Drainage blind pipe construction positioning tool
Patent Information
- Application Number
- CN202421501608.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-27
- Publication Date
- 2025-03-07
- Estimated Expiration
- 2034-06-27
AI Technical Summary
In railway tunnel construction, the low side wall and gutter cable trough construction is carried out in two batches, resulting in insufficient length of blind pipe joints and requires chiseling of joints, resulting in low construction efficiency, damage to concrete integrity and increase labor costs.
A drainage blind pipe construction positioning tool is designed, including a die, a stop ring, a pressure plate and an inner top bolt. By abutting the rotary lock nut and the inner convex part, the precise positioning and fixing of the blind pipe on the low-side wall formwork is achieved.
Significantly improve construction efficiency, eliminate the removal of concrete surfaces of low-side walls, ensure construction quality, widely adaptable and reusable, and reduce labor costs.
Smart Images

Figure CN222576683U_ABST