A cross-tier heterogeneous computing resource coordination system and method
By performing unified time-base processing and resource association structure analysis on multi-source data from cloud centers, edge nodes, and terminal devices, cross-level resource bottlenecks are identified and optimized, solving the problem of inaccurate resource perception in cloud-edge-device collaborative systems and improving the collaborative efficiency and stability of the system.
Patent Information
- Application Number
- CN202611111816.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2026-07-24
- Publication Date
- 2026-11-24
AI Technical Summary
In cross-level heterogeneous computing resource collaboration systems, existing technologies struggle to accurately identify resource bottlenecks and task migration timing between the cloud, edge, and endpoint, leading to task queuing, production line imbalances, and missed detection of critical defects, thus affecting system stability.
By acquiring multi-source operating parameters from cloud centers, edge nodes, and terminal devices, alignment and standardization are performed under a unified time benchmark to construct a cross-level resource association structure, analyze load changes and propagation effects, identify bottleneck transmission processes, and perform dynamic scheduling optimization.
It improves the accuracy and comparability of cross-level resource perception, enhances the system's collaborative efficiency and stability, reduces the risk of task queuing and response delay, and strengthens service capabilities in complex scenarios.
Smart Images

Figure CN123164072A_ABST
Abstract
Description
Technical Field
[0001] This invention relates to the field of cloud computing and distributed computing resource management technology, specifically to a cross-level heterogeneous computing resource collaborative sensing system and method. Background Technology
[0002] With the continuous development of cloud computing, edge computing and terminal smart devices, cross-level heterogeneous computing resource collaboration technology has been widely used in fields such as smart manufacturing, smart parks and industrial internet. Existing technologies typically integrate cloud center operation status data, edge node load data and terminal device perception data to uniformly schedule and dynamically manage computing tasks.
[0003] However, in long-running cloud-edge-device collaborative systems, there are significant differences in the hardware architecture, resource scheduling methods, and task carrying modes of nodes at different levels. This causes the status of multi-source computing resources to exhibit non-stationary changes in the temporal and spatial dimensions. Existing methods typically assume that the resource status among the cloud center, edge nodes, and terminal devices has a consistent expression method and use fixed resource indicators as the basis for scheduling. However, in practical applications, resource status is affected by sudden task events, network fluctuations, and changes in the device operating environment, making it difficult to accurately characterize using static thresholds. For example, in a vision inspection production line in smart manufacturing, multiple industrial cameras continuously acquire images and upload them to edge nodes for defect identification. When high-precision inspection tasks are triggered intensively in a short period of time, the inference load of edge nodes rises rapidly, and terminal devices are unable to complete data transmission in a timely manner due to communication bandwidth limitations. The cloud center also experiences delays due to cross-regional scheduling. Existing systems struggle to identify resource bottlenecks and task migration opportunities between the cloud, edge, and device in a timely manner, which can easily lead to queuing of inspection tasks, production line imbalance, and missed detection of critical defects.
[0004] The aforementioned issues make the system prone to inaccurate resource perception, delayed collaborative scheduling response, and reduced high-priority task processing capabilities when deployed across regions or in complex business scenarios, thus affecting the overall system stability. Summary of the Invention
[0005] To address the shortcomings of existing technologies, this invention provides a cross-level heterogeneous computing resource collaborative sensing system and method, which has the advantage of improving the accuracy of cross-level resource sensing and solves the problems mentioned in the background technology.
[0006] To achieve the aforementioned goal of improving the accuracy of cross-level resource perception, this invention provides the following technical solution: a cross-level heterogeneous computing resource collaborative perception method, comprising the following steps: Acquire parameters related to the processing capacity and operating load of cloud centers, edge nodes and terminal devices, and perform time alignment and standardization on data with different sampling frequencies according to a unified time base to form basic resource status data; Based on basic resource status data, resource identification information of nodes at all levels is uniformly mapped, and a cross-level resource association structure is established by combining the task call order, data transmission relationship and communication connection relationship between nodes. Based on the cross-level resource association structure, the load changes of adjacent resource nodes in continuous time segments are analyzed to calculate the propagation impact of upstream node state changes on downstream node task responses, and the resource association strength between corresponding resource nodes is determined according to the propagation impact. Based on the resource association strength, the trend of association strength changes within a continuous time segment is analyzed. When the association strength continues to rise and the growth rate exceeds the corresponding historical fluctuation range, it is determined that there is a bottleneck transmission process in the corresponding resource link, and the bottleneck propagation path and priority processing node are determined according to the order of association strength changes. Based on the bottleneck propagation path and priority processing nodes, the tasks to be executed are dynamically scheduled. High-priority tasks are assigned to target nodes first. When the bottleneck propagation is not resolved, the resource allocation strategy is readjusted until the correlation strength is restored to the set range, and the cross-level resource collaborative scheduling results are output.
[0007] Preferably, the process of generating basic resource status data is as follows: Collect data on cloud center computing resource utilization, task queue length, and network throughput status. Collect data on task processing latency, cache utilization, and link transmission status of edge nodes; Collect data on the task request frequency, processing response time, and remaining local resources of the terminal device; Data with different sampling frequencies are resampled and timestamp aligned based on a unified time reference. Outlier removal, missing value completion, and scale unification are performed on the multi-source data after timestamp alignment to form basic resource status data with a unified expression.
[0008] Preferably, the process of uniformly mapping the resource identification information of nodes at each level is as follows: Based on the basic resource status data, extract the node number, resource type, level identifier, and service function attribute information of each level of node to construct the original node identifier structure; Based on the original node identifier structure, the node identifier is formatted in accordance with the unified resource coding rules, and the uniqueness of conflicting or duplicate identifiers is reconstructed to form standardized node identifier information. By combining standardized node identification information, node hierarchical relationships, and service function attributes, nodes with the same or mutually dependent task functions are associated and merged to generate node mapping relationships. A unified resource identifier table is constructed based on the node mapping relationship across cloud centers, edge nodes, and terminal devices.
