Melamine production line with cooler efficient regeneration capacity

By setting up arrays of coolers and coolant temporary storage tanks in the melamine production line, combined with ammonia or steam-assisted regeneration, the problem of poor cooler regeneration is solved, production efficiency and crystallization quality are improved, and the service life of the filter is extended. and save costs.

CN221802647UActive Publication Date: 2024-10-01SHANDONG HUALU HENGSHENG CHEM IND
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202420124769.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-18
Publication Date
2024-10-01
Estimated Expiration
2034-01-18

Smart Images

  • Figure CN221802647U_ABST
    Figure CN221802647U_ABST
Patent Text Reader

Abstract

A melamine production line with cooler efficient regeneration capacity comprises a fused salt heater, a fluidized bed reactor, a gas buffer tank, a plurality of groups of coolers, a plurality of filters, a quenching crystallizer and a hot process gas regeneration pipeline connected between the fused salt heater and the plurality of groups of coolers, the number of the cooling agent temporary storage tanks corresponds to the number of the groups of the coolers and the cooling agent temporary storage tanks are connected with the plurality of groups of coolers, and the urea washing tower is connected with the plurality of groups of coolers. The cooling agent in the cooler is fed into the corresponding cooling agent temporary storage tank before the cooler regeneration, the generated gas is discharged into the urea washing tower during the cooler regeneration, and the cooling agent is reinjected into the cooler after the cooler regeneration. Therefore, the regeneration effect of the cooler in the melamine production line can be improved, and the filter is prevented from being influenced by the regeneration operation of the cooler.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of melamine production, in particular to a melamine production line with a cooler having high-efficiency regeneration capability. Background Art

[0002] In the melamine production process, whether it is the normal pressure method or the pressurized method, there is a situation in which the high-boiling-point products (such as melamine and melamine, which are often mixed with catalyst powder) condense and form on the wall due to the temperature drop during the cooling process of the reaction-generated process gas in the cooler, causing the high-boiling-point products to adhere to the inner wall of the heat exchange tube (tube array) in the cooler, thereby reducing its heat transfer effect and increasing the resistance in the heat exchange tube, thereby reducing the production efficiency of the production line and affecting the crystallization quality of melamine. For this reason, the existing melamine production lines are all equipped with a regeneration operation link for the cooler, such as Figure 1 As shown, it is a schematic diagram of the process flow of an existing atmospheric pressure melamine production line, wherein the process gas is heated by a molten salt heater 1' and enters a fluidized bed reactor 2' to react with molten urea under the action of a catalyst to generate a reaction-generated process gas, and then the reaction-generated process gas enters a gas buffer tank 3' through a pipeline for buffering, and then enters a cooler 4' through a branch pipeline for cooling, and then enters a filter 5' connected in series with the cooler through a pipeline for filtration, and then enters a quenching crystallizer (not shown) to crystallize and precipitate melamine crystals, and in order to realize the regeneration operation of the cooler in the production line, a regeneration pipeline 6' is provided to introduce the process gas heated by the molten salt heater 1' into the cooler 4' to heat up and vaporize the high boiling point products in the heat exchange tube and discharge them into the filter 5' for filtration. However, due to the presence of coolant in the cooler, the rate of increase of temperature in the heat exchange tube is slowed down, which not only prolongs the regeneration operation time, but also a small amount of high-boiling point products are easily left on the inner wall of the heat exchange tube, making the regeneration effect not thorough enough; in addition, the regenerated process gas generated in the regeneration operation enters the filter for filtration, thereby increasing the operating burden of the filter, shortening the service life of the filter material, affecting the operating stability of the filter, and also affecting the crystallization quality of melamine.

[0003] Therefore, how to improve the regeneration effect of the cooler and prevent the regenerated process gas generated during the regeneration operation from affecting subsequent process links has become one of the technical problems that need to be urgently solved in this technical field. Utility Model Content

[0004] The technical problem to be solved by this technical solution is how to improve the regeneration effect of the cooler in the melamine production line and avoid the regeneration process gas generated during the regeneration operation affecting the subsequent process links, thereby ensuring that the production line maintains a high production efficiency and produces high-quality melamine grains.

