Transition roller swing correcting device

By designing a transition roller swing device including a roller replacement assembly and a swing correction assembly, the problem that the transition roller cannot be effectively swinged when replaced is solved, and effective control of the swing of the transition roller is achieved, preventing scratches and extending service life.

CN222631305UActive Publication Date: 2025-03-18HENAN SUNSHINE ELECTRIC TECH CO LTD +1
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202420195743.8
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-01-26
Publication Date
2025-03-18
Estimated Expiration
2034-01-26

AI Technical Summary

Technical Problem

In the prior art, the transition roller cannot be effectively swung during replacement, resulting in the transition roller swing, which is prone to scratches with the slag box, causing damage to the roller surface and huge losses.

Method used

A transition roller sway device including a roll change assembly and a sway correction assembly is designed. The roller replacement assembly supports the first and second roller replacement structures through the support structure to ensure that no height difference occurs during replacement. The swing assembly includes a support frame structure, swing structure and a swing structure. The position of the swing structure is adjusted through the swing structure, so that it is against the swing roller when it is replaced, so as to prevent scratches caused by swing.

Benefits of technology

It effectively solves the swing problem of transition rollers during replacement, prevents scratches with the slag box, extends the service life of transition rollers, and reduces losses during replacement.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222631305U_ABST
    Figure CN222631305U_ABST
Patent Text Reader

Abstract

The transition roller swing correcting device comprises a roller replacing assembly and a swing correcting assembly. The roller changing assembly comprises a first roller changing structure, a second roller changing structure and a supporting structure, and the first roller changing structure and the second roller changing structure are both arranged on the supporting structure. The swing correcting assembly comprises a supporting frame structure, a swing correcting structure and an abutting structure, the supporting frame structure is connected with the supporting structure, the swing correcting structure is connected with the supporting frame structure, and the swing correcting structure is matched with the abutting structure. According to the technical scheme, the problem that in the prior art, when the transition roller is replaced, swing of the transition roller cannot be effectively corrected is effectively solved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of glass cover plate production, and in particular to a transition roller sway correction device. Background Art

[0002] The float glass transition roller is a key device between the tin bath equipment and the annealing furnace. It is the continuation of the end of the tin bath equipment. Its main function is to introduce the glass ribbon of about 600 degrees Celsius drawn from the tin bath into the annealing furnace through the "U"-shaped groove through the transition roller. Although the "U"-shaped groove is made of high-temperature resistant steel, it is in high temperature for a long time. In addition, the length of the "U"-shaped groove reaches 6 meters, so it will produce a certain amount of deformation. There are two shapes of "U"-shaped groove after high-temperature deformation. The first is that the middle is arched upward. This deformation has little effect on the replacement of transition rollers; the other is that it is deformed into an "S" shape in the horizontal direction. At the same time, there is a height difference between the two shoulders of the "U"-shaped groove. This deformation has a greater impact on the replacement of transition rollers, and will cause the old roller pulled out and the new roller pushed in to swing left and right, or tilt to the side with the lower shoulder of the "U"-shaped groove. The transition roller is likely to touch the wall of the slag box hole, and the roller surface is damaged, resulting in the scrapping of the transition roller, causing huge losses.

[0003] The existing transition roller replacement device (for example, application number: 201820619705.5, name: a transition roller table device capable of online roller replacement) can realize the replacement of transition rollers without stopping production. However, there is no good solution to the problem of transition roller swing during the replacement process. Utility Model Content

[0004] The present application provides a transition roller sway correction device to solve the problem in the prior art that the sway of the transition roller cannot be effectively corrected when the transition roller is replaced.

[0005] A transition roller sway correction device provided by the present application includes: a roller changing assembly and a sway correction assembly. The roller changing assembly includes a first roller changing structure, a second roller changing structure and a supporting structure, and the first roller changing structure and the second roller changing structure are both arranged on the supporting structure. The sway correction assembly includes a support frame structure, a sway correction structure and a top-stop structure, the support frame structure is connected to the support structure, the sway correction structure is connected to the support frame structure, and the sway correction structure cooperates with the top-stop structure.

