Electrical switch operation
By introducing load transistors and circuits into electrical switches, the capacity of capacitive loads is predicted using capacity signal derivation steps. Switching strategies are adjusted to adapt to capacity changes and aging, thus solving the surge current problem when capacitive loads are switched on and off, and improving safety and flexibility.
Patent Information
- Application Number
- CN202610464179.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Priority Date
- 2025-05-21
- Filing Date
- 2026-04-09
- Publication Date
- 2026-11-24
AI Technical Summary
Existing electrical switches are prone to inrush current when connecting and disconnecting capacitive loads, which can damage equipment and lack the flexibility to cope with capacity changes and aging issues.
By introducing load transistors and circuits into electrical switches, the capacity of capacitive loads is predicted using a capacity signal derivation step. Switching strategies are adjusted to adapt to capacity changes and aging, including current measurement, load voltage signal processing, and capacity derivation, combined with a pre-charging step to reduce inrush current.
It achieves safety and flexibility in connecting and disconnecting capacitive loads, and can automatically adapt to capacity changes and aging processes, reducing inrush current and improving equipment reliability.
Smart Images

Figure CN123163579A_ABST
Abstract
Description
Technical Field
[0001] This disclosure generally relates to the operation of an electrical switch, and more specifically, to the operation of such an electrical switch for applying an output or load voltage individually to a capacitive load. Background Technology
[0002] Switching on and off electrical equipment that includes capacitors typically results in inrush currents far exceeding the rated current during normal operation. It should be noted that, in addition to capacitors, electrical equipment may also include resistors and / or inductors.
[0003] Here, inrush current is the current that conducts immediately after electrical equipment is switched on and decreases over a period of time. Inrush current originates from the capacitance of electrical equipment, hereinafter referred to as a "capacitive load." This effect can be observed in many electrical applications in consumer products and industry, such as motors, transformers, and power supplies, all of which can constitute capacitance, either directly through capacitors (such as voltage regulators, buffers, or filter capacitors) or indirectly through parasitic effects. Inrush current is subsequently caused by the initial charging of a capacitive load that is at least partially discharged, which behaves like a short circuit in the first moment of charging. Because high current can cause damage, protective functions such as fuses, NTC resistors, or pulse charging concepts are known. These protective functions are designed or parameterized for the expected capacity of the capacitive load, making them inflexible in the face of capacity variations. Such capacity variations may, for example, be caused by the use of multiple capacitive loads, which are switched simultaneously, in groups, or individually by electrical switches depending on usage.
[0004] The aforementioned capacity changes can also be caused by the aging of capacitive loads, which may require different switching strategies or even replacement of capacitive components. Similarly, known electrical switches lack flexibility. Summary of the Invention
[0005] In general, this disclosure describes techniques for the effective operation of an electrical switch, which includes a load transistor and circuitry.
[0006] During the switching process, the load transistor is switched from the off state to the on state based on a trigger signal to apply an output voltage to the capacitive load; this output voltage is therefore referred to below as the "load voltage." This is normal operation of the switch, during which the capacitive load is driven based on a trigger signal, which can be received from an external control device. The off state means that the load transistor does not conduct voltage to the capacitive load. The on state means that the load transistor applies the load voltage (typically derived from the supply voltage) to the capacitive load. The on state can include applying the load voltage to the capacitive load in the form of pulse width modulation, etc.
[0007] Prior to the aforementioned switching step, a capacity signal representing the capacitance of the capacitive load is derived in the derivation step. Therefore, the capacity signal is available even before the switching step is performed, particularly before the load voltage is applied to the capacitive load. This allows the electrical switch to be operated based on the capacity signal. For example, this may affect how the capacitive load is initially charged in the pre-charging step, as explained below. This may also involve the switching step itself, particularly the parameterization of protection functions.
[0008] In the capacity derivation step, the capacity signal is derived from the load current signal and the load voltage signal, where the load current signal represents the load current through the capacitive load, and the load voltage signal is or represents the load voltage. This derivation is based on the general physical relationship between capacitance, charge, voltage, and the integral of the current at the capacitor.
[0009] As a result, the operation of the electrical switch can be based on the capacity of a single capacitive load. This allows for changes in the capacitive load and automatic adaptation of the switching strategy to the new capacity. Furthermore, this allows for the detection and potentially automatic response to the aging process of the capacitive load.
[0010] In one example, this disclosure describes a method for operating an electrical switch, the electrical switch including a load transistor and circuitry, the method comprising: receiving a trigger signal from a trigger input port of the electrical switch, and in a switching step switching the load transistor based on the trigger signal to apply a load voltage to a capacitive load; in a current measurement step providing a load current signal representing a load current through the capacitive load by a current measurement circuit; providing a load voltage signal that is or represents a load voltage; in a capacity derivation step deriving a capacity signal representing the capacity of the capacitive load from the load current signal and the load voltage signal by a capacity derivation circuit; and operating the electrical switch based on the capacity signal by outputting the capacity signal to a measurement output port of the electrical switch and / or components of the circuitry in a measurement output step prior to the switching step.
