A photovoltaic racking module structure suitable for offshore piers
By integrating the offshore photovoltaic support structure with the jetty structure, and using PHC pipe piles and modular connection components, the problem of separate construction of the offshore photovoltaic support structure and jetty was solved, thereby improving the stability and economy of the structure and adapting to the complexity of the marine environment.
Patent Information
- Application Number
- CN202611570673.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-10-12
- Publication Date
- 2026-11-24
AI Technical Summary
In existing technologies, the separate construction of offshore photovoltaic support systems and offshore pier structures leads to a waste of sea area, increased engineering costs, unreliable connections, poor overall structural integrity, and an inability to adapt to long-term safe operation in harsh marine environments.
The photovoltaic support modules are integrated with the offshore pier structure. The pier’s lower PHC pipe piles and upper steel frame structure are combined with modular connection components to form a synergistic force-bearing system, which enables reliable connection and rapid assembly of the photovoltaic support and the pier.
It effectively saves sea area and engineering construction costs, improves structural stability and space utilization efficiency, adapts to the harsh marine environment, enables rapid construction and functional integration, and promotes the coordinated development of marine photovoltaics and marine engineering.
Smart Images

Figure CN123163485A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the fields of marine engineering structures, photovoltaic power generation infrastructure and steel structure integration technology, and in particular to a photovoltaic support module structure suitable for offshore piers. Background Technology
[0002] Offshore photovoltaic (PV) power generation, with its advantages of not being limited by land space, superior sunlight, and stable power generation, has become an important direction for the development of the new energy industry and is being widely promoted in coastal areas. Meanwhile, offshore piers, as important supporting structures for offshore PV sites and other areas, are used for personnel passage, operation and maintenance, and material transportation, and their construction scale continues to expand along with the development of the offshore PV industry.
[0003] The offshore photovoltaic support system is a reliable connection structure and integrated deployment technology between standardized photovoltaic support modules and the upper steel frame structure of the pier.
[0004] Currently, offshore photovoltaic (PV) support systems and offshore pier structures are mostly constructed separately and independently. This means the PV support system has its own pile foundation support system, unrelated to the pier structure. This construction method not only wastes marine space and increases construction costs, but also results in both structures having limited functions and failing to achieve efficient use of space resources. Furthermore, the two independent structures are prone to mutual interference under the complex environmental conditions of wind, waves, and currents at sea, affecting the overall structural stability and service life.
[0005] In the existing technology, although there are a few attempts to simply stack photovoltaic brackets and trestle bridges, none of them have formed a standardized and modular integrated structure. They also have problems such as unreasonable connection construction, unclear force transmission path, and poor overall structural integrity. As a result, the connection between photovoltaic brackets and trestle bridges is unreliable, and the trestle bridge is subjected to localized stress concentration, which cannot meet the requirements for long-term safe operation in the harsh marine environment.
[0006] Therefore, how to achieve a new type of photovoltaic support module structure that is reliable in connection and coordinated in force distribution, and is convenient and economical in construction, in order to solve the shortcomings of existing technologies and promote the coordinated development of offshore photovoltaics and marine engineering, has become a technical problem that urgently needs to be solved by those skilled in the art. Summary of the Invention
[0007] In view of the above-mentioned defects of the prior art, the present invention provides a photovoltaic support module structure suitable for offshore piers. The purpose is to solve the problems of the prior art, such as the waste of sea area and high construction cost of separate construction of offshore photovoltaic support system and offshore pier structure, as well as the unreliability of simple superposition connection and poor structural integrity, so as to improve structural stability and space utilization efficiency and realize the integrated construction of offshore pier and photovoltaic support.
[0008] To achieve the above objectives, the present invention discloses a photovoltaic support module structure suitable for offshore piers, including a PHC pipe pile at the bottom of the pier, a steel frame structure at the top of the pier, a standardized photovoltaic support module, and modular connection components;
[0009] The upper steel frame structure of the trestle is a cuboid frame extending horizontally. Below it, there are several rows of at least two PHC pipe piles for the lower part of the trestle along the length direction. The standardized photovoltaic support modules are rigidly connected to the upper part through the modular connection components.
