Connecting structure for butt joint of steel towers
By designing a connecting structure including locking rod, shrink groove, return spring and correcting slope, the problem of large errors in the steel tower lifting and assembly process is solved, and efficient, accurate docking and convenient assembly of the steel tower is achieved.
Patent Information
- Application Number
- CN202323402841.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-13
- Publication Date
- 2024-11-12
- Estimated Expiration
- 2033-12-13
AI Technical Summary
Existing steel towers are prone to shake during lifting and assembly, resulting in large errors during docking and require multiple adjustments, resulting in cumbersome assembly.
A connection structure including a bridge body, twisted seat, tire frame, connecting frame, locking rod, shrink groove, return spring and correction surface is designed. Through the coordination between the locking rod and the connecting hole, self-correction is achieved, error is reduced, and through The return spring and corrected slope ensure an accurate fit.
It effectively reduces the number of adjustments during assembling the steel tower, improves the convenience of assembly, ensures the accuracy of the docking of the steel tower, and avoids multiple position adjustments caused by errors.
Smart Images

Figure CN221989076U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of bridge steel towers, in particular to a connection structure for butt-jointing steel towers. Background Art
[0002] A bridge steel tower is an important structure on a bridge. Due to the small size of the steel tower, the construction space is limited during its construction, so it is prefabricated in sections and then assembled.
[0003] However, when existing steel towers are constructed in sections and then assembled, they are assembled by hoisting. Since the sections of the steel tower need to be suspended in the air, it is easy for them to shake to a certain extent. When the steel towers are fitted together, the shaking in the air makes it easy for them to fit inaccurately and there is a certain error. Multiple adjustments are needed, making the assembly of the steel towers very troublesome and cumbersome. Utility Model Content
[0004] The utility model aims to provide a connection structure for steel tower docking, which solves the problem that the steel towers are prone to errors during docking due to shaking during hoisting when being assembled, and multiple adjustments are required, making the docking very troublesome.
[0005] The embodiments of the present invention are implemented by the following technical solutions:
[0006] The utility model provides a connection structure for connecting steel towers, comprising a bridge body, a capstan seat is arranged on the top of the bridge body, a tire frame is arranged on the top of the bridge body, a steel tower is connected to the top of the tire frame, one end of the steel tower is connected to the capstan seat, the bridge body is assembled into several sections, a connecting frame is arranged on the side wall of one end of each section of the bridge body, an installation frame is arranged on the side wall of one end of the bridge body away from the connecting frame, a locking rod is arranged on the top of the connecting frame, a connecting hole is arranged on the top of the installation frame, and the locking rod slides along the connecting hole.
[0007] Preferably, the locking rod is a round shaft protrusion at the bottom of the connecting frame.
[0008] Preferably, the locking rod further includes a contraction groove, a stop block and a return spring, the contraction groove is a groove on both sides of the locking rod, the stop block is arranged in the middle of the contraction groove, and the return spring is arranged at one end of the stop block.
[0009] Preferably, the stop block is connected in the contraction groove via a return spring at one end.
[0010] Preferably, one end of the return spring provided on the stop block is connected to a telescopic rod and the contraction groove.
[0011] Preferably, the connecting hole further comprises a correction bevel, and the correction bevel is arranged on the inner wall of the connecting hole.
[0012] Preferably, the correction slope is a slope that is inclined by an arc of the inner wall of the connecting hole, and the opening at the bottom of the correction slope cooperates with the locking rod.
[0013] The technical solution of the embodiment of the utility model has at least the following advantages and beneficial effects:
[0014] 1. Through the cooperation of the locking rod and the connecting hole provided in the device, when the steel tower is assembled, the connecting frame and the mounting frame can be corrected automatically when they are fitted together, so that the error between the two is reduced when they are fitted together, thereby reducing the number of adjustments during assembly, making the assembly of the steel tower more convenient. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] In order to more clearly illustrate the technical solutions of the embodiments of the utility model, the drawings required for use in the embodiments will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the utility model and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other relevant drawings can be obtained based on these drawings without paying creative work.
[0016] Figure 1 It is a schematic diagram of the overall structure of the utility model;
[0017] Figure 2 It is a schematic diagram of the separation structure of the steel tower of the utility model;
[0018] Figure 3 It is a partial side structural schematic diagram of the steel tower of the utility model;
[0019] Figure 4 For this utility model Figure 3 A schematic diagram of the enlarged structure at A in the middle;
[0020] Icons: bridge body 1, capstan seat 2, steel tower 3, connecting frame 301, locking rod 302, shrinkage groove 3021, stop block 3022, return spring 3023, installation frame 303, connecting hole 3031, correction slope 3032, tire frame 4. DETAILED DESCRIPTION
[0021] In the description of the present invention, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms "set", "install", "connect", and "connect" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0022] Combine the following Figures 1 to 4 The utility model is described in detail.
