Flexible support middle column structure
By designing the central column sleeve and steel pipe of the flexible support central column structure, the problem of central column construction elevation deviation was solved, achieving high-precision construction and stable connection, reducing economic losses and shortening the construction period.
CN223470348UActive Publication Date: 2025-10-24ZHEJIANG PANAN HUADIAN NEW ENERGY CO LTD +1
View PDF 0 Cites 0 Cited by
Patent Information
- Application Number
- CN202422579901.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-24
- Publication Date
- 2025-10-24
- Estimated Expiration
- 2034-10-24
Smart Images

Figure CN223470348U_ABST
Abstract
The utility model provides a flexible support center pillar structure, which belongs to the technical field of building construction and comprises a center pillar sleeve and a center pillar steel tube, and the bottom of the center pillar sleeve is suitable for being connected with the ground; an accommodating space is formed in the middle column sleeve; a part of the center pillar steel pipe is suitable for extending into the accommodating space of the center pillar sleeve; the center pillar steel pipe has an adjusting state and a locking state, and when the center pillar steel pipe is in the adjusting state, the center pillar steel pipe is suitable for being in sliding connection with the center pillar sleeve; when the center pillar steel pipe is in the locking state, the center pillar steel pipe is fixedly connected with the center pillar sleeve. According to the scheme, when the center pillar steel pipe is in the adjusting state, the relative position of the center pillar steel pipe and the center pillar sleeve is adjusted, so that the elevation error caused by civil construction is solved, the construction precision is improved, the economic loss caused by field rectification is reduced, the construction period is shortened, and the economic benefit of a project is improved.
Need to check novelty before this filing date? Find Prior Art