Assembly pier column construction shaping operation platform capable of being integrally hoisted

CN221895581UActive Publication Date: 2024-10-25CHINA CONSTR THIRD ENG BUREAU GRP SOUTH CHINA CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420299437.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-02-19
Publication Date
2024-10-25
Estimated Expiration
2034-02-19

Smart Images

  • Figure CN221895581U_ABST
    Figure CN221895581U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of pier column construction auxiliary devices, in particular to an integrally-hoisted assembly pier column construction shaping operation platform which comprises an installation module, the installation module comprises an upper cross beam, a lower cross beam and stand columns, and the stand columns are located at the four corners of the lower end of the upper cross beam and the four corners of the upper end of the lower cross beam. The two ends of the stand column are welded to the upper cross beam and the lower cross beam, a bamboo plywood is installed in the upper cross beam, elastic clamping assemblies are evenly installed on the upper cross beam and located on one side of the upper end of the bamboo plywood, a climbing frame is installed on one side of the installation module, and protection assemblies are installed on one side of the installation module and one side of the climbing frame. The climbing ladder is fixedly mounted in the climbing frame, the mounting modules are single and are mutually connected through the U-shaped buckles, the mounting modules are convenient to disassemble and assemble, meanwhile, the integrity is high, hoisting is convenient, meanwhile, the mounting modules can be freely assembled, and the device is suitable for construction of pier columns of different sizes.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model specifically relates to a standardized operation platform for pier column construction which can be hoisted as a whole and belongs to the technical field of pier column construction auxiliary devices. Background Art

[0002] With the continuous development of construction technology, construction units have higher and higher requirements for the overall construction period of construction projects, construction safety and external image display. This requires that the circulation efficiency of the bridge pier operation platform should be improved and the safety factor should be more guaranteed during the construction process. Especially for municipal bridge projects, the pier construction speed should be fast to reduce the impact time on the original traffic. At the same time, there is a large volume of traffic and a large number of people near the construction scope, so the requirements for safe construction and external display are higher. Use standardized operation platforms as much as possible to improve construction efficiency, increase safety factors, and improve external image. However, the traditional buckle frame has slow installation and disassembly efficiency, and it is difficult to manage personnel working at high altitudes during installation and disassembly. There are many materials, and it is difficult to manage civilized construction on site, and the external management image cannot be guaranteed.

[0003] In view of this, the present utility model is proposed. Utility Model Content

[0004] The purpose of the utility model is to provide a standardized operating platform for the construction of assembled pier columns that can be hoisted as a whole in order to solve the above-mentioned problems. The platform has the advantages of strong integrity, strong applicability and simple operation. The installation modules are single and are connected to each other by U-shaped buckles. While being convenient for disassembly and assembly, the platform has strong integrity and is convenient for hoisting. At the same time, the installation modules can be freely assembled, which is suitable for the construction of pier columns of different sizes.

[0005] The utility model achieves the above-mentioned purpose through the following technical scheme: a standardized operation platform for the construction of an assembly pier column that can be hoisted as a whole, comprising an installation module, the installation module comprising an upper crossbeam, a lower crossbeam and a column, the column is located at the four corners of the lower end of the upper crossbeam and the upper end of the lower crossbeam, and both ends of the column are welded to the upper crossbeam and the lower crossbeam, a bamboo plywood is installed inside the upper crossbeam, and an elastic clamping component is evenly installed on the upper crossbeam, the elastic clamping component is located on one side of the upper end of the bamboo plywood, a climbing frame is installed on one side of the installation module, a protective component is installed on one side of the installation module and the climbing frame, a ladder is fixedly installed inside the climbing frame, when in use, the installation module is placed at the use location, then another installation module is connected thereto and fixed by the U-shaped buckle, then the bamboo plywood is placed on the installation module and fixed by the elastic clamping component, in the process of use, the protective component can provide protection for workers, ensure the safety of workers, and enable workers to climb to a high place through the ladder.

[0006] Furthermore, in order to limit the two installation modules and facilitate the clamping, limiting columns are fixedly installed at the four corners of the upper end of the upper beam, and limiting holes are opened at the four corners of the lower end of the lower beam, and the limiting columns can be clamped in the limiting holes.

[0007] Furthermore, in order to place the bamboo plywood in the upper crossbeam, a placement strip is evenly and fixedly installed at the inner lower end of the upper crossbeam, and the bamboo plywood is placed on the placement strip.

[0008] Furthermore, in order to fix the bamboo plywood and prevent it from moving during use, rotation grooves are evenly opened on both sides of the upper end of the upper crossbeam, and the elastic clamping assembly includes a clamping block, one end of the clamping block is rotatably clamped in the rotation groove, and one end of the clamping block is located above the bamboo plywood.

[0009] Furthermore, in order to drive the clamping block to rotate in the rotating groove, return springs are installed on both sides of the clamping block, and the two ends of the return spring are fixedly connected to the clamping block and the rotating groove respectively.

