Tunnel construction trolley
By designing a movable and adjustable tunnel construction trolley, the problems of long-term charging operations and difficulty in mechanized operations in tunnel construction are solved, and construction efficiency and safety are improved.
Patent Information
- Application Number
- CN202420743889.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-11
- Publication Date
- 2025-04-25
- Estimated Expiration
- 2034-04-11
AI Technical Summary
In tunnel construction, the charging operation takes a long time, and it is difficult for the existing technology to achieve mechanized operation, resulting in high costs, difficulty in positioning, inconvenient transportation, and low construction efficiency.
A tunnel construction trolley is designed, including the vehicle body, the foundation platform and the first lifting platform. The platform is switched and lifted through the driving mechanism, and a movable and adjustable loading platform is provided to adapt to different sections and working conditions.
It improves the efficiency of tunnel construction, provides convenient charging operation conditions, reduces costs, and improves the safety and flexibility of construction.
Smart Images

Figure CN222797503U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of tunnel construction equipment, in particular to a tunnel construction trolley. Background Art
[0002] In some tunnel excavation construction, drilling and blasting is the most commonly used excavation method, which is widely used in rock tunnel construction of various sizes. The most time-consuming process of this construction method is charging, and the speed of charging can determine the progress of the entire drilling and blasting construction. For various cross-section tunnel drilling and blasting operations, due to space constraints, it is difficult to achieve mechanized operations. Usually, the construction unit temporarily sets up a scaffold for construction. If the scaffold needs to be moved, it needs to be pushed by an excavator or a bulldozer. Therefore, there are defects such as high cost, difficulty in positioning, inconvenient transportation, and non-adjustable platform. Therefore, it cannot adapt well to actual working conditions and has the problem of low construction efficiency. Utility Model Content
[0003] In order to solve the above technical problems, the utility model discloses a tunnel construction trolley, which can provide a charging platform that is easy to move and can adapt to actual working conditions, thereby effectively improving the efficiency of tunnel construction.
[0004] The specific technical solution of the utility model is as follows:
[0005] A tunnel construction trolley, comprising:
[0006] Vehicle body;
[0007] A base platform, wherein the base platform has a first driving mechanism for driving the base platform to switch between a first recovery position and a first support position; and
[0008] The first lifting platform is provided with a first lifting mechanism between the first lifting platform and the base platform, and the first lifting platform has a second driving mechanism for driving the first lifting platform to switch between a second recovery position and a second supporting position.
[0009] The first lifting platform can expand the working range on the basis of the basic platform, and create convenient conditions for construction in terms of the height, width and other directions of the tunnel. Different working heights can be achieved through the first lifting mechanism, and in the width direction, the working range can be correspondingly expanded through the first driving mechanism and the second driving mechanism. The vehicle body can also carry drilling equipment and explosives at the same time, so it can provide quick working conditions at different sections and improve the efficiency of tunnel construction.
[0010] Preferably, it also includes:
[0011] A first leg, the first leg is movably connected to the base platform and is used to support the base platform on the ground when the base platform is in the first supporting position, and when the base platform is in the first recovery position, the first leg is hidden between the vehicle body and the base platform;
[0012] When the base platform is long, the first leg can improve the support strength of the base platform to prevent the base platform from bending or even breaking when bearing a large load. Preferably, a second leg is provided between the first lifting platform and the base platform, and one of the first lifting platform and the base platform is rotatably connected to the second leg, and the other is detachably connected to the second leg.
[0013] The second supporting leg can improve the supporting strength of the first lifting platform, thereby preventing the first lifting platform from bending or even breaking when bearing a heavy load.
[0014] Preferably, the second leg is a retractable leg.
[0015] The second leg can adapt to the lifting height between the first lifting platform and the basic platform, so as to better meet the actual use requirements.
[0016] Preferably, it also includes:
[0017] A first ladder is hooked or rotatably connected to the first lifting platform.
[0018] The first ladder can facilitate workers to go up to the first lifting platform to carry out tunnel excavation construction.
