Aluminum ash solid waste extraction system

By combining a crusher and a multi-stage classifier system, the problems of high energy consumption and low efficiency in aluminum ash recycling have been solved, achieving efficient separation of aluminum and impurities and recovery of precious metals.

CN221951372UActive Publication Date: 2024-11-05SHANDONG HAONA MECHANICAL EQUIP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323382209.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-12
Publication Date
2024-11-05
Estimated Expiration
2033-12-12

AI Technical Summary

Technical Problem

Existing methods for aluminum ash recycling suffer from high energy consumption and low efficiency.

Method used

A combined system of crusher, classifying wheel and multi-stage classifier is used to achieve efficient separation and recovery of aluminum and impurities through equipment such as grinding, classification and cyclone collector.

Benefits of technology

It reduces energy consumption in aluminum ash recycling, improves recycling efficiency, and achieves efficient extraction of aluminum and separation of precious metals.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221951372U_ABST
    Figure CN221951372U_ABST
Patent Text Reader

Abstract

The utility model discloses an aluminum ash solid waste extraction system, which comprises a crusher, a material inlet, a grinding part, a grading wheel, a material guide screw, a first material outlet and a second material outlet, after an aluminum ash waste mixture is ground in the grinding part, an aluminum-containing metal mixture is discharged from the first discharging end through the material guide screw, and other impurities are discharged from the second discharging end through the grading wheel; the first grading unit is connected with the first discharging end, and aluminum metal is recycled from the aluminum-containing metal mixture through sorting of the first grading unit; and the second grading unit is connected with the second discharging end, other impurities are sorted, filtered and dedusted through the second grading unit, and purified air is discharged. When the device is used, the aluminum metal recovery rate is high, and the recovery and extraction process is energy-saving and environment-friendly.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of aluminum ash extraction and recovery, in particular to an aluminum ash solid waste extraction system. Background Art

[0002] Aluminum ash is a byproduct of the entire process of aluminum industrial production. The recovery of metals in the ash has always been a hot topic. Extracting aluminum metal from aluminum ash can reduce the loss of aluminum metal, reduce the consumption of aluminum metal raw materials, and reduce the energy consumption of aluminum metal production. Therefore, how to efficiently extract aluminum metal from aluminum ash is particularly important in the recycling system of aluminum resources.

[0003] In the prior art, the basic process of aluminum ash recovery is: slagging → hot ash treatment → cooling → cooling ash screening → secondary hot ash treatment → cooling → cooling ash screening → waste ash treatment. In the existing aluminum ash recovery method, the aluminum ash undergoes a process of hot, cold, cold, hot, cold, cold, which consumes a lot of energy and has low recovery efficiency.

[0004] How to reduce the energy consumption of aluminum ash recovery and improve the recovery efficiency is a technical problem that needs to be solved urgently by technical personnel in this field. Utility Model Content

[0005] In view of this, the purpose of the utility model is to provide an aluminum ash solid waste extraction system to address the deficiencies of the prior art, which includes:

[0006] A pulverizer, comprising a feed end, a grinding part, a classifying wheel, a guide screw, a first discharge end and a second discharge end; after the aluminum ash waste mixture is ground in the grinding part, the aluminum-containing metal mixture is discharged from the first discharge end through the guide screw, and other impurities are discharged from the second discharge end through the classifying wheel;

[0007] A first classification unit connected to the first discharge end, wherein the aluminum-containing metal mixture is sorted and aluminum metal is recovered by the first classification unit;

[0008] The second classifying unit connected to the second discharging end is used for sorting, filtering and dust removal of other impurities and discharges purified air.

[0009] In certain embodiments, in the aluminum ash solid waste extraction system, the first classifying unit includes a first classifier and a second classifier;

[0010] After sorting by the first classifier, the precious metals in the aluminum-containing metal mixture are extracted, and the remaining aluminum-containing metal mixture is sorted by the second classifier to separate aluminum and other substances and recover aluminum.

[0011] In certain embodiments, in the aluminum ash solid waste extraction system, relevant air unloading valves are provided at the lower parts of the first classifier and the second classifier.

[0012] In certain embodiments, in the aluminum ash solid waste extraction system, the second classifying unit includes a third classifier.

[0013] In certain embodiments, in the aluminum ash solid waste extraction system, an air unloading valve is provided at the bottom of the third classifier.

[0014] In certain embodiments, in the aluminum ash solid waste extraction system, the first classifying unit further includes a first cyclone collector, a first dust collector and a first induced draft fan connected to the second classifier.