[0006] In some embodiments, the correction structure includes a rotating shaft, a roller body, a buffer layer and a high temperature resistant layer. The roller body is arranged on the circumferential outer side of the rotating shaft. A card groove is arranged on the circumferential outer side of the roller body. The buffer layer is located on the circumferential outer side of the roller body and has protrusions that cooperate with multiple card grooves. The high temperature resistant layer is arranged on the circumferential outer side of the buffer layer.

[0007] In some embodiments, the correction structure also includes a support frame, a first bearing, a second bearing, a first positioning sleeve and a second positioning sleeve. The rotating shaft is passed through the support frame. The first bearing and the second bearing are both installed on the circumferential outside of the rotating shaft. The first positioning sleeve and the second positioning sleeve are both installed on the circumferential outside of the rotating shaft. The first positioning sleeve is located between the support frame and the first bearing, and the second positioning sleeve is located between the support frame and the second bearing. The roller body has a limiting portion, which is located between the first bearing and the second bearing and abuts against the first bearing and the second bearing.

[0008] In some embodiments, the support frame structure includes a support upright plate, a support platform and a connecting seat. The support upright plate and the connecting seat are both arranged on the support platform, and the support frame is swingably arranged on the connecting seat.

[0009] In some embodiments, the swing correction structure can swing in a direction away from the transition roller, and the angle between the center line of the rotation axis and the support platform is less than or equal to 90°.

[0010] In some embodiments, the supporting plate has a matching hole, the matching hole has an internal thread, the top structure includes a top screw and an operating handle, the operating handle is fixedly connected to the top screw, the top screw has an external thread, the top screw is meshed with the matching hole, and the top screw is in contact with the support frame.

[0011] In some embodiments, the first roller changing structure includes a first bearing seat and a movable roller, and the first bearing seat is arranged on the movable roller.

[0012] In some embodiments, the second roller changing structure includes a second bearing seat and a roller pulling trolley, and the second bearing seat is arranged on the roller pulling trolley.

[0013] In some embodiments, the supporting structure includes a first roller groove, a second roller groove and a movable platform. The first roller groove, the second roller groove and the third roller groove are connected to form a roller changing channel. The second roller groove and the roller pulling trolley are movably arranged on the movable platform.

[0014] In some embodiments, there are multiple sets of sway correction components, and the sway correction components are arranged on both sides of the moving platform.

[0015] The technical solution of the present application is applied to a transition roller correction device, including: a roller changing assembly and a correction assembly. The roller changing assembly includes a first roller changing structure, a second roller changing structure and a support structure. The first roller changing structure and the second roller changing structure are both arranged on the support structure and supported by the support structure, so that when the first roller changing structure and the second roller changing structure replace the transition roller, it is not easy to produce a height difference so that the surface of the transition roller and the slag box are scratched. The first roller changing structure and the second roller changing structure are connected to the transition roller respectively, and the transition roller is driven to move by applying a force to the first roller changing structure and the second roller changing structure to achieve the replacement of the transition roller. The correction assembly includes a support frame structure, a correction structure and a top structure. The support frame structure is connected to the support structure, the correction structure is connected to the support frame structure, and the correction structure cooperates with the top structure. The correction structure is adjusted to the correct position by the top structure, and the correction structure faces the direction close to the transition roller. When the transition roller swings during the replacement process, the correction structure can be abutted against the transition roller, so that the transition roller will not be scratched against the slag box. The technical solution of the present application effectively solves the problem in the prior art that the swing of the transition roller cannot be effectively corrected when the transition roller is replaced. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments consistent with the present application and, together with the description, serve to explain the principles of the present application.

[0017] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, for ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative labor.

[0018] Figure 1 A schematic diagram of the structure of a sway correction assembly according to an embodiment of the present application is shown;

[0019] Figure 2 A schematic structural diagram of a sway correction structure according to an embodiment of the present application is shown;

[0020] Figure 3 A structural schematic diagram of a supporting structure and a supporting structure of an embodiment of the present application is shown;

[0021] Figure 4 A schematic structural diagram of a transition roller sway correction device according to an embodiment of the present application is shown.