[0019] Preferably, it also includes:
[0020] A second lifting platform, a second lifting mechanism is arranged between the second lifting platform and the first lifting platform, and the second lifting platform has a third driving mechanism for driving the second lifting platform to switch between a third recovery position and a third supporting position.
[0021] The second lifting platform further increases the operating range of the trolley, and it and the first lifting platform achieve staged lifting, effectively providing working positions within a width range, thereby further expanding the actual operating range.
[0022] Preferably, it also includes:
[0023] A second ladder is connected to the second lifting platform by being hooked or rotatably connected.
[0024] The second ladder can facilitate workers to go up to the second lifting platform to carry out tunnel excavation construction.
[0025] Preferably, the second ladder is connected to the first lifting platform.
[0026] The staff can continuously go up to the second lifting platform via the first ladder and the second ladder, thereby facilitating the staff to reach the expected working position.
[0027] Preferably, the first ladder and / or the second ladder is a retractable structure.
[0028] The retractable first ladder and / or second ladder can adapt to the height between adjacent platforms, thereby better adapting to actual working conditions.
[0029] Preferably, among the base platform, the first lifting platform and the second lifting platform, any one platform has a fixed part and a rotating part, the fixed part and the rotating part in the same platform are rotatably connected, and a driving mechanism is arranged between the fixed part and the rotating part; a lifting mechanism is arranged between any two adjacent fixed parts.
[0030] The fixed part of each platform can achieve basic support, so that the rotating part can provide stable support for the staff after the position is switched.
[0031] Preferably, the fixing part has a placement interlayer, and when any rotating part is located in the hidden position, all or part of the rotating part is located in the placement interlayer.
[0032] The placement interlayer can reduce the space occupied by the rotating part when the rotating part is in the hidden position, making it convenient for the trolley to move in the tunnel, and the placement interlayer can support the rotating part, thereby providing suitable accommodation conditions for the rotating part.
[0033] Compared with the prior art, the utility model provides a reliable charging platform, so that the staff can perform adaptive operations in different sections of the tunnel, avoiding the inconvenience caused by temporary rigging, and also avoiding the inconvenience of carrying drilling equipment and explosives; in addition, the utility model has a high supporting strength, which can ensure the safety of the staff's operations. BRIEF DESCRIPTION OF THE DRAWINGS
[0034] Figure 1 It is a schematic diagram of an embodiment of the utility model when it is unfolded;
[0035] Figure 2 It is a schematic diagram of the embodiment of the utility model when it is retracted;
[0036] Figure 3 for Figure 2 Schematic diagram of another direction.
[0037] In the figure: 1-vehicle body; 2-basic platform; 3-first leg; 4-first lifting platform; 5-scissor-type bracket; 6-second lifting platform; 7-second leg; 8-first ladder; 9-second ladder; 10-fixed part; 11-rotating part; 12-placement interlayer; 13-fixed ladder. DETAILED DESCRIPTION
[0038] In order to enable those skilled in the art to better understand the technical solution of the present invention, the present invention is further described in detail below in conjunction with specific implementation methods.
[0039] like Figure 1 to Figure 3 As shown, a tunnel construction trolley includes a vehicle body 1, a base platform 2 and a first lifting platform 4; the base platform 2 has a first driving mechanism for driving the base platform 2 to switch between a first recovery position and a first support position; a first lifting mechanism is provided between the first lifting platform 4 and the base platform 2, and the first lifting platform 4 has a second driving mechanism for driving the first lifting platform 4 to switch between a second recovery position and a second support position. Furthermore, it also includes a first leg 3, the first leg 3 is movably connected to the base platform 2, and is used to support the base platform 2 on the ground when the base platform 2 is in the first support position, and when the base platform 2 is in the first recovery position, the first leg 3 is hidden between the vehicle body 1 and the base platform 2.