[0011] In another example, this disclosure describes an electrical switch comprising: a load transistor; circuitry including: a trigger input port for receiving a trigger signal, based on which the load transistor can be switched in a switching step to apply a load voltage to a capacitive load; a current measurement circuit configured to provide a load current signal representing the load current through the capacitive load in a current measurement step; a capacity derivation circuit configured to derive a capacity signal representing the capacity of the capacitive load from the load current signal and the load voltage signal in a capacity derivation step; a measurement output port for outputting the capacity signal in a measurement output step; and a control unit.
[0012] The circuit is configured to operate the electrical switch based on the capacity signal by outputting the capacity signal to the measurement output port and / or components of the circuit during the measurement output step, prior to the switching step.
[0013] Details of one or more examples of the technology disclosed herein are set forth in the accompanying drawings and the following description. Other features, objects, and advantages of the technology will become clear from the description, the drawings, and the claims. Attached Figure Description
[0014] Figure 1 A conceptual illustration of an embodiment of the proposed electrical switch is shown, configured to perform the proposed method.
[0015] Figure 2 The following figures illustrate a) load current and b) load voltage during the pre-charge step.
[0016] Figure 3 A circuit diagram showing another embodiment of the proposed electric switch, and
[0017] Figure 4 Show Figure 3 Alternative implementations of medium current measurement circuits, and
[0018] Figure 5 A flowchart illustrating an embodiment of the proposed method is shown. Detailed Implementation
[0019] Figure 1 The illustrated apparatus is configured to perform the proposed method of operating the electrical switch 1, which is an independent teaching. The electrical switch 1 may be, for example, a component of an automotive control system used to drive various capacitive loads 2, such as electric actuators (especially motors), electric heating elements, electric lighting equipment, etc. The corresponding capacitance of the capacitive load may be provided directly by capacitors (such as voltage regulators, buffers, or filter capacitors), or indirectly by parasitic effects.
[0020] like Figure 1 As shown in the conceptual diagram, the electrical switch 1 includes a load transistor 3 and a circuit 4.
[0021] The core function of switch 1 is to execute the switching step S of the proposed method. W The switching step S W This includes receiving a trigger signal 5 from the trigger input port 6 of the electrical switch 1 and switching the load transistor 3 from the off state to the on state, so as to adjust the load voltage V according to the trigger signal 5. L It is applied to capacitive load 2. For example... Figure 1 As shown, this mainly functions as a relay, used to adjust the power supply voltage V according to the trigger signal 5. supConnect it separately to a capacitive load 2 or connect it to the power supply voltage V. sup Disconnect from capacitive load 2.
[0022] Circuit 4 of the electrical switch 1 provides several peripheral functions. One of these functions is in the current measurement step S of the proposed method. M The load current signal 7 is provided by the current measurement circuit 8. The load current signal 7 represents the load current I through the capacitive load 2. L For example, the amplitude of the load current signal 7 can be related to the load current I. L Proportional. Here, and preferably, the current measuring circuit 8 interacts with the sensing resistor 9, in which case the load current signal 7 is preferably the resistor voltage V across the sensing resistor 9. S .
[0023] Another of the aforementioned peripheral functions is to provide a load voltage signal 10, which is hereby, and preferably, a load voltage V. L The load voltage signal 10 can also be related to the load voltage V. L Not exactly the same, but it represents the load voltage V. L For example, the amplitude of the load voltage signal 10 is related to the load voltage V. L Proportional.
[0024] like Figure 1 As shown, in order to derive the capacity signal 11 from the load current signal 7 and the load voltage signal 10, in the capacity derivation step S of the proposed method... D In this circuit, load current signal 7 and load voltage signal 10 are provided to capacitance induction circuit 12. Capacity signal 11 (here and preferably a voltage signal) represents the capacitance of capacitive load 2. For example, the amplitude of capacitance signal 11 is preferably proportional to the capacitance of capacitive load 2.
[0025] The proposed method can be controlled by a control device, which, according to the overall control concept, can be partly an internal control unit 13 and partly an external control device 14. In one embodiment, the control unit 13 is configured to provide at least one protection function. According to an aspect of this disclosure, the protection function is an overcurrent protection function, which protects against overcurrent when the load current I... L If the overcurrent threshold is exceeded, an overcurrent routine is executed. In the overcurrent routine, the control unit 13 outputs a warning signal and / or modifies the control of the load transistor 3 and / or controls the load transistor 3 to the off state.
[0026] For capacity derivation step S D Load current I L and load voltage V L The charging of capacitive load 2 is established, and the load current I... L and load voltage VL Capacity signal 11 can be derived. As explained below, for this purpose, for example, in the pre-charge step S... P Load current I during the period L and load voltage V L This can be utilized. Since deriving the capacity of capacitive load 2 is an internal function of electrical switch 1 itself, in one embodiment, for deriving step S... D The load transistor 3 is controlled by the circuit 4 of the electrical switch 1, preferably by the internal control unit 13.
[0027] The derived capacity signal 11 can be used as the basis for operating the electrical switch 1, as shown in the example below. In any case, operating the electrical switch 1 is based on the capacity signal 11 in the following manner: during switching step S... W Previously, in the measurement output step S of the proposed method O The capacity signal 11 is output to the measurement output port 15 of the electrical switch 1. Alternatively, the capacity signal 11 can be output to components of the circuit 4, particularly the control unit 13.