[0022] The above drawings include the following reference numerals:

[0023] 10. Roller changing assembly; 11. First roller changing structure; 111. First bearing seat; 112. Moving roller; 12. Second roller changing structure; 121. Second bearing seat; 122. Roller pulling trolley; 13. Support structure; 131. First roller groove; 132. Second roller groove; 133. Moving platform; 20. Correction assembly; 21. Support frame structure; 211. Support vertical plate; 212. Support platform; 213. Connecting seat; 22. Correction structure; 221. Rotating shaft; 222. Roller body; 223. Buffer layer; 224. High temperature resistant layer; 225. Support frame; 226. First bearing; 227. Second bearing; 228. First positioning sleeve; 229. Second positioning sleeve; 23. Push-up structure; 231. Push-up screw; 232. Operating handle; 100. Transition roller; 101. Third roller groove; 102. Roller changing channel. DETAILED DESCRIPTION

[0024] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present application can be combined with each other. The present application will be described in detail below with reference to the accompanying drawings and in combination with the embodiments.

[0025] It should be noted that the following detailed descriptions are illustrative and are intended to provide further explanation of the present application. Unless otherwise specified, all technical and scientific terms used herein have the same meanings as those commonly understood by those skilled in the art to which the present application belongs.

[0026] For ease of description, spatially relative terms such as "above", "above", "on the upper surface of", "above", etc. may be used herein to describe the spatial positional relationship between a device or feature and other devices or features as shown in the figure. It should be understood that spatially relative terms are intended to include different orientations of the device in use or operation in addition to the orientation described in the figure. For example, if the device in the accompanying drawings is inverted, the device described as "above other devices or structures" or "above other devices or structures" will be positioned as "below other devices or structures" or "below other devices or structures". Thus, the exemplary term "above" may include both "above" and "below". The device may also be positioned in other different ways, rotated 90 degrees or in other orientations, and the spatially relative descriptions used herein are interpreted accordingly.

[0027] like Figure 1 and Figure 4As shown, the embodiment relates to a transition roller sway correction device, including: a roller changing assembly 10 and a sway correction assembly 20. The roller changing assembly 10 includes a first roller changing structure 11, a second roller changing structure 12 and a support structure 13, and the first roller changing structure 11 and the second roller changing structure 12 are both arranged on the support structure 13. The sway correction assembly 20 includes a support frame structure 21, a sway correction structure 22 and a top structure 23, the support frame structure 21 is connected to the support structure 13, the sway correction structure 22 is connected to the support frame structure 21, and the sway correction structure 22 cooperates with the top structure 23.

[0028] The technical solution of this embodiment is applied, and the transition roller sway correction device includes: a roller changing assembly 10 and a sway correction assembly 20. The roller changing assembly 10 includes a first roller changing structure 11, a second roller changing structure 12 and a support structure 13. The first roller changing structure 11 and the second roller changing structure 12 are both arranged on the support structure 13 and supported by the support structure 13, so that when the first roller changing structure 11 and the second roller changing structure 12 replace the transition roller 100, it is not easy to produce a height difference so that the surface of the transition roller 100 and the slag box are scratched. The first roller changing structure 11 and the second roller changing structure 12 are connected to the transition roller 100 respectively, and the transition roller 100 is driven to move by applying a force to the first roller changing structure 11 and the second roller changing structure 12 to achieve the replacement of the transition roller 100. The swing correction assembly 20 includes a support frame structure 21, a swing correction structure 22 and a support structure 23. The support frame structure 21 is connected to the support structure 13, and the swing correction structure 22 is connected to the support frame structure 21. The swing correction structure 22 cooperates with the support structure 23. The swing correction structure 22 is adjusted to the correct position by the support structure 23. The swing correction structure 22 faces the direction close to the transition roller 100. When the transition roller 100 swings during the replacement process, the swing correction structure 22 can be supported against the transition roller 100, so that the transition roller 100 will not be scratched against the slag box. The technical solution of the present application effectively solves the problem in the prior art that the swing of the transition roller 100 cannot be effectively corrected when the transition roller 100 is replaced.