[0010] Preferably, the PHC pipe piles at the bottom of the trestle are standardized PHC pipe piles, with the lower part embedded into the seabed foundation at a predetermined depth, and the top part fixed to the upper steel frame structure of the trestle by welding.
[0011] More preferably, the diameter of the PHC pipe piles at the bottom of the trestle is 700mm, and the depth of embedment into the seabed foundation is not less than 10m.
[0012] Preferably, the upper steel frame structure of the trestle bridge includes four longitudinal main beams extending horizontally and corresponding to the longest side of the cuboid frame, and several transverse secondary beams, all parallel to the vertical direction, arranged between every two adjacent longitudinal main beams.
[0013] Each rectangular structure formed by two adjacent transverse secondary beams and the corresponding two longitudinal main beams is provided with diagonal bracing.
[0014] The top of each of the PHC pipe piles under the trestle is welded and fixed to the longitudinal main beam at the corresponding position of the steel frame structure above the trestle. The height of the weld is not less than the minimum wall thickness of the corresponding PHC pipe pile under the trestle or the corresponding longitudinal main beam. Ultrasonic testing is performed after welding to ensure welding quality.
[0015] More preferably, all the longitudinal main beams are fixed to the corresponding transverse secondary beams and the corresponding diagonal braces, and all the transverse secondary beams are fixed to the corresponding diagonal braces by welding.
[0016] All longitudinal main beams, all transverse secondary beams, and all diagonal braces have their outer surfaces treated with hot-dip galvanizing for corrosion protection, and the thickness of the hot-dip galvanized layer is not less than 80μm.
[0017] More preferably, each of the longitudinal main beams is made of H-beams of type HN400×200×8×13; each of the transverse secondary beams is made of H-beams of type HN300×150×6.5×9.
[0018] The spacing between each pair of adjacent transverse secondary beams and the corresponding longitudinal main beams forming a grid is 2m to 3m.
[0019] Preferably, the standardized photovoltaic support module is a prefabricated integrated component, which is prefabricated in the factory and transported to the site for installation. It includes multiple sets of support structures evenly distributed along the length direction, including front support columns, rear support columns, inclined beams, transverse purlins and two photovoltaic module mounting arms.
[0020] Each of the front columns of the bracket and the corresponding rear columns of the bracket are vertically arranged and staggered in height.
[0021] The height of each of the rear columns of the bracket is higher than that of the corresponding front column of the bracket, so that the corresponding inclined beam is inclinedly connected to the top of the corresponding front column and the corresponding rear column of the bracket, forming an inclined angle adapted to the installation of photovoltaic modules.
[0022] Each of the transverse purlins is horizontally fixed to the corresponding inclined beam to support the photovoltaic module;
[0023] The two photovoltaic module mounting arms are respectively set between the front column of the corresponding bracket and the corresponding inclined beam, and between the rear column of the corresponding bracket and the corresponding inclined beam;
[0024] All the aforementioned support structures are arranged in multiple parallel groups along the length of the upper steel frame structure of the trestle bridge.
[0025] The spacing between each group of adjacent support structures is 1.5m.
[0026] More preferably, the standardized photovoltaic support module is made of Q235B steel and has a hot-dip galvanized surface treatment;
[0027] The height of the front column of each bracket is 1.2m, the height of the rear column of each bracket is 1.5m, and the angle between each inclined beam and the horizontal plane is 30°.
[0028] Each of the transverse purlins is made of 10# channel steel;
[0029] All photovoltaic module mounting brackets are made of angle steel;
[0030] The distance between the two photovoltaic module mounting arms connected to the front column of each bracket and the corresponding rear column of the bracket is 1.0m to 1.2m.