[0028] exist Figure 1 In the illustrated embodiment, the electrical switch 1 includes an additional measurement output port 16 for outputting the load current signal 7. The measurement output port 15 and the additional measurement output port 16 can be well combined into a single output port according to the multiplexing concept, such as... Figure 3 The embodiment shown is implemented as described below, and will be explained later.
[0029] The proposed solution enables the switching step S of the capacitive load 2. W Previously, the capacitance signal 11 for the exact capacitive load 2 was available, allowing the operation of the electrical switch 1 to be based on the capacitance signal 11. This raises the question: when is the measurement output step S optimally performed? O And the subsequent capacitance derivation step S D As an aspect of this disclosure, it is generally possible that the measurement output step S... O And the subsequent capacitance derivation step S D Only for specific triggering events (such as since the last switching step S) W The response is executed based on the elapsed time interval. However, according to one embodiment, a measurement output step S is proposed. O In each switching step S W It was executed previously.
[0030] According to one embodiment, it is proposed that the electrical switch 1 is at least partially, preferably completely, implemented as an integrated circuit. In one aspect of this disclosure, at least the circuit 4 is implemented as an integrated circuit.
[0031] The term "integrated circuit" means that multiple electronic components and / or functions, in this case, multiple electronic components and / or functions of electrical switch 1, are implemented on a common substrate in a single monolithic chip. This integration reduces the area, complexity, and cost required for electrical switch 1 and improves the reliability of the electrical switch.
[0032] In one embodiment, at least the load transistor 3, control unit 13, current measurement circuit 8, and capacitor driving circuit 12 are implemented on a common substrate within a single monolithic chip. Other supporting functions, such as gate drivers, voltage converters, protection functions, and sensors, can also be integrated without significantly increasing the chip size.
[0033] However, in one aspect of this disclosure, the load transistor 3 is implemented separately from the rest of the electrical switch 1. This may be advantageous because the load transistor 3 conducts a relatively high load current I. L Furthermore, the heat dissipation is high. In the case of a separate implementation of load transistor 3, cooling measures can be specifically allocated to load transistor 3.
[0034] As described above, capacitor derivation step S D The capacitive load 2 needs to be charged so that the capacitance signal 11 can be generated from the load current I. L and load voltage V L This is derived from [the previous description]. In one aspect of this disclosure, the pre-charge step S [is described]. P It was used for this purpose.
[0035] Perform the above pre-charging step S P This is to prevent high inrush currents that could damage components of the electrical switch 1. As described above, when the load transistor 3 is in switching step S... W When a capacitor is controlled to conduct, if the current is not limited by protective components such as resistors or coils, a discharged or nearly discharged capacitor may cause these high surge currents.
[0036] Therefore, it is advantageous to perform the switching step S W Previously, that is, before the normal operation of capacitive load 2 begins, in the pre-charging step S P The capacitive load 2 is pre-charged. Thus, in switching step S... W Previously, in the pre-charging step S P In this circuit, the load transistor 3 is controlled by the control unit 13 of the circuit 4 or the external control device 14 to precharge the capacitive load 2 from at least a partially discharged state to a precharged state according to the precharge strategy.
[0037] In one aspect of this disclosure, the overall pre-charge strategy is based on reducing the average load voltage V. LSlow charging of the capacitive load 2 prevents high inrush current. This can be achieved by pulse-width modulation of the on-state of the load transistor 3, which may result in a reduction in the average load current I. L The current can be adjusted by the width and frequency of the conduction state of the load transistor 3.
[0038] Another embodiment implements an improved pre-charge strategy, according to which the average load voltage V is reduced. L It can be adjusted in a closed-loop control circuit based on sensor information (such as temperature information). This serves as an example in... Figure 2 As shown in the image.
[0039] Figure 2 b) shows that load transistor 3 is controlled such that the load voltage V L Gradually increase. This is by ensuring the load current I... L The temperature will not rise excessively, as excessive rising could lead to accidental damage. Preferably, this is ensured by taking into account the temperature information from the internal temperature sensor (not shown) of the electrical switch 1.
[0040] in particular, Figure 2 a) Illustration of pre-charging step S P Starting at time t0, the load current I... L The load transistor 3 is switched off when the first temperature threshold is reached. During this period, the load current I... L Attenuation. After cooling to the second temperature threshold, electrical switch 1 again controls the load transistor 3 to the on state. This process is repeated until the exit condition is met, which is up to the pre-charge step S. P The scheduled pre-charge time T has expired. Figure 2 In a), this time point is marked as t. on At this time, the switching step S W start. Figure 2 As shown, in the pre-charging step S P In this case, the switching step S can be effectively prevented. W Excessive load current I in the initial stage L .
[0041] As is evident from the above, the capacity derivation step S D It is advantageous to at least partially perform the pre-charging step S P This is performed during the period. Thus, the pre-charge step S... P Load current I during the period L and load voltage V L It can be used to derive the capacity signal 11 as described above.
[0042] In summary, in one embodiment, the pre-charging step S P This includes the controlled switching of load transistor 3 to control the load current I. L The process may involve sensor information, such as temperature information from an internal temperature sensor. In one aspect of this disclosure, the controlled switching is controlled at least in part by circuit 4, specifically the internal control unit 13. Pre-charging step S P The startup and possible parameterization can be well provided by an external control device 14, possibly via trigger input port 6.