[0029] like Figure 2As shown, in some embodiments, the sway correction structure 22 includes a rotating shaft 221, a roller body 222, a buffer layer 223 and a high temperature resistant layer 224. The roller body 222 is arranged on the circumferential outer side of the rotating shaft 221, and a clamping groove is arranged on the circumferential outer side of the roller body 222. The buffer layer 223 is located on the circumferential outer side of the roller body 222 and has a plurality of protrusions matched with the clamping grooves. The high temperature resistant layer 224 is arranged on the circumferential outer side of the buffer layer 223. The rotating shaft 221 is limited by a cotter pin, and the clamping groove and the protrusion cooperate so that the buffer layer 223 can be closely attached to the roller body 222. The buffer layer 223 is arranged on the circumferential outer side of the buffer layer. Since the surface temperature of the old transition roller 100 is about 500 degrees Celsius, the high temperature resistant layer 224 can effectively prevent the buffer layer 223 from being scalded. When installing a new transition roller 100, the high temperature resistant layer 224 can be removed. Usually, the buffer layer 223 can be a rubber buffer layer, and the high temperature resistant layer 224 can be a graphite high temperature resistant layer.

[0030] It should be noted that the thickness of the buffer layer 223 is between 4.7 mm and 5.3 mm. When the buffer layer 223 is against the transition roller 100 for swing correction, the buffer layer will be deformed, and the thickness after deformation is between 2.7 mm and 4.3 mm.

[0031] It should also be noted that when the transition roller 100 is replaced (pushing out the old transition roller 100 and pushing in the new transition roller 100), the high temperature resistant layer 224, the buffer layer 223 and the roller body 222 can rotate around the rotating axis 221 under the action of the transition roller 100 and are in linear contact with the surface of the transition roller 100, which can reduce the impact of the correction structure 22 on the transition roller 100.

[0032] like Figure 2As shown, in some embodiments, the correction structure 22 also includes a support frame 225, a first bearing 226, a second bearing 227, a first positioning sleeve 228 and a second positioning sleeve 229. The rotating shaft 221 is passed through the support frame 225 and is limited by a cotter pin. The first bearing 226 and the second bearing 227 are both installed on the circumferential outer side of the rotating shaft 221, which can reduce friction. The first positioning sleeve 228 and the second positioning sleeve 229 are both installed on the circumferential outer side of the rotating shaft 221 to play a positioning role. The first positioning sleeve 228 is located between the support frame 225 and the first bearing 226, and the second positioning sleeve 229 is located between the support frame 225 and the second bearing 227. The roller body 222 has a limiting portion, which is located between the first bearing 226 and the second bearing 227 and abuts against the first bearing 226 and the second bearing 227. The limiting portion (the raised portion of the roller body 222 close to the rotating shaft 221) abuts against the first bearing 226 and the second bearing 227, the first bearing 226 and the second bearing 227 abut against the first positioning sleeve 228 and the second positioning sleeve 229 respectively, and the first positioning sleeve 228 and the second positioning sleeve 229 abut against the support frame 225 respectively, which prevents the roller body 222, the buffer layer 223 and the high temperature resistant layer 224 from moving axially along the rotating shaft 221.

[0033] like Figure 3 As shown, in some embodiments, the support frame structure 21 includes a support upright plate 211, a support platform 212 and a connecting seat 213. The support upright plate 211 and the connecting seat 213 are both arranged on the support platform 212. The support frame 225 is swingably arranged on the connecting seat 213. The distance between the correction structure 22 and the transition roller 100 can be adjusted by the swing of the support frame 225. The position of the correction structure 22 is based on the transition roller 100 not colliding with the slag box. On this basis, the swing degree of the correction structure 22 is adjusted according to the swing range of the transition roller 100.

[0034] like Figure 1 As shown, in some embodiments, the swing correction structure 22 can swing away from the transition roller 100, and the angle between the center line of the rotating shaft 221 and the supporting platform 212 is less than or equal to 90°. When the swing range of the transition roller 100 is small during the replacement process, the transition roller 100 will not abut against the swing correction structure 22, and the transition roller 100 will not collide with the slag box, and the angle between the center line of the rotating shaft 221 and the supporting platform 212 is less than or equal to 90°, which makes the swing correction structure 22 always contact with the abutting structure 23 under the action of gravity, and the swing correction structure 22 will not impact the surface of the transition roller 100.

