Connecting structure for hanging frame sliding beam section adding and construction integration platform

CN223358686UActive Publication Date: 2025-09-19CHINA CONSTR THIRD ENG BUREAU GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202422826370.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-11-19
Publication Date
2025-09-19
Estimated Expiration
2034-11-19

Smart Images

  • Figure CN223358686U_ABST
    Figure CN223358686U_ABST
Patent Text Reader

Abstract

The utility model discloses a connecting structure for hanging frame sliding beam section adding and a construction integration platform, the connecting structure comprises a lengthened section sliding beam main plate, a first connecting plate and a second connecting plate, the first connecting plate is connected with the upper end face of a lower chord of a truss in the extending direction perpendicular to the lower chord of the truss in the construction integration platform, and the second connecting plate is connected with the upper end face of the lower chord of the truss. The lower end face of a lower chord of the truss is connected with the upper end face of a first sliding beam in the extending direction perpendicular to the first sliding beam in the construction integrated platform, the first end of a lengthened section sliding beam main plate is rotationally connected with a first connecting plate, and the second end of the lengthened section sliding beam main plate is connected with the upper end face of a second sliding beam to be added. The second connecting plate is connected with the first sliding beam and the second sliding beam and used for fixing and aligning the first sliding beam and the second sliding beam. According to the utility model, the second sliding beam to be added with the section can be detachably connected with the first sliding beam in the construction integrated platform, so that the construction operation range can be expanded, and the problem of interference and collision in the construction process can be solved.
Need to check novelty before this filing date? Find Prior Art