[0023] A connection structure for connecting steel towers, including a bridge body 1, a capstan 2 is arranged on the top of the bridge body 1, a tire frame 4 is arranged on the top of the bridge body 1, a steel tower 3 is connected to the top of the tire frame 4, one end of the steel tower 3 is connected to the capstan 2, the bridge body 1 is assembled into several sections, a connecting frame 301 is arranged on the side wall of one end of each section of the bridge body 1, an installation frame 303 is arranged on the side wall of the end of the bridge body 1 away from the connecting frame 301, a locking rod 302 is arranged on the top of the connecting frame 301, a connecting hole 3031 is arranged on the top of the installation frame 303, and the locking rod 302 slides along the connecting hole 3031.
[0024] First, the steel tower 3 is built on the tire frame 4 on the top of the bridge body 1. When constructing the steel tower 3, it can be constructed by segmented splicing to reduce the limitation of the construction site. The steel towers 3 are assembled together by fitting the connecting frame 301 and the installation frame 303 together and then connecting them through reinforcement structures such as bolts to assemble the steel tower 3 segments together to form a whole.
[0025] At the same time, when each section of the steel tower 3 is assembled, the locking rod 302 on the connecting frame 301 will be embedded in the connecting hole 3031 in the middle of the installation frame 303. The locking rod 302 slides along the connecting hole 3031, so that the locking rod 302 can be embedded in the connecting hole 3031 by itself, without the need for multiple manual adjustments.
[0026] Furthermore, the locking rod 302 is a round shaft protrusion at the bottom of the connecting frame 301, and the locking rod 302 also includes a contraction groove 3021, a stop block 3022 and a return spring 3023. The contraction groove 3021 is a groove on both sides of the locking rod 302, the stop block 3022 is arranged in the middle of the contraction groove 3021, and the return spring 3023 is arranged at one end of the stop block 3022.
[0027] When the connecting frame 301 and the mounting frame 303 are fitted together to assemble the steel tower, the locking rod 302 at the bottom of the connecting frame 301 will extend into the connecting hole 3031. If there is an error between the connecting frame 301 and the mounting frame 303, the locking rod 302 will press against the correction slope 3032 on the inner wall of the connecting hole 3031. The correction slope 3032 can slide along the slope when the locking rod 302 continues to extend, and can be easily corrected to make it completely fit into the opening of the correction slope 3032, so as to correct the error between the connecting frame 301 and the mounting frame 303.
[0028] By correcting the bevel 303 and the locking rod 302, it is easier to align the steel tower 3 when assembling it by hoisting, so as to facilitate the connection of structures such as bolts, etc., without the need for multiple position adjustments due to errors that make it impossible to connect the bolts, etc.
[0029] Furthermore, the stop block 3022 is connected to the shrinkage groove 3021 through a return spring 3023 at one end. The stop block 3022 is provided with a return spring 3023, one end of which is connected to a telescopic rod and connected to the shrinkage groove 3021. The connecting hole 3031 also includes a correction bevel 3032, and the correction bevel 3032 is arranged on the inner wall of the connecting hole 3031. The correction bevel 3032 is a bevel arranged to be inclined by an arc of the inner wall of the connecting hole 3031, and the opening at the bottom of the correction bevel 3032 cooperates with the locking rod 302.
[0030] At the same time, when the locking rod 302 extends into the connecting hole 3031, the stoppers 3022 on both sides will press against the surface of the correcting inclined surface 3032. As the locking rod 302 extends, the arc end of the stopper 3022 will press against the inclined surface of the correcting inclined surface 3032 due to the decrease in the hole diameter, forcing the stopper 3022 to shrink into the shrinkage groove 3021, so that the locking rod 302 can continue to extend into the correcting inclined surface 3032. Then, when the locking rod 302 is completely fitted into the correcting inclined surface 3032, At this time, the stop block 3022 will pop out due to the elasticity of the reset spring 3023 because it has no abutment, so that it will abut on both sides of the opening of the correction slope 3032 at the bottom of the installation frame 303, so that the connecting frame 301 and the installation frame 303 can be temporarily locked after the correction and fitting, so that the connecting frame 301 and the installation frame 303 will not be easily separated after the fitting connection, thereby facilitating the connection of the connecting frame 301 and the installation frame 303 with bolts and other workpieces, making the assembly of the steel tower more convenient.