[0009] Preferably, the process of establishing a cross-level resource association structure is as follows: Based on the unified resource identifier table, the task triggering order and task execution sequence between nodes are obtained, and the task dependency relationship between nodes is determined. By combining the data transmission direction, transmission frequency and communication link connection status between nodes, the actual interaction relationship between nodes is determined, and the communication association relationship is identified. Based on task dependencies and communication relationships, nodes are abstracted into resource nodes; A cross-level resource association structure is generated by using resource nodes as the associated units and task call paths and communication relationships as the connecting edges.
[0010] Preferably, the process of calculating the propagation impact of upstream node state changes on downstream node task responses is as follows: Based on the task invocation path and data transmission path defined in the cross-level resource association structure, structural association pairs between adjacent upstream and downstream nodes are determined within a continuous time segment; By combining the communication connection relationships in the structural association pairs and cross-level resource association structures, the state changes of upstream nodes and the task responses of downstream nodes are mapped to a unified time propagation window to complete the time alignment process; Under the joint constraints of the task invocation path and the data transmission path, the state changes of the upstream node after time alignment are used as the driving input, and the task response changes of the downstream node are used as the output response to establish the correspondence between input and output. Based on the correspondence between input and output, the change delay and response offset between the two are calculated, and the propagation relationship is corrected by combining the connection strength in the cross-level resource association structure; Based on the corrected change delay and response offset results, the propagation impact parameter of upstream node state changes on downstream node task responses is determined.
[0011] Preferably, the process of determining the strength of resource associations between corresponding resource nodes based on the degree of propagation impact is as follows: The parameters for the degree of propagation impact, such as delayed response, load fluctuation, and duration of impact, are normalized. Based on the normalization results, corresponding weight coefficients are set according to the strength of the influence of each parameter on the stability of task execution, and weighted fusion calculation is performed on each parameter to obtain a comprehensive influence characterization. The overall impact is represented by mapping the strength of resource associations between resource nodes.
[0012] Preferably, the process of determining that a bottleneck exists in the transmission of the corresponding resource link is as follows: Continuous-time distribution analysis of resource association strength within continuous time segments is performed to determine the variation characteristics of association strength in the time dimension. Based on the characteristics of change, three dynamic change indicators are extracted: growth magnitude, growth rate, and duration of continuous rise. Based on the fluctuation range under historical normal operating conditions, threshold constraints are applied to determine the growth amplitude, growth rate, and duration of continuous rise. When the growth rate exceeds the magnitude threshold, the growth rate exceeds the rate threshold, and the duration of continuous increase exceeds the duration threshold, it is determined that there is a bottleneck transmission process in the corresponding resource link.
[0013] Preferably, the process of determining the bottleneck propagation path and priority processing nodes based on the order of changes in correlation strength is as follows: Based on resource links that have been identified as having bottleneck transmission processes, they are sorted according to the time sequence in which the correlation strength first shows an abnormal increase within a continuous time segment to determine the time trigger node for the bottleneck to occur. By combining the upstream and downstream dependencies defined in the cross-level resource association structure, path tracing is performed on time-triggered nodes to determine the propagation direction and diffusion range of bottleneck status between resource nodes. Based on the direction of propagation and the scope of diffusion, identify the key nodes that have a continuous impact on the task response of multiple nodes; Key nodes are identified as priority processing nodes, and based on the propagation direction and the impact diffusion relationship, they are recursively connected along the upstream and downstream dependent links to generate corresponding bottleneck propagation paths.
[0014] Preferably, the process of outputting cross-level resource collaborative scheduling results is as follows: Identify affected tasks based on bottleneck propagation paths, and determine task priorities by combining task response time limits, business importance, and resource requirements. Priority processing nodes are used as the core scheduling nodes, and priority tasks are assigned to target nodes that have takeover capabilities and whose current load is within a safe range. Based on the load changes and task response status of each node after task redistribution, the resource association strength of priority processing nodes and adjacent nodes is continuously monitored. When monitoring results indicate that the bottleneck propagation has not been resolved, the resource allocation path is adjusted and the scheduling strategy is updated with the priority processing node as the center until the resource association strength is restored to the set range, and the cross-level resource collaborative scheduling results are output.
[0015] A cross-level heterogeneous computing resource collaborative awareness system includes: Status acquisition module: Acquires resource and load data from cloud center, edge nodes and terminal devices, performs time alignment and standardization processing to form basic resource status data; Identifier Mapping Module: Performs unified mapping of resource identifiers for nodes at all levels, and constructs a cross-level resource association structure by combining task and communication relationships; Propagation Analysis Module: Analyzes the load change relationship between adjacent nodes, calculates the degree of propagation impact of upstream on downstream task response, and determines the strength of resource association; Bottleneck identification module: Identifies the bottleneck propagation process based on the trend of changes in resource correlation strength, and determines the bottleneck propagation path and priority processing nodes based on the order of changes in correlation strength; Collaborative scheduling module: Dynamically schedules tasks based on bottleneck propagation paths, continuously adjusts resource allocation until stability is restored while the bottleneck remains unresolved, and outputs cross-level resource collaborative scheduling results.
