Agriculture low-altitude operation-based computing power scheduling and edge collaborative control method and device

By constructing an edge node group of UAVs and ground agricultural operation vehicle-mounted edge gateways, and dynamically adjusting the topology path and memory buffer control, the problems of long data processing queue latency and transmission continuity in existing technologies are solved, and efficient real-time processing of remote sensing big data is achieved.

CN123164489APending Publication Date: 2026-11-24SINOVINE BEIJING TECH CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202611236844.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2026-08-14
Publication Date
2026-11-24

AI Technical Summary

Technical Problem

Existing technologies, when expanding the physical capacity of the memory buffer or using fixed bandwidth to distribute traffic evenly, cannot eliminate the lock-up state under multi-level storage bus contention, resulting in an increase in disk random read blocking time. Furthermore, the cooperative network generates high-frequency reciprocating shears when the node state reaches the home boundary, which disrupts the continuity of transmission. The flow path of remote sensing big data between disk, memory and video memory is inefficient and cannot meet the real-time production efficiency requirements.

Method used

By constructing an edge node group between the UAV terminal and the ground agricultural operation vehicle-mounted edge gateway terminal, grid affiliation labels are generated. Based on the channel degradation threshold and hardware transfer delay benchmark, the topology path is dynamically adjusted, and the memory buffer occupancy rate and video memory prefetch step size are controlled to achieve precise data diversion and dynamic adjustment, avoid performance bottlenecks, and optimize the data processing queue.

Benefits of technology

It shortens the average waiting time of the data processing queue inside the distributed nodes, improves the throughput efficiency of data processing, ensures the real-time transmission continuity and processing efficiency of remote sensing big data, and meets the timeliness requirements of distributed production.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN123164489A_ABST
    Figure CN123164489A_ABST
Patent Text Reader

Abstract

This disclosure presents a method and apparatus for computing power scheduling and edge collaborative control based on low-altitude agricultural operations. One specific implementation of the method includes: constructing an edge node group by connecting a UAV terminal used for low-altitude agricultural inspection with a ground-based agricultural operation vehicle-mounted edge gateway terminal, resulting in an end-to-end collaborative edge node group; extracting the remote sensing multispectral image slice data stream to be processed concurrently uploaded by each end-to-end collaborative edge node in the end-to-end collaborative edge node group; and for each end-to-end collaborative edge node in the end-to-end collaborative edge node group, performing the following processing steps: generating a grid affiliation label based on the end-to-end collaborative edge node, a preset channel degradation threshold, and a preset standard hardware transfer delay benchmark; and controlling the memory pre-fetch step size in the target edge node based on the memory buffer occupancy rate and a preset buffer occupancy rate threshold. This implementation shortens the average waiting latency of the data processing queue within the distributed nodes.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The embodiments disclosed herein relate to the fields of edge computing and end-to-end collaborative control technology, specifically to a method and apparatus for computing power scheduling and edge collaborative control based on low-altitude agricultural operations. Background Technology

[0002] Distributed computing grids, based on the remaining computing power of nodes, implement peer-to-peer resource collaboration and data scheduling, and have been applied in spatial big data processing practices. In scenarios of surveying and mapping data acquisition and agricultural information preprocessing, UAV swarms and ground gateway swarms form multi-node heterogeneous edge networks, distributing remote sensing image slices through end-to-end wireless links and migrating backlogged data to adjacent lightly loaded nodes to balance the load. Currently, the common approaches are: simply increasing the physical capacity of the memory buffer or using fixed bandwidth to distribute traffic evenly.

[0003] However, when using the above method, the following technical problems often arise: Simply increasing the physical capacity of the memory buffer or using fixed bandwidth to distribute traffic evenly cannot eliminate the lock-up state caused by bus preemption in multi-level storage. On the contrary, the backlog of buffers at faulty nodes leads to an increasing trend in disk random read blocking time. Meanwhile, when a node's state reaches its home boundary in a cooperative network, the lack of directional decoupling control procedures makes it easy for adjacent nodes to generate high-frequency reciprocating shears between different grid labels, directly causing global topology reconstruction oscillations and disrupting the transmission continuity of the spatial mapping data link. Furthermore, the flow path of remote sensing big data between disk, memory, and video memory remains at the operating system's memory swapping layer, resulting in low throughput efficiency for on-site preprocessing, and the inability of massive spatial data to meet the timeliness requirements of distributed real-time production. Summary of the Invention

[0004] The summary portion of this disclosure is intended to provide a brief overview of the concepts, which will be described in detail in the detailed description portion. This summary portion is not intended to identify key or essential features of the claimed technical solutions, nor is it intended to limit the scope of the claimed technical solutions.

[0005] Some embodiments of this disclosure propose a method, apparatus, equipment, and medium for computing power scheduling and edge collaborative control based on low-altitude agricultural operations to solve the technical problems mentioned in the background section above.

[0006] In a first aspect, some embodiments of this disclosure provide a computing power scheduling and edge collaborative control method based on agricultural low-altitude operations. The method includes: constructing an edge node group by connecting a UAV terminal used for agricultural low-altitude inspection with a ground-based agricultural operation vehicle-mounted edge gateway terminal, resulting in an end-to-end collaborative edge node group; extracting the remote sensing multispectral image slice data stream to be processed concurrently uploaded by each end-to-end collaborative edge node in the aforementioned end-to-end collaborative edge node group; for each end-to-end collaborative edge node in the aforementioned end-to-end collaborative edge node group, performing the following processing steps: generating a grid attribution label based on the aforementioned end-to-end collaborative edge node, a preset channel degradation threshold, and a preset standard hardware transfer delay benchmark; sending a topology path reconstruction instruction to a target edge node based on the aforementioned grid attribution label and the aforementioned remote sensing multispectral image slice data stream to be processed; in response to determining that the target edge node has received the aforementioned topology path reconstruction instruction, generating a memory buffer occupancy rate based on the aforementioned target edge node; and controlling the video memory prefetch step size in the aforementioned target edge node based on the aforementioned memory buffer occupancy rate and a preset buffer occupancy rate threshold.

[0007] Secondly, some embodiments of this disclosure provide a computing power scheduling and edge collaborative control device based on low-altitude agricultural operations. The device includes: a construction unit configured to construct an edge node group by connecting a UAV terminal used for low-altitude agricultural inspection and a ground-based agricultural operation vehicle-mounted edge gateway terminal, thereby obtaining an end-to-end collaborative edge node group; an extraction unit configured to extract the remote sensing multispectral image slice data stream to be processed that is concurrently uploaded by each end-to-end collaborative edge node in the end-to-end collaborative edge node group; and an execution unit configured to perform the following processing steps for each end-to-end collaborative edge node in the end-to-end collaborative edge node group: generating a grid attribution label based on the end-to-end collaborative edge node, a preset channel degradation threshold, and a preset standard hardware transfer delay benchmark; sending a topology path reconstruction instruction to a target edge node based on the grid attribution label and the remote sensing multispectral image slice data stream to be processed; in response to determining that the target edge node has received the topology path reconstruction instruction, generating a memory buffer occupancy rate based on the target edge node; and controlling the video memory prefetch step size in the target edge node based on the memory buffer occupancy rate and a preset buffer occupancy rate threshold.