[0043] Current measurement step S M Capacitor derivation steps S D and measurement output steps S O (Possibly related to pre-charging step S) P (parallel execution) and the subsequent switching step S W The sequence, as an example, is in Figure 5 As shown in the image.
[0044] By utilizing the pre-charging step S as described above P For capacity derivation step S D The capacity signal 11 can be well used for the pre-charge step S. P The basis for its own optimization. Therefore, in one embodiment, the pre-charge step S is based on the capacity signal 11. P Modifications can be made by control unit 13 or external control device 14. For example, if the capacity signal 11 represents a very large capacity of the capacitive load 2, it may be possible even during the start-up switch step S. W Previously, in the pre-charging step S P During this period, the charge on capacitive load 2 is further increased. Thus, even with a very large capacity of capacitive load 2, the switching step S... W Excessive load current I in the initial stage L It can also be prevented. If capacitance signal 11 indicates that the capacitance of capacitive load 2 is extremely small, then the opposite reaction is appropriate.
[0045] Therefore, in the embodiment, the pre-charging step S is performed according to the capacity signal 11. P The pre-charge time T is extended or shortened. In another embodiment, the pre-charge step S is determined according to the capacity signal 11. P It is repeatedly executed by control unit 13 or external control device 14.
[0046] Another preferred response to the capacity signal 11 is not for the pre-charge step S. P Instead, it targets the switching step S. W Therefore, according to an aspect of this disclosure, a switching step S is proposed based on the capacity signal 11. WModifications may be made by control unit 13 or external control device 14.
[0047] In one embodiment, the switching step S is performed according to the capacity signal 11. W Through load voltage V L The modification can be applied to the entire capacitive load 2 or only to a portion of the capacitive load 2. This requires that the electric switch 1 can switch only a portion of the capacitive load 2, i.e., from switching step S. W The portion excluding capacitive load 2 is provided. A variation of this is to provide at least one switching device for capacitive load 2, such as the aforementioned electrical switch 1.
[0048] Regardless of the approach, in one embodiment it is proposed that, based on capacity signal 11, during switching step S... W In the middle, only a portion of the capacitive load 2 is supplied with the load voltage V. L Furthermore, another portion of the capacitive load 2 is excluded during switching step S. W In addition, the switching step S W Load current I in the initial stage L Excessive increases can be effectively prevented. In another embodiment, during the switching step S... W In the later stages, the portion of capacitive load 2 that has been excluded can be gradually incorporated into the switching step S. W And no load current I L The risk of excessive increases.
[0049] Figure 3 An embodiment for electrical switch 1 is shown in the circuit diagram, which follows... Figure 1 The overall structure of the electrical switch 1 is shown. As combined with... Figure 1 As explained, the electrical switch 1 includes a load transistor 3 and a circuit 4. Circuit 4 includes a current measuring circuit 8 and a capacity inference circuit 12. Please refer to the information regarding... Figure 1 All explanations given.
[0050] As described above, in capacity derivation step S D The capacitance signal 11 is determined based on the physical relationship between capacitance, charge, voltage, and the time integral of the capacitor current. This physical relationship is based on the known interrelationship between charge, capacitance, and the voltage applied to the capacitor (here, the capacitive load 2):
[0051] The current through the capacitor can be determined by the time integral of the charge, resulting in the following capacitance:
[0052] about Figure 3This means that the capacitance of capacitive load 2 is related to the load current I. L Time integral and load voltage V L The ratios between them are proportional.
[0053] As a result, as mentioned above, the capacitance of capacitive load 2 can be determined from the load voltage V. L This is derived from the load current I, on the other hand. L It is derived from the time integral.
[0054] exist Figure 3 In the illustrated embodiment, based on the above, the capacity signal 11 is generated by a fully analog circuit. Accordingly, an integrator circuit 17 is provided such that, in capacity derivation step S... D In this circuit, the integrated load current signal 7 can be generated by the integrating circuit 17. Preferably, the integrating circuit 17 mainly relies on the integrating capacitor 18, which is interconnected with the load current signal 7. It should be noted that the load current signal 7 is, preferably, related to the actual load current I. L The scaling factor is based on the structure of the current measurement circuit and sensing resistor 9, as described below. However, this scaling factor does not play a major role in the proposed solution.
[0055] According to one embodiment, an integrating circuit 17 is proposed in capacity derivation step S. D A reset is performed previously. This can be achieved by short-circuiting the integrating capacitor 18 via an additional switch (not shown).
[0056] While the above affirms the theoretical necessity of constructing a time integral of the load current signal 7, this integral can potentially be replaced by a simple multiplication of the load current signal 7 with time. For example, if in capacity derivation step S... D During the period, the load current I L The variation over time is relatively small, which is possible. However, here and preferably, the load current I L The time integral is the capacity derivation step S D The foundation.