[0016] Compared with existing technologies, the present invention provides a cross-level heterogeneous computing resource collaborative sensing system and method, which has the following beneficial effects: This invention acquires multi-source operating parameters from cloud centers, edge nodes, and terminal devices, and aligns and standardizes them under a unified time base. This provides a consistent basis for expressing the state of heterogeneous computing resources across different levels, thereby improving the accuracy and comparability of resource perception. By constructing a cross-level resource association structure that integrates task invocation relationships, data transmission relationships, and communication connection relationships, it achieves a unified characterization of the dependencies between cloud, edge, and terminal resources, transforming resource interaction relationships from static descriptions to structured expressions. Based on load changes within continuous time segments, a propagation impact analysis mechanism is introduced to quantify the impact of upstream node state changes on downstream task responses and form resource association strength, thus realizing the understanding of cross-level resource coupling relationships. Dynamic perception, by analyzing the temporal trend of resource correlation strength, identifies its continuous rise and abnormal growth characteristics, enabling early perception of the bottleneck transmission process, and further determining the bottleneck propagation path and key priority processing nodes, thereby improving the ability to locate the resource bottleneck diffusion process. By introducing a dynamic scheduling mechanism based on the propagation path, high-priority tasks are preferentially allocated to nodes with takeover capabilities, and the resource allocation strategy is continuously adjusted while the bottleneck is not resolved, realizing adaptive optimization and closed-loop control of the scheduling process. This effectively improves the collaborative efficiency of cross-level computing resources and the overall operational stability of the system, reduces the risk of task queuing and response delay, and improves the continuous service capability and resource utilization efficiency of the system in complex scenarios. Attached Figure Description
[0017] Figure 1 This is a schematic diagram of the method of the present invention.
[0018] Figure 2 This is a schematic diagram of the structure of the present invention. Detailed Implementation
[0019] The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are only some embodiments of the present invention, and not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative effort are within the scope of protection of the present invention.
[0020] Example 1: Please refer to Figure 1 As shown in the embodiment of the present invention, a cross-level heterogeneous computing resource collaborative awareness method includes the following steps: S1: Obtain the processing capabilities and operating load parameters of cloud centers, edge nodes, and terminal devices, and perform time alignment and standardization on data with different sampling frequencies according to a unified time base to form basic resource status data.
[0021] The process of generating basic resource status data in S1 is as follows: The system collects data on computing resource utilization, task queue length, and network throughput status in the cloud center. It periodically acquires computing resource utilization indicators such as CPU and GPU utilization and memory utilization through a resource monitoring agent module deployed in the cloud center. At the same time, it records the number of tasks to be executed and the queuing time in real time based on the task scheduling queue to form task queue length data. It also collects data transmission rate and throughput information per unit time through the network traffic monitoring interface, thereby forming multi-dimensional status data that reflects the overall operating load and network carrying capacity of the cloud center. Collect task processing latency, cache utilization, and link transmission status data of edge nodes; deploy lightweight monitoring components on each edge node to record end-to-end processing latency from task reception to completion and output in real time, monitor the local cache space usage ratio to reflect data storage pressure, and obtain link transmission status information such as data transmission latency, packet loss rate, and bandwidth utilization between nodes through the link quality detection module, thereby forming operational status data to characterize the computing and communication bottlenecks on the edge side; Collect data on task request frequency, processing response time, and remaining local resources of terminal devices; continuously record the number of task requests generated per unit time through the terminal-side perception agent module to form a request frequency index, and record the terminal's response completion time to task instructions to characterize the processing response time, and simultaneously collect the remaining available ratio of terminal CPU, memory, and storage resources, thereby constructing status data that reflects the load intensity and resource constraint capabilities of terminal devices. Based on a unified time benchmark, data with different sampling frequencies are resampled and timestamped. Using a preset global time benchmark as a unified reference, time axis mapping is performed on multi-source data from cloud center, edge nodes and terminal devices. Data with different sampling periods are resampled through interpolation or sliding window methods, and a unified timestamp is added to various types of data to eliminate time deviations caused by different collection frequencies and transmission delays, thereby forming a time-synchronized multi-source resource state sequence. Outlier removal, missing data completion, and scale unification are performed on multi-source data after timestamp alignment to form basic resource status data with a unified expression. Based on time-synchronized multi-source resource status sequences, outlier removal, missing data completion, and scale unification are performed to form basic resource status data with a unified expression. Among them, outlier data points are identified and removed or corrected based on statistical thresholding or moving average deviation detection methods. For data missing due to transmission loss or acquisition interruption, time neighborhood interpolation or estimation methods based on historical averages are used to complete the missing data. Finally, index data of different dimensions are normalized or standardized so that various types of resource status data are expressed in a unified scale space, thereby forming basic resource status data with consistent structure, time consistency, and comparable values.
[0022] S2: Based on basic resource status data, resource identification information of nodes at each level is uniformly mapped, and a cross-level resource association structure is established by combining the task call order, data transmission relationship and communication connection relationship between nodes.
[0023] The process of uniformly mapping the resource identification information of nodes at each level in S2 is as follows: Based on the basic resource status data, node number, resource type, level identifier, and service function attribute information of each level of node are extracted to construct the original node identifier structure. By parsing the constructed basic resource status data structure, unique node identifier fields are extracted from the operation records of cloud center, edge nodes, and terminal devices. Combined with the device type identification tags, computing resource attribute tags, and business function description information preset in the resource monitoring module, field alignment and structured parsing are performed on data from different sources to form the original node identifier structure containing node identity, resource category, and functional attribute description, providing basic data support for unified mapping. Based on the original node identifier structure, the node identifiers are formatted and standardized according to the unified resource coding rules. Conflicting or duplicate identifiers are reconstructed for uniqueness, forming standardized node identifier information. Based on the preset unified resource coding rules, the identifier formats of nodes at different levels are standardized and reconstructed, such as unifying coding length, field order, and separator rules. A rule verification mechanism is used to automatically correct illegal coding or inconsistent data. At the same time, for nodes with duplicate identifiers or cross-system conflicting identifiers, a globally unique identifier generation mechanism is introduced to reconstruct for uniqueness, thereby generating globally unique standardized node identifier information. By combining standardized node identification information, node hierarchical relationships, and service function attributes, nodes with the same or mutually dependent task functions are associated and merged to generate node mapping relationships. After completing the identification standardization, each node is grouped according to its cloud center, edge node, and terminal device hierarchy, and a functional similarity matching model is constructed based on its service function attributes. Nodes with the same business functions or with upstream and downstream dependencies are associated and analyzed. A method combining rule matching and functional similarity threshold judgment is used to merge the logical relationships between nodes, thereby forming a node mapping relationship that reflects cross-level functional associations and dependencies. Based on the node mapping relationship, a unified resource identifier table is constructed across cloud centers, edge nodes, and terminal devices. The generated node mapping relationship is used as input, and a two-dimensional index is organized according to the hierarchical structure and functional category to establish a resource mapping index structure with hierarchical identifier-functional type as the primary key. The unique identifier information of nodes and the associated relationship data are integrated to form a unified resource identifier table that can be used for global retrieval and scheduling. This table is used to realize the unified expression and invocation of heterogeneous resources in the cloud, edge, and terminal in the same semantic space, and to provide a standardized identifier foundation for cross-level resource association analysis and collaborative scheduling.