[0031] Preferably, the modular connection assembly includes a plurality of connection seats and corresponding rigid connectors;
[0032] Each of the connecting seats is formed by welding steel plates, and its dimensions match the cross-sectional dimensions of the front column and the rear column of the bracket at the corresponding position in the photovoltaic bracket module.
[0033] Each of the aforementioned connecting seats is fixedly welded to the corresponding longitudinal main beam or the corresponding transverse secondary beam in the upper steel frame structure of the trestle bridge;
[0034] Each of the rigid connectors is a high-strength bolt that passes through the corresponding connector and the front or rear column of the photovoltaic support module, and is rigidly fixed by bolt tightening.
[0035] Preferably, each of the connecting seats has a through hole corresponding to the corresponding rigid connecting member;
[0036] The inner wall of each of the aforementioned through holes is smoothed.
[0037] Each of the connectors in the modular connection assembly is welded from a 16mm thick steel plate.
[0038] Each of the aforementioned connectors has four through holes;
[0039] The diameter of each of the aforementioned through holes is matched with the diameter of the corresponding rigid connector.
[0040] The beneficial effects of this invention are:
[0041] This invention integrates standardized photovoltaic support modules with the offshore pier structure, replacing the traditional separate construction method. This effectively saves sea area and construction costs, achieving efficient use of space resources. Modular connection components ensure a reliable rigid connection between the photovoltaic support modules and the pier's steel frame, forming a synergistic force-bearing system that enhances the overall structural stability and wave resistance, adapting to the harsh marine environment. The standardized photovoltaic support modules are prefabricated, enabling rapid assembly, improving construction efficiency, and facilitating future maintenance and replacement. Simultaneously, the original passage function of the pier is preserved, achieving a "transportation + photovoltaic" functional integration and promoting the coordinated development of offshore photovoltaics and marine engineering.
[0042] The following will further explain the concept, specific structure, and technical effects of the present invention in conjunction with the accompanying drawings, so as to fully understand the purpose, features, and effects of the present invention. Attached Figure Description
[0043] Figure 1 A schematic diagram of an embodiment of the present invention is shown.
[0044] Figure 2 A side view of an embodiment of the present invention is shown.
[0045] Figure 3 This diagram shows a partial connection of the upper steel frame of a trestle according to an embodiment of the present invention.
[0046] Figure 4This diagram illustrates the combined layout of multiple photovoltaic support modules in one embodiment of the present invention.
[0047] The components include: 1. PHC pipe piles; 2. Upper steel frame structure of the trestle bridge; 201. Longitudinal main beams; 202. Transverse secondary beams; 3. Standardized photovoltaic support modules; 301. Front support column; 302. Rear support column; 303. Inclined beams; 304. Transverse purlins; 305. Photovoltaic module mounting brackets; 4. Modular connection components; 401. Connecting seats; 402. Rigid connecting parts. Detailed Implementation
[0048] Example: Figures 1 to 4 As shown, a photovoltaic support module structure suitable for offshore piers includes a PHC pipe pile 1 at the bottom of the pier, a steel frame structure 2 at the top of the pier, a standardized photovoltaic support module 3, and a modular connection component 4.
[0049] The upper steel frame structure 2 of the trestle is a rectangular frame extending horizontally. Below it are several rows of PHC pipe piles 1, each with at least two piles, which are rigidly connected to the standardized photovoltaic support module 3 via modular connection components 4.
[0050] The PHC pipe pile 1 at the bottom of the pier provides vertical support for the entire structure. The upper steel frame structure 2 of the pier is fixedly installed on the top of the PHC pipe pile 1 at the bottom of the pier. The standardized photovoltaic support module 3 is rigidly connected to the upper steel frame structure 2 of the pier through the modular connection component 4. The four together form a composite structural system of spatial synergistic force bearing, realizing the integration of the passage function of the sea pier and the load-bearing function of the photovoltaic support.
