Construction platform for aerial assembly of deck type concrete-filled steel tube arch bridge arch ribs

CN222100636UActive Publication Date: 2024-12-03ZHEJIANG DACHENG CONSTR GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420689754.1
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-07
Publication Date
2024-12-03
Estimated Expiration
2034-04-07

AI Technical Summary

Technical Problem

Conventional aerial operating platforms for assembling arch ribs of top-supported steel tube concrete arch bridges interfere with tensioned buckle cables, posing safety risks and complicating the assembly and disassembly process.

Method used

A construction platform with a platform body, body connecting piece, and pedals, featuring a skeleton structure, double-layer design, and split main connecting members, which is fixed to the steel arch ribs and avoids interference with buckle cables, facilitating safe and efficient assembly.

Benefits of technology

The platform enhances safety and ease of assembly by minimizing interference with buckle cables, allowing for convenient operation and easy disassembly, suitable for aerial assembly of steel tube concrete arch bridges.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222100636U_ABST
    Figure CN222100636U_ABST
Patent Text Reader

Abstract

The utility model discloses an aerial construction platform for a concrete-filled steel tube arch bridge, and belongs to the technical field of aerial assembly of deck type concrete-filled steel tube arch bridge arch ribs. The platform comprises a platform body, a body connecting piece and a pedal. The platform main body is fixed on the steel arch rib, the main body connecting piece fixedly penetrates through the platform main body and is connected with the steel arch rib, and the pedal is fixedly arranged on the platform main body to form an operation platform. The construction platform is arranged on the steel arch rib, and based on the characteristic that the whole structure is easy to disassemble, the influence of a buckle cable is effectively avoided, the safety of steel arch rib assembly is improved, the convenience of steel arch rib assembly by operators is achieved, and the steel arch rib assembly platform is suitable for aerial assembly construction of the steel tube concrete arch bridge arch rib; angle steel is welded and spliced into a whole and is matched with a main body connecting piece to be erected on a steel arch rib; a double-layer operation platform is formed through the arranged pedals, so that workers can construct different positions of the steel arch rib conveniently; and the main body connecting pieces are arranged in a split manner, so that splicing connection can be further facilitated.