[0024] The process of establishing a cross-level resource association structure in S2 is as follows: Based on the unified resource identifier table, the task triggering order and task execution sequence between nodes are obtained, and the task dependencies between nodes are determined. By parsing the task execution logs and scheduling records recorded in the unified resource identifier table, the task triggering timestamps and execution completion timestamps of each node within a unit time window are extracted and sorted according to time sequence to obtain the task triggering chain between different nodes. Combined with the preceding task dependency field in the task call record, the sequential dependency constraints between tasks are identified to form structured sequence data that represents the order of task execution, and the task dependencies between nodes are determined accordingly. By combining the data transmission direction, transmission frequency, and communication link connection status between nodes, the actual interaction relationship between nodes is determined, and the communication association is identified. By collecting network communication logs and link monitoring data between nodes, the communication direction information between the data sender and receiver is extracted, and the number of data transmissions and the data traffic volume per unit time are counted to characterize the transmission frequency. At the same time, based on the link status monitoring module, stability indicators of the connection between nodes are obtained, including parameters such as link latency, packet loss rate, and bandwidth utilization, to determine whether there is continuous and stable data interaction between nodes. When the communication direction is consistent, the transmission frequency exceeds the preset threshold, and the link status meets the stability conditions, it is determined that there is a communication association between the nodes. Based on task dependencies and communication relationships, nodes are abstracted into resource nodes. On the basis of the established task dependencies and communication relationships, the functional attributes and interactive behaviors of each node are uniformly abstracted and mapped to resource node models with computing, storage or forwarding capabilities. The differences in underlying hardware and implementation details are ignored, and only the functional role attributes in the process of task execution and data interaction are retained. This achieves a unified resource abstraction expression for cloud centers, edge nodes and terminal devices, and provides a standardized node representation for structural modeling. Using resource nodes as the associated units and task call paths and communication relationships as connecting edges, a cross-level resource association structure is generated. The abstracted resource nodes are used as vertex units in the graph structure, and the execution dependencies reflected by the task call paths are used as directed connecting edges. At the same time, the data interaction relationships reflected by the communication relationships are used as auxiliary connecting edges to construct a cross-level resource graph structure containing multiple types of edge relationships. The node connection relationships in the graph structure are integrated and redundancy is removed to form a cross-level resource association structure that can simultaneously reflect task dependencies and communication interaction relationships, which is used for resource state propagation analysis and collaborative scheduling calculation.
[0025] S3: Based on the cross-level resource association structure, perform correlation analysis on the load changes of adjacent resource nodes in continuous time segments, calculate the degree of propagation impact of upstream node state changes on downstream node task responses, and determine the resource association strength between corresponding resource nodes based on the degree of propagation impact.
[0026] The process in S3 for calculating the propagation impact of upstream node state changes on downstream node task responses is as follows: Based on the task invocation path and data transmission path defined in the cross-level resource association structure, structural association pairs between adjacent upstream and downstream nodes are determined within consecutive time slices. By traversing the directed graph path in the cross-level resource association structure, node pairs with direct invocation or data transmission relationships are extracted, and node interaction behavior is segmented in units of time slices. Thus, node combinations that satisfy the consistency of task invocation path and data transmission path are selected within each consecutive time window to form structural association pairs between upstream and downstream nodes, which serve as the basic units for propagation analysis. By combining the communication connections in the structural association pairs and cross-level resource association structures, the state changes of upstream nodes and the task responses of downstream nodes are mapped to a unified time propagation window to complete time alignment. By modeling the link delay characteristics, the time delay range of data transmission between different nodes is determined, and a unified time propagation window is constructed based on this time delay range. Within this window, the resource state change sequence of upstream nodes and the task response sequence of downstream nodes are aligned according to timestamps. For data points with time offsets or inconsistent sampling, time interpolation or window sliding is used to fill in the gaps, thereby achieving synchronous mapping of cross-node state changes and task response behaviors at a unified time scale. Under the constraints of both the task invocation path and the data transmission path, the state changes of upstream nodes after time alignment are used as driving inputs, and the task response changes of downstream nodes are used as output responses to establish an input-output correspondence. The state changes of upstream nodes in the structural association pair are used as the system driving inputs, which are represented as multi-dimensional time series including load changes, resource consumption changes, and processing capacity changes. At the same time, the task response changes of downstream nodes are used as output response signals, including indicators such as task execution latency, response success rate, and queuing changes. Under the dual constraints of task dependency and data transmission path, the input and output sequences are time-synchronized and matched to establish an input-output correspondence with causal constraints. Based on the input-output correspondence, the change delay and response offset between them are calculated, and the propagation relationship is corrected by combining the connection strength in the cross-level resource association structure. After establishing the input-output correspondence, the change delay parameter and response offset parameter between the state change of the upstream node and the task response of the downstream node are calculated. The change delay parameter is obtained by calculating the time difference between the time when the state change occurs and the time when the task response occurs, and is used to characterize the propagation delay. The response offset parameter is obtained by comparing the difference between the amplitude of the state change and the amplitude of the response change, and is used to characterize the degree of response distortion. The connection strength parameter in the cross-level resource association structure is introduced to correct the above results. The connection strength is calculated based on the link stability, historical communication success rate and task dependency weight. The change delay and response offset are weighted and corrected by the connection strength, so that the influence of weak connection path is appropriately weakened and the propagation effect of strong connection path is strengthened, thereby improving the realism of the propagation relationship. Based on the corrected change delay and response offset results, the propagation impact parameters of upstream node state changes on downstream node task responses are determined. The corrected change delay is used to characterize the propagation speed characteristics, and the corrected response offset is used to characterize the propagation attenuation characteristics. Combined with structural association, a comprehensive influence function is constructed for the corresponding connection strength, thereby obtaining the propagation impact parameters of upstream node state changes on downstream node task responses. This is used to quantify the strength of the impact of different upstream node state changes on downstream node task behavior, achieving a refined characterization of the propagation effect in cross-level resource systems.
