Rectangular culvert pipe full-section prefabricated template
By using precast templates for the entire cross-section of rectangular culverts, one-time full-section casting is achieved, which solves the problems of low construction efficiency and high cost of precast rectangular culverts, improves construction efficiency and quality, and saves costs.
CN223507387UActive Publication Date: 2025-11-04NO 2 ENG CO LTD OF CCCC FIRST HARBOR ENG +1
View PDF 0 Cites 0 Cited by
Patent Information
- Application Number
- CN202422895139.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-26
- Publication Date
- 2025-11-04
- Estimated Expiration
- 2034-11-26
AI