[0008] Thirdly, some embodiments of this disclosure provide an electronic device, including: one or more processors; and a storage device having one or more programs stored thereon, wherein when the one or more programs are executed by the one or more processors, the one or more processors implement the method described in any implementation of the first aspect above.

[0009] Fourthly, some embodiments of this disclosure provide a computer-readable medium having a computer program stored thereon, wherein the computer program, when executed by a processor, implements the method described in any of the implementations of the first aspect above.

[0010] The above-described embodiments of this disclosure have the following beneficial effects: The computing power scheduling and edge collaborative control method based on low-altitude agricultural operations, as described in some embodiments of this disclosure, shortens the average waiting latency of the data processing queue within distributed nodes. Specifically, the reason for the long average waiting latency of the data processing queue within distributed nodes is that simply increasing the physical capacity of the memory buffer or using fixed bandwidth to distribute traffic evenly cannot eliminate the lock-up state of multi-level storage under bus preemption. Instead, the backlog of buffers in faulty nodes leads to an increasing disk random read blocking time. Simultaneously, when the node state reaches its home boundary in the collaborative network, due to the lack of directional decoupling control procedures, adjacent nodes are prone to high-frequency reciprocating shears between different grid labels, directly triggering global topology reconstruction oscillations and disrupting the transmission continuity of the spatial mapping data link. Furthermore, the flow path of remote sensing big data between disk, memory, and video memory remains at the operating system's memory swapping layer, resulting in low throughput efficiency for on-site preprocessing, and the inability of massive spatial data to meet the timeliness requirements of distributed real-time production. Based on this, some embodiments of this disclosure first construct an edge node group by connecting the UAV terminal used for low-altitude agricultural inspection with the ground agricultural operation vehicle-mounted edge gateway terminal, thus obtaining an end-to-end collaborative edge node group. This provides a physical topology foundation for subsequent computing power scheduling and data collaboration. Then, the remote sensing multispectral image slice data streams to be processed, which are concurrently uploaded by each end-to-end collaborative edge node in the aforementioned end-to-end collaborative edge node group, are extracted. Thus, by extracting the data streams uploaded by each node simultaneously in parallel, the concurrent transmission capability of the end-to-end peer-to-peer links is fully utilized, avoiding queuing caused by serial reception. Next, a grid affiliation label is generated based on the aforementioned end-to-end collaborative edge nodes, a preset channel degradation threshold, and a preset standard hardware transfer delay benchmark. Thus, by jointly evaluating the external wireless link status (node ​​link loss rate) and the internal hardware processing status (GPU write-back latency change rate), the type of performance bottleneck that a node will face (communication-limited or computation-limited) can be identified in advance. Afterward, based on the aforementioned grid affiliation label and the aforementioned remote sensing multispectral image slice data streams to be processed, a topology path reconstruction command is sent to the target edge node. This enables precise task routing and dynamic adjustment, allowing data to bypass performance bottleneck nodes and flow to better processing nodes, effectively reducing data queuing and backlog at congested nodes from the task scheduling perspective. Then, in response to the determination that the target edge node has received the topology path reconstruction instruction, a memory buffer occupancy rate is generated based on the target edge node. This provides a decision-making basis for the subsequent dynamic adjustment of the memory prefetch step size. Finally, the memory prefetch step size in the target edge node is controlled based on the memory buffer occupancy rate and a preset buffer occupancy rate threshold. This ensures efficient data injection when memory is sufficient and system stability when memory is near saturation, ultimately reducing the average waiting latency of the data processing queue within the distributed nodes. Attached Figure Description

[0011] The above and other features, advantages, and aspects of the embodiments of this disclosure will become more apparent from the accompanying drawings and the following detailed description. Throughout the drawings, the same or similar reference numerals denote the same or similar elements. It should be understood that the drawings are schematic, and elements are not necessarily drawn to scale.

[0012] Figure 1 This is a schematic diagram of an application scenario of the computing power scheduling and edge collaborative control method based on low-altitude agricultural operations, which is one of the embodiments of this disclosure. Figure 2 This is a flowchart of some embodiments of the computing power scheduling and edge collaborative control method based on agricultural low-altitude operations according to this disclosure; Figure 3 This is a structural schematic diagram of some embodiments of the computing power scheduling and edge collaborative control device based on low-altitude agricultural operations according to the present disclosure; Figure 4 This is a schematic diagram of the structure of an electronic device suitable for implementing some embodiments of the present disclosure; Figure 5 This is a schematic diagram illustrating the redirection of a computing power scheduling and edge collaborative control method based on low-altitude agricultural operations, according to some embodiments of this disclosure. Detailed Implementation

[0013] Embodiments of this disclosure will now be described in more detail with reference to the accompanying drawings. While some embodiments of this disclosure are shown in the drawings, it should be understood that this disclosure can be implemented in various forms and should not be construed as limited to the embodiments set forth herein. Rather, these embodiments are provided to provide a more thorough and complete understanding of this disclosure. It should be understood that the accompanying drawings and embodiments of this disclosure are for illustrative purposes only and are not intended to limit the scope of protection of this disclosure.

[0014] It should also be noted that, for ease of description, only the parts relevant to the invention are shown in the accompanying drawings. Unless otherwise specified, the embodiments and features described in this disclosure can be combined with each other.

[0015] It should be noted that the concepts of "first" and "second" mentioned in this disclosure are used only to distinguish different devices, modules or units, and are not used to limit the order of functions performed by these devices, modules or units or their interdependencies.

[0016] It should be noted that the terms "a" and "a plurality of" used in this disclosure are illustrative rather than restrictive, and those skilled in the art should understand that, unless otherwise expressly indicated in the context, they should be understood as "one or more".

[0017] The names of messages or information exchanged between multiple devices in the embodiments of this disclosure are for illustrative purposes only and are not intended to limit the scope of such messages or information.

[0018] This disclosure will now be described in detail with reference to the accompanying drawings and embodiments.

[0019] Figure 1 This is a schematic diagram of an application scenario of the computing power scheduling and edge collaborative control method based on low-altitude agricultural operations, which is one of the embodiments of this disclosure.

[0020] exist Figure 1 In the application scenario, firstly, the computing device 101 can construct an edge node group by connecting the UAV terminal 102 used for low-altitude agricultural inspection with the ground agricultural operation vehicle-mounted edge gateway terminal 103, thus obtaining an end-to-end collaborative edge node group. The aforementioned wireless transceiver link can be a wireless communication module installed on the UAV and the ground gateway.

[0021] It should be noted that the aforementioned computing device 101 can be either hardware or software. When the computing device is hardware, it can be implemented as a distributed cluster composed of multiple servers or terminal devices, or as a single server or a single terminal device. When the computing device is software, it can be installed in the hardware devices listed above. It can be implemented as, for example, multiple software programs or software modules used to provide distributed services, or as a single software program or software module. No specific limitations are made here. It should be understood that... Figure 1 The number of computing devices in the system can be arbitrary, depending on the implementation requirements.

