Prefabricated cabin drainage flow guide assembly convenient to adjust

CN222025357UActive Publication Date: 2024-11-19JIANGSU YOUZHIGONG ELECTRICAL EQUIP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202421045523.3
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-05-14
Publication Date
2024-11-19
Estimated Expiration
2034-05-14

Smart Images

  • Figure CN222025357U_ABST
    Figure CN222025357U_ABST
Patent Text Reader

Abstract

The utility model discloses a prefabricated cabin drainage flow guide assembly convenient to adjust, and particularly relates to the technical field of prefabricated cabin drainage, the prefabricated cabin drainage flow guide assembly comprises a flow guide groove, a connector is arranged at one end of the flow guide groove, a matching groove is formed in the other end of the flow guide groove, a connecting frame is installed in the matching groove, and a sealing gasket is fixed on the connecting frame. The connecting frame and the sealing gasket are jointly connected with two connecting assemblies, the two connecting assemblies are installed at the bottom end of the interior of the flow guide groove, a plurality of sliding blocks are connected to one side of the flow guide groove in a bolted mode, and the sliding blocks are jointly connected with a sliding rail in a sliding mode. According to the utility model, the flow guide components are modularly combined and connected, so that the flow guide components can be mounted along with the building of the prefabricated cabin, and synchronous construction can be carried out, so that the construction efficiency is improved, the construction period is shortened, and meanwhile, the flow guide components can be matched according to the building size of the prefabricated cabin.
Need to check novelty before this filing date? Find Prior Art