[0005] In order to solve the above technical problems, the present technical scheme provides a melamine production line with high-efficiency regeneration capability of cooler, which comprises: a fluidized bed reactor, a process gas supply pipeline, a molten salt heater, a reaction generated process gas delivery pipeline, a gas buffer tank, an array of coolers, several hot process gas regeneration pipelines, several reaction generated process gas branch pipelines, several cooled process gas delivery pipelines, several filters, a quenching crystallizer, several coolant temporary storage tanks, several coolant pipelines, several regenerated process gas delivery pipelines and a urea washing tower, wherein the fluidized bed reactor has a reaction space inside and molten salt heating coils and liquid urea spray guns are arranged in sequence from bottom to top, and the process A molten salt heater is provided on the process gas supply pipeline, and the process gas supply pipeline is connected to the bottom of the fluidized bed reactor and communicated with the reaction space, one end of the reaction generated process gas delivery pipeline is connected to the upper part of the fluidized bed reactor and communicated with the reaction space, the other end of the reaction generated process gas delivery pipeline is communicated with the gas buffer tank, each group of coolers contains at least two coolers, the first valve is provided on the several reaction generated process gas branch pipelines, and one end of the several reaction generated process gas branch pipelines is respectively communicated with the gas buffer tank, the other end of the several reaction generated process gas branch pipelines is respectively communicated with the heat source inlet end of the cooler in the array of coolers, and the several hot process gas regeneration The pipelines are all provided with on-off valves and one end of the several hot process gas regeneration pipelines is commonly connected to the pipeline section between the molten salt heater and the bottom of the fluidized bed reactor on the process gas supply pipeline, and the other ends of the several hot process gas regeneration pipelines are respectively connected to the pipeline sections between the first valve and the heat source inlet end on the several reaction generation process gas branch pipelines, one end of the several cooled process gas delivery pipelines is respectively connected to the cold source outlet end of the cooler in the array of coolers, and the other end of the several cooled process gas delivery pipelines is respectively connected to the inlet end of the several filters, and the outlet ends of the several filters are commonly connected to the quenching crystallizer through pipelines; the number of coolant temporary storage tanks It corresponds to the number of groups of coolers, the several coolant pipelines are all provided with on-off valves and one end of the several coolant pipelines is respectively connected to the coolant inlet and outlet of the cooler in the array of coolers, the other end of the several coolant pipelines is respectively connected to the corresponding coolant temporary storage tank, the several cooled process gas delivery pipelines are all provided with a second valve, the several regenerated process gas delivery pipelines are all provided with a third valve and one end of the several regenerated process gas delivery pipelines is respectively connected to the pipeline section between the cold source outlet and the second valve on the several cooled process gas delivery pipelines, and the other end of the several regenerated process gas delivery pipelines is commonly connected to the urea washing tower.Accordingly, by setting up a plurality of coolers and a corresponding number of coolant temporary storage tanks, and by controlling the above-mentioned valves on each group of coolers and their connecting pipelines, the melamine production line can regenerate each group of coolers in a cycle without stopping (that is, when one group of coolers is regenerated, the other groups of coolers are still operating normally), thereby improving the cooling effect of each group of coolers and ensuring that the melamine production line has a high production efficiency; and by controlling the opening degree of the third valve to control the flow rate of the regenerated process gas, the temperature in the cooler tube array can be controlled within the optimal temperature range suitable for the reverse reaction gasification of the polymer, which can further improve the regeneration effect of the cooler; in addition, the regenerated process gas is discharged to the urea washing tower through the regenerated process gas conveying pipeline for recycling and reuse, which can avoid causing the operating burden of the filter, extend the service life of the filter material, ensure the stability of the filter operation, and thus ensure the crystallization quality of melamine.

[0006] As another implementation of the present technical solution, the melamine production line also includes: several ammonia delivery pipelines and / or several medium-pressure steam delivery pipelines, the several ammonia delivery pipelines and / or the several medium-pressure steam delivery pipelines are all provided with on-off valves and one end of the several ammonia delivery pipelines and / or the several medium-pressure steam delivery pipelines is commonly connected to the ammonia supply source and / or the medium-pressure steam supply source, and the other end of the several ammonia delivery pipelines and / or the several medium-pressure steam delivery pipelines is respectively connected to the pipeline section between the first valve and the heat source inlet end on the several reaction generation process gas branch pipelines. Accordingly, in the regeneration process of the cooler, ammonia and / or steam are used as auxiliary regeneration gas to further improve the reverse reaction gasification rate and complete gasification degree of the polymer, thereby further improving the regeneration effect of the cooler.

[0007] As another implementation of the technical solution, the melamine production line also includes: a pipeline distributor and several process gas distribution and delivery pipelines, the pipeline distributor has several input ports and several output ports and can be controlled to selectively connect some input ports with some output ports, the other ends of the several cooled process gas delivery pipelines are respectively connected to the several input ports of the pipeline distributor, the several process gas distribution and delivery pipelines are all provided with fourth valves and one end of the several process gas distribution and delivery pipelines is respectively connected to the several output ports, and the other ends of the several process gas distribution and delivery pipelines are respectively connected to the inlet ends of the several filters. Accordingly, the application of the pipeline distributor can realize the selective connection of any number of coolers and any number of filters, which can not only avoid the disadvantage that in the series connection of the cooler and the filter, due to the failure of one device, the other device cannot be used, but also can flexibly adjust the amount of filtered gas received by the filter, and can flexibly repair or replace the filter material of individual filters without stopping the production line.