[0022] Continue to refer to Figure 2 The diagram illustrates a flow 200 of some embodiments of the computing power scheduling and edge collaborative control method based on low-altitude agricultural operations according to this disclosure. This computing power scheduling and edge collaborative control method based on low-altitude agricultural operations includes the following steps: Step 201: Construct an edge node group by connecting the UAV terminal used for low-altitude agricultural inspection with the ground agricultural operation vehicle-mounted edge gateway terminal to obtain an end-to-end collaborative edge node group.

[0023] In some embodiments, the execution entity of the computing power scheduling and edge collaborative control method based on low-altitude agricultural operations (e.g., Figure 1 The computing device 101 shown can construct an edge node group by connecting the UAV terminal used for low-altitude agricultural inspection with the ground agricultural operation vehicle-mounted edge gateway terminal, thereby obtaining an end-to-end collaborative edge node group.

[0024] The aforementioned UAV terminal can include multiple UAVs equipped with multispectral cameras, inertial navigation units, and heterogeneous computing cores. These UAV terminals are responsible for acquiring remote sensing images of agricultural operations on the ground from low altitudes. The aforementioned vehicle-mounted edge gateway for agricultural operations can include multiple vehicle-mounted edge gateways. Each vehicle-mounted edge gateway can be an edge computing gateway installed on a ground vehicle (such as a tractor, plant protection drone, or inspection vehicle), equipped with a main controller, an independent graphics processing core, a disk array, and a wireless transceiver link. The aforementioned remote sensing images of agricultural operations can be images of agricultural and forestry operations (such as farmland irrigation) captured by multispectral cameras in the air during agricultural and forestry inspections.

[0025] The aforementioned multispectral camera can be an imaging device mounted on a drone, capable of simultaneously acquiring image data across multiple spectral bands (such as visible light and near-infrared) for analyzing agricultural information such as crop growth status, soil moisture, and pests and diseases. The aforementioned inertial navigation unit (IMU), composed of an accelerometer and gyroscope, is used to measure the drone's attitude (pitch, roll, yaw) and position changes, providing relatively accurate three-dimensional spatial coordinate data for agricultural remote sensing images. The aforementioned heterogeneous computing core can be different types of processors (such as CPU, GPU, NPU, FPGA, etc.) used to segment the raw remote sensing images into small data blocks suitable for network transmission. The aforementioned main controller can be a high-performance CPU used to schedule computing tasks and manage memory and disk resources. The aforementioned independent graphics processing core can be a dedicated graphics processor (i.e., an independent GPU) independent of the main controller. The aforementioned disk array can be used for persistent storage of the large amount of remote sensing image data acquired. The aforementioned wireless transceiver link can be a wireless communication module (such as Wi-Fi, 4G / 5G, data radio, etc.) installed on the drone and ground gateway, used to establish end-to-end peer-to-peer links between various end-to-end collaborative edge nodes to realize data transmission and control command interaction. The aforementioned end-to-end peer-to-peer link can be a point-to-point direct wireless communication link established between any two end-to-end collaborative edge nodes.

[0026] As an example, the aforementioned execution entity can connect the various drones in the drone terminal used for low-altitude agricultural inspection with the various ground agricultural operation vehicle-mounted edge gateways in the ground agricultural operation vehicle-mounted edge gateway terminal to form a distributed computing cluster, serving as an end-to-end collaborative edge node group. Any two end-to-end collaborative edge nodes in this group can communicate directly via end-to-end peer-to-peer links. The communication between any two end-to-end collaborative edge nodes uses an end-to-end direct communication protocol (e.g., Device-to-Device Communication), meaning it does not require forwarding through a base station (BS) or access point (AP). Each pair of end-to-end collaborative edge nodes communicates bidirectionally, making independent decisions without a master-slave distinction; they can communicate directly or via multi-hop relays through other end-to-end collaborative edge nodes.

[0027] Step 202: Extract the remote sensing multispectral image slice data streams to be processed that are concurrently uploaded by each end-to-end collaborative edge node in the above-mentioned end-to-end collaborative edge node group.

[0028] In some embodiments, the execution entity may extract the remote sensing multispectral image slice data streams to be processed that are concurrently uploaded by each end-to-end collaborative edge node in the aforementioned end-to-end collaborative edge node group.

[0029] The aforementioned remote sensing multispectral image slice data stream to be processed can be an agricultural operation remote sensing image data stream captured by a multispectral camera, which has completed preliminary slice segmentation but has not yet undergone in-depth processing, including color image data, spectral reflectance data, and spatial three-dimensional coordinate data. The aforementioned concurrent upload can be performed in parallel by each end-to-end collaborative edge node within the same sampling period (e.g., 1 second) through its respective wireless transceiver link.

[0030] The aforementioned color image data can be red, green, and blue (RGB) three-channel visible light images captured by a multispectral camera. This color image data can be used to visually observe phenotypic information such as crop color, morphology, and planting density. For example, healthy rice appears green, while diseased rice appears yellowish-brown. The aforementioned spectral reflectance data can be quantified values ​​of electromagnetic wave energy reflected by ground objects, measured by a multispectral camera in multiple specific spectral bands (such as near-infrared and short-wave infrared), typically expressed as reflectance values ​​from 0 to 1 or 0 to 100%. The aforementioned three-dimensional spatial coordinate data can be longitude, latitude, and altitude triplets (i.e., the precise geographical location corresponding to each pixel) provided by an inertial navigation unit combined with a GPS / RTK positioning system.

[0031] As an example, the aforementioned execution entity can first segment the original remote sensing image into slices according to a preset task distribution granularity (8MB) using a heterogeneous computing core on the UAV, generating remote sensing multispectral image slices to be processed. Then, the UAVs concurrently send the remote sensing multispectral image slices to be processed to the aggregation node in the end-to-end collaborative edge node group via their respective wireless transceiver links. The aggregation node receives the remote sensing multispectral image slices to be processed from each UAV via wireless transceiver links and arranges them according to the original acquisition order of each remote sensing multispectral image slice to be processed, obtaining the remote sensing multispectral image slice data stream.

[0032] Step 203: For each end-to-end collaborative edge node in the above-mentioned end-to-end collaborative edge node group, perform the following processing steps: Step 2031: Generate a grid affiliation label based on the aforementioned end-to-end collaborative edge nodes, preset channel degradation threshold, and preset standard hardware transfer delay benchmark.

[0033] In some embodiments, the aforementioned execution entity may generate a grid affiliation label based on the aforementioned end-to-end collaborative edge nodes, a preset channel degradation threshold, and a preset standard hardware transfer delay benchmark.

[0034] The aforementioned preset channel degradation threshold can be a pre-set threshold for judging wireless channel quality deterioration, used to determine whether the node link loss rate has become severe enough to affect normal communication. For example, the aforementioned preset channel degradation threshold can be 12.0 dB. The aforementioned preset standard hardware transfer latency benchmark can be a pre-set reference value for normal hardware processing latency, used to determine whether the video memory write latency is abnormal. For example, the aforementioned preset standard hardware transfer latency benchmark can be 10.0 milliseconds per megabyte. The aforementioned mesh affiliation label can be the mesh category label for finally determining the mesh category to which the aforementioned end-to-end collaborative edge nodes belong.