[0015] In certain embodiments, in the aluminum ash solid waste extraction system, the second classifying unit further includes a second cyclone collector, a second dust collector and a second induced draft fan connected to the third classifier.

[0016] In certain embodiments, in the aluminum ash solid waste extraction system, the extraction system also includes a feeder connected to the feed end, and the feeder transports the aluminum ash waste mixture to the pulverizer.

[0017] The beneficial effects of the utility model are:

[0018] The utility model discloses an aluminum ash solid waste extraction system. A mixture of aluminum ash and waste is crushed in a pulverizer, and the broken materials enter a classification area. The ash in the materials passes through a classification wheel and enters a collection area for collection. The aluminum-containing metal in the materials falls into a material guide spiral for extraction. In order to increase the aluminum content, the aluminum-containing metal enters a classifier. Under the centripetal force of a fan, the classifier moves from the lower end of the classifier to the classification area at high speed along with the rising air flow. Under the strong centrifugal force generated by the high-speed rotating classification impeller, the aluminum and ash materials are separated. A small amount of ash contained in the aluminum enters a cyclone separator through the gap between the blades of the classification wheel for collection. During the aluminum descent process, the ash is sorted again through the secondary air supply port, and then rises to the classification area for secondary classification. The aluminum falls to the discharge port for discharge, completing an aluminum recovery. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1 This is a first structural schematic diagram of the aluminum ash solid waste extraction system described in the utility model;

[0020] Figure 2 This is a second structural schematic diagram of the aluminum ash solid waste extraction system described in the utility model.

[0021] In the figure: 1-crusher, 2-feeding end, 3-grinding part, 4-classifying wheel, 5-guiding screw, 6-first discharging end, 7-second discharging end, 8-first classifying unit, 9-second classifying unit, 10-first classifier, 11-second classifier, 12-third classifier, 13-first cyclone collector, 14-first dust collector, 15-first induced draft fan, 16-second cyclone collector, 17-second dust collector, 18-second induced draft fan, 19-feeder. DETAILED DESCRIPTION

[0022] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention.

[0023] like Figure 1 and Figure 2 As shown, an aluminum ash solid waste extraction system comprises:

[0024] A pulverizer 1 includes a feed end 2, a grinding part 3, a classifying wheel 4, a guide screw 5, a first discharge end 6 and a second discharge end 7; after the aluminum ash waste mixture is ground in the grinding part 3, the aluminum-containing metal mixture is discharged from the first discharge end 6 through the guide screw 5, and other impurities are discharged from the second discharge end 7 through the classifying wheel 4;

[0025] A first classification unit 8 connected to the first discharge end 6, the aluminum-containing metal mixture is sorted and aluminum metal is recovered by the first classification unit 8;

[0026] The second classifying unit 9 connected to the second discharging end 7, other impurities are sorted, filtered, and dusted by the second classifying unit 9, and purified air is discharged.

[0027] Aluminum ash waste enters the crushing mill 1 through the quantitative feeding and conveying system, and is broken up by the collision, friction, shearing and other comprehensive forces of the high-speed rotating grinding block and the gear ring. The broken up materials include metal mixtures containing aluminum and other impurities. Other impurities enter the classification area, and the ash in the material passes through the classification wheel 4 and enters the collection area for collection. The metal mixture containing aluminum in the material falls into the guide screw 5 and is discharged. Other substances are ground into ultrafine powder by the crusher 1 and enter the second dust collector 17. After being filtered by the bag, the purified air is discharged by the second induced draft fan 18. The aluminum-containing metal mixture discharged by the guide screw 5 will carry some ash during the discharge process. In order to increase the aluminum content, the aluminum-containing metal mixture enters the first classifier 10 and the second classifier 11. Different metal parts have different specific gravities and particle sizes after grinding. Under the centripetal force of the fan, they move at high speed from the feeding port at the lower end of the classifier along with the rising air flow to the grading area. In the first classifier 10, the precious metals heavier than aluminum are located at the bottom, and aluminum is located at the top. After grading, the air shut-off discharge valve at the bottom of the first classifier 10 is opened to discharge the precious metals from the first classifier 10, and the remaining metal containing aluminum enters the second classifier 11. High-speed rotation grading is performed again in the second classifier 11 to separate the aluminum and the remaining metal. The remaining metal is discharged from the air shut-off discharge valve at the bottom of the second classifier 11. A small amount of flying dust is still attached to the remaining aluminum metal. After passing through the first cyclone collector 13, the first dust collector 14 and the first induced draft fan 15, dust is removed to obtain relatively clean aluminum metal, completing a crushing operation.