[0027] The process in S3 for determining the strength of resource associations between corresponding resource nodes based on the degree of propagation influence is as follows: The parameters of propagation impact degree, including delay response, load fluctuation, and duration of impact, are normalized. Delay response is based on the time difference between the moment a node state change occurs and the moment a task response occurs. Extreme value constraints are used to map all samples to a unified interval, so that delays at different time granularities have a consistent expression. Load fluctuation is based on the change in resource utilization rate per unit time. By calculating the proportional relationship between the change amplitude and the historical maximum fluctuation range, the fluctuation intensity is standardized. Duration of impact is based on the duration of the propagation effect. It is proportionally converted to the maximum observation window set by the system to form a unified time scale representation. Through the above processing, all three types of parameters are expressed in a dimensionless form and are within the same numerical range, providing consistent input conditions for fusion calculation. Based on the normalized results, corresponding weight coefficients are set according to the strength of the influence of each parameter on the stability of task execution, and the parameters are weighted and fused to obtain a comprehensive impact characterization. According to the stability sensitivity characteristics under different resource scheduling scenarios, the weights of delay response, load fluctuation, and duration of impact are pre-set. Among them, delay response usually has a more significant impact on real-time tasks, so it is given a higher weight. Load fluctuation reflects the instantaneous pressure change of the system and has a strong impact on short-term stability. Duration of impact reflects the continuous cumulative effect of the impact. The weights of the three satisfy the normalization constraint to ensure the consistency of calculation. The three types of normalized parameters are fused and calculated using weighted summation or weighted nonlinear fusion to obtain a comprehensive impact characterization value, which is used to uniformly characterize the overall intensity level of the propagation impact between resource nodes. The comprehensive impact is mapped to the resource association strength between resource nodes. A mapping function relationship between the comprehensive impact value and the association strength is constructed. Piecewise linear mapping is used to convert the comprehensive impact into a resource association strength index in the interval [0,1] or [0,100]. The larger the value, the more significant the impact of the upstream node's state change on the downstream node's resource operation. The resource association strength can be divided into three levels: weak association, medium association, and strong association, which can be combined with a threshold grading mechanism to describe the strength of the dependency relationship between cross-level resource nodes. This provides a quantitative basis for resource scheduling, bottleneck identification, and propagation path analysis, and realizes the computable expression of the association relationship between resource nodes.
[0028] S4: Based on the resource association strength, analyze the changing trend of association strength within a continuous time segment. When the association strength continues to rise and the growth rate exceeds the corresponding historical fluctuation range, determine that there is a bottleneck transmission process in the corresponding resource link, and determine the bottleneck propagation path and priority processing node according to the order of association strength changes.
[0029] The process in S4 to determine that a bottleneck exists in the transmission of the corresponding resource link is as follows: A continuous-time distribution analysis of resource association strength within a continuous time segment is performed to determine the variation characteristics of association strength in the time dimension. A sliding time window is constructed with a preset time step to continuously sample the resource association strength between upstream and downstream nodes in the target resource link, obtaining a continuously evolving association strength sequence over time. This sequence is then time-aligned to eliminate the time offset caused by inconsistent sampling frequencies of different nodes. The continuous time segment is divided into several equally spaced sub-intervals, and the local mean and local slope of the resource association strength are calculated in each sub-interval, thus forming the variation characteristics of association strength in the time dimension, which is used to characterize the dynamic evolution trend of the resource link during the propagation process. Based on the change characteristics, three dynamic change indicators are extracted: growth amplitude, growth rate, and duration of continuous rise. Based on the change characteristics, the starting reference point and local peak point of resource association strength are determined, and the difference between the two is used as the growth amplitude to characterize the cumulative enhancement of the link propagation effect. Then, the change in resource association strength between adjacent sub-intervals within a continuous time segment is calculated by difference and normalized by combining the time step to obtain the growth rate, which is used to characterize the speed of propagation enhancement. The time intervals in which the resource association strength remains in a continuous non-decreasing state in the time series are statistically analyzed. When a short-term decline occurs, a tolerance threshold is used for smoothing correction to obtain the duration of continuous rise, which is used to characterize the continuous stability of the propagation enhancement process. Based on the fluctuation range under historical normal operating conditions, threshold constraints are applied to the growth amplitude, growth rate, and duration of continuous rise. Historical correlation strength sequences of resource links under stable operation without bottlenecks or with low load are selected as baseline samples. Statistical analysis is performed on the growth amplitude, growth rate, and duration of continuous rise, and probability distribution models for the corresponding indicators are constructed. The upper bound of normal fluctuations for each indicator is determined based on quantile statistics. The growth amplitude threshold corresponds to the high quantile growth level of historical samples, the growth rate threshold corresponds to the historical maximum stable rate of change range, and the duration of continuous rise threshold corresponds to the upper bound of the historical continuous stable growth duration. A multi-dimensional constraint threshold system is formed in the above way to determine abnormal deviations of indicators under the current operating conditions. When the growth rate exceeds the magnitude threshold, the growth rate exceeds the rate threshold, and the duration of continuous increase exceeds the duration threshold, it is determined that the corresponding resource link is in a bottleneck transmission process. The three dynamic indicators are logically coupled as joint judgment conditions for the same propagation evolution process. The growth rate is used to characterize the cumulative enhancement of the propagation impact, the growth rate is used to characterize the acceleration characteristics of propagation diffusion, and the duration of continuous increase is used to characterize the persistence of the propagation process. When all three meet the threshold conditions, it indicates that the resource association strength exhibits a consistent evolutionary characteristic of continuous enhancement + accelerated expansion + long-term accumulation in the time dimension. Based on this, it is determined that the resource link is in a bottleneck transmission process, and the link can be marked as a bottleneck propagation link for propagation path blocking and load redistribution decisions in resource scheduling.
