Photovoltaic installation auxiliary device
By designing photovoltaic installation auxiliary devices, the installation process of photovoltaic brackets is simplified by using clamping components and platform mechanisms, solving the problems of time-consuming disassembly and assembly of gantry scaffolds and terrain limitations, and achieving efficient and flexible installation auxiliary effects.
Patent Information
- Application Number
- CN202420387776.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-29
- Publication Date
- 2024-10-22
- Estimated Expiration
- 2034-02-28
AI Technical Summary
During the installation process of photovoltaic projects, multiple components of the gantry scaffold need to be disassembled and assembled, which takes a long time and requires a flat ground as support, otherwise it will easily tip over, limiting installation efficiency and flexibility.
A photovoltaic installation auxiliary device is designed, including photovoltaic brackets, riser and platform mechanism. The riser is bound to the photovoltaic bracket through clamping components, and a wooden board or iron plate is placed on the top of the beam to build a working platform, which simplifies components and assembly and disassembly. The process improves installation efficiency and can be used in uneven terrain.
It achieves convenient installation and disassembly and rapid transfer, improves installation efficiency, reduces losses caused by tool disassembly and assembly and transfer, overcomes terrain limitations, and improves work flexibility.
Smart Images

Figure CN221886327U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the field of photovoltaic installation equipment, in particular to a photovoltaic installation auxiliary device. Background Art
[0002] When installing a photovoltaic project, a portal scaffolding is usually required as a support to install photovoltaic brackets and components. However, the portal scaffolding itself requires multiple parts to be assembled. Therefore, when the work position is transferred, the portal scaffolding needs to be disassembled. The disassembly and installation of multiple parts takes time. At the same time, the portal scaffolding needs to be on a flat ground when in use, otherwise the portal scaffolding will topple over. Utility Model Content
[0003] The purpose of the utility model is to provide a photovoltaic installation auxiliary device to solve the problems raised in the above background technology.
[0004] To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a photovoltaic installation auxiliary device, including a photovoltaic bracket, a clamp for frame installation is arranged at the bottom of the photovoltaic bracket, a riser is arranged at the top of the clamp, and a platform mechanism for building an installation platform is respectively arranged at the top and bottom of the riser, the platform mechanism includes a platform assembly and a clamp assembly, the platform assembly includes a first cross beam and a second cross beam, and the first cross beam and the second cross beam are both arranged on one side of the riser.
[0005] Preferably, the clamp assembly comprises a first connecting plate and a second connecting plate which are symmetrically arranged with respect to the first cross beam and the second cross beam, and one end of the first connecting plate and the second connecting plate is provided with a connecting piece for connecting with a vertical pipe.
[0006] Preferably, the connecting member includes a first bolt and a second bolt, and one end of the first connecting plate and the second connecting plate is provided with a first connecting hole and a second connecting hole for passing through the vertical pipe, the first beam and the second beam, and the first bolt and the second bolt are respectively inserted and connected with the first connecting hole and the second connecting hole.
[0007] Preferably, the other ends of the first connecting plate and the second connecting plate are respectively provided with a first clamping hole and a second clamping hole penetrating the first cross beam and the second cross beam, the first clamping hole and the second clamping hole are respectively inserted with a first plug rod and a second plug rod connected thereto, and one end of the first plug rod and the second plug rod are respectively provided with a locking piece for limiting the movement of the first plug rod and the second plug rod.
[0008] Preferably, the first and second insertion rods are respectively provided with a first insertion hole and a second insertion hole at one end for inserting the locking member, and the locking member comprises a first latch and a second latch, which are respectively inserted and connected with the first and second insertion holes.
[0009] Preferably, the bottom ends of the first cross beam and the second cross beam are fixedly connected with the first oblique reinforcement and the second oblique reinforcement, respectively, and the bottoms of the first oblique reinforcement and the second oblique reinforcement are fixedly connected to one side of the first cross beam.
[0010] Preferably, top ends of the first cross beam and the second cross beam are respectively fixedly connected to limit rods.
[0011] Technical effects and advantages of the utility model:
[0012] The utility model utilizes the design of the photovoltaic bracket, riser and platform mechanism, binds the riser and the photovoltaic bracket through a clamping assembly, and then uses wooden boards, iron plates, steel pipes and other materials to be placed on the top of the first beam and the second beam respectively to form a working platform for auxiliary installation work. This device has a simple structure, fewer components, and is easy to assemble and disassemble, and can be transferred quickly. It can effectively improve the installation efficiency and reduce various losses caused by the disassembly and transfer of installation tools, and at the same time will not be restricted by terrain. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 It is a schematic diagram of the cross-sectional structure of the connection between the utility model and the photovoltaic support.