[0035] like Figure 3As shown, in some embodiments, the support upright plate 211 has a matching hole, the matching hole has an internal thread, the abutting structure 23 includes a abutting screw 231 and an operating handle 232, the operating handle 232 is fixedly connected to the abutting screw 231, the abutting screw 231 has an external thread, the abutting screw 231 is meshed with the matching hole, and the abutting screw 231 is in contact with the support frame 225. By screwing the operating handle 232, the movement of the abutting screw 231 can be achieved, the abutting screw 231 is in contact with the support frame 225, and with the movement of the abutting screw 231, the swing of the swing correction structure 22 can be adjusted.

[0036] like Figure 4 As shown, in some embodiments, the first roller changing structure 11 includes a first bearing seat 111 and a moving roller 112, and the first bearing seat 111 is arranged on the moving roller 112. The first end of the transition roller 100 is fixed to the first bearing seat 111 by a locking nut and a shoulder (or a top screw) to limit the axial movement of the transition roller 100.

[0037] like Figure 4 As shown, in some embodiments, the second roller changing structure 12 includes a second bearing seat 121 and a roller pulling trolley 122, and the second bearing seat 121 is arranged on the roller pulling trolley 122. The second end of the transition roller 100 is fixed to the second bearing seat 121 by a locking nut and a shaft shoulder (or a top screw), and the second bearing seat 121 is arranged on the roller pulling trolley 122. By pulling the roller pulling trolley 122, the second bearing seat 121 is driven to move, and then the transition roller 100, the first bearing seat 111 and the moving roller 112 are driven to move, so as to realize the replacement of the transition roller 100.

[0038] like Figure 1 and Figure 4 As shown, in some embodiments, the support structure 13 includes a first roller groove 131, a second roller groove 132 and a moving platform 133. The first roller groove 131, the second roller groove 132 and the third roller groove 101 are connected to form a roller changing channel 102. The second roller groove 132 and the roller pulling trolley 122 are movably arranged on the moving platform 133. The moving roller 112 can move on the roller changing channel 102. When replacing the old transition roller 100, the second bearing seat 121 is driven to move by pulling the roller pulling trolley 122, and then the transition roller 100 is driven to move gradually. With the movement of the transition roller 100, the moving roller 112 gradually moves from the first roller groove 131 to the third roller groove 101 and then to the second roller groove 132. The first bearing seat 111 arranged on the moving roller 112 moves together with the moving roller 112. The first bearing seat 111 and the transition roller 100 are fixed by a locking nut and a shaft shoulder, so that the transition roller 100 is gradually pushed out to achieve the purpose of replacement. When replacing a new transition roller 100, the pushing direction is different, and the rest is the same as the old transition roller 100, which will not be described in detail here.

[0039] It should be noted that the second roller groove 132 is movably placed on the mobile platform 133 through rollers, so as to be aligned with the third roller groove 101. A brake structure is provided on the roller. After the second roller groove 132 is aligned with the third roller groove 101, the rotation of the roller is limited by the brake structure to prevent the movement of the second roller groove 132. The brake structure on the roller is well known to those skilled in the art and will not be described in detail here. It is also possible to place a stop block on the mobile platform 133 to limit the second roller groove 132 after the second roller groove 132 is aligned with the third roller groove 101 (that is, after the position of the second roller groove 132 is determined). The stop block is arranged along the moving direction of the second roller groove 132 and stops against the second roller groove 132 to prevent the second roller groove 132 from moving.

[0040] like Figure 4 As shown, in some embodiments, the sway correction assembly 20 has multiple groups, and the sway correction assembly 20 is arranged on both sides of the mobile platform 133. The position adjustment of the sway correction assembly 20 can be achieved by pushing the mobile platform 133, and multiple sway correction assemblies 20 can limit the horizontal swing of the transition roller 100. The sway correction assembly 20 is located between the first roller changing structure 11 and the second roller changing structure 12. As the old transition roller 100 is pushed out or the new transition roller 100 is pushed in, the sway correction assembly 20 can perform the sway correction function throughout the process of replacing the transition roller 100, which can not only prevent the transition roller 100 from being scrapped due to scratches, but also greatly reduce the time required to replace the transition roller 100.