[0051] This invention provides stable vertical support through the PHC pipe piles 1 at the bottom of the pier, while the steel frame structure 2 at the top of the pier bears its own weight, the load of personnel and equipment passage, and the load of the photovoltaic support module 3, which is transferred to the seabed foundation through the PHC pipe piles. The standardized photovoltaic support module 3 is rigidly connected to the steel frame structure through modular connecting components 4 to form a collaborative force-bearing system, avoiding localized stress concentration and improving the overall structure's resistance to wind and waves. The prefabricated integrated photovoltaic support module 3 can be quickly assembled on-site, improving construction efficiency, while retaining the original passage function of the pier, realizing the functional integration of "transportation + photovoltaics" and making full use of marine space resources.
[0052] This invention integrates standardized photovoltaic support modules 3 with the offshore pier structure, replacing the traditional separate construction method. This effectively saves marine area and construction costs, achieving efficient use of space resources. PHC pipe piles are used as the pile foundation, combined with the upper steel frame structure 2 of the pier, enhancing the overall structural load-bearing capacity and wave resistance, adapting to the harsh marine environment. The standardized photovoltaic support modules 3 are prefabricated components in the factory, enabling rapid on-site assembly through modular connection components 4, improving construction efficiency and facilitating later maintenance and replacement. Simultaneously, the original passage function of the pier is retained, achieving a functional integration of "transportation + photovoltaics." The structure is stable and economical, promoting the coordinated development of offshore photovoltaics and marine engineering.
[0053] In some embodiments, the PHC pipe piles 1 at the bottom of the trestle are standardized PHC pipe piles, which are embedded at a predetermined depth in the seabed foundation and fixed to the upper steel frame structure 2 of the trestle by welding.
[0054] In practical applications, the PHC pipe piles 1 under the trestle are standardized PHC pipe piles. The lower part of the pile is embedded into the seabed foundation at a preset depth to ensure the load-bearing stability of the pile. The top of the pile is fixed to the upper steel frame structure 2 of the trestle by welding to ensure the reliability of the connection. It is used to bear the self-weight of the upper structure, the load of the photovoltaic module and the load of wind and waves at sea, and to ensure the stability of the overall structure.
[0055] In some embodiments, the diameter of the PHC pipe pile 1 under the trestle is 700mm, and the depth of embedment into the seabed foundation is not less than 10m.
[0056] In practical applications, the diameter and embedment depth of the PHC pipe piles 1 under the trestle are adjusted according to the marine geological conditions to ensure that they can withstand the horizontal and vertical loads brought by the wind, waves and currents at sea as well as the load on the pile top.
[0057] In some embodiments, the upper steel frame structure 2 of the trestle bridge includes four longitudinal main beams 201 extending horizontally and corresponding to the longest side of the cuboid frame, and a number of transverse secondary beams 202, which are parallel to the vertical direction, disposed between every two adjacent longitudinal main beams 201.
[0058] Each rectangular structure formed by two adjacent transverse secondary beams 202 and the corresponding two longitudinal main beams 201 is equipped with diagonal bracing.
[0059] The top of each PHC pipe pile 1 at the bottom of the trestle is welded and fixed to the longitudinal main beam 201 at the corresponding position of the steel frame structure 2 at the top of the trestle. The height of the weld is not less than the minimum wall thickness of the corresponding PHC pipe pile 1 at the bottom of the trestle or the corresponding longitudinal main beam 201. Ultrasonic testing is performed after welding to ensure welding quality.
[0060] In practical applications, the longitudinal main beam 201 and the transverse secondary beam 202 are interconnected to form a grid-like frame. The longitudinal main beam 201 is arranged along the length of the trestle bridge, and the transverse secondary beam 202 is arranged along the width of the trestle bridge, forming a complete load-bearing frame.
[0061] In some embodiments, all longitudinal main beams 201 are fixed to the corresponding transverse secondary beams 202 and the corresponding diagonal braces, and all transverse secondary beams 202 are fixed to the corresponding diagonal braces by welding.