[0035] Optionally, the aforementioned executing entity can generate a mesh affiliation label based on the aforementioned end-to-end collaborative edge nodes, a preset channel degradation threshold, and a preset standard hardware transfer delay benchmark through the following steps: The first step is to collect the node link loss rate and memory write-back latency change rate of the aforementioned end-to-end collaborative edge nodes.

[0036] The node link loss rate mentioned above can be the signal loss value of the wireless link between the end-to-end collaborative edge node and its adjacent end-to-end collaborative edge node, in dB. The memory write-back latency change rate mentioned above can be the rate of change of the memory write feedback latency inside the end-to-end collaborative edge node, in ms / MB. The adjacent end-to-end collaborative edge node mentioned above is the closest to the end-to-end collaborative edge node in terms of physical topology.

[0037] As an example, the aforementioned execution entity can receive the node link loss rate of the aforementioned end-to-end collaborative edge node via a wireless link, and read the memory write-back latency change rate of the aforementioned end-to-end collaborative edge node through an internal register.

[0038] The second step is to perform parameter normalization processing on the above-mentioned node link loss rate, the above-mentioned memory write-back delay change rate, the preset channel degradation threshold and the preset standard hardware transfer delay benchmark to generate comprehensive evaluation parameters.

[0039] The aforementioned comprehensive evaluation parameters can be dimensionless comprehensive evaluation values, which can be used to reflect the external channel quality (i.e., node link loss rate) and the internal hardware status (i.e., memory write-back latency change rate). The higher the value of the aforementioned comprehensive evaluation parameters, the worse the external channel quality (i.e., the greater the node link loss) and the more blocked the internal hardware status (i.e., the higher the memory write-back latency).

[0040] As an example, the aforementioned execution entity can multiply the ratio of (node ​​link loss rate to preset channel degradation threshold) by the ratio of (memory write-back latency change rate to preset standard hardware throughput latency benchmark) to obtain the product value. Finally, the product value is added to a preset value to obtain the comprehensive evaluation parameter. The preset value can be 1.

[0041] The third step is to perform a mesh attribution determination on the above comprehensive evaluation parameters under the pre-defined directional hysteresis boundary constraint, so as to generate mesh attribution labels for the above end-to-end collaborative edge nodes.

[0042] The aforementioned preset directional hysteresis boundary constraint can be: "Along the node state degradation direction (characterizing an increase in the comprehensive evaluation parameter), migration is triggered when the comprehensive evaluation parameter exceeds the preset channel degradation threshold for two consecutive time periods. Along the node state recovery direction (characterizing a decrease in the comprehensive evaluation parameter), migration is triggered when the comprehensive evaluation parameter is below the recovery migration threshold for three consecutive time periods." The aforementioned recovery migration threshold is the difference between the aforementioned preset channel degradation threshold and the control hysteresis variable. The aforementioned control hysteresis variable monotonically increases with the on-chip system bus occupancy rate within the aforementioned end-to-end collaborative edge node.

[0043] As an example, the aforementioned execution entity can compare the value of the comprehensive evaluation parameter with a preset channel degradation threshold and with a recovery migration threshold to trigger the node state direction, thereby determining the mesh affiliation label of the aforementioned end-to-end collaborative edge node. For instance, if the value of the comprehensive evaluation parameter is greater than or equal to the preset channel degradation threshold, and this condition is met for two consecutive time periods, then migration along the degradation direction is triggered, and the mesh affiliation label of the aforementioned end-to-end collaborative edge node is determined to be a high-dissipation, high-computing-power mesh label. If the value of the comprehensive evaluation parameter is less than the recovery migration threshold, and this condition is met for three consecutive time periods, then migration along the recovery direction is triggered, and the mesh affiliation label of the aforementioned end-to-end collaborative edge node is determined to be a lossless, high-bandwidth mesh label. If no migration is triggered, the original mesh label (i.e., the lossless, high-bandwidth mesh label) is maintained.

[0044] Step 2032: Based on the grid attribution labels and the remote sensing multispectral image slice data stream to be processed, send a topology path reconstruction command to the target edge node.

[0045] In some embodiments, the execution entity may send a topology path reconstruction instruction to the target edge node based on the grid affiliation label and the remote sensing multispectral image slice data stream to be processed.

[0046] The target edge node can be a node selected to receive data or execute tasks. The result of the mesh attribution label determination dynamically determines whether it is the closest physical location to the end-to-end collaborative edge node or a physical location relatively far from it. The topology path reconstruction instruction can be a control command used to notify the target edge node to change its data flow path. The mesh attribution label can include: lossless high-bandwidth mesh label, channel-intact hardware-choked mesh label, and high-dissipation, high-computing-power mesh label. The channel-intact hardware-choked mesh label indicates that the target edge node has good wireless link quality (i.e., intact channel), but its internal hardware (i.e., memory) is severely blocked (i.e., hardware choked). The lossless high-bandwidth mesh label indicates that the target edge node has good wireless link quality and its internal hardware is not blocked, and is in optimal working condition. The high-dissipation, high-computing-power mesh label indicates that the target edge node has poor wireless link quality (i.e., high dissipation), but its internal hardware has abundant computing power.

[0047] Optionally, the aforementioned execution entity can send a topology path reconstruction instruction to the target edge node based on the aforementioned grid affiliation label and the aforementioned remote sensing multispectral image slice data stream to be processed through the following steps: In the first step, in response to determining that the grid attribution label carries the aforementioned channel-intact hardware-suffocated grid label, the aforementioned remote sensing multispectral image slice data stream to be processed is redirected to the target edge node carrying the aforementioned lossless high-bandwidth grid label.

[0048] As an example, the aforementioned execution entity can change the direction of the aforementioned remote sensing multispectral image slice data stream to be processed, so as to forward it to the target edge node carrying the aforementioned lossless high-bandwidth grid label. For example... Figure 5 As shown in the redirection diagram, the remote sensing multispectral image slice data stream to be processed includes color image data, spectral reflectance data, and spatial three-dimensional coordinate data. This remote sensing multispectral image slice data stream can be redirected to lossless high-bandwidth grid labels, channel-intact hardware-constrained grid labels, and high-dissipation, computationally efficient grid labels.

[0049] The second step is to send a topology path reconstruction command to the aforementioned target edge nodes.

[0050] As an example, the aforementioned executing entity can send a topology path reconstruction command to the target edge node via an end-to-end peer-to-peer link. This topology path reconstruction command can be a control command used to notify the target edge node to change its data flow path.

[0051] Optionally, the above method further includes: The first step, in response to determining that the aforementioned grid affiliation label carries the aforementioned high-dissipation, high-computing-power grid label, is to determine the ratio of the aforementioned node link loss rate to the aforementioned channel degradation threshold as the ratio result, and to set the product of the preset task distribution granularity and the ratio result as the minimum spatial granularity of the aforementioned end-to-end collaborative edge node. The preset task distribution granularity can be a pre-set basic data distribution size, for example, the preset task distribution granularity can be 8.0 megabytes. The minimum spatial granularity can be the minimum data block size for a single distribution.