[0030] The process in S4 for determining the bottleneck propagation path and priority nodes based on the order of changes in correlation strength is as follows: Based on resource links identified as having bottleneck propagation processes, they are sorted according to the time sequence of the first abnormal increase in correlation strength within a continuous time segment to determine the time trigger node for bottleneck occurrence. For resource links marked as bottleneck propagation states, their corresponding resource correlation strength time series are extracted, and the series is scanned time-by-time to detect whether the resource correlation strength meets the sudden increase condition exceeding the normal fluctuation threshold compared to the previous time segment. When the abnormal increase condition is met for the first time in a certain time segment, the upstream and downstream resource nodes corresponding to that time segment are jointly marked as a time trigger node pair, and their occurrence timestamps are recorded. In the case of multiple links having bottleneck propagation in parallel, they are sorted in ascending order according to the first abnormal occurrence time corresponding to the time trigger node, thus forming the time sequence structure of bottleneck propagation, providing a time base constraint for propagation path derivation. By combining the upstream and downstream dependencies defined in the cross-level resource association structure, path tracing is performed on time-triggered nodes to determine the propagation direction and diffusion range of bottleneck status among resource nodes. Starting from the time-triggered node, the graph structure is traversed in the cross-level resource association structure according to the predefined task call relationship and data dependency relationship. The search range is expanded layer by layer according to the topological direction of upstream influencing downstream. During the traversal, whether the change in resource association strength is synchronously abnormal is used as the judgment condition. Nodes that meet the characteristics of synchronous enhancement or lagging enhancement are marked with propagation path extension. By continuously pushing to downstream nodes, until the resource association strength recovers to the normal fluctuation range or the propagation impact decays to below the threshold, the propagation direction of bottleneck status in the network structure and its coverage diffusion range are determined, realizing a structured mapping from local trigger point to global propagation area. Based on the propagation direction and diffusion range, key nodes that have a continuous impact on the task response of multiple nodes are identified. Within the determined bottleneck diffusion range, the impact contribution of all resource nodes participating in the propagation is calculated. The impact contribution is composed of the change in the node's own resource load, the increase in task response latency, and the number of relays in the propagation path. At the same time, the duration of the continuous impact of each node on the task response latency of downstream nodes in multiple time segments is counted. When a node meets the conditions of high impact contribution and continuous impact across multiple downstream nodes, it is determined to be a key node. This key node is not only an intermediate transmission node in the propagation path, but also the main source of impact that causes the overall performance degradation of the resource link, and is used for priority processing object screening. Key nodes are identified as priority processing nodes, and based on the propagation direction and impact diffusion relationship, they are recursively connected along the upstream and downstream dependency links to generate corresponding bottleneck propagation paths. Using key nodes as path anchors, bidirectional path tracing is performed in the cross-level resource association structure along both the upstream and downstream directions. The upstream direction backtracks according to the change of resource association strength from low to high over time until the node that first meets the normal fluctuation threshold is located, which is then identified as the bottleneck propagation source node. The downstream direction expands layer by layer according to the change of resource association strength from high to low, and in each layer, the adjacent node with the highest association strength and meeting the continuous impact condition is selected to characterize the diffusion direction and range of the bottleneck impact. Key nodes are embedded as control nodes in the propagation link, so that the upstream source node, key nodes, and downstream affected nodes are connected in the order of change of association strength, thereby generating a bottleneck propagation path that matches the dynamic change process of resource association strength, used to characterize the propagation trajectory of the bottleneck state among resource nodes.
[0031] S5: Dynamically schedule tasks to be executed based on bottleneck propagation paths and priority processing nodes, prioritize the allocation of high-priority tasks to target nodes, and readjust resource allocation strategies when bottleneck propagation is not resolved until the correlation strength is restored to the set range, and output cross-level resource collaborative scheduling results.