[0062] All longitudinal main beams 201, all transverse secondary beams 202, and all diagonal braces have their outer surfaces treated with hot-dip galvanizing for corrosion protection, and the thickness of the hot-dip galvanized layer is not less than 80μm.
[0063] In practical applications, all longitudinal main beams 201 are fixed to the corresponding transverse secondary beams 202 and the corresponding diagonal braces by welding, and all transverse secondary beams 202 are fixed to the corresponding diagonal braces by welding. The surface of the steel frame structure is treated with anti-corrosion, preferably using hot-dip galvanizing anti-corrosion process, to adapt to the complex corrosive environment of high humidity and high salt spray at sea, improve anti-corrosion performance, and extend service life.
[0064] In some embodiments, each longitudinal main beam 201 is made of H-beams of type HN400×200×8×13; each transverse secondary beam 202 is made of H-beams of type HN300×150×6.5×9.
[0065] The spacing between each pair of adjacent transverse secondary beams 202 and the corresponding longitudinal main beams 201 forming a network is 2m to 3m.
[0066] In practical applications, the above structure not only ensures the overall rigidity and lateral displacement resistance of the steel frame, but also facilitates the installation and layout of the modular connection component 4 and the photovoltaic support module 3.
[0067] In some embodiments, the standardized photovoltaic support module 3 is a prefabricated integrated component. After being prefabricated in the factory, it is transported to the site for installation. It includes multiple sets of support structures evenly distributed along the length direction, including a front support column 301, a rear support column 302, a diagonal beam 303, a transverse purlin 304, and two photovoltaic module mounting arms 305.
[0068] Each support frame’s front column 301 and its corresponding rear column 302 are vertically arranged and staggered in height.
[0069] The height of each rear column 302 of the bracket is higher than that of the corresponding front column 301 of the bracket, so that the corresponding inclined beam 303 is inclined to be connected to the top of the corresponding front column 301 and the corresponding rear column 302 of the bracket, forming an inclined angle adapted to the installation of photovoltaic modules.
[0070] Each transverse purlin 304 is horizontally fixed to the corresponding inclined beam 303 to support the photovoltaic module;
[0071] Two photovoltaic module mounting arms 305 are respectively set between the front column 301 of the corresponding bracket and the corresponding inclined beam 303, and between the rear column 302 of the corresponding bracket and the corresponding inclined beam 303.
[0072] All supporting structures are set up in multiple parallel arrangements along the length of the upper steel frame structure 2 of the trestle bridge.
[0073] The spacing between each group of adjacent support structures is 1.5m.
[0074] In practical applications, the above structure does not affect the normal passage of the trestle bridge, and can realize the efficient deployment of photovoltaic modules, which facilitates the operation and maintenance of photovoltaic modules in the later stage. Depending on the length of the trestle bridge, 10-20 sets of photovoltaic support modules can be deployed to realize large-scale photovoltaic power generation.
[0075] In some embodiments, the standardized photovoltaic support module 3 is made of Q235B steel and has a hot-dip galvanized surface treatment;
[0076] The height of each front column 301 of the bracket is 1.2m, the height of each rear column 302 of the bracket is 1.5m, and the angle between each inclined beam 303 and the horizontal plane is 30°. In practical applications, the inclined beam 303 with an angle of 30° to the horizontal plane is adapted to the optimal light-receiving angle of the photovoltaic module.
[0077] Each transverse purlin is made of 304 stainless steel and 10# channel steel;
[0078] All photovoltaic module mounting brackets 305 are made of angle steel;
[0079] The distance between the two photovoltaic module mounting arms 305 connected to the front column 301 and the corresponding rear column 302 of each bracket is 1.0m to 1.2m.
[0080] In practical applications, the above structure can be used to stably support photovoltaic modules; the standardized photovoltaic support module 3 is made of Q235B steel and hot-dip galvanized to ensure durability in the marine environment, and the number and spacing can be flexibly adjusted according to the width and length of the pier.