[0052] The second step involves resetting the data slice granularity of the aforementioned remote sensing multispectral image slice data stream according to the minimum spatial granularity, thereby generating a large-granularity data block sequence. The data size of each large-granularity data block in the aforementioned large-granularity data block sequence is greater than or equal to the aforementioned minimum spatial granularity.

[0053] As an example, the aforementioned execution entity can resize the data slices of the remote sensing multispectral image data stream to be processed according to the smallest spatial granularity (e.g., dividing it from 8MB into large blocks of 9.87MB) to generate a sequence of large-granularity data blocks. This sequence can be a list of data blocks, each with a size greater than or equal to 9.87MB. For example, 100 remote sensing multispectral images originally divided into 8MB blocks can be repackaged into approximately 80 large-granularity data blocks of 9.87MB each. 9.87MB represents the smallest spatial granularity.

[0054] The third step is to distribute the above-mentioned large-granularity data block sequence to end-to-end collaborative edge nodes that carry the above-mentioned grid labels with high dissipation computing power.

[0055] As an example, the aforementioned execution entity can distribute the large-granularity data block sequence to end-to-end collaborative edge nodes carrying the aforementioned high-dissipation-power-rich grid labels via end-to-end peer-to-peer links. For example, 80 large-granularity data blocks can be sent to the end-to-end collaborative edge nodes carrying the aforementioned high-dissipation-power-rich grid labels.

[0056] Step 2033: In response to determining that the target edge node has received the topology path reconstruction instruction, a memory buffer occupancy rate is generated based on the target edge node.

[0057] In some embodiments, the execution entity may generate a memory buffer occupancy rate based on the target edge node in response to determining that the target edge node has received the topology path reconstruction instruction.

[0058] The aforementioned memory buffer occupancy rate can be the percentage of the current used capacity of the memory buffer in the target edge node relative to the total capacity, with a value ranging from 0% to 100%.

[0059] As an example, the aforementioned execution entity may, in response to determining that the aforementioned target edge node has received the aforementioned topology path reconstruction instruction, immediately read the memory buffer status of the aforementioned target edge node, i.e., the used capacity is 768MB and the total capacity is 1024MB, then the memory buffer occupancy rate is 75%.

[0060] Optionally, the aforementioned execution entity may, in response to determining that the aforementioned target edge node has received the aforementioned topology path reconstruction instruction, generate a memory buffer occupancy rate based on the aforementioned target edge node through the following steps: The first step is to switch the target edge node to data interruption mode in response to the determination that the target edge node has received the topology path reconstruction instruction, thus obtaining an interruption mode edge node. The data interruption mode is used to truncate the real-time computing data stream of the target edge node.

[0061] As an example, the aforementioned execution entity can switch the target edge node from normal operation mode to data interruption mode, resulting in an interruption mode edge node. The interruption mode edge node can be a target edge node that has already been switched to data interruption mode.

[0062] The second step is to monitor the memory buffer occupancy rate in the aforementioned interrupt mode edge nodes in real time to generate the memory buffer occupancy rate.

[0063] Optionally, the aforementioned execution entity can monitor the memory buffer occupancy rate in the interrupt mode edge node in real time through the following steps to generate the memory buffer occupancy rate: The first sub-step involves calling the memory buffer status read interface in the interrupt mode edge node to obtain the current used capacity and total capacity of the memory buffer in the interrupt mode edge node.

[0064] The aforementioned memory buffer status reading interface can be an API interface provided by the operating system or hardware for querying memory buffer usage. The currently used capacity can be the amount of data already occupied in the memory buffer, in MB. The total capacity can be the total size of the memory buffer, in MB.

[0065] As an example, the aforementioned execution entity can use a software API to read the hardware status register and call the memory buffer status read interface in the aforementioned interrupt mode edge node to obtain the current used capacity and total capacity of the memory buffer in the aforementioned interrupt mode edge node.

[0066] The second sub-step is to determine the ratio of the currently used capacity to the total capacity as the memory buffer occupancy rate of the interrupt mode edge node.

[0067] As an example, the aforementioned execution entity can divide the currently used capacity by the total capacity to obtain the memory buffer occupancy rate of the aforementioned interrupt mode edge node.

[0068] Step 2034: Based on the memory buffer occupancy rate and the preset buffer occupancy rate threshold, control the video memory prefetching step size in the target edge node.

[0069] In some embodiments, the execution entity may control the pre-fetch step size of the video memory in the target edge node based on the memory buffer occupancy rate and the preset buffer occupancy rate threshold.

[0070] The aforementioned preset buffer occupancy threshold can be a pre-set threshold value for trigger step size control. For example, the aforementioned preset buffer occupancy threshold can be 75%. The aforementioned video memory prefetch step size can be the amount of data read each time when the graphics processing core prefetches data from the memory buffer into the video memory.

[0071] As an example, the aforementioned execution entity can dynamically adjust the video memory prefetch step size by determining whether the memory buffer occupancy rate has reached a preset buffer occupancy rate threshold, thereby slowing down the speed at which data is written to the graphics processing core and preventing buffer overflow.

[0072] Optionally, the aforementioned execution entity can control the pre-fetch step size of the video memory in the target edge node based on the aforementioned memory buffer occupancy rate and a preset buffer occupancy rate threshold through the following steps: The first step is to control the memory prefetch step size in the target edge node to increase in a stepwise manner in response to the determination that the memory buffer occupancy rate has not reached the preset buffer occupancy rate threshold.

[0073] As an example, the aforementioned execution entity can assume that the memory buffer occupancy rate is 45%, which has not reached the preset buffer occupancy rate threshold of 75%. The control memory prefetch step size is gradually increased from 8MB to 16MB and then to 32MB in a stepwise manner, while writing directly to the GPU through the memory direct mapping channel.

[0074] The second step involves controlling the memory prefetch step size to decrease to a preset lower limit value in response to the determination that the memory buffer occupancy rate has reached the preset buffer occupancy rate threshold. This preset lower limit value can be a pre-set minimum step size, typically 1 / 4 or 1 / 2 of the memory prefetch step size, as the reduction target.

[0075] As an example, the aforementioned execution entity can assume that the memory buffer occupancy rate reaches 75%, and reduce the video memory prefetch step size from 32MB to 8MB (i.e., the preset step size lower limit) to slow down the data write speed and prevent buffer overflow crashes.

[0076] Optionally, after "step 203" above, the method further includes: The first step involves storing the historical link loss parameters within the preceding fixed sampling window of the aforementioned ground agricultural operation vehicle-mounted edge gateway using a sliding window method to generate a historical link loss parameter sequence. The length of this historical link loss parameter sequence is equal to the number of preceding fixed sampling windows.

[0077] The aforementioned preceding fixed sampling window can be several sampling periods preceding the current window, with each window representing a fixed time period, such as one sampling window every 1 second. The aforementioned current window can be the sampling period currently being processed by the ground agricultural operation vehicle-mounted edge gateway. The aforementioned historical link loss parameter can be the channel loss value recorded over several past sampling windows, in dB. The aforementioned preset quantity can be 5.