[0014] Figure 2 This is one of the three-dimensional structural schematic diagrams of the utility model.
[0015] Figure 3 This is the second schematic diagram of the three-dimensional structure of the utility model.
[0016] In the figure: 1. photovoltaic support; 2. vertical pipe; 3. first crossbeam; 4. first connecting plate; 5. first bolt; 6. first plug rod; 7. first latch; 8. first oblique tie bar; 9. second crossbeam; 10. second bolt; 11. second plug rod; 12. second latch; 13. second oblique tie bar; 14. limit rod; 15. second connecting plate; 16. clamp. DETAILED DESCRIPTION
[0017] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0018] The utility model provides Figure 1-3 A photovoltaic installation auxiliary device is shown, including a photovoltaic bracket 1, a clamp 16 for frame installation is arranged at the bottom of the photovoltaic bracket 1, a vertical pipe 2 is arranged at the top of the clamp 16, and a platform mechanism for installing the platform is respectively arranged at the top and bottom of the vertical pipe 2. The platform mechanism includes a platform assembly and a clamp assembly, and the platform assembly includes a first cross beam 3 and a second cross beam 9, and the first cross beam 3 and the second cross beam 9 are both arranged on one side of the vertical pipe 2.
[0019] Specifically, the clamping assembly includes a first connecting plate 4 and a second connecting plate 15 symmetrically arranged with the first cross beam 3 and the second cross beam 9. One end of the first connecting plate 4 and the second connecting plate 15 is provided with a connecting piece for connecting with the vertical pipe 2. The connecting piece includes a first bolt 5 and a second bolt 10. One end of the first connecting plate 4 and the second connecting plate 15 is provided with a first connecting hole and a second connecting hole for passing through the vertical pipe 2, the first cross beam 3 and the second cross beam 9. The first bolt 5 and the second bolt 10 are respectively inserted and connected with the first connecting hole and the second connecting hole. The top ends of the first cross beam 3 and the second cross beam 9 are respectively fixedly connected with the limiting rod 14.
[0020] Further, the riser 2, the first crossbeam 3 and the second crossbeam 9 can be made of square tubes. The first crossbeam 3 and the second crossbeam 9 are respectively arranged at the top and bottom ends of one side of the riser 2. The top ends of the first crossbeam 3 and the second crossbeam 9 are fixedly connected to the bottom end of the limit rod 14 by welding. The function of the limit rod 14 is to prevent materials such as wooden boards, iron plates, steel pipes, etc. from sliding off the top ends of the first crossbeam 3 or the second crossbeam 9. The first crossbeam 3 and the second crossbeam 9 are respectively fixedly connected to one end of the limit rod 14, and the first connecting holes and the second connecting holes are arranged in opposite directions. The first bolt 5 and the second bolt 10 have the same size. The outer wall thread sleeves at one end of the first bolt 5 and the second bolt 10 are provided with nuts, so that the first crossbeam 3, the riser 2 and the first connecting plate 4 are connected in sequence by the first bolt 5, so that the first connecting plate 4 and the first crossbeam 3 are installed on both sides of the riser 2. The second bolt 10 connects the second crossbeam 9, the riser 2 and the second connecting plate 15 in sequence, completes the installation of the second crossbeam 9 and the second connecting plate 15, and realizes the basic state of the auxiliary device.
[0021] Specifically, the other ends of the first connecting plate 4 and the second connecting plate 15 are respectively provided with a first clamping hole and a second clamping hole that pass through the first cross beam 3 and the second cross beam 9, and the first clamping hole and the second clamping hole are respectively inserted and connected with the first plug rod 6 and the second plug rod 11, and one end of the first plug rod 6 and the second plug rod 11 is respectively provided with a locking piece for limiting the movement of the first plug rod 6 and the second plug rod 11, and one end of the first plug rod 6 and the second plug rod 11 is respectively provided with a first insertion hole and a second insertion hole for inserting the locking piece, and the locking piece includes a first latch 7 and a second latch 12, and the first latch 7 and the second latch 12 are respectively inserted and connected with the first insertion hole and the second insertion hole.