[0008] As another implementation of the technical solution, the melamine production line further includes: a plurality of valve heat purge pipelines, each of which is provided with a regulating valve, one end of each of which is respectively connected to each of the second valves, the third valves and the fourth valves, and the other end of each of which is commonly connected to a pipeline section between the molten salt heater and the bottom of the fluidized bed reactor on the process gas supply pipeline. Accordingly, by heat-purging the above valves through the valve heat purge pipeline, the occurrence of a regulation failure caused by polymer condensation due to the relatively low temperature of the above valves can be effectively prevented.

[0009] As another implementation of the technical solution, the several coolant temporary storage tanks are all provided with electric heaters. Accordingly, the coolant temporarily stored in the coolant temporary storage tanks can be kept in a hot standby state to prevent the cooling effect from being affected due to the temperature being lower than the cooling temperature required by the process after being injected back into the cooler; in addition, it can also prevent the occurrence of a large amount of polymers in the tube array due to relatively low temperature.

[0010] As another implementation of the technical solution, the setting height of the coolant temporary storage tank is lower than the setting height of the cooler, and the other end of the coolant pipeline is connected to the bottom of the corresponding coolant temporary storage tank, so that the coolant in the cooler can be transferred to the coolant temporary storage tank through the coolant pipeline under the effect of the height difference for temporary storage; the upper part of the coolant temporary storage tank is connected to a nitrogen pressurizing pipeline, and nitrogen is pressed into the coolant temporary storage tank through the nitrogen pressurizing pipeline to promote the coolant to be injected back into the cooler through the coolant pipeline. In this way, the transfer of the coolant can be completed without pumping the coolant through a driving source such as a pump, thereby avoiding the contamination of the power source device by the coolant and saving material costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0011] Figure 1 The present invention is a schematic diagram of a process flow of a normal pressure melamine production line in the prior art;

[0012] Figure 2 It is a process flow diagram of an embodiment of a melamine production line with high-efficiency regeneration capability of a cooler according to the utility model;

[0013] Figure 3 The utility model is a process flow diagram of another embodiment of a melamine production line with high-efficiency cooler regeneration capability.

[0014] Explanation of symbols in the accompanying drawings:

[0015] Explanation of symbols in the prior art: 1' molten salt heater; 2' fluidized bed reactor; 3' gas buffer tank; 4' cooler; 5' filter; 6' regeneration pipeline. Explanation of symbols in the utility model: 1 fluidized bed reactor; 11 reaction space; 12 molten salt heating coil; 13 liquid urea spray gun; 2 molten salt heater; 3 gas buffer tank; 4A, 4B, 4C, 4D cooler; 5A, 5B, 5C, 5D filter; 6A, 6B coolant temporary storage tank; 61 electric heater; 7 pipeline distributor; N1, N2, N3, N4 input ports; N5, N6, N7, N8 output ports; A1 process gas supply pipeline; A2 reaction generated process gas delivery pipeline; A3 hot process gas regeneration pipeline; A4 reaction generated process gas branch pipeline; A5 cooled process gas delivery pipeline; A6 cooling agent pipeline; A7 regeneration process gas delivery pipeline; A8 ammonia delivery pipeline; A9 medium-pressure steam delivery pipeline; A10 nitrogen pressurization pipeline; A11 process gas distribution and delivery pipeline; A12 valve heat purge pipeline; B1, B2, B3, B4 first valve; C1, C2, C3, C4 on-off valve; D1, D2, D3, D4 on-off valve; E1, E2, E3, E4 second valve; F1, F2, F3, F4 third valve; G1, G2, G3, G4 on-off valve; H1, H2, H3, H4 on-off valve; I1, I2, I3, I4 fourth valve; J1, J2, J3 regulating valve. DETAILED DESCRIPTION

[0016] The detailed description and technical contents of the technical solution are described as follows with the help of the drawings. However, the drawings are only provided for reference and explanation and are not used to limit the technical solution.

[0017] In the context of this specification, any two or more implementations of the technical solution can be arbitrarily combined, and the technical solution thus formed belongs to part of the original disclosure of this specification and also falls within the protection scope of the technical solution.