[0010] Furthermore, in order to connect the two installation modules, a U-shaped buckle is arranged between the installation modules, a fixing plate is slidably installed at one end of the U-shaped buckle, and fixing nuts are threadedly installed at both ends of the U-shaped buckle, and the fixing nuts are located on one side of the fixing plate.

[0011] Furthermore, in order to provide protection for workers, the protection component is located on the outer facade of the installation module and the climbing frame. The protection component includes a mounting frame, which is fixedly installed on one side of the installation module and the climbing frame, and a perforated mesh is fixedly installed inside the mounting frame.

[0012] The technical effects and advantages of the utility model are as follows: the installation modules are single and are connected to each other by U-shaped buckles, which are convenient for disassembly and assembly while having strong integrity and convenient for lifting. At the same time, the installation modules can be freely assembled and are suitable for the construction of piers of different sizes. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] Figure 1 It is a schematic diagram of the overall structure of the utility model;

[0014] Figure 2 This is a schematic diagram of the connection relationship of the installation modules in the utility model;

[0015] Figure 3 This is a schematic diagram of the structure of the lower cross beam in the utility model;

[0016] Figure 4This is a schematic diagram of the structure of the upper crossbeam in the utility model;

[0017] Figure 5 It is a structural schematic diagram of the elastic clamping assembly in the utility model;

[0018] Figure 6 It is a structural schematic diagram of the U-shaped buckle in the utility model;

[0019] Figure 7 It is a structural schematic diagram of the protective component in the utility model.

[0020] In the figure: 1. Installation module; 101. Upper crossbeam; 102. Lower crossbeam; 103. Column; 2. Bamboo plywood; 3. Elastic snap-in assembly; 301. Snap-in block; 302. Return spring; 4. Climbing frame; 5. Protection assembly; 501. Installation frame; 502. Perforated mesh; 6. Ladder; 7. Limiting column; 8. Limiting hole; 9. Placement strip; 10. Rotation slot; 11. U-shaped buckle; 12. Fixing plate; 13. Fixing nut. DETAILED DESCRIPTION

[0021] The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

[0022] See also Figure 1-7 As shown, a standardized operation platform for the construction of assembled pier columns that can be hoisted as a whole includes an installation module 1, and the installation module 1 includes an upper crossbeam 101, a lower crossbeam 102 and a column 103. The column 103 is located at the four corners of the lower end of the upper crossbeam 101 and the upper end of the lower crossbeam 102, and both ends of the column 103 are welded to the upper crossbeam 101 and the lower crossbeam 102. A bamboo plywood 2 is installed inside the upper crossbeam 101, and elastic clamping components 3 are evenly installed on the upper crossbeam 101. The elastic clamping components 3 are located on one side of the upper end of the bamboo plywood 2. A climbing frame 4 is installed on one side of the module 1, and a protective component 5 is installed on one side of the installation module 1 and the climbing frame 4. A ladder 6 is fixedly installed inside the climbing frame 4. When in use, the installation module 1 is placed at the use location, and then another installation module 1 is connected to it and fixed by a U-shaped buckle 11. Then the bamboo plywood 2 is placed on the installation module 1 and fixed by an elastic clamping component 3. During use, the protective component 5 can provide protection for the workers and ensure the safety of the workers, and the ladder 6 allows the workers to climb to a high place.

[0023] Limiting columns 7 are fixedly installed at the four corners of the upper end of the upper crossbeam 101, and limiting holes 8 are provided at the four corners of the lower end of the lower crossbeam 102. The limiting columns 7 can be snapped into the limiting holes 8. When in use, first fix one installation module 1 at the place of use, and then snap another installation module 1 onto the installation module 1 with the cooperation of the limiting columns 7 and the limiting holes 8.

[0024] A placement strip 9 is evenly fixedly installed at the inner lower end of the upper crossbeam 101, and the bamboo plywood 2 is placed on the placement strip 9. Rotation grooves 10 are evenly opened on both sides of the upper end of the upper crossbeam 101. The elastic clamping assembly 3 includes a clamping block 301, one end of the clamping block 301 is rotatably clamped in the rotation groove 10, and one end of the clamping block 301 is located above the bamboo plywood 2. Return springs 302 are installed on both sides of the clamping block 301, and the two ends of the return spring 302 are respectively fixedly connected to the clamping block 301 and the rotation groove 10. When in use, pull the clamping block 301, then place the bamboo plywood 2 on the placement strip 9, and then release the clamping block 301. Under the action of the return spring 302, the clamping block 301 presses and fixes the bamboo plywood 2, thereby preventing the bamboo plywood 2 from moving when in use.

[0025] A U-shaped clip 11 is arranged between the mounting modules 1, a fixing plate 12 is slidably installed at one end of the U-shaped clip 11, fixing nuts 13 are threadedly installed at both ends of the U-shaped clip 11, and the fixing nuts 13 are located on one side of the fixing plate 12. When in use, the U-shaped clip 11 is clamped between the two mounting modules 1, and the mounting modules 1 are connected and fixed by the fixing plate 12 and the fixing nuts 13.