[0057] As described above, the capacity signal 11 and the load current I L Time integral and load voltage V LThe ratio between them is proportional. To determine this ratio, circuit 4 includes a division circuit 19 having a dividend input 20, a divisor input 21, and a quotient output 22, wherein the integrated load current signal 7 is provided to the dividend input 20, the load voltage signal 10 is provided to the divisor input 21, and the quotient output 22 provides a capacity signal 11 or a signal proportional to the capacity signal 11. The division circuit 19 is preferably implemented in a manner known per se, having a multiplier 23 arranged in the feedback loop of the first inverter circuit 24. The quotient output 22 is connected to a second inverter circuit 25 for receiving the positive capacity signal 11 only at the measurement output port 15.
[0058] The capacity signal 11 can be used for various purposes within the operating switch 1. According to one embodiment, the capacity signal 11 is proposed as a fault signal, indicating that the capacity of the capacitive load 2 is equal to or higher than a first capacity threshold, or that the capacity of the capacitive load 2 is equal to or lower than a second capacity threshold. For example, Figure 3 The electrical switch 1 shown can be connected to an external control device 14, which monitors whether the capacity signal 11 exceeds or falls below the aforementioned threshold.
[0059] As explained above, in Figure 3 In the illustrated embodiment, a single measurement output port 15 exists, which, according to the multiplexing concept, can provide both the load current signal 7 and the capacity signal 11. Therefore, according to this embodiment, the circuit 4 is proposed to include a switching device 26 for implementing the multiplexing concept. The control unit 13 of the circuit 4 or an external control device 14 controls it. Figure 3 The switch device 26 shown enables the load current signal 7 or capacity signal 11 to be provided at the measurement output port 15 of the electrical switch 1, depending on the switching state of the switch device 26.
[0060] In the first state of the switching device 26, the load current signal 7 is available at the measurement output port 15. Then, a first switching element 27, preferably arranged between the current measurement circuit 8 and the measurement output port 15, is in the ON state, making the load current signal 7 available at the measurement output port 15. In this first state, preferably, a second switching element 28 is in the ON state, which directs the load current signal 7 to the dividend input 20 of the division circuit 19, so that the capacity signal 11 can be generated by the division circuit 19 simultaneously. Similarly, in this first state of the switching device 26, the quotient output 22 of the division circuit 19 is disconnected from the measurement output port 15 by a third switching element 29 in the OFF state, so that the output of the load current signal 7 via the measurement output port 15 is not affected.
[0061] In the second state of the switching device 26, both the first switching element 27 and the second switching element 28 are in the off state, making the load current signal 7 unavailable at both the measurement output port 15 and the dividend input 20 of the division circuit 19. The third switching element 29 is in the on state, providing the capacity signal 11 to the measurement output port 15. Since the first switching element 27 is in the off state at this time, the output of the capacity signal 11 is not affected by the current measurement circuit 8. To ensure the stable availability of the capacity signal 11, preferably, even if the load current signal 7 is no longer available at the dividend input 20, the voltage buffer stores the capacity signal 11 for a period of time. This function is provided by the integrating capacitor 18.
[0062] According to one embodiment, the control unit 13 of the circuit 4 or the external control device 14 generates a clock signal, and the circuit 4 or the external control device 14 changes the state of the switching device 26 according to the clock signal. This synchronous control of the switching device 26 results in the load current signal 7 and the capacity signal 11 being available at the measurement output port 15 in each alternating clock cycle.
[0063] Finally, it can be pointed out that the current measurement circuit 8 can be implemented in a variety of ways, one of which is as follows: Figure 3 As shown. Preferably, the current measurement circuit 8 includes a load branch 30 with a load transistor 3 and a sensing transistor 32 for conducting the sensed current I. S The sensing branch 31.
[0064] Using this current measuring circuit 8, the load current signal 7 is the resistor voltage V. S And based on the fundamental scaling factor and the actual load current I L Proportional. The current measurement circuit 8 is configured to adjust the sensed current I in the sensing branch 31. S To track the load current I in load branch 30 L Sensing current I S Conducted through sensing resistor 9, a resistor voltage V is generated across sensing resistor 9. S The load current signal 7. Using the current measurement circuit 8, the load current signal 7 is the resistor voltage V across the sensing resistor 9. S And based on the fundamental scaling factor and the actual load current I L Proportional.
[0065] Figure 3 A special feature of the current measurement circuit 8 shown is the additional switching element 33, which ensures that the sensing transistor 32 in the sensing branch 31 and the load transistor 3 operate at the same operating point. Figure 3 The charge pump voltage V is shown. cpThis voltage is used in the usual manner for the charge pump (not shown) of the load transistor 3. When the charge pump voltage V cp Equal to the power supply voltage V sup When, the sensed current I S Conduction is achieved solely by the additional switching element 33 in the ON state. Consequently, the switching of the additional switching element 33 is synchronized with the internal switching of the charge pump used for the load transistor 3. This synchronization ensures that when measuring the sensed current I... S At this time, the load transistor 3 and the sensing transistor 32 have the same drain-source voltage and gate-source voltage. Since these transistors are of the same type but different sizes, and therefore have different ohmic resistances, the load current I... L With sensing current I S Proportional.