[0078] As an example, the aforementioned execution entity can use a first-in, first-out (FIFO) approach to store historical link loss parameters within a pre-fixed sampling window at the aforementioned ground agricultural operation vehicle-mounted edge gateway, thereby generating a historical link loss parameter sequence. Specifically, when a new historical link loss parameter enters, the oldest historical link loss parameter is removed, maintaining the same window size. For example, the historical link loss parameter sequence could be {8.4dB, 9.6dB, 11.2dB, 13.5dB, 17.2dB}.

[0079] The second step is to perform differential processing on the channel loss values ​​of adjacent fixed sampling windows in the above historical link loss parameter sequence to generate the channel loss time series change rate.

[0080] The aforementioned adjacent fixed sampling windows can be two windows that are adjacent in position in the sequence, such as fixed sampling window 1 and fixed sampling window 2. The aforementioned channel loss values ​​can be the specific loss values ​​recorded in each fixed sampling window in the aforementioned historical link loss parameter sequence, in dB, i.e., values ​​such as 8.4, 9.6, and 11.2 in the sequence.

[0081] As an example, the aforementioned execution entity can perform differential processing on each channel loss value of adjacent fixed sampling windows in the historical link loss parameter sequence to generate the channel loss time change rate, thus obtaining the channel loss time series change rate. For example, the historical link loss parameter sequence: [8.4, 9.6, 11.2, 13.5, 17.2] is differentially processed as follows: 9.6-8.4=1.2, 11.2-9.6=1.6, 13.5-11.2=2.3, 17.2-13.5=3.7, resulting in the channel loss time series change rate: [1.2, 1.6, 2.3, 3.7].

[0082] The third step involves determining that the channel loss time series change rate is positive and monotonically increasing within the aforementioned preset number of fixed sampling windows, identifying the ground agricultural operation vehicle-mounted edge gateway corresponding to the channel loss time series change rate as a faulty gateway node, and sending a transmission termination command to the faulty gateway node.

[0083] The aforementioned faulty gateway node indicates that the gateway is about to or has already disconnected from the network. The aforementioned transmission termination command can be a control command to notify the faulty gateway to stop sending data.

[0084] Fourth, in response to the determination that the aforementioned faulty gateway node has received the aforementioned transmission termination instruction, the aforementioned remote sensing multispectral image tile data stream to be processed is redirected and distributed to the ground backup gateway. The aforementioned ground backup gateway can be a backup node that receives the redirected remote sensing multispectral image tile data stream.

[0085] As an example, the aforementioned execution entity can change the direction of the aforementioned remote sensing multispectral image slice data stream to be processed, so as to forward it to the ground backup gateway.

[0086] The fifth step is to perform spatial attribute overlap detection on adjacent image blocks in the remote sensing multispectral image slice data stream to be processed in the above-mentioned ground backup gateway, so as to generate image block overlap detection values.

[0087] The image block overlap detection value can be a percentage value, which can characterize the degree of overlap between adjacent image blocks.

[0088] As an example, the aforementioned execution entity can determine the feature similarity (e.g., cosine similarity) between adjacent image patches in the aforementioned remote sensing multispectral image slice data stream to be processed in the aforementioned ground backup gateway, in order to generate image patch overlap detection values.

[0089] Step 6: In response to determining that the overlap detection value of the above image block falls within the preset overlap range and the reading input / output blocking time of the above ground backup gateway exceeds the preset blocking time threshold, the mapping topology relationship of the time-space reference feature data block in the above ground backup gateway is solidified into a static constant.

[0090] The aforementioned preset overlap range can be a pre-defined overlap range, which can be between 70% and 85%. The aforementioned read input / output blocking duration can be the time spent waiting during random disk reads, measured in milliseconds. The aforementioned preset blocking duration threshold can be a pre-defined upper limit for blocking tolerance, which can be 12.0 ms. The aforementioned temporal and spatial reference feature data block can be feature data containing temporal and spatial coordinate reference information, used for fast image location matching. The aforementioned mapping topology can be the spatial association structure between feature data blocks. The aforementioned static constant can be fixed and unchanging constant data.

[0091] As an example, the aforementioned execution entity can convert the mapping topology of the time-space reference feature data blocks in the aforementioned ground backup gateway into fixed static constants.

[0092] Step 7: Load the above static constants into the static cache of the above end-to-end collaborative edge node group.

[0093] Among them, the aforementioned static cache can be a cache memory located in the edge node group, with an access speed much higher than that of a disk, used to store frequently used static data to achieve fast matching.

[0094] Steps one through seven above address the following technical issues: transient loss in wireless links often triggers bus preemption, leading to inaccurate state identification, high-frequency reciprocating shearing between adjacent states, and consequently, global topology reconstruction oscillations. Furthermore, the lack of path redirection and state transition delay penalty procedures to handle transient interruptions causes scheduling logic to fall into a waiting deadlock when encountering sudden node interruptions, failing to guarantee the steady-state flow of computing power collaboration. To solve this problem, this disclosure firstly records the link loss values ​​of the preceding five sampling windows using a sliding window method, providing a data foundation for subsequent fault trend determination. Then, the static historical loss values ​​are transformed into dynamic trend information. Next, when the rate of change is consistently positive and monotonically increasing, the system proactively identifies the node as a faulty gateway and sends a transmission termination command before the node completely disconnects. Secondly, before the faulty gateway completely goes offline, the data stream originally destined for that gateway is seamlessly switched to a backup gateway. Finally, spatial attribute overlap detection is performed on adjacent image blocks redirected to the backup gateway, generating quantified overlap percentage values ​​to avoid resource waste caused by blind caching. Then, when the overlap falls within the 70%-85% range and disk I / O blocking exceeds the 12ms threshold, the dynamic mapping topology is solidified into static constants to avoid redundant calculations. Finally, the static constants are pre-loaded into the cache, and subsequent image matching reads directly from the cache without accessing the disk, significantly improving the processing efficiency of redirected data.

[0095] Further reference Figure 3 As an implementation of the methods shown in the above figures, this disclosure provides some embodiments of a computing power scheduling and edge collaborative control device based on low-altitude agricultural operations. These device embodiments are similar to... Figure 2 Corresponding to the method embodiments shown, this computing power scheduling and edge collaborative control device based on low-altitude agricultural operations can be specifically applied to various electronic devices.

[0096] like Figure 3As shown, some embodiments of the computing power scheduling and edge collaborative control device 300 based on low-altitude agricultural operations include: a construction unit 301, an extraction unit 302, and an execution unit 303. The construction unit 301 is configured to construct an edge node group by connecting the UAV terminal used for low-altitude agricultural inspection with the ground agricultural operation vehicle-mounted edge gateway terminal, thereby obtaining an end-to-end collaborative edge node group; the extraction unit 302 is configured to extract the remote sensing multispectral image slice data stream to be processed that is concurrently uploaded by each end-to-end collaborative edge node in the aforementioned end-to-end collaborative edge node group; the execution unit 303 is configured to perform the following processing steps for each end-to-end collaborative edge node in the aforementioned end-to-end collaborative edge node group: generating a grid attribution label based on the aforementioned end-to-end collaborative edge node, a preset channel degradation threshold, and a preset standard hardware transfer delay benchmark; sending a topology path reconstruction instruction to the target edge node based on the aforementioned grid attribution label and the aforementioned remote sensing multispectral image slice data stream to be processed; in response to determining that the aforementioned target edge node has received the aforementioned topology path reconstruction instruction, generating a memory buffer occupancy rate based on the aforementioned target edge node; and controlling the memory prefetch step size in the aforementioned target edge node based on the aforementioned memory buffer occupancy rate and a preset buffer occupancy rate threshold.