[0018] The present technical solution relates to a regeneration method capable of improving the regeneration effect of a cooler. The regeneration method is mainly used to regenerate a cooler for cooling a reaction-generated process gas generated by a fluidized bed reactor in a melamine production line. Of course, the implementation steps of the regeneration method are not limited to the regeneration of the cooler in the melamine production line. The regeneration method of the present technical solution can be applied to regenerate the cooler if the cooling principle and regeneration process of the cooler in other chemical product production lines are similar to those of the cooler in the present technical solution, so as to improve the regeneration effect of the cooler.

[0019] The main steps of the cooler regeneration method involved in this technical solution include:

[0020] Stop the cooler operation step: stop inputting the reaction generated process gas (i.e., the fluid to be cooled) to the heat source inlet end of the cooler;

[0021] Coolant transfer step: transfer the coolant in the cooler to the coolant temporary storage tank through the pipeline for temporary storage;

[0022] Cooler regeneration step: input hot process gas to the heat source inlet end to increase the temperature inside the tubes of the cooler, and cause the polymer condensed on the inner wall of the tubes to increase the temperature and undergo a reverse reaction to gasify and generate regenerated process gas and discharge it through the cold source outlet end of the cooler;

[0023] Coolant reinjection step: stop inputting hot process gas to the heat source inlet end, and reinject the coolant temporarily stored in the coolant temporary storage tank into the cooler through the pipeline;

[0024] Restart the cooler step: continue to input the reaction-generated process gas to the heat source inlet to continue cooling the reaction-generated process gas.

[0025] As a further implementation of the regeneration method, in the above cooler regeneration step, the flow rate of the regenerated process gas discharged from the outlet of the cold source is controlled to control the heating rate in the tube array, wherein when the discharge flow rate of the regenerated process gas is increased, the heating rate in the tube array increases, and when the discharge flow rate of the regenerated process gas is reduced, the heating rate in the tube array decreases. By controlling the discharge flow rate of the regenerated process gas, the temperature in the tube array can be controlled in the optimal temperature range suitable for the reverse reaction gasification of the polymer, that is, the temperature in the tube array can be quickly increased at a large flow rate in the early stage, and then the flow rate is gradually reduced to control the temperature in the tube array in the optimal temperature range, and the optimal reverse reaction gasification temperature range for the polymer produced in the melamine production line is usually 380°C to 405°C, which can further improve the regeneration effect of the cooler.

[0026] As a further implementation of the regeneration method, the cooler regeneration step may also include an auxiliary regeneration step, in which when the temperature in the tubes is raised to more than 380°C, ammonia and / or steam may be additionally input to the heat source inlet end to further increase the reverse reaction gasification degree of the polymer, thereby ensuring that the polymer is completely gasified without residue. It should be noted that when the temperature in the tubes is raised to more than 380°C, the polymer condensed on the tubes will gradually undergo a reverse reaction and gasify to regenerate hot process gas and other by-product gases, but as the concentration of the hot process gas in the tubes increases, it will directly affect the progress of the polymer reverse reaction (reducing the reverse reaction rate), and the additional input ammonia can dilute the concentration of the hot process gas, thereby promoting the reverse reaction of the polymer. Of course, the temperature in the tubes is preferably controlled between 380°C and 405°C to prevent the higher temperature from causing the additional input ammonia to be decomposed, thereby affecting the regeneration effect of the cooler.

[0027] As a further implementation of the regeneration method, in the above coolant transfer step, the coolant temporary storage tank is set at a height lower than the cooler, so that the coolant in the cooler is transferred to the coolant temporary storage tank through the pipeline under the effect of the height difference; and in the coolant reinjection step, nitrogen is pressed into the coolant temporary storage tank to prompt the coolant to be reinjected into the cooler through the pipeline. In this way, the coolant transfer can be completed without pumping the coolant through a driving device such as a pump, thereby avoiding the contamination of the driving device by the coolant and saving material costs.

[0028] When the cooler is regenerated by the regeneration method of the cooler of the technical solution, the coolant can be transferred to the coolant temporary storage tank for temporary storage, so that the shell side of the cooler is emptied to avoid the coolant affecting the temperature rise process on the tube side, so that the tubes of the cooler can be quickly heated after the hot process gas is input, and the polymer condensed on the inner wall is quickly heated and reversely reacted and gasified to generate the regenerated process gas and then discharged from the tubes, thereby improving the regeneration effect of the cooler. The coolant used in the cooler in the technical solution can be Dasheng oil, etc., but the technical solution is not limited to this.