[0032] The process of outputting cross-level resource collaborative scheduling results in S5 is as follows: Based on the bottleneck propagation path, affected tasks are identified, and task priorities are determined by combining task response time limits, business importance, and resource requirements. Based on the bottleneck propagation path, a node-by-node mapping analysis is performed on the resource nodes covered in the path to obtain a set of tasks to be executed that have calling relationships or data dependencies with each resource node. The tasks to be executed are associated and labeled according to the topological hierarchical position of their dependent nodes in the bottleneck propagation path to characterize the degree of association between the task and the bottleneck propagation source node and propagation link. A multi-dimensional feature evaluation vector of the task is constructed by combining the task response time limit constraint, business importance, and resource consumption requirements. The indicators of each dimension are normalized to eliminate the difference in units. Based on the normalized evaluation vector, the comprehensive priority score of the task is calculated, and a task priority sequence is generated from high to low according to the score results, thereby completing the hierarchical identification and scheduling of tasks affected by the bottleneck. Using priority processing nodes as the core scheduling nodes, priority tasks are assigned to target nodes with takeover capabilities and whose current load is within a safe range. The priority processing nodes, as the scheduling core, assess the resource takeover capabilities of their respective layers and adjacent upstream and downstream nodes. The assessment includes the node's current computing load margin, task processing capacity redundancy, and communication latency stability. Target nodes are selected from those meeting the takeover conditions, and the remaining resource capacity of the target nodes is verified to match the task type. Based on the task priority sequence, high-priority tasks are assigned to corresponding target nodes for execution according to resource demand matching principles. Simultaneously, task dependencies and execution mappings are updated to migrate and schedule tasks from bottleneck nodes to non-bottleneck nodes, thereby reducing the load pressure on local nodes. Based on the load changes and task response status of each node after task redistribution, the resource association strength of priority processing nodes and adjacent nodes is continuously monitored. After the task redistribution is completed, the resource nodes participating in the scheduling are continuously monitored at the time slice level. The node resource occupancy rate, task queue length and task response latency change data are collected in real time. Based on the collected data, the dynamic change sequence of the resource association strength between nodes is calculated, and the trend of the association strength change of priority processing nodes and their adjacent upstream and downstream nodes is tracked in particular. When the monitoring results show that the resource association strength still has abnormal enhancement or lag attenuation, it is determined that the bottleneck propagation has not been resolved, and the current status is fed back to the scheduling control module to provide a basis for iterative adjustment. When monitoring results indicate that the bottleneck propagation has not been resolved, the resource allocation path is adjusted and the scheduling strategy is updated with the priority processing node as the center until the resource association strength recovers to the set range, and the cross-level resource collaborative scheduling result is output. When the bottleneck propagation has not been resolved, the local scheduling subgraph is reconstructed with the priority processing node as the center, and the resource allocation path is dynamically reconstructed in combination with the latest node load status and task execution status. During the reconstruction process, the task allocation ratio and target node selection strategy are adjusted so that the resource load gradually tends to a balanced distribution state. The above adjustment process is continuously executed, and whether the resource association strength falls back to the set normal fluctuation range is used as the convergence criterion. When multiple consecutive time slices meet the stability constraints, the bottleneck propagation is determined to be resolved and the iterative scheduling process is terminated. The final cross-level resource collaborative scheduling result is output, including the final task allocation relationship, node load balance status and bottleneck resolution indicator.
[0033] Example 2: Please refer to Figure 2 A cross-layer heterogeneous computing resource collaborative sensing system, comprising: Status acquisition module: Acquires resource and load data from cloud center, edge nodes and terminal devices, performs time alignment and standardization processing to form basic resource status data; Identifier Mapping Module: Performs unified mapping of resource identifiers for nodes at all levels, and constructs a cross-level resource association structure by combining task and communication relationships; Propagation Analysis Module: Analyzes the load change relationship between adjacent nodes, calculates the degree of propagation impact of upstream on downstream task response, and determines the strength of resource association; Bottleneck identification module: Identifies the bottleneck propagation process based on the trend of changes in resource correlation strength, and determines the bottleneck propagation path and priority processing nodes based on the order of changes in correlation strength; Collaborative scheduling module: Dynamically schedules tasks based on bottleneck propagation paths, continuously adjusts resource allocation until stability is restored while the bottleneck remains unresolved, and outputs cross-level resource collaborative scheduling results.
[0034] It should be noted that, in this document, relational terms such as "first" and "second" are used only to distinguish one entity or operation from another, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Furthermore, the terms "comprising," "including," or any other variations thereof are intended to cover non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements includes not only those elements but also other elements not expressly listed, or elements inherent to such process, method, article, or apparatus.
[0035] Although embodiments of the invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made to these embodiments without departing from the principles and spirit of the invention, the scope of which is defined by the appended claims and their equivalents.
Claims
1. A method for collaborative sensing of heterogeneous computing resources across different levels, characterized in that, Includes the following steps: Acquire parameters related to the processing capacity and operating load of cloud centers, edge nodes and terminal devices, and perform time alignment and standardization on data with different sampling frequencies according to a unified time base to form basic resource status data; Based on basic resource status data, resource identification information of nodes at all levels is uniformly mapped, and a cross-level resource association structure is established by combining the task call order, data transmission relationship and communication connection relationship between nodes. Based on the cross-level resource association structure, the load changes of adjacent resource nodes in continuous time segments are analyzed to calculate the propagation impact of upstream node state changes on downstream node task responses, and the resource association strength between corresponding resource nodes is determined according to the propagation impact. Based on the resource association strength, the trend of association strength changes within a continuous time segment is analyzed. When the association strength continues to rise and the growth rate exceeds the corresponding historical fluctuation range, it is determined that there is a bottleneck transmission process in the corresponding resource link, and the bottleneck propagation path and priority processing node are determined according to the order of association strength changes. Based on the bottleneck propagation path and priority processing nodes, the tasks to be executed are dynamically scheduled. High-priority tasks are assigned to target nodes first. When the bottleneck propagation is not resolved, the resource allocation strategy is readjusted until the correlation strength is restored to the set range, and the cross-level resource collaborative scheduling results are output.
2. The cross-level heterogeneous computing resource collaborative sensing method according to claim 1, characterized in that, The process of generating basic resource status data is as follows: Collect data on cloud center computing resource utilization, task queue length, and network throughput status. Collect data on task processing latency, cache utilization, and link transmission status of edge nodes; Collect data on the task request frequency, processing response time, and remaining local resources of the terminal device; Data with different sampling frequencies are resampled and timestamp aligned based on a unified time reference. Outlier removal, missing value completion, and scale unification are performed on the multi-source data after timestamp alignment to form basic resource status data with a unified expression.
3. The cross-level heterogeneous computing resource collaborative sensing method according to claim 2, characterized in that, The process of uniformly mapping the resource identification information of nodes at all levels is as follows: Based on the basic resource status data, extract the node number, resource type, level identifier, and service function attribute information of each level of node to construct the original node identifier structure; Based on the original node identifier structure, the node identifier is formatted in accordance with the unified resource coding rules, and the uniqueness of conflicting or duplicate identifiers is reconstructed to form standardized node identifier information. By combining standardized node identification information, node hierarchical relationships, and service function attributes, nodes with the same or mutually dependent task functions are associated and merged to generate node mapping relationships. A unified resource identifier table is constructed based on the node mapping relationship across cloud centers, edge nodes, and terminal devices.