[0022] Furthermore, the second connecting plate 15 and the first connecting plate 4 can be made of channel steel, the first clamping hole and the second clamping hole are the same, the first plug rod 6 and the second plug rod 11 are the same, the first plug rod 6 and the second plug rod 11 are the same T-shaped round rods, the first insertion hole and the second insertion hole are opened at one end of the first plug rod 6 and the second plug rod 11 close to the first connecting plate 4 and the second connecting plate 15. When the auxiliary device needs to be installed, the side of the riser 2 facing the first plug rod 6 is fitted with the outer wall of the photovoltaic bracket 1, and then the first plug rod 6 and the second plug rod 11 are respectively inserted into the first clamping hole and the second clamping hole, and then the first plug 7 and the second plug 12 are respectively inserted into the first insertion hole and the second insertion hole, and then place the bottom end of the vertical pipe 2 on the top of the clamp 16, so that the clamp 16 supports the vertical pipe 2. The movement of the vertical pipe 2 can be limited by the first plug rod 6 and the second plug rod 11, so that the installation between the vertical pipe 2 and the photovoltaic bracket 1 is realized. At this time, wooden boards or iron plates, steel pipes and other materials can be placed on the top of the first beam 3 and the second beam 9 to build a working platform. When the auxiliary device needs to be disassembled, the first plug pin 7 and the second plug pin 12 are pulled to respectively pull the first plug rod 6 and the second plug rod 11 out of the first clamp hole and the second clamp hole, so that the auxiliary device can be disassembled quickly and conveniently, and the use of the auxiliary device will not be affected by the terrain.
[0023] Specifically, the bottom ends of the first cross beam 3 and the second cross beam 9 are fixedly connected with the first oblique reinforcement 8 and the second oblique reinforcement 13 respectively, and the bottoms of the first oblique reinforcement 8 and the second oblique reinforcement 13 are fixedly connected to one side of the first cross beam 3 .
[0024] Furthermore, the first oblique tie bar 8 and the second oblique tie bar 13 respectively form a right triangle between the first cross beam 3 and the vertical pipe 2, and between the second cross beam 9 and the vertical pipe 2, so as to enhance the supporting force and stability of the first cross beam 3 and the second cross beam 9. The two ends of the first oblique tie bar 8 are fixedly connected to the first cross beam 3 and the vertical pipe 2 by welding, and the two ends of the second oblique tie bar 13 are fixedly connected to the second cross beam 9 and the vertical pipe 2 by welding.
[0025] Finally, it should be noted that the above is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A photovoltaic installation auxiliary device, comprising a photovoltaic bracket (1), wherein a clamp (16) for bracket installation is provided at the bottom of the photovoltaic bracket (1), characterized in that: A stand pipe (2) is arranged at the top end of the clamp (16); a platform mechanism for installing a platform is arranged at the top and bottom of the stand pipe (2); the platform mechanism comprises a platform assembly and a clamp assembly; the platform assembly comprises a first cross beam (3) and a second cross beam (9); the first cross beam (3) and the second cross beam (9) are both arranged on one side of the stand pipe (2).
2. A photovoltaic installation auxiliary device according to claim 1, characterized in that: The clamp assembly comprises a first connecting plate (4) and a second connecting plate (15) which are symmetrically arranged with respect to the first cross beam (3) and the second cross beam (9); one end of the first connecting plate (4) and the second connecting plate (15) is provided with a connecting piece for connecting with the riser (2).
3. A photovoltaic installation auxiliary device according to claim 2, characterized in that: The connecting member comprises a first bolt (5) and a second bolt (10); one end of the first connecting plate (4) and the second connecting plate (15) is provided with a first connecting hole and a second connecting hole for passing through the vertical pipe (2), the first cross beam (3) and the second cross beam (9); the first bolt (5) and the second bolt (10) are respectively inserted and connected with the first connecting hole and the second connecting hole.
4. A photovoltaic installation auxiliary device according to claim 2, characterized in that: The other ends of the first connecting plate (4) and the second connecting plate (15) are respectively provided with a first clamping hole and a second clamping hole penetrating the first cross beam (3) and the second cross beam (9); the first clamping hole and the second clamping hole are respectively inserted and connected with a first plug rod (6) and a second plug rod (11); one end of the first plug rod (6) and the second plug rod (11) are respectively provided with a locking piece for limiting the movement of the first plug rod (6) and the second plug rod (11).
5. A photovoltaic installation auxiliary device according to claim 4, characterized in that: One end of the first insertion rod (6) and the second insertion rod (11) are respectively provided with a first insertion hole and a second insertion hole for inserting the locking member, and the locking member comprises a first latch pin (7) and a second latch pin (12), and the first latch pin (7) and the second latch pin (12) are respectively inserted and connected with the first insertion hole and the second insertion hole.
6. A photovoltaic installation auxiliary device according to claim 1, characterized in that: The bottom ends of the first cross beam (3) and the second cross beam (9) are respectively fixedly connected to a first oblique tie bar (8) and a second oblique tie bar (13); the bottoms of the first oblique tie bar (8) and the second oblique tie bar (13) are both fixedly connected to one side of the first cross beam (3).
7. A photovoltaic installation auxiliary device according to claim 1, characterized in that: The top ends of the first crossbeam (3) and the second crossbeam (9) are respectively fixedly connected to limit rods (14).