[0066] Figure 4 Show Figure 3 An alternative embodiment of the current measurement circuit 8. Here, the current measurement circuit 8 includes an adjustment device 34 coupled to the load branch 30 and the sensing branch 31, the adjustment device 34 being configured to adjust the sensed current I in the sensing branch 31. S To track the load current I in load branch 30 L Preferably, the regulating device 34 includes an operational amplifier 35 that controls the regulating transistor 36. In principle, the operational amplifier 35 and the regulating transistor 36 are combined for closed-loop control to ensure that the source voltages of the load transistor 3 and the sensing transistor 32 are equal. Using the same measurement circuit, the load current signal 7 is the resistor voltage V. S And based on the fundamental scaling factor and the actual load current I L Proportional.
[0067] The sources of load transistor 3 and sensing transistor 32 are coupled to the input of operational amplifier 35, and adjusting transistor 36 is controlled by operational amplifier 35 such that the sources of load transistor 3 and sensing transistor 32 have the same potential. In this case, the gate-source voltages of load transistor 3 and sensing transistor 32 are equal. Both transistors operate at the same operating point, causing the sensed current I to... S With load current I L Proportional, because the drain-source voltages are also equal. Load current I L With sensing current I S They are proportional because the transistors are the same type but different in size and have different ohmic resistances.
[0068] As mentioned above, Figure 5 An example flowchart illustrating an embodiment of the proposed method is shown. In the current measurement step S... M The load current signal 7 is provided, wherein the capacity signal 11 is provided in the capacity derivation step S.D The value is derived from the load current signal 7 and the aforementioned load voltage signal 10. Based on the capacity signal 11, the electrical switch 1 performs the switching step S. W Previously, the measurement output step S was executed. O Operation. Current measurement steps S M Capacity derivation steps S D and measurement output steps S O Can be combined with pre-charging step S P Parallel execution. For further options on how to execute each step, please refer to the above. It should be noted that these steps can also be executed in different orders, overlapping, or simultaneously.
[0069] Another equally important lesson concerns the aforementioned electrical switch 1 itself. Please refer to the explanation given above. Example
[0070] Example 1: A method for operating an electrical switch 1, the electrical switch 1 including a load transistor 3 and a circuit 4, the method comprising: receiving a trigger signal 5 from a trigger input port 6 of the electrical switch 1, and in switching step S W The load transistor 3 is switched according to the trigger signal 5 to switch the load voltage V. L Applied to capacitive load 2; in current measurement step S M In the middle, the load current I representing the current passing through the capacitive load 2 is provided by the current measuring circuit 8. L The load current signal 7 provides a load voltage signal 10, which is or represents the load voltage V. L In capacitor derivation step S D In the process, the capacitance signal 11 is derived from the load current signal 7 and the load voltage signal 10 by the capacitance-derived circuit 12. The capacitance signal 11 represents the capacitance of the capacitive load 2. The electrical switch 1 is operated based on the capacitance signal 11 in the following manner: during the switching step S W Previously, in the measurement output step S O The capacity signal 11 is output to the measurement output port 15 of the electrical switch 1 and / or to the components of the circuit 4.
[0071] Example 2: The method described in Example 1, wherein the output measurement step is performed before each switching step.
[0072] Example 3: The method according to Example 1 or 2, wherein the electrical switch 1 is at least partially, preferably completely, implemented as an integrated circuit, and preferably, wherein the circuit 4 is implemented as an integrated circuit.
[0073] Example 4: The method according to any one of Examples 1-3, wherein, prior to the switching step, in the pre-charging step, the load transistor 3 is controlled by the control unit 13 of the circuit 4 or the external control device 14 to pre-charge the capacitive load 2 from at least a partially discharged state to a pre-charged state according to the pre-charging strategy, and wherein the capacitance derivation step is performed at least partially during the pre-charging step.
[0074] Example 5: The method according to any one of Examples 1-4, wherein the pre-charging step is modified by the control unit 13 or the external control device 14 according to the capacity signal 11, in particular, the pre-charging time T of the pre-charging step is extended or shortened according to the capacity signal 11, or the pre-charging step is repeatedly performed by the control unit 13 or the external control device 14.
[0075] Example 6: The method according to any one of Examples 1-5, wherein the switching steps are modified by the control unit 13 or the external control device 14 according to the capacity signal 11, and in particular, the load voltage V according to the capacity signal 11. L It may be applied to the entire capacitive load 2 or only to a portion of the capacitive load 2.
[0076] Example 7: The method according to any one of Examples 1-6, wherein in the capacitor derivation step, the integrated load current signal 7 is derived from the load current signal 7 through the integrator circuit 17.
[0077] Example 8: The method according to any one of Examples 1-7, wherein the integrator circuit 17 is reset before the capacitor derivation step.
[0078] Example 9: The method according to any one of Examples 1-8, wherein the circuit 4 includes a divider circuit 19 having a dividend input 20, a divisor input 21 and a quotient output 22, wherein an integral load current signal 7 is provided to the dividend input 20 and a load voltage signal 10 is provided to the divisor input 21, and wherein the quotient output 22 provides a capacity signal 11 or a signal proportional to the capacity signal 11.
[0079] Example 10: The method according to any one of Examples 1-9, wherein the capacity signal 11 is a fault signal indicating that the capacitance of the capacitive load 2 is equal to or higher than a first capacitance threshold, or the capacitance of the capacitive load 2 is equal to or lower than a second capacitance threshold.