[0029] The present technical solution provides a melamine production line with high-efficiency regeneration capability of a cooler (hereinafter referred to as melamine production line), such as Figure 2The figure shows a process flow diagram of a specific embodiment of the melamine production line. The melamine production line includes a fluidized bed reactor 1, a process gas supply pipeline A1, a molten salt heater 2, a reaction generated process gas delivery pipeline A2, a gas buffer tank 3, an array of coolers 4A, 4B, 4C, 4D, several hot process gas regeneration pipelines A3, several reaction generated process gas branch pipelines A4, several cooled process gas delivery pipelines A5, several filters 5A, 5B, 5C, 5D, a quenching crystallizer (not shown), several coolant temporary storage tanks 6A, 6B, several coolant pipelines A6, several regenerated process gas delivery pipelines A7 and a urea scrubber (not shown). In order to facilitate the understanding of the process of the present technical solution by referring to the attached drawings, Features, the technical solution is based on the melamine production line including two groups of coolers, each group of coolers contains two coolers, four hot process gas regeneration pipelines, four reaction generation process gas branch pipelines, four cooled process gas delivery pipelines, four filters, two coolant temporary storage tanks and each coolant temporary storage tank corresponds to each group of coolers, four coolant pipelines and four regenerated process gas delivery pipelines as an example, of course, the technical solution does not limit the number of cooler groups, the number of coolers contained in each group of coolers, and the number of corresponding connected pipelines, etc. The user can flexibly set the number of the above components according to the production capacity requirements of the melamine production line.Next, the fluidized bed reactor 1 has a reaction space 11 inside, and a molten salt heating coil 12 and a liquid urea spray gun 13 are arranged in sequence from bottom to top therein, a molten salt heater 2 is arranged on the process gas supply pipeline A1, and the process gas supply pipeline A1 is connected to the bottom of the fluidized bed reactor 1 and communicates with the reaction space 11, one end of the reaction generated process gas delivery pipeline A2 is connected to the upper part of the fluidized bed reactor 1 and communicates with the reaction space 11, and the other end of the reaction generated process gas delivery pipeline A2 is communicated with the gas buffer tank 3, and the four reaction generated process gas branch pipelines A4 are each provided with a first valve B1, B2, B3, B4, and the four reaction generated process gas branch pipelines A4 are ... One end of the process gas branch pipeline A4 is respectively connected to the gas buffer tank 3, and the other ends of the four reaction-generated process gas branch pipelines A4 are respectively connected to the heat source inlet ends of the coolers 4A, 4B, 4C, and 4D in the two groups of coolers. The four hot process gas regeneration pipelines A3 are all provided with on-off valves C1, C2, C3, and C4, and one end of the four hot process gas regeneration pipelines A3 is commonly connected to the pipeline section between the molten salt heater 2 and the bottom of the fluidized bed reactor 1 on the process gas supply pipeline A1, and the other ends of the four hot process gas regeneration pipelines A3 are respectively connected to the first valves B1, B2 on the four reaction-generated process gas branch pipelines A4. , B3, B4 to the pipeline section between the heat source inlet end, one end of the four cooled process gas delivery pipelines A5 is respectively connected to the cold source outlet end of the coolers 4A, 4B, 4C, 4D in the two groups of coolers, the other end of the four cooled process gas delivery pipelines A5 is respectively connected to the inlet end of the four filters 5A, 5B, 5C, 5D, and the outlet ends of the four filters 5A, 5B, 5C, 5D are commonly connected to the quenching crystallizer through pipelines; the four coolant pipelines A6 are all provided with on-off valves D1, D2, D3, D4 and one end of the four coolant pipelines A6 is respectively connected to the coolers 4A, 4B, 4C in the two groups of coolers , 4D are connected to the coolant inlet and outlet, the other ends of the four coolant pipelines A6 are connected to the corresponding coolant temporary storage tanks 6A, 6B respectively, the four cooled process gas delivery pipelines A5 are each provided with a second valve E1, E2, E3, E4, the four regenerated process gas delivery pipelines A7 are each provided with a third valve F1, F2, F3, F4 and one end of the four regenerated process gas delivery pipelines A7 is respectively connected to the pipeline section between the cold source outlet end and the second valves E1, E2, E3, E4 on the four cooled process gas delivery pipelines A5, and the other ends of the four regenerated process gas delivery pipelines A7 are commonly connected to the urea washing tower.The above regeneration method is applied to group and step-by-step control the four first valves B1, B2, B3, B4, the on-off valves D1, D2, D3, D4 on the four coolant pipelines A6, the on-off valves C1, C2, C3, C4 on the four hot process gas regeneration pipelines A3, the four second valves E1, E2, E3, E4 and the four third valves F1, F2, F3, F4, so that the two groups of coolers 4A, 4B, 4C, 4D can be cyclically regenerated without stopping the melamine production line. Specifically, the two first valves B1, B2 and the two second valves E1, E2 corresponding to one group of coolers 4A, 4B are closed and the two third valves F1, F2 are opened, while the two first valves B3, B4 and the two second valves E3, E4 corresponding to the other group of coolers 4C, 4D are in an open state and the two third valves F3, F4 are in a closed state so that the other group of coolers 4C, 4D can be kept in operation, and the two third valves F3, F4 are opened. The on-off valves D1 and D2 on the two coolant pipelines A6 corresponding to one group of coolers 4A and 4B are used to transfer the coolant to a corresponding coolant temporary storage tank 6A for temporary storage. Then, the on-off valves C1 and C2 on the two hot process gas regeneration pipelines A3 corresponding to one group of coolers 4A and 4B are opened to regenerate the coolers 4A and 4B. After regeneration, the two on-off valves C1 and C2 are closed, and the on-off valves D1 and D2 on the two coolant pipelines A6 are opened again to inject the coolant back into the coolers 4A and 4B. After the injection is completed, the two on-off valves D1 and D2 and the two third valves F1 and F2 are closed, and the two first valves B1 and B2 and the two second valves E1 and E2 are opened to complete the regeneration operation of one group of coolers 4A and 4B. Then, the other group of coolers 4C and 4D can be regenerated according to the above operation, so that the groups of coolers can be cyclically regenerated without stopping the melamine production line. Of course, the user can enable all coolers at the same time according to the production capacity requirements, or use some of the grouped coolers and disable the rest of the grouped coolers, or not use some of the grouped coolers after regeneration (out of service state), or recycle and regenerate each group of coolers... and other usage modes, which are not limited by the present technical solution. In addition, the present technical solution can use manual control for the control of the above-mentioned valves, but can also be equipped with a central control unit (not shown) and temperature detectors and other instruments in the melamine production line to improve the automation of the production line. The central control unit can be an automatic control unit composed of a programmable logic control circuit (PLC), or a centralized control circuit, centralized control system or host computer containing a microprocessor, memory, etc. The present technical solution does not limit the form of the central control unit. The central control unit can be electrically connected to the above-mentioned valves respectively to control the operation of the above-mentioned valves according to the monitoring data or control instructions of instruments such as temperature detectors (such as those set at the outlet of the cold source of the cooler), thereby realizing automatic operation and saving labor costs.As far as current technology is concerned, most existing chemical product production lines have achieved automated control. In view of the fact that the central control unit currently used controls the operating status of various components (such as valves, drive devices, etc.) according to input or programmed instructions or monitored parameter data, it is a very widely used and common control method in the field of automated control, that is, the existing control technology, and the operating process of the central control unit controlling the above-mentioned valves in the technical scheme is not within the scope of protection of this scheme, therefore, it will not be elaborated.