[0031] The following is a specific implementation process of the utility model. First, the steel tower 3 is built on the tire frame 4 at the top of the bridge body 1. When the steel tower 3 is built, it can be constructed by segmented splicing to reduce the limitation of the construction site. The assembly of the steel towers 3 is through the mutual fit of the connecting frame 301 and the installation frame 303 and then connected by bolts and other reinforcement structures to assemble the steel tower 3 segments together to form a whole. When the connecting frame 301 and the installation frame 303 are fitted together to assemble the steel tower When the locking rod 302 at the bottom of the connecting frame 301 is inserted into the connecting hole 3031, if there is an error between the connecting frame 301 and the mounting frame 303, the locking rod 302 will be pressed against the correction slope 3032 on the inner wall of the connecting hole 3031, and the correction slope 3032 can slide along the slope when the locking rod 302 continues to extend, and can be corrected calmly so that it is completely embedded in the opening of the correction slope 3032, so as to correct the error between the connecting frame 301 and the mounting frame 303. The error is caused by the fact that when the locking rod 302 is inserted into the connecting hole 3031, the stoppers 3022 on both sides will press against the surface of the correction bevel 3032. As the locking rod 302 is inserted, the arc end of the stopper 3022 will press against the bevel of the correction bevel 3032 due to the decrease in the hole diameter, forcing the stopper 3022 to shrink into the shrinkage groove 3021, so that the locking rod 302 can continue to extend into the correction bevel 3032. Then, when the locking rod 302 is completely fitted into the correction bevel 303 2, the stop block 3022 will pop out due to the elasticity of the reset spring 3023 because it has no abutment, so that it will abut on both sides of the opening of the correction inclined surface 3032 at the bottom of the installation frame 303, so that the connecting frame 301 and the installation frame 303 can be temporarily locked after the correction and fitting, so that the connecting frame 301 and the installation frame 303 will not be easily separated after the fitting connection, thereby facilitating the connection of the connecting frame 301 and the installation frame 303 with bolts and other workpieces, making the assembly of the steel tower more convenient.
[0032] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. For those skilled in the art, the present invention may be subject to various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A connection structure for connecting steel towers, comprising a bridge body (1), a capstan seat (2) being arranged on the top of the bridge body (1), a tire frame (4) being arranged on the top of the bridge body (1), a steel tower (3) being connected to the top of the tire frame (4), one end of the steel tower (3) being connected to the capstan seat (2), It is characterized in that The bridge body (1) is assembled into several sections, a connecting frame (301) is provided on one end side wall of each section of the bridge body (1), a mounting frame (303) is provided on one end side wall of the bridge body (1) away from the connecting frame (301), a locking rod (302) is provided on the top of the connecting frame (301), a connecting hole (3031) is provided on the top of the mounting frame (303), and the locking rod (302) slides along the connecting hole (3031).
2. A connection structure for steel tower docking according to claim 1, It is characterized in that The locking rod (302) is a round shaft protrusion at the bottom of the connecting frame (301).
3. A connection structure for steel tower docking according to claim 1, It is characterized in that The locking rod (302) further comprises a contraction groove (3021), a stop block (3022) and a return spring (3023); the contraction groove (3021) is a groove on both sides of the locking rod (302); the stop block (3022) is arranged in the middle of the contraction groove (3021); and the return spring (3023) is arranged at one end of the stop block (3022).
4. A connection structure for steel tower docking according to claim 3, It is characterized in that The stop block (3022) is connected to the contraction groove (3021) via a return spring (3023) at one end.
5. A connection structure for steel tower docking according to claim 3, It is characterized in that The stop block (3022) is provided with a return spring (3023) at one end thereof connected to a telescopic rod and the contraction groove (3021).
6. A connection structure for steel tower docking according to claim 1, It is characterized in that The connection hole (3031) further comprises a correction bevel (3032), and the correction bevel (3032) is arranged on the inner wall of the connection hole (3031).
7. A connection structure for steel tower docking according to claim 6, It is characterized in that The correction slope (3032) is a slope that is arranged in an arc-shaped manner on the inner wall of the connection hole (3031), and the opening at the bottom of the correction slope (3032) cooperates with the locking rod (302).