[0040] In this embodiment, the car body 1 has a displacement drive mechanism that can realize movement in the tunnel. The middle and rear ends of the car body 1 are storage parts. In the initial state, the basic platform 2, the first lifting platform 4 and other facilities are all stored in the storage part, and the storage part also has a placement position for accommodating drilling equipment and explosives, so as to facilitate actual use needs. It should be noted that in this embodiment, the corresponding equipment and explosives can also be carried by hand and boarded on each platform to complete the corresponding tunnel construction work on each platform. The car body 1 is equipped with a fixed ladder 13, so that the staff can easily go up from the ground to the storage part, so as to further walk the basic platform 2 or go up to the first lifting platform 4. It is known that the basic platform 2 and the first lifting platform 4 are stored in the storage part, that is, the basic platform 2 is located at the first recovery position, the first lifting platform 4 is located at the second recovery position, and the first recovery position is located at the lower side of the second recovery position. During specific use, the first driving mechanism is actuated to switch the basic platform 2 to the first supporting position, at which time the staff can perform the corresponding charging operation on the basic platform 2. If the basic platform 2 cannot meet the working condition requirements, the first lifting mechanism and the second driving mechanism are driven to switch the first lifting platform 4 to the second supporting position and to the working height required by the staff, at which time the staff can perform the corresponding charging operation on the first lifting platform 4. In this embodiment, the lifting mechanism is driven by a cylinder to push or pull the scissor-type bracket 5 to achieve height adjustment, and the driving mechanism is a rotating cylinder to switch the corresponding platform between the recovery position and the supporting position, and the lifting mechanism and driving mechanism described below are similar to this, and the following description will not be repeated.
[0041] Furthermore, a second lifting platform 6 is included, a second lifting mechanism is provided between the second lifting platform 6 and the first lifting platform 4, and the second lifting platform 6 has a third driving mechanism for driving the second lifting platform 6 to switch between the third recovery position and the third support position. If the first lifting platform 4 cannot meet the use requirements, the second lifting mechanism and the third driving mechanism are used to lift the second lifting platform 6 to a higher working height, and switch from the third recovery position to the third support position. It can be seen that the third recovery position is located on the upper side of the second recovery position.
[0042] In this embodiment, a second leg 7 is provided between the first lifting platform 4 and the base platform 2. One of the first lifting platform 4 and the base platform 2 is rotatably connected to the second leg 7, and the other is detachably connected to the second leg 7. Since the first lifting platform 4 is relatively long, the second support can avoid the platform shaking caused by the overlong suspension length. In this embodiment, one end of the second leg 7 is rotatably connected to the first lifting platform 4, and the other end is clamped to the base platform 2. The second leg 7 can also be connected to the first lifting platform 4 in a detachable manner. Further, the second leg 7 is a retractable leg, so that it can be adjusted according to the actual height between the first lifting platform 4 and the base platform 2 to obtain better support.
[0043] In this embodiment, a first ladder 8 is also included, and the first ladder 8 is connected to the first lifting platform 4 by being hung or rotatably connected. A second ladder 9 is also included, and the second ladder 9 is connected to the second lifting platform 6 by being hung or rotatably connected. The second ladder 9 is connected to the first lifting platform 4, and the first ladder 8 and the second ladder 9 can provide a mobile passage for the staff, so as to facilitate the staff to perform construction at an appropriate working position. In this embodiment, the first ladder 8 and the second ladder 9 are both retractable structures, thereby adapting to actual height requirements.
[0044] In order to better use this embodiment, in this embodiment, among the basic platform 2, the first lifting platform 4, and the second lifting platform 6, any one platform has a fixed part 10 and a rotating part 11, and the fixed part 10 and the rotating part 11 in the same platform are rotatably connected, and a driving mechanism is arranged between the fixed part 10 and the rotating part 11; a lifting mechanism is arranged between any two adjacent fixed parts 10. In the height direction of the vehicle body 1, the projection of the fixed part 10 of each platform is in the storage part, which can realize the auxiliary support of each platform. After the corresponding driving mechanism is actuated, the rotating part 11 moves to expand the working area at an appropriate position, so that the staff can carry out tunnel construction at a suitable position. When the rotating part 11 moves to the supporting position, the first leg 3 and the second leg 7 are used to provide supporting stability, thereby improving the construction safety of the staff.