[0041] It should be noted that a plug-in plate seat is fixedly connected to both sides of the mobile platform 133, and the support frame structure 21 also includes a plug-in plate, which is fixedly connected to the support platform 212. The plug-in plate can be inserted into the plug-in plate seat. At this time, the plug-in plate seat can limit the plug-in plate, thereby limiting the support platform 212. At this time, the sway correction component 20 can be firmly installed on both sides of the mobile platform 133, which is convenient for correcting the sway of the transition roller 100 and also convenient for disassembly and maintenance of the sway correction component 20. The sway correction component 20 can also be welded on both sides of the mobile platform 133, and both can achieve the sway correction of the transition roller 100.

[0042] From the above, it can be known that the transition roller correction device mainly includes a plug-in plate seat, a fixed bracket (support frame structure 21), a T-type adjustment screw (top structure 23), a movable roller frame (support frame 225) and a heat-resistant buffer roller (correction structure 22) and corresponding accessories. The socket seat is symmetrically welded on both sides of the end of the roller-changing trolley close to the slag box. When in use, the lower plug-in plate of the fixed bracket is directly inserted into the plug-in plate seat, and can also be pulled out when not in use. The T-type adjustment screw is installed in the middle of the fixed bracket. The movable roller frame is installed on the lower ear seat of the fixed bracket through a rotating shaft, and the cotter pin limits the withdrawal of the rotating shaft. The heat-resistant buffer roller is composed of a roller body, a bearing, an elastic retaining ring and a surface graphite paper (wrapped), and is installed on the movable roller frame through a central shaft and a positioning sleeve and rotates freely. The cotter pin limits the upward movement of the central shaft. When replacing the transition roller, move the first "U"-shaped groove (first roller groove 131) toward the slag box until it is seamlessly connected with the "U"-shaped groove (third roller groove 101) of the slag box, and the second "U"-shaped groove (second roller groove 132) is also seamlessly connected and fixed with the other end of the "U"-shaped groove of the slag box. The three sections of the "U"-shaped groove are tightly connected together to form an integral slideway (roller changing channel 102). One end of the transition roller 100 is fixed to the hand-pulled sliding platform (roller pulling trolley 122) through the second bearing seat 121, and the other end is fixed to the movable roller 112 through the first bearing seat 111. The movable roller 112 is placed in the "U"-shaped groove slideway. Pulling (pushing) the hand-pulled sliding platform can drive the movable roller 112 at the other end to pass through the slag box to pull out the old roller or push in the new roller. Before changing the rollers, rotate the T-shaped adjusting screws on both sides clockwise respectively to push the movable roller frame and the heat-resistant buffer roller assembly on the corresponding side to rotate around the lower rotating shaft until the heat-resistant buffer roller and the transition roller 100 are in contact with the surface. Since one end of the old roller being pulled out or the new roller being pushed in is fixed on the hand-pull sliding platform and the movable gap is small, the T-shaped adjusting screw can limit the transition roller 100 from sliding in the slag box. It is affected by the high-temperature deformation of the "U"-shaped groove installed on the base of the slag box and swings left and right, so that the old roller can be pulled out smoothly or the new roller can be pushed in. The heat-resistant buffer roller is composed of a bearing, a steel roller body, a rubber buffer layer and a wrapped surface graphite paper. The function of the rubber buffer layer is to avoid damaging the roller surface of the transition roller 100 due to excessive pressure when limiting the swing of the transition roller 100, and to buffer the pressure of the transition roller 100 on the surface graphite paper. The surface graphite paper is a high-temperature resistant material. Its function is to prevent the rubber buffer layer from being burned by the excessive surface temperature of the old roller (about 500°C) when the old roller is pulled out. When installing a new roller, the roller surface temperature is at room temperature, and the wrapped surface graphite paper can be removed at this time.

[0043] It should be noted that the terms used herein are only for describing specific embodiments and are not intended to limit the exemplary embodiments according to the present application. As used herein, unless the context clearly indicates otherwise, the singular form is also intended to include the plural form. In addition, it should be understood that when the terms "comprise" and / or "include" are used in this specification, it indicates the presence of features, steps, operations, devices, components and / or combinations thereof.

[0044] It should be noted that the terms "first", "second", etc. in the specification and claims of the present application and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchangeable where appropriate, so that the embodiments of the present application described herein can be implemented in an order other than those illustrated or described herein, for example. In addition, the terms "including" and "having" and any of their variations are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.

