operating mode and the optimal triple phase shifting ratio combination. Based on the voltage conversion ratio, power transmission direction, and the range where the target power is located, a pre-established segmented analytical mapping relationship is invoked to convert the optimal triple shift ratio combination into the PWM timing of the primary-side full-bridge and secondary-side full-bridge power switching devices, and the PWM timing is applied in the next control cycle.
2. The control method according to claim 1, characterized in that, The acquisition of the operating status parameters of the dual active bridge converter includes the acquisition of the input voltage in each control cycle. Output voltage Uo(k) and load current ,in For discrete sampling times; calculate the voltage conversion ratio K based on the input voltage, output voltage, and high-frequency isolation transformer turns ratio N, and determine the operating region under triple phase-shift modulation based on K and the power transmission direction.
3. The control method according to claim 1, characterized in that, The establishment of the superlocal output voltage model includes: based on the output-side capacitor current balance relationship and the power transfer relationship under triple phase-shift modulation, , and The synergistic effect is characterized as And based on the nominal series inductance inside the controller. and nominal output capacitor The output voltage dynamics are reconstructed; the lumped disturbances include series inductor parameter mismatch, output capacitor parameter mismatch, unmodeled dynamics, and external disturbances, and when the input voltage uses real-time sampled values, the time-varying coefficients in the model are updated according to the current input voltage.
4. The control method according to claim 1, characterized in that, The adaptive superspiral sliding mode observer takes the output voltage observation error as input to estimate the output voltage and lumped disturbance. The observer gain is obtained by multiplying the base gain by the time-varying enhancement factor. The evolution law of observation error is identified online using the recursive least squares method with forgetting factor, and the time-varying enhancement factor is updated according to the online updated weight coefficients to increase the observer gain when the observation error increases or the disturbance changes rapidly, and decrease the observer gain when the observation error decreases and tends to stabilize.
5. The control method according to claim 1, characterized in that, The two-step output voltage prediction model is based on the estimated output voltage, lumped disturbance, input voltage, and load current at the current sampling time. It assumes that the input voltage changes little between two adjacent sampling periods and uses the load current obtained from the current sampling to approximate the load current in the next sampling period. The cost function is a quadratic error function between the output voltage reference value and the two-step predicted output voltage. By setting the partial derivative of the cost function with respect to the equivalent control quantity to be obtained in the next control period to zero, the optimal equivalent control quantity is analytically obtained.
6. The control method according to claim 1, characterized in that, The current stress optimization aims at the per-unit value of current stress under triple phase-shift modulation, and is constrained by the per-unit value of target transmission power and the feasible region constraint of the phase shift ratio of the m-th operating mode. When the internal stationary point satisfies the phase shift ratio constraint of the corresponding operating mode, the internal stationary point is taken as the candidate optimal point. When the internal stationary point does not satisfy the constraint, the candidate solution on the boundary of the feasible region is calculated, and the current stress of the internal candidate point and the boundary candidate point are compared.
7. The control method according to claim 1, characterized in that, The segmented analytical mapping relationship is determined before the controller runs based on the voltage conversion ratio, per-unit value of transmitted power, power transmission direction, operating mode, and optimal parameters. , , It is pre-established and stored in the form of piecewise functions, conditional statements, or lookup tables; during forward power transmission, the optimal operating mode is determined between mode D and mode E, and during reverse power transmission, the optimal operating mode is determined between mode H and mode J; during online control, the corresponding mapping relationship is directly called according to the current operating range without traversing all operating modes and shift ratio combinations.
8. A robust model prediction and current stress co-optimization control device for a dual active bridge converter, characterized in that, It includes a dual active bridge power circuit, voltage and current sampling circuits, a digital controller, and an isolated drive circuit; The dual active bridge power circuit includes an input-side capacitor, a primary-side full bridge, a high-frequency isolation transformer, an equivalent inductor connected in series with the high-frequency isolation transformer, a secondary-side full bridge, an output-side capacitor, and a load. The primary-side full bridge and the secondary-side full bridge transmit bidirectional power through the high-frequency isolation transformer and the series equivalent inductor. The voltage and current sampling circuit is used to collect input voltage, output voltage and load current and input them to the digital controller. The digital controller is used to perform hyperlocal model, lumped disturbance observation, model prediction considering one-step control delay and triple phase-shift current stress segmentation optimization based on the sampled state quantities, and output triple phase-shift PWM control signal. The isolation drive circuit drives the power switching devices of the primary-side full bridge and the secondary-side full bridge according to the triple phase-shift PWM control signal.
9. The control device according to claim 8, characterized in that, The digital controller includes a cooperative adaptive superspiral sliding mode observation and recursive least squares update unit, a two-step output voltage prediction and model prediction control unit, and a piecewise gradient optimization mapping unit. The adaptive superspiral sliding mode observation and recursive least squares update unit provides the two-step output voltage prediction and model prediction control unit with output voltage estimates and lumped disturbance estimates. The two-step output voltage prediction and model prediction control unit provides the target equivalent control quantity to the piecewise gradient optimization mapping unit. The piecewise gradient optimization mapping unit outputs the optimal operating mode and... , , .
10. The control device according to claim 8, characterized in that, The digital controller includes an ADC module for real-time acquisition of status variables and an EPWM module for updating the PWM register. The segmented parsing mapping relationship is stored in the digital controller, and the EPWM module optimizes the mapping. , , The switching timings of the primary-side full-bridge and secondary-side full-bridge are converted and output through an isolation drive circuit; the digital controller is implemented using a DSP, and there is a digital control delay of one control cycle between sampling, calculation, PWM register update and power switching action.