[0097] It is understandable that the various units and references described in the computing power scheduling and edge collaborative control device 300 based on low-altitude agricultural operations are... Figure 2 The steps in the described method correspond accordingly. Therefore, the operations, features, and beneficial effects described above for the method are also applicable to the computing power scheduling and edge collaborative control device 300 based on low-altitude agricultural operations and the units contained therein, and will not be repeated here.

[0098] The following is for reference. Figure 4 It shows a schematic diagram of the structure of an electronic device (e.g., a computing device) 400 suitable for implementing some embodiments of the present disclosure. Figure 4 The electronic device shown is merely an example and should not be construed as limiting the functionality and scope of the embodiments of this disclosure.

[0099] like Figure 4 As shown, the electronic device 400 may include a processing unit (e.g., a central processing unit, a graphics processing unit, etc.) 401, which can perform various appropriate actions and processes according to a program stored in a read-only memory 402 or a program loaded from a storage device 408 into a random access memory 403. The random access memory 403 also stores various programs and data required for the operation of the electronic device 400. The processing unit 401, the read-only memory 402, and the random access memory 403 are interconnected via a bus 404. An input / output interface 405 is also connected to the bus 404.

[0100] Typically, the following devices can be connected to the input / output interface 405: input devices 406 including, for example, a touchscreen, touchpad, keyboard, mouse, camera, microphone, accelerometer, gyroscope, etc.; output devices 407 including, for example, a liquid crystal display (LCD), speaker, vibrator, etc.; storage devices 408 including, for example, magnetic tape, hard disk, etc.; and communication devices 409. Communication device 409 allows electronic device 400 to communicate wirelessly or wiredly with other devices to exchange data. Although Figure 4 An electronic device 400 with various devices is shown; however, it should be understood that it is not required to implement or possess all of the devices shown. More or fewer devices may be implemented or possessed alternatively. Figure 4 Each box shown can represent a device or multiple devices as needed.

[0101] In particular, according to some embodiments of this disclosure, the processes described above with reference to the flowcharts can be implemented as computer software programs. For example, some embodiments of this disclosure include a computer program product comprising a computer program carried on a computer-readable medium, the computer program containing program code for performing the methods shown in the flowcharts. In such embodiments, the computer program can be downloaded and installed from a network via a communication device 409, or installed from a storage device 408, or installed from a read-only memory 402. When the computer program is executed by the processing device 401, it performs the functions defined in the methods of some embodiments of this disclosure.

[0102] It should be noted that, in some embodiments of this disclosure, the computer-readable medium may be a computer-readable signal medium or a computer-readable storage medium, or any combination thereof. A computer-readable storage medium may be, for example,—but not limited to—an electrical, magnetic, optical, electromagnetic, infrared, or semiconductor system, apparatus, or device, or any combination thereof. More specific examples of a computer-readable storage medium may include, but are not limited to: an electrical connection having one or more wires, a portable computer disk, a hard disk, random access memory (RAM), read-only memory (ROM), erasable programmable read-only memory (EPROM or flash memory), optical fiber, portable compact disk read-only memory (CD-ROM), optical storage device, magnetic storage device, or any suitable combination thereof. In some embodiments of this disclosure, a computer-readable storage medium may be any tangible medium containing or storing a program that can be used by or in conjunction with an instruction execution system, apparatus, or device. In some embodiments of this disclosure, a computer-readable signal medium may include a data signal propagated in baseband or as part of a carrier wave, carrying computer-readable program code. Such propagated data signals may take various forms, including but not limited to electromagnetic signals, optical signals, or any suitable combination thereof. A computer-readable signal medium can be any computer-readable medium other than a computer-readable storage medium, which can send, propagate, or transmit a program for use by or in connection with an instruction execution system, apparatus, or device. The program code contained on the computer-readable medium can be transmitted using any suitable medium, including but not limited to: wires, optical fibers, RF (radio frequency), etc., or any suitable combination thereof.

[0103] In some implementations, clients and servers can communicate using any currently known or future-developed network protocol such as HTTP (Hypertext Transfer Protocol) and can interconnect with digital data communication (e.g., communication networks) of any form or medium. Examples of communication networks include local area networks (“LANs”), wide area networks (“WANs”), the Internet (e.g., the Internet of Things), and peer-to-peer networks (e.g., ad hoc peer-to-peer networks), as well as any currently known or future-developed networks.

[0104] The aforementioned computer-readable medium may be included in the aforementioned electronic device; or it may exist independently and not assembled into the electronic device. The aforementioned computer-readable medium carries one or more programs, which, when executed by the electronic device, cause the electronic device to: construct an edge node group by connecting a UAV terminal used for low-altitude agricultural inspection with a ground-based agricultural operation vehicle-mounted edge gateway terminal, obtaining an end-to-end collaborative edge node group; extract the remote sensing multispectral image slice data stream to be processed concurrently uploaded by each end-to-end collaborative edge node in the aforementioned end-to-end collaborative edge node group; for each end-to-end collaborative edge node in the aforementioned end-to-end collaborative edge node group, perform the following processing steps: generate a grid attribution label based on the aforementioned end-to-end collaborative edge node, a preset channel degradation threshold, and a preset standard hardware transfer delay benchmark; send a topology path reconstruction instruction to the target edge node based on the aforementioned grid attribution label and the aforementioned remote sensing multispectral image slice data stream to be processed; in response to determining that the target edge node has received the aforementioned topology path reconstruction instruction, generate a memory buffer occupancy rate based on the aforementioned target edge node; and control the video memory prefetch step size in the aforementioned target edge node based on the aforementioned memory buffer occupancy rate and a preset buffer occupancy rate threshold.

[0105] Computer program code for performing operations of some embodiments of this disclosure can be written in one or more programming languages ​​or a combination thereof, including object-oriented programming languages ​​such as Java, Smalltalk, C++, and Python, and conventional procedural programming languages ​​such as the "C" language or similar programming languages. The program code can be executed entirely on the user's computer, partially on the user's computer, as a standalone software package, partially on the user's computer and partially on a remote computer, or entirely on a remote computer or server. In cases involving remote computers, the remote computer can be connected to the user's computer via any type of network—including a local area network (LAN) or a wide area network (WAN)—or can be connected to an external computer (e.g., via the Internet using an Internet service provider).

[0106] The flowcharts and block diagrams in the accompanying drawings illustrate the architecture, functionality, and operation of possible implementations of systems, methods, and computer program products according to various embodiments of this disclosure. In this regard, each block in a flowchart or block diagram may represent a module, segment, or portion of code containing one or more executable instructions for implementing a specified logical function. It should also be noted that in some alternative implementations, the functions indicated in the blocks may occur in a different order than those indicated in the drawings. For example, two consecutively indicated blocks may actually be executed substantially in parallel, and they may sometimes be executed in reverse order, depending on the functions involved. It should also be noted that each block in the block diagrams and / or flowcharts, and combinations of blocks in the block diagrams and / or flowcharts, can be implemented using a dedicated hardware-based system that performs the specified function or operation, or using a combination of dedicated hardware and computer instructions.

