Tower crane foundation hole advance water stop structure and construction system thereof
Patent Information
- Application Number
- CN202421344069.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-13
- Publication Date
- 2025-04-15
- Estimated Expiration
- 2034-06-13
AI Technical Summary
The tower crane foundation is subjected to dynamic load during the tower crane lifting operation, resulting in loosening, failure and leakage of the middle buried water stop steel plate. The construction of the tower crane hole in the basement floor is often affected by groundwater, resulting in poor concrete pouring quality. The high water pressure under the bottom plate causes the post-pouring sealed concrete to be diluted or penetrated, resulting in sand hole leakage.
The water stop structure is adopted for the tower crane foundation hole, including a first bottom plate downward ring beam is provided on the edge of the tower crane foundation, and a first water stop is buried in the middle of its inner circumference side; a second water stop is buried in the middle of the inner circumference side of the ring beam is buried in the middle of the foundation; a grouting pipe and its ball valve are used to achieve visual monitoring; and a water stop steel plate is used at the construction joint to ensure the water stop effect.
Through the concave and convex ring beam structure and the use of flexible materials, four flexible advance water stop layers are realized, avoiding the impact of settlement difference on the water stop structure, preventing water penetration, and ensuring the stability and safety of the closure opening of the tower crane.
Smart Images

Figure CN222758960U_ABST