[0081] In some embodiments, the modular connection assembly 4 includes a plurality of connectors 401 and corresponding rigid connectors 402;
[0082] Each connector 401 is formed by welding steel plates, and its size matches the cross-sectional dimensions of the front support column 301 and the rear support column 302 at the corresponding position in the photovoltaic support module 3.
[0083] Each connecting seat 401 is fixedly welded to the corresponding longitudinal main beam 201 or the corresponding transverse secondary beam 202 in the upper steel frame structure 2 of the trestle bridge;
[0084] Each rigid connector 402 is a high-strength bolt that passes through the corresponding connector 401 and the front column 301 or rear column 302 of the photovoltaic bracket module 3, and is rigidly fixed by bolt tightening.
[0085] In some embodiments, each connector 401 is provided with a through hole corresponding to the corresponding rigid connector 402;
[0086] The inner wall of each through hole is smoothed; in practical applications, this facilitates the installation and fixing of the rigid connector 402, ensuring the reliability of the connection and the integrity of the structure.
[0087] Each connector 401 of the modular connection assembly 4 is welded from a 16mm thick steel plate;
[0088] Each connector 401 has 4 through holes;
[0089] The diameter of each through hole is matched with the diameter of the corresponding rigid connector 402.
[0090] In practical applications, M16 high-strength bolts are used for rigid connector 402 to ensure the rigid fixation of connector 401 and photovoltaic support module column, and to prevent bolts from loosening due to vibration at sea.
[0091] The preferred embodiments of the present invention have been described in detail above. It should be understood that those skilled in the art can make numerous modifications and variations based on the concept of the present invention without creative effort. Therefore, all technical solutions that can be obtained by those skilled in the art based on the concept of the present invention through logical analysis, reasoning, or limited experimentation on the basis of existing technology should be within the scope of protection defined by the claims.
Claims
1. A photovoltaic support module structure suitable for offshore piers; characterized in that, The structure includes PHC pipe piles (1) at the bottom of the trestle, steel frame structure (2) at the top of the trestle, standardized photovoltaic support modules (3), and modular connection components (4). The upper steel frame structure (2) of the trestle is a cuboid frame extending in the horizontal direction. Below it are several rows of at least two PHC pipe piles (1) of the lower part of the trestle, and above it are standardized photovoltaic support modules (3) rigidly connected by the modular connection components (4).
2. The photovoltaic support module structure suitable for offshore piers according to claim 1 is characterized in that, The lower part of the trestle is a PHC pipe pile (1), which is a standardized PHC pipe pile. The lower part is embedded into the seabed foundation at a preset depth, and the top part is fixed to the upper steel frame structure (2) of the trestle by welding.
3. The photovoltaic support module structure suitable for offshore piers according to claim 2 is characterized in that, The diameter of the PHC pipe pile (1) under the trestle is 700mm, and the depth of embedment into the seabed foundation is not less than 10m.
4. The photovoltaic support module structure suitable for offshore piers according to claim 1 is characterized in that, The upper steel frame structure (2) of the trestle bridge includes four longitudinal main beams (201) extending horizontally and corresponding to the longest side of the cuboid frame, and several transverse secondary beams (202) that are parallel to the vertical direction and are arranged between every two adjacent longitudinal main beams (201). Each rectangular structure formed by two adjacent transverse secondary beams (202) and the corresponding two longitudinal main beams (201) is provided with diagonal bracing; The top of each of the PHC pipe piles (1) at the bottom of the trestle is welded and fixed to the longitudinal main beam (201) at the corresponding position of the upper steel frame structure (2) of the trestle. The height of the weld is not less than the minimum wall thickness of the corresponding PHC pipe pile (1) at the bottom of the trestle or the corresponding longitudinal main beam (201). Ultrasonic testing is performed after welding to ensure the welding quality.