4. The cross-level heterogeneous computing resource collaborative sensing method according to claim 3, characterized in that, The process of establishing a cross-level resource association structure is as follows: Based on the unified resource identifier table, the task triggering order and task execution sequence between nodes are obtained, and the task dependency relationship between nodes is determined. By combining the data transmission direction, transmission frequency and communication link connection status between nodes, the actual interaction relationship between nodes is determined, and the communication association relationship is identified. Based on task dependencies and communication relationships, nodes are abstracted into resource nodes; A cross-level resource association structure is generated by using resource nodes as the associated units and task call paths and communication relationships as the connecting edges.
5. The cross-level heterogeneous computing resource collaborative sensing method according to claim 4, characterized in that, The process of calculating the propagation impact of upstream node state changes on downstream node task responses is as follows: Based on the task invocation path and data transmission path defined in the cross-level resource association structure, structural association pairs between adjacent upstream and downstream nodes are determined within a continuous time segment; By combining the communication connection relationships in the structural association pairs and cross-level resource association structures, the state changes of upstream nodes and the task responses of downstream nodes are mapped to a unified time propagation window to complete the time alignment process; Under the joint constraints of the task invocation path and the data transmission path, the state changes of the upstream node after time alignment are used as the driving input, and the task response changes of the downstream node are used as the output response to establish the correspondence between input and output. Based on the correspondence between input and output, the change delay and response offset between the two are calculated, and the propagation relationship is corrected by combining the connection strength in the cross-level resource association structure; Based on the corrected change delay and response offset results, the propagation impact parameter of upstream node state changes on downstream node task responses is determined.
6. The cross-level heterogeneous computing resource collaborative sensing method according to claim 5, characterized in that, The process of determining the strength of resource associations between corresponding resource nodes based on the degree of propagation impact is as follows: The parameters for the degree of propagation impact, such as delayed response, load fluctuation, and duration of impact, are normalized. Based on the normalization results, corresponding weight coefficients are set according to the strength of the influence of each parameter on the stability of task execution, and weighted fusion calculation is performed on each parameter to obtain a comprehensive influence characterization. The overall impact is represented by mapping the strength of resource associations between resource nodes.
7. The cross-level heterogeneous computing resource collaborative sensing method according to claim 6, characterized in that, The process of determining that a bottleneck exists in the corresponding resource link is as follows: Continuous-time distribution analysis of resource association strength within continuous time segments is performed to determine the variation characteristics of association strength in the time dimension. Based on the characteristics of change, three dynamic change indicators are extracted: growth magnitude, growth rate, and duration of continuous rise. Based on the fluctuation range under historical normal operating conditions, threshold constraints are applied to determine the growth amplitude, growth rate, and duration of continuous rise. When the growth rate exceeds the magnitude threshold, the growth rate exceeds the rate threshold, and the duration of continuous increase exceeds the duration threshold, it is determined that there is a bottleneck transmission process in the corresponding resource link.
8. The cross-level heterogeneous computing resource collaborative sensing method according to claim 7, characterized in that, The process of determining the bottleneck propagation path and priority nodes based on the order of changes in correlation strength is as follows: Based on resource links that have been identified as having bottleneck transmission processes, they are sorted according to the time sequence in which the correlation strength first shows an abnormal increase within a continuous time segment to determine the time trigger node for the bottleneck to occur. By combining the upstream and downstream dependencies defined in the cross-level resource association structure, path tracing is performed on time-triggered nodes to determine the propagation direction and diffusion range of bottleneck status between resource nodes. Based on the direction of propagation and the scope of diffusion, identify the key nodes that have a continuous impact on the task response of multiple nodes; Key nodes are identified as priority processing nodes, and based on the propagation direction and the impact diffusion relationship, they are recursively connected along the upstream and downstream dependent links to generate corresponding bottleneck propagation paths.
9. A cross-level heterogeneous computing resource collaborative sensing method according to claim 8, characterized in that, The process of outputting cross-level resource collaborative scheduling results is as follows: Identify affected tasks based on bottleneck propagation paths, and determine task priorities by combining task response time limits, business importance, and resource requirements. Priority processing nodes are used as the core scheduling nodes, and priority tasks are assigned to target nodes that have takeover capabilities and whose current load is within a safe range. Based on the load changes and task response status of each node after task redistribution, the resource association strength of priority processing nodes and adjacent nodes is continuously monitored. When monitoring results indicate that the bottleneck propagation has not been resolved, the resource allocation path is adjusted and the scheduling strategy is updated with the priority processing node as the center until the resource association strength is restored to the set range, and the cross-level resource collaborative scheduling results are output.
10. A cross-level heterogeneous computing resource collaborative sensing system, applied to the method described in any one of claims 1-9, characterized in that, include: Status acquisition module: Acquires resource and load data from cloud center, edge nodes and terminal devices, performs time alignment and standardization processing to form basic resource status data; Identifier Mapping Module: Performs unified mapping of resource identifiers for nodes at all levels, and constructs a cross-level resource association structure by combining task and communication relationships; Propagation Analysis Module: Analyzes the load change relationship between adjacent nodes, calculates the degree of propagation impact of upstream on downstream task response, and determines the strength of resource association; Bottleneck identification module: Identifies the bottleneck propagation process based on the trend of changes in resource correlation strength, and determines the bottleneck propagation path and priority processing nodes based on the order of changes in correlation strength; Collaborative scheduling module: Dynamically schedules tasks based on bottleneck propagation paths, continuously adjusts resource allocation until stability is restored while the bottleneck remains unresolved, and outputs cross-level resource collaborative scheduling results.