[0030] As a further implementation of the embodiment of the present technical solution, the melamine production line may also include a plurality of ammonia gas delivery pipelines A8 and / or a plurality of medium-pressure steam delivery pipelines A9. For the convenience of illustration, the figure shows that the number of the ammonia gas delivery pipelines A8 and / or the medium-pressure steam delivery pipelines A9 is four, and the four ammonia gas delivery pipelines A8 and / or the four medium-pressure steam delivery pipelines A9 are all provided with on-off valves G1, G2, G3, G4, H1, H2, H3, H4, and one end of the four ammonia gas delivery pipelines A8 and / or the four medium-pressure steam delivery pipelines A9 is Commonly connected to an ammonia supply source (not shown) and / or a medium-pressure steam supply source (not shown), the other ends of the four ammonia delivery pipelines A8 and / or the four medium-pressure steam delivery pipelines A9 are respectively connected to the pipeline sections between the first valves B1, B2, B3, B4 and the heat source inlet end on the four reaction-generated process gas branch pipelines A4, so that ammonia and / or steam are used as auxiliary regeneration gas during the regeneration process of the cooler, which can further improve the reverse reaction gasification rate and the degree of complete gasification of the polymer, thereby further improving the regeneration effect of the cooler.

[0031] As a further implementation of the embodiment of the present technical solution, the several coolant storage tanks 6A, 6B (two are shown in the figure) are all provided with electric heaters 61 to keep the coolant temporarily stored in the coolant storage tanks 6A, 6B in a hot standby state to prevent the cooling effect from being affected after being reinjected into the coolers 4A, 4B, 4C, 4D due to the temperature being lower than the cooling temperature required by the process; in addition, it can also avoid the occurrence of a large amount of polymer condensation in the tubes due to relatively low temperature.