[0080] Example 11: According to any one of Examples 1-10, the control unit 13 of the circuit 4 or the external control device 14 controls the switching device 26 such that, depending on the switching state of the switching device 26, the load current signal 7 or the capacity signal 11 is provided at the measurement output port 15 of the electrical switch 1.
[0081] Example 12: According to any one of Examples 1-11, the control unit 13 or external control device 14 of the circuit 4 generates a clock signal, and wherein the circuit 4 or external control device 14 changes the state of the switching device 26 according to the clock signal.
[0082] Example 13: An electrical switch 1 includes: a load transistor 3; a circuit 4 including: a trigger input port 6 for receiving a trigger signal 5, according to which the load transistor 3 can be switched during a switching step to switch the load voltage V. L The current is applied to the capacitive load 2; the current measuring circuit 8 is configured to provide, during the current measuring step, a load current I representing the current through the capacitive load 2. L The load current signal 7; the capacitance derivation circuit 12, configured to derive the capacitance signal 11 from the load current signal 7 and the load voltage signal 10 in the capacitance derivation step, the capacitance signal 11 representing the capacitance of the capacitive load 2; the measurement output port 15, for outputting the capacitance signal 11 in the measurement output step; the control unit 13; the circuit 4 is configured to operate the electrical switch 1 based on the capacitance signal 11 by outputting the capacitance signal 11 to the measurement output port 15 and / or to the components of the circuit 4 in the measurement output step before the switching step.
[0083] Example 14: The electrical switch 1 according to Example 13, wherein the electrical switch 1 is at least partially implemented as an integrated circuit, preferably wherein the circuit 4 is implemented as an integrated circuit.
[0084] Example 15: The electrical switch 1 according to Example 13 or 14, wherein the control unit 13 is configured to: control the load transistor 3 to precharge the capacitive load 2 from at least a partially discharged state to a precharged state according to a precharge strategy in a precharge step before the switching step, and control the capacitor driving circuit 12 to perform the capacitor driving step at least partially during the precharge step.
[0085] Example 16: The electrical switch 1 according to any one of Examples 13-15, wherein the circuit 4 includes an integrating circuit 17 configured to derive an integrated load current signal 7 from the load current signal 7 via the integrating circuit 17.
[0086] Example 17: The electrical switch 1 according to any one of Examples 13-16, wherein the circuit 4 includes a divider circuit 19 having a dividend input 20, a divisor input 21 and a quotient output 22, wherein an integral load current signal 7 is provided to the dividend input 20 and a load voltage signal 10 is provided to the divisor input 21, and wherein the quotient output 22 provides a capacity signal 11 or a signal proportional to the capacity signal 11.
[0087] Example 18: The electrical switch 1 according to any one of Examples 13-17, wherein the circuit 4 includes a switching device 26 having at least two switching elements, wherein the control unit 13 is configured to control the switching device 26 such that, depending on the switching state of the switching device 26, a load current signal 7 or a capacity signal 11 is provided at the measurement output port 15 of the integrated electrical switch 1.
[0088] Example 19: The electrical switch 1 according to any one of Examples 13-18, wherein the current measuring circuit 8 includes: a load branch 30 having a load transistor 3; and a sensing transistor 32 for conducting the sensed current I. S The sensing branch 31; wherein the current measurement circuit 8 is configured to adjust the sensing current I in the sensing branch 31. S To track the load current I in load branch 30 L And in which the sensing current I S A resistor voltage V can be generated across the sensing resistor 9 by conduction. S 7. Load current signal.
Claims
1. A method for operating an electrical switch (1), the electrical switch (1) comprising a load transistor (3) and a circuit (4), the method comprising: The trigger signal (5) is received from the trigger input port (6) of the electrical switch (1), and in the switching step (S) W The load transistor (3) is switched according to the trigger signal (5) to apply the load voltage (VL) to the capacitive load (2); In the current measurement step (S) M In the process, the current measurement circuit (8) provides a load current signal (7) representing the load current (IL) through the capacitive load (2). Provide a load voltage signal (10), which is or represents the load voltage (VL); In the capacity derivation step (S) D In the capacitance derivation circuit (12), the capacitance signal (11) is derived from the load current signal (7) and the load voltage signal (10), and the capacitance signal (11) represents the capacitance of the capacitive load (2); The electrical switch (1) is operated based on the capacity signal (11) in the following manner: during the switching step (S) W Before the measurement output step (S) O The capacity signal (11) is output to the measurement output port (15) of the electrical switch (1) and / or to a component of the circuit (4).
2. The method according to claim 1, wherein the measurement output step (S) O In each switching step (S) W It was executed before.
3. The method according to claim 1 or 2, wherein the electrical switch (1) is at least partially, preferably completely, implemented as an integrated circuit, and preferably, wherein the circuit (4) is implemented as an integrated circuit.
4. The method according to any one of the preceding claims, wherein in the switching step (S) W Before the pre-charge step (S) P In the circuit (4), the load transistor (3) is controlled by the control unit (13) of the circuit (4) or an external control device (14) to precharge the capacitive load (2) from at least a partially discharged state to a precharged state according to a precharge strategy, and wherein the capacity derivation step (S) D At least in part during the pre-charging step (S) P It was executed during the period.