[0028] In the above scheme, the first classifying unit 8 includes a first classifier 10 and a second classifier 11; the precious metals in the aluminum-containing metal mixture are extracted after sorting by the first classifier 10, and the remaining aluminum-containing metal mixture is sorted by the second classifier 11 to separate aluminum and other substances and recover aluminum.

[0029] In the above scheme, relevant air discharge valves are arranged at the lower parts of the first classifier 10 and the second classifier 11.

[0030] In the above solution, the second classifying unit 9 includes a third classifying machine 12 .

[0031] In the above scheme, an air discharge valve is arranged at the lower part of the third classifier 12 .

[0032] During the high-speed operation of the first classifier 10 , the second classifier 11 and the third classifier 12 , the air-closing discharge valve separates the separated precious metals, other non-aluminum metals and impurities from the first classifier 10 , the second classifier 11 and the third classifier 12 .

[0033] In the above solution, the first classifying unit 8 further includes a first cyclone collector 13 , a first dust collector 14 and a first induced draft fan 15 which are connected to the second classifier 11 .

[0034] After dust removal treatment in the first cyclone collector 13, the first dust collector 14 and the first induced draft fan 15, dust-free aluminum metal is finally recovered.

[0035] In the above solution, the second classifying unit 9 further includes a second cyclone collector 16 , a second dust collector 17 and a second induced draft fan 18 which are in communication with the third classifier 12 .

[0036] After passing through the second cyclone collector 16, the second dust collector 17 and the second induced draft fan 18, dust is removed and clean air is discharged.

[0037] In the above scheme, the extraction system also includes a feeder 19 connected to the input end of the pulverizer 1, and the feeder 19 transports the aluminum ash waste mixture to the pulverizer 1.

[0038] Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the utility model rather than to limit it. Other modifications or equivalent substitutions made to the technical solution of the utility model by ordinary technicians in this field should be included in the scope of the claims of the utility model as long as they do not depart from the spirit and scope of the technical solution of the utility model.

Claims

1. An aluminum ash solid waste extraction system, characterized in that: include: A pulverizer (1) comprises a feed end (2), a grinding section (3), a classifying wheel (4), a guide screw (5), a first discharge end (6) and a second discharge end (7); after the aluminum ash waste mixture is ground in the grinding section (3), the aluminum-containing metal mixture is discharged from the first discharge end (6) through the guide screw (5), and other impurities are discharged from the second discharge end (7) through the classifying wheel (4); A first classifying unit (8) connected to the first discharge end (6), wherein the aluminum-containing metal mixture is sorted by the first classifying unit (8) to recover aluminum metal; A second classifying unit (9) connected to the second discharge end (7) is used to sort, filter and remove dust from other impurities and discharge them into purified air.

2. The aluminum ash solid waste extraction system according to claim 1 is characterized in that: The first classifying unit (8) comprises a first classifying machine (10) and a second classifying machine (11); After being sorted by the first classifier (10), precious metals in the aluminum-containing metal mixture are extracted, and the remaining aluminum-containing metal mixture is sorted by the second classifier (11) to separate aluminum from other substances and recover aluminum.

3. The aluminum ash solid waste extraction system according to claim 2 is characterized in that: Relevant air discharge valves are arranged at the lower parts of the first classifier (10) and the second classifier (11).

4. The aluminum ash solid waste extraction system according to claim 1 is characterized in that: The second classifying unit (9) comprises a third classifying machine (12).

5. The aluminum ash solid waste extraction system according to claim 4 is characterized in that: A relevant air discharge valve is arranged at the lower part of the third classifier (12).

6. The aluminum ash solid waste extraction system according to claim 2 is characterized in that: The first classifying unit (8) further comprises a first cyclone collector (13), a first dust collector (14) and a first induced draft fan (15) which are in communication with the second classifying machine (11).

7. The aluminum ash solid waste extraction system according to claim 4 is characterized in that: The second classifying unit (9) further comprises a second cyclone collector (16), a second dust collector (17) and a second induced draft fan (18) which are in communication with the third classifying machine (12).

8. The aluminum ash solid waste extraction system according to claim 1 is characterized in that: The extraction system further comprises a feeder (19) connected to the feed end (2), wherein the feeder (19) delivers the aluminum ash waste mixture to the pulverizer (1).