[0107] The functions described above in this document can be performed at least in part by one or more hardware logic components. For example, exemplary types of hardware logic components that can be used, without limitation, include: field-programmable gate arrays (FPGAs), application-specific integrated circuits (ASICs), application-specific standard products (ASSPs), system-on-a-chip (SoCs), complex programmable logic devices (CPLDs), and so on.

[0108] The above description is merely a selection of preferred embodiments of this disclosure and an explanation of the technical principles employed. Those skilled in the art should understand that the scope of the invention involved in the embodiments of this disclosure is not limited to technical solutions formed by specific combinations of the above-described technical features, but should also cover other technical solutions formed by arbitrary combinations of the above-described technical features or their equivalents without departing from the above-described inventive concept. For example, technical solutions formed by substituting the above-described features with (but not limited to) technical features with similar functions disclosed in the embodiments of this disclosure.

Claims

1. A method for computing power scheduling and edge collaborative control based on low-altitude agricultural operations, characterized in that, include: An edge node group is constructed by connecting the drone terminal used for low-altitude agricultural inspection with the ground agricultural operation vehicle-mounted edge gateway terminal to obtain an end-to-end collaborative edge node group. Extract the remote sensing multispectral image slice data streams to be processed that are concurrently uploaded by each end-to-end collaborative edge node in the end-to-end collaborative edge node group; For each end-to-end collaborative edge node in the aforementioned end-to-end collaborative edge node group, the following processing steps are performed: Based on the end-to-end collaborative edge nodes, the preset channel degradation threshold, and the preset standard hardware transfer delay benchmark, a grid affiliation label is generated; Based on the grid affiliation label and the remote sensing multispectral image slice data stream to be processed, a topology path reconstruction instruction is sent to the target edge node; In response to determining that the target edge node has received the topology path reconstruction instruction, a memory buffer occupancy rate is generated based on the target edge node; The prefetch step size of the video memory in the target edge node is controlled based on the memory buffer occupancy rate and the preset buffer occupancy rate threshold.

2. The method according to claim 1, characterized in that, The step of responding to determining that the target edge node has received the topology path reconstruction instruction and generating a memory buffer occupancy rate based on the target edge node includes: In response to determining that the target edge node has received the topology path reconstruction instruction, the target edge node is switched to data interruption mode to obtain an interruption mode edge node, wherein the data interruption mode is used to truncate the real-time computing data stream of the target edge node; The memory buffer occupancy rate in the interrupt mode edge node is monitored in real time to generate the memory buffer occupancy rate.

3. The method according to claim 1, characterized in that, The step of generating a grid affiliation label based on the end-to-end collaborative edge nodes, a preset channel degradation threshold, and a preset standard hardware transfer delay benchmark includes: Collect the node link loss rate and memory write-back latency change rate of the end-to-end collaborative edge nodes; The node link loss rate, the memory write-back latency change rate, the preset channel degradation threshold, and the preset standard hardware transfer latency benchmark are subjected to parameter normalization processing to generate comprehensive evaluation parameters. The comprehensive evaluation parameters are subjected to a pre-defined directional hysteresis boundary constraint for mesh attribution determination, so as to generate mesh attribution labels for the end-to-end collaborative edge nodes.

4. The method according to claim 3, characterized in that, The grid attribution labels include: lossless high-bandwidth grid labels and channel-intact hardware choke grid labels; The step of sending a topology path reconstruction instruction to the target edge node based on the grid affiliation label and the remote sensing multispectral image slice data stream to be processed includes: In response to determining that the grid attribution label carries the channel-intact hardware-stifled grid label, the remote sensing multispectral image slice data stream to be processed is redirected to the target edge node carrying the lossless high-bandwidth grid label; Send a topology path reconstruction command to the target edge node.

5. The method according to claim 4, characterized in that, The grid affiliation label also includes: grid labels with high dissipation computing power; The method also includes: In response to determining that the grid affiliation label carries the high-dissipation computing power abundant grid label, the ratio of the node link loss rate to the channel degradation threshold is determined as the ratio result, and the product of the preset task distribution granularity and the ratio result is set as the minimum spatial granularity of the end-to-end collaborative edge node, wherein the minimum spatial granularity increases monotonically with the node link loss rate. According to the minimum spatial granularity, the data slice granularity of the remote sensing multispectral image slice data stream to be processed is reset to generate a large granularity data block sequence, wherein the data volume of each large granularity data block in the large granularity data block sequence is greater than or equal to the minimum spatial granularity. The large-granularity data block sequence is distributed to end-to-end collaborative edge nodes carrying the high-dissipation computing power grid labels.

6. The method according to claim 1, characterized in that, The step of controlling the video memory prefetching step size in the target edge node based on the memory buffer occupancy rate and a preset buffer occupancy rate threshold includes: In response to determining that the memory buffer occupancy rate has not reached the preset buffer occupancy rate threshold, the video memory prefetch step size in the target edge node is controlled to increase in a stepwise manner. In response to determining that the memory buffer occupancy rate has reached the preset buffer occupancy rate threshold, the video memory prefetch step size is controlled to be reduced to the preset step size lower limit.

7. The method according to claim 2, characterized in that, The real-time monitoring of memory buffer occupancy in the interrupt mode edge node to generate memory buffer occupancy rate includes: Call the memory buffer status read interface in the interrupt mode edge node to obtain the current used capacity and total capacity of the memory buffer in the interrupt mode edge node; The ratio of the currently used capacity to the total capacity is determined as the memory buffer occupancy rate of the interrupt mode edge node.

8. A computing power scheduling and edge collaborative control device based on low-altitude agricultural operations, characterized in that, include: The building unit is configured to construct an edge node group by connecting the drone end used for low-altitude agricultural inspection with the ground agricultural operation vehicle-mounted edge gateway end, thus obtaining an end-to-end collaborative edge node group. The extraction unit is configured to extract the remote sensing multispectral image slice data stream to be processed that is concurrently uploaded by each end-to-end collaborative edge node in the end-to-end collaborative edge node group. The execution unit is configured to perform the following processing steps for each end-to-end collaborative edge node in the end-to-end collaborative edge node group: generate a mesh affiliation label based on the end-to-end collaborative edge node, a preset channel degradation threshold and a preset standard hardware flow delay benchmark; Based on the grid attribution label and the remote sensing multispectral image slice data stream to be processed, a topology path reconstruction instruction is sent to the target edge node; in response to determining that the target edge node has received the topology path reconstruction instruction, a memory buffer occupancy rate is generated based on the target edge node; and the memory prefetch step size in the target edge node is controlled based on the memory buffer occupancy rate and a preset buffer occupancy rate threshold.

9. An electronic device, characterized in that, include: One or more processors; A storage device on which one or more programs are stored; When the one or more programs are executed by the one or more processors, the one or more processors implement the method as described in any one of claims 1 to 7.

10. A computer-readable medium, characterized in that, It stores a computer program thereon, wherein the computer program, when executed by a processor, implements the method as described in any one of claims 1 to 7.