[0032] As a further implementation of the embodiment of the present technical solution, the setting height of the coolant temporary storage tanks 6A and 6B is lower than the setting height of the coolers 4A, 4B, 4C, and 4D, and the other end of the coolant pipeline A6 is connected to the bottom of the corresponding coolant temporary storage tanks 6A and 6B, so that the coolant in the coolers 4A, 4B, 4C, and 4D can be transferred to the coolant temporary storage tanks 6A and 6B through the coolant pipeline A6 for temporary storage under the action of the height difference; and the upper part of the coolant temporary storage tanks 6A and 6B is connected with a nitrogen pressurizing pipeline A10, and nitrogen is pressed into the coolant temporary storage tanks 6A and 6B through the nitrogen pressurizing pipeline A10 to promote the coolant to be injected back into the coolers 4A, 4B, 4C, and 4D through the coolant pipeline A6, so that the transfer of the coolant can be completed without sucking the coolant through a driving device such as a pump, thereby avoiding the contamination of the driving device by the coolant and saving material costs.

[0033] like Figure 3 As shown, it is a process flow diagram of another specific embodiment of the melamine production line of the present technical solution. The only difference between this other specific embodiment and the aforementioned specific embodiment is that a pipeline distributor 7 for selectively connecting pipelines is added between several coolers 4A, 4B, 4C, 4D (four in the figure) and several filters 5A, 5B, 5C, 5D (four in the figure). The following content only describes the special features of this other specific embodiment, and no longer describes the same parts. In this other specific embodiment, the melamine production line also includes a pipeline distributor 7 and several process gas distribution and transportation pipelines A11 (four in the figure). The pipeline distributor 7 has several input ports N1, N2, N3, N4 (four in the figure) and several output ports N5, N6, N7, N8 (four in the figure) and can be controlled (manually controlled or controlled by a central control unit, which is not limited to this) to selectively connect some input ports with some output ports. The four cooled process gas transportation pipelines A5 The other end is connected to the four input ports N1, N2, N3, and N4 of the pipeline distributor 7, and the four process gas distribution and delivery pipelines A11 are provided with fourth valves I1, I2, I3, and I4 (manual control or central control unit control, not limited to this), and one end of the four process gas distribution and delivery pipelines A11 is connected to the four output ports N5, N6, N7, and N8, and the other end of the four process gas distribution and delivery pipelines A11 is connected to the inlet ends of the four filters 5A, 5B, 5C, and 5D, respectively. The application of the pipeline distributor 7 can realize the selective connection of any number of coolers and any number of filters, which can not only avoid the disadvantage that the failure of one device in the series connection of the cooler and the filter makes the other device unusable, but also can flexibly adjust the amount of filtered gas received by the filter, and can flexibly repair or replace the filter material of individual filters without stopping the production line.

[0034] As a further implementation of another embodiment of the present technical solution, the melamine production line may also include several valve heat purge pipelines A12, each of which is provided with a regulating valve J1, J2, and J3, one end of each of which is respectively connected to the four second valves E1, E2, E3, and E4, the four third valves F1, F2, F3, and F4, and the four fourth valves I1, I2, I3, and I4, and the other end of each of which is commonly connected to the pipeline section of the process gas supply pipeline A1 between the molten salt heater 2 and the bottom of the fluidized bed reactor 1. The heat purge of the above valves by the valve heat purge pipeline A12 can effectively prevent the occurrence of a regulation failure caused by polymer condensation due to the relatively low temperature of the above valves.

[0035] In summary, the melamine production line of the present technical solution is provided with groups of coolers and a corresponding number of coolant temporary storage tanks. By controlling the above-mentioned valves on each group of coolers and their connecting pipelines, the melamine production line can recycle and regenerate each group of coolers without stopping (that is, when one group of coolers is regenerated, the other groups of coolers are still operating normally), thereby improving the cooling effect of each group of coolers and ensuring that the melamine production line has a high production efficiency; and by controlling the opening degree of the third valve to control the flow rate of the regenerated process gas, the temperature in the cooler tube array can be controlled in the optimal temperature range suitable for the reverse reaction gasification of the polymer, which can further improve the regeneration effect of the cooler; in addition, the regenerated process gas is discharged to the urea washing tower through the regenerated process gas conveying pipeline for recycling and reuse, which can avoid causing the operating burden of the filter, extend the service life of the filter material, ensure the stability of the filter operation, and thus ensure the crystallization quality of melamine.

[0036] The above are only preferred embodiments of the present technical solution and are not intended to limit the patent scope of the present technical solution. Other equivalent changes made using the patent concept of the present technical solution should all fall within the patent protection scope of the present technical solution.