5. The photovoltaic support module structure suitable for offshore piers according to claim 4 is characterized in that, All the longitudinal main beams (201) are fixed to the corresponding transverse secondary beams (202) and the corresponding diagonal braces, and all the transverse secondary beams (202) are fixed to the corresponding diagonal braces by welding. All longitudinal main beams (201), all transverse secondary beams (202), and all diagonal braces have their outer surfaces treated with hot-dip galvanizing for corrosion protection, and the thickness of the hot-dip galvanized layer is not less than 80 μm.
6. The photovoltaic support module structure suitable for offshore piers according to claim 4 is characterized in that, Each of the longitudinal main beams (201) is made of H-beams of type HN400×200×8×13; each of the transverse secondary beams (202) is made of H-beams of type HN300×150×6.5×9. The spacing between each pair of adjacent transverse secondary beams (202) and the corresponding longitudinal main beams (201) forming a network is 2m to 3m.
7. A photovoltaic support module structure suitable for offshore piers according to claim 1, characterized in that, The standardized photovoltaic bracket module (3) is a prefabricated integrated component. After being prefabricated in the factory, it is transported to the site for installation. It includes multiple sets of support structures evenly distributed along the length direction, including the front column (301), the rear column (302), the inclined beam (303), the transverse purlin (304), and two photovoltaic module mounting arms (305). Each of the front columns (301) and the corresponding rear columns (302) of the bracket are vertically arranged and staggered in height; Each of the rear columns (302) of the bracket is higher than the corresponding front column (301) of the bracket, so that the corresponding inclined beam (303) is inclinedly connected to the top of the corresponding front column (301) and the corresponding rear column (302) of the bracket, forming an inclined angle adapted to the installation of photovoltaic modules. Each of the transverse purlins (304) is horizontally fixed to the corresponding inclined beam (303) for supporting the photovoltaic module; The two photovoltaic module mounting arms (305) are respectively set between the corresponding front column (301) of the bracket and the corresponding inclined beam (303), and between the corresponding rear column (302) of the bracket and the corresponding inclined beam (303); All the aforementioned support structures are arranged in multiple parallel groups along the length of the upper steel frame structure (2) of the trestle bridge; The spacing between each group of adjacent support structures is 1.5m.
8. A photovoltaic support module structure suitable for offshore piers according to claim 7, characterized in that, The standardized photovoltaic support module (3) is made of Q235B steel and has a hot-dip galvanized surface treatment; The height of each of the front columns (301) of the bracket is 1.2m, the height of each of the rear columns (302) of the bracket is 1.5m, and the angle between each of the inclined beams (303) and the horizontal plane is 30°. Each of the transverse purlins (304) is made of 10# channel steel; All of the photovoltaic module mounting brackets (305) are made of angle steel; The distance between the two photovoltaic module mounting arms (305) connected to each of the front column (301) of the bracket and the corresponding rear column (302) of the bracket is 1.0m to 1.2m.
9. A photovoltaic support module structure suitable for offshore piers according to claim 1, characterized in that, The modular connection assembly (4) includes several connection seats (401) and corresponding rigid connectors (402). Each of the connecting seats (401) is formed by welding steel plates, and its size matches the cross-sectional dimensions of the front column (301) and the rear column (302) of the bracket at the corresponding position in the photovoltaic bracket module (3). Each of the connecting seats (401) is fixedly welded to the corresponding longitudinal main beam (201) or the corresponding transverse secondary beam (202) in the upper steel frame structure (2) of the trestle bridge; Each of the rigid connectors (402) is a high-strength bolt that passes through the corresponding connector (401) and the front column (301) or rear column (302) of the photovoltaic bracket module (3), and is rigidly fixed by bolt locking.
10. A photovoltaic support module structure suitable for offshore piers according to claim 1, characterized in that, Each of the connecting seats (401) is provided with a through hole corresponding to the corresponding rigid connecting member (402); The inner wall of each of the aforementioned through holes is smoothed. Each of the connectors (401) of the modular connection assembly (4) is formed by welding 16mm thick steel plate; Each of the connecting seats (401) has four through holes; The diameter of each of the through holes is matched with the diameter of the corresponding rigid connector (402).