[0045] In this embodiment, the fixed part 10 has a placement interlayer 12. When any rotating part 11 is in the hidden position, all or part of the rotating part 11 is located in the placement interlayer 12. The hidden interlayer can not only well realize the recovery and hiding of the rotating part 11, but also provide a supporting effect for the rotating part 11 when the rotating part 11 is hidden, thereby preventing the rotating part 11 from bending or even breaking in the recovery position. That is to say, when the rotating part 11 of the corresponding platform needs to return to the hidden position, the rotating part 11 rotates relative to the fixed part 10, and then part or all of the rotating part 11 is hidden in the placement interlayer 12. Since the fixed part 10 is supported at its position, the rotating part 11 is also supported by the placement interlayer 12, thereby ensuring that it maintains a good hidden posture in the non-working state, so that the rotating part 11 will not be damaged due to external forces such as shaking and vibration during the movement of the trolley, thereby ensuring the specific use effect of each platform.
[0046] Therefore, this embodiment can adapt to different sections, adjust the lifting height of each level of platform according to the section, and can also select the number of open platform layers according to the section width, so as to meet the specific tunnel construction requirements of the staff.
[0047] The above are only preferred embodiments of the present invention. It should be noted that the above preferred embodiments should not be regarded as limiting the present invention. The protection scope of the present invention should be based on the scope defined by the claims. For ordinary technicians in this technical field, several improvements and modifications can be made without departing from the spirit and scope of the present invention, and these improvements and modifications should also be regarded as the protection scope of the present invention.
Claims
1. A tunnel construction trolley, characterized in that: include: Vehicle body; A base platform, wherein the base platform has a first driving mechanism for driving the base platform to switch between a first recovery position and a first support position; as well as The first lifting platform is provided with a first lifting mechanism between the first lifting platform and the base platform, and the first lifting platform has a second driving mechanism for driving the first lifting platform to switch between a second recovery position and a second supporting position.
2. A tunnel construction trolley as claimed in claim 1, characterized in that: Also includes: The first leg is movably connected to the base platform and is used to support the base platform on the ground when the base platform is located in the first supporting position. When the base platform is located in the first recovery position, the first leg is hidden between the vehicle body and the base platform.
3. A tunnel construction trolley as claimed in claim 1 or 2, characterized in that: A second leg is arranged between the first lifting platform and the base platform. Among the first lifting platform and the base platform, one is rotatably connected to the second leg, and the other is detachably connected to the second leg.
4. A tunnel construction trolley as claimed in claim 3, characterized in that: The second supporting leg is a retractable supporting leg.
5. A tunnel construction trolley as claimed in claim 1, characterized in that: Also includes: A first ladder is hooked or rotatably connected to the first lifting platform.
6. A tunnel construction trolley as claimed in claim 1, characterized in that: Also includes: A second lifting platform, a second lifting mechanism is arranged between the second lifting platform and the first lifting platform, and the second lifting platform has a third driving mechanism for driving the second lifting platform to switch between a third recovery position and a third supporting position.
7. A tunnel construction trolley as claimed in claim 6, characterized in that: Also includes: A second ladder is connected to the second lifting platform by being hooked or rotatably connected.
8. A tunnel construction trolley as claimed in claim 7, characterized in that: The second ladder is connected to the first lifting platform.
9. A tunnel construction trolley as claimed in claim 6, characterized in that: Among the basic platform, the first lifting platform and the second lifting platform, any one platform has a fixed part and a rotating part. The fixed part and the rotating part in the same platform are rotatably connected, and a driving mechanism is arranged between the fixed part and the rotating part; a lifting mechanism is arranged between any two adjacent fixed parts.
10. A tunnel construction trolley according to claim 9, characterized in that: The fixing part has a placement interlayer, and when any rotating part is located at the hidden position, all or part of the rotating part is located in the placement interlayer.