[0045] The above are only preferred embodiments of the present application and are not intended to limit the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.

Claims

1. A transition roller sway correction device, characterized in that: include: A roller changing assembly (10), the roller changing assembly (10) comprising a first roller changing structure (11), a second roller changing structure (12) and a support structure (13), wherein the first roller changing structure (11) and the second roller changing structure (12) are both arranged on the support structure (13); A sway correction assembly (20), the sway correction assembly (20) comprising a support frame structure (21), a sway correction structure (22) and a top structure (23), the support frame structure (21) being connected to the support structure (13), the sway correction structure (22) being connected to the support frame structure (21), and the sway correction structure (22) cooperating with the top structure (23).

2. The transition roller sway correction device according to claim 1 is characterized in that: The sway correction structure (22) comprises a rotating shaft (221), a roller body (222), a buffer layer (223) and a high temperature resistant layer (224); the roller body (222) is arranged on the circumferential outer side of the rotating shaft (221); a retaining groove is arranged on the circumferential outer side of the roller body (222); the buffer layer (223) is located on the circumferential outer side of the roller body (222) and has protrusions that match the plurality of retaining grooves; and the high temperature resistant layer (224) is arranged on the circumferential outer side of the buffer layer (223).

3. The transition roller sway correction device according to claim 2 is characterized in that: The oscillation correction structure (22) further comprises a support frame (225), a first bearing (226), a second bearing (227), a first positioning sleeve (228) and a second positioning sleeve (229); the rotating shaft (221) is arranged on the support frame (225); the first bearing (226) and the second bearing (227) are both mounted on the circumferential outer side of the rotating shaft (221); the first positioning sleeve (228) and the second positioning sleeve (229) are both mounted on the circumferential outer side of the rotating shaft (221); the first positioning sleeve (228) is located between the support frame (225) and the first bearing (226); the second positioning sleeve (229) is located between the support frame (225) and the second bearing (227); the roller body (222) comprises a limiting portion, the limiting portion is located between the first bearing (226) and the second bearing (227), and abuts against the first bearing (226) and the second bearing (227).

4. The transition roller sway correction device according to claim 3 is characterized in that: The support frame structure (21) comprises a support upright plate (211), a support platform (212) and a connecting seat (213); the support upright plate (211) and the connecting seat (213) are both arranged on the support platform (212); and the support frame (225) is swingably arranged on the connecting seat (213).

5. The transition roller sway correction device according to claim 4 is characterized in that: The swing correction structure (22) can swing in a direction away from the transition roller (100), and the angle formed by the center line of the rotating shaft (221) and the supporting platform (212) is less than or equal to 90°.

6. The transition roller sway correction device according to claim 4 is characterized in that: The supporting vertical plate (211) has a matching hole, and the matching hole has an internal thread. The abutting structure (23) includes a abutting screw (231) and an operating handle (232). The operating handle (232) is fixedly connected to the abutting screw (231), and the abutting screw (231) has an external thread. The abutting screw (231) is meshed with the matching hole, and the abutting screw (231) is in contact with the supporting frame (225).

7. The transition roller sway correction device according to claim 1 is characterized in that: The first roller changing structure (11) comprises a first bearing seat (111) and a movable roller (112), and the first bearing seat (111) is arranged on the movable roller (112).

8. The transition roller sway correction device according to claim 7 is characterized in that: The second roller changing structure (12) comprises a second bearing seat (121) and a roller pulling trolley (122), and the second bearing seat (121) is arranged on the roller pulling trolley (122).

9. The transition roller sway correction device according to claim 8, characterized in that: The support structure (13) includes a first roller groove (131), a second roller groove (132) and a movable platform (133); the first roller groove (131), the second roller groove (132) and the third roller groove (101) are connected to form a roller changing channel (102); the second roller groove (132) and the roller pulling trolley (122) are movably arranged on the movable platform (133).

10. The transition roller sway correction device according to claim 9, characterized in that: The sway correction components (20) have multiple groups, and the sway correction components (20) are arranged on both sides of the moving platform (133).

Citation Information

Patent Citations

  • Transition roller platform device of roll change on line

    CN208454816U