Premixed flow-state solidified geotechnical pile

CN221919358UActive Publication Date: 2024-10-29WUHAN MUNICIPAL CONSTR GROUP
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202420058549.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-10
Publication Date
2024-10-29
Estimated Expiration
2034-01-10

Smart Images

  • Figure CN221919358U_ABST
    Figure CN221919358U_ABST
Patent Text Reader

Abstract

The utility model provides a pre-mixing flow state solidification geotechnical method pile which comprises a pre-formed hole, profile steel, a pouring material and a hole forming auxiliary structure, the pouring material is filled in the pre-formed hole, the profile steel is inserted into the pouring material in the pre-formed hole, the hole forming auxiliary structure comprises a guide groove and a positioning frame, the guide groove is arranged along the position of the pre-formed hole, and the positioning frame is arranged at the top of the guide groove. According to the utility model, the construction method pile and the premixed flow state solidified soil are combined to be used for supporting pile construction, so that the pile forming speed can be accelerated, the construction cost can be effectively controlled, the resources are effectively saved, and the on-site environmental pollution is reduced.
Need to check novelty before this filing date? Find Prior Art

Citation Information

Cited By

  • Premixed flow state solidification geotechnical method pile construction method and construction method pile

    CN121272895A