Claims

1. A melamine production line with high-efficiency regeneration capability of a cooler, comprising: A fluidized bed reactor, a process gas supply pipeline, a molten salt heater, a reaction-generated process gas delivery pipeline, a gas buffer tank, an array cooler, several hot process gas regeneration pipelines, several reaction-generated process gas branch pipelines, several cooled process gas delivery pipelines, several filters and a quenching crystallizer. The fluidized bed reactor has a reaction space inside and molten salt heating coils and liquid urea spray guns are arranged in sequence from bottom to top. The process gas supply pipeline is provided with the molten salt heater, and the process gas supply pipeline is connected to the bottom of the fluidized bed reactor and communicates with the reaction space. One end of the reaction-generated process gas delivery pipeline is connected to the upper part of the fluidized bed reactor and communicates with the The reaction spaces are connected, the other end of the reaction generated process gas delivery pipeline is connected to the gas buffer tank, each group of coolers contains at least two coolers, the several reaction generated process gas branch pipelines are provided with a first valve and one end of the several reaction generated process gas branch pipelines are respectively connected to the gas buffer tank, the other ends of the several reaction generated process gas branch pipelines are respectively connected to the heat source inlet end of the cooler in the array of coolers, the several hot process gas regeneration pipelines are provided with on-off valves and one end of the several hot process gas regeneration pipelines are commonly connected to the pipeline section on the process gas supply pipeline located between the molten salt heater and the bottom of the fluidized bed reactor, The other ends of the several hot process gas regeneration pipelines are respectively connected to the pipeline sections between the first valve and the heat source inlet end on the several reaction generation process gas branch pipelines, one ends of the several cooled process gas delivery pipelines are respectively connected to the cold source outlet end of the cooler in the array cooler, the other ends of the several cooled process gas delivery pipelines are respectively connected to the inlet ends of the several filters, and the outlet ends of the several filters are commonly connected to the quenching crystallizer through pipelines; it is characterized in that it also includes: several coolant temporary storage tanks, several coolant pipelines, several regenerated process gas delivery pipelines and urea washing towers, the number of the coolant temporary storage tanks is the same as the number of cooler branches. Corresponding to the number of groups, the several coolant pipelines are all provided with on-off valves and one end of the several coolant pipelines is respectively connected to the coolant inlet and outlet of the cooler in the array of coolers, the other ends of the several coolant pipelines are respectively connected to the corresponding coolant temporary storage tanks, the several cooled process gas delivery pipelines are all provided with second valves, the several regenerated process gas delivery pipelines are all provided with third valves and one end of the several regenerated process gas delivery pipelines is respectively connected to the pipeline section between the outlet end of the cold source to the second valve on the several cooled process gas delivery pipelines, and the other ends of the several regenerated process gas delivery pipelines are commonly connected to the urea washing tower.

2. The melamine production line according to claim 1, characterized in that: Also includes: Several ammonia gas delivery pipelines and / or several medium-pressure steam delivery pipelines, each of which is provided with an on-off valve and one end of each of which is commonly connected to an ammonia gas supply source and / or a medium-pressure steam supply source, and the other ends of each of which is respectively connected to the pipeline section between the first valve and the heat source inlet end on the several reaction generation process gas branch pipelines.

3. The melamine production line according to claim 1, characterized in that: Also includes: A pipeline distributor and several process gas distribution and delivery pipelines, the pipeline distributor has several input ports and several output ports and can be controlled to selectively connect some of the input ports with some of the output ports, the other ends of the several cooled process gas delivery pipelines are respectively connected to the several input ports of the pipeline distributor, the several process gas distribution and delivery pipelines are each provided with a fourth valve and one end of the several process gas distribution and delivery pipelines is respectively connected to the several output ports, and the other ends of the several process gas distribution and delivery pipelines are respectively connected to the inlet ends of the several filters.

4. The melamine production line according to claim 3, characterized in that: Also includes: Several valve heat purge pipelines are provided with regulating valves, one end of the several valve heat purge pipelines is respectively connected to several second valves, several third valves and several fourth valves, and the other end of the several valve heat purge pipelines is commonly connected to the pipeline section between the molten salt heater and the bottom of the fluidized bed reactor on the process gas supply pipeline.

5. The melamine production line according to claim 1, characterized in that: The several coolant temporary storage tanks are all provided with electric heaters.

6. The melamine production line according to claim 1, characterized in that: The setting height of the coolant temporary storage tank is lower than the setting height of the cooler, and the other end of the coolant pipeline is connected to the bottom of the corresponding coolant temporary storage tank, so that the coolant in the cooler can be transferred to the coolant temporary storage tank through the coolant pipeline under the effect of the height difference for temporary storage; the upper part of the coolant temporary storage tank is connected to a nitrogen pressurizing pipeline, and nitrogen is pressed into the coolant temporary storage tank through the nitrogen pressurizing pipeline to prompt the coolant to be injected back into the cooler through the coolant pipeline.

Citation Information

Cited By

  • Regeneration method of cooler and melamine production line applying regeneration method

    CN117804268A