5. The method according to claim 4, wherein the pre-charge step (S) is performed according to the capacity signal (11). P The pre-charge step (S) is modified by the control unit (13) or the external control device (14), in particular, according to the capacity signal (11). P The pre-charge time (T) of the pre-charge step (S) is extended or shortened, or the pre-charge step (S) is shortened. P The operation is repeated by the control unit (13) or the external control device (14).
6. The method according to any one of the preceding claims, wherein the switching step (S) is performed according to the capacity signal (11). W The load voltage (VL) is modified by the control unit (13) or the external control device (14), in particular, according to the capacity signal (11), the load voltage (VL) is applied to the entire capacitive load (2) or only to a portion of the capacitive load (2).
7. The method according to any one of the preceding claims, wherein in the capacity derivation step (S D In the integral load current signal (7), the integral load current signal (7) is derived from the load current signal (7) through the integral circuit (17).
8. The method according to claim 7, wherein the integrating circuit (17) is in the capacity derivation step (S D It was previously reset.
9. The method according to claim 7 or 8, wherein the circuit (4) comprises a divider circuit (19) having a dividend input (20), a divisor input (21) and a quotient output (22), wherein the integral load current signal (7) is provided to the dividend input (20), and the load voltage signal (10) is provided to the divisor input (21), and wherein the quotient output (22) provides the capacity signal (11) or a signal proportional to the capacity signal (11).
10. The method according to any one of the preceding claims, wherein the capacity signal (11) is a fault signal indicating that the capacity of the capacitive load (2) is equal to or higher than a first capacity threshold, or the capacity of the capacitive load (2) is equal to or lower than a second capacity threshold.
11. The method according to any one of the preceding claims, wherein the control unit (13) of the circuit (4) or the external control device (14) controls the switching device (26) such that, depending on the switching state of the switching device (26), the load current signal (7) or the capacity signal (11) is provided at the measurement output port (15) of the electrical switch (1).
12. The method according to any one of the preceding claims, wherein the control unit (13) of the circuit (4) or the external control device (14) generates a clock signal, and wherein the circuit (4) or the external control device (14) changes the state of the switching device (26) according to the clock signal.
13. An electrical switch, comprising: Load transistor (3); Circuit (4) includes: The trigger input port (6) is used to receive the trigger signal (5), according to which the load transistor (3) can switch in the switching step (S). W The load voltage (VL) is switched to be applied to the capacitive load (2); The current measurement circuit (8) is configured to perform the current measurement step (S) M The load current signal (7) is provided in the form of a load current signal (IL) representing the load current (IL) through the capacitive load (2). The capacity derivation circuit (12) is configured to perform the capacity derivation step (S) D The capacity signal (11) is derived from the load current signal (7) and the load voltage signal (10), and the capacity signal (11) represents the capacity of the capacitive load (2); Measurement output port (15) is used for measurement output step (S) O The capacity signal (11) is output in the output. Control unit (13); The circuit (4) is configured to operate the electrical switch (1) based on the capacity signal (11) in the following manner: during the switching step (S W Before the measurement output step (S) O The component that outputs the capacity signal (11) to the measurement output port (15) and / or to the circuit (4).
14. The electrical switch according to claim 13, wherein the electrical switch (1) is at least partially implemented as an integrated circuit, preferably wherein the circuit (4) is implemented as an integrated circuit.
15. The electrical switch according to claim 13 or 14, wherein the control unit (13) is configured to: during the switching step (S) W Before the pre-charge step (S) P In the pre-charge step (S), the load transistor (3) is controlled according to the pre-charge strategy to pre-charge the capacitive load (2) from at least a partially discharged state to a pre-charge state, and the capacity pushing circuit (12) is controlled to perform the pre-charge step (S) P The capacity derivation step (S) is performed at least partially during the period. D ).
16. The electrical switch according to any one of claims 13 to 15, wherein the circuit (4) includes an integrating circuit (17) configured to derive an integrated load current signal (7) from the load current signal (7) via the integrating circuit (17).
17. The electrical switch of claim 16, wherein the circuit (4) comprises a divider circuit (19) having a dividend input (20), a divisor input (21) and a quotient output (22), wherein the integral load current signal (7) is provided to the dividend input (20) and the load voltage signal (10) is provided to the divisor input (21), and wherein the quotient output (22) provides the capacity signal (11) or a signal proportional to the capacity signal (11).
18. The electrical switch according to any one of claims 13 to 17, wherein the circuit (4) comprises a switching device (26) having at least two switching elements, wherein the control unit (13) is configured to control the switching device (26) such that, depending on the switching state of the switching device (26), the load current signal (7) or the capacity signal (11) is provided at the measurement output port (15) of the integrated electrical switch (1).
19. The electrical switch according to any one of claims 13 to 18, wherein the current measuring circuit (8) comprises: A load branch (30) having the load transistor (3). A sensing branch (31) with a sensing transistor (32) is used to conduct the sensing current (IS); The current measurement circuit (8) is configured to adjust the sensed current (IS) in the sense branch (31) to track the load current (IL) in the load branch (30), and the sensed current (IS) can be conducted by the sense resistor (9) to generate a resistor voltage (V) across the sense resistor (9). S The load current signal (7) of the load current signal.