[0026] The protection component 5 is located on the outer facade of the installation module 1 and the climbing frame 4. The protection component 5 includes a mounting frame 501, which is fixedly installed on one side of the installation module 1 and the climbing frame 4. A perforated mesh 502 is fixedly installed inside the mounting frame 501. When in use, the perforated mesh 502 can prevent tools from falling and causing injuries to pedestrians, and can prevent workers from falling, thereby improving safety.

[0027] When the utility model is used, firstly, one installation module 1 is fixed at the place of use, then the other installation module 1 is clamped on the installation module 1 under the cooperation of the limiting column 7 and the limiting hole 8, the clamping block 301 is pulled, and then the bamboo plywood 2 is placed on the placement strip 9, and then the clamping block 301 is released, and the clamping block 301 presses and fixes the bamboo plywood 2 under the action of the return spring 302, so as to prevent the bamboo plywood 2 from moving when in use, and the U-shaped buckle 11 is clamped on the two installation modules 1.

[0028] The mounting module 1 is connected and fixed by the fixing plate 12 and the fixing nut 13. The perforated mesh 502 can prevent the tools from falling and causing harm to pedestrians, and can prevent the workers from falling, thereby improving safety.

[0029] It is obvious to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the present invention can be implemented in other specific forms without departing from the spirit or essential features of the present invention. Therefore, the embodiments should be regarded as exemplary and non-restrictive from any point of view, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims be included in the present invention. Any reference numeral in a claim should not be regarded as limiting the claim to which it relates.

[0030] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.

Claims

1. A standardized operation platform for the construction of an assembly pier column that can be hoisted as a whole, comprising an installation module (1), wherein the installation module (1) comprises an upper crossbeam (101), a lower crossbeam (102) and a column (103), wherein the column (103) is located at the four corners of the lower end of the upper crossbeam (101) and the upper end of the lower crossbeam (102), and both ends of the column (103) are welded to the upper crossbeam (101) and the lower crossbeam (102), and characterized in that: A bamboo plywood (2) is installed inside the upper crossbeam (101), and elastic snap-in components (3) are evenly installed on the upper crossbeam (101), and the elastic snap-in components (3) are located on one side of the upper end of the bamboo plywood (2). A climbing frame (4) is installed on one side of the installation module (1), and a protective component (5) is installed on one side of the installation module (1) and the climbing frame (4), and a ladder (6) is fixedly installed inside the climbing frame (4).

2. The standardized operation platform for the construction of assembly pier columns that can be hoisted as a whole as claimed in claim 1 is characterized by: Limiting columns (7) are fixedly installed at the four corners of the upper end of the upper crossbeam (101), and limiting holes (8) are provided at the four corners of the lower end of the lower crossbeam (102), and the limiting columns (7) can be snapped into the limiting holes (8).

3. The standardized operation platform for the construction of assembly pier columns that can be hoisted as a whole as claimed in claim 1 is characterized by: A placement strip (9) is evenly and fixedly mounted on the inner lower end of the upper cross beam (101), and the bamboo plywood (2) is placed on the placement strip (9).

4. The standardized operation platform for the construction of assembly pier columns that can be hoisted as a whole as claimed in claim 1 is characterized by: Rotation grooves (10) are evenly formed on both sides of the upper end of the upper cross beam (101), and the elastic clamping assembly (3) comprises a clamping block (301), one end of which is rotatably clamped in the rotation groove (10), and one end of the clamping block (301) is located above the bamboo plywood (2).

5. The standardized operation platform for the construction of assembly pier columns that can be hoisted as a whole as claimed in claim 4 is characterized by: Return springs (302) are installed on both sides of the clamping block (301), and the two ends of the return spring (302) are fixedly connected to the clamping block (301) and the rotating groove (10) respectively.

6. The standardized operation platform for the construction of assembly pier columns that can be hoisted as a whole as claimed in claim 1, characterized in that: A U-shaped buckle (11) is provided between the installation modules (1), and a fixing plate (12) is slidably mounted on one end of the U-shaped buckle (11).

7. The standardized operation platform for the construction of assembly pier columns that can be hoisted as a whole as claimed in claim 6, characterized in that: Both ends of the U-shaped buckle (11) are threadedly mounted with fixing nuts (13), and the fixing nuts (13) are located on one side of the fixing plate (12).

8. The standardized operation platform for the construction of assembly pier columns that can be hoisted as a whole as claimed in claim 1, characterized in that: The protective component (5) is located on the outer facade of the installation module (1) and the climbing frame (4), and the protective component (5) comprises a mounting frame (501), wherein the mounting frame (501) is fixedly mounted on one side of the installation module (1) and the climbing frame (4), and a perforated mesh (502) is fixedly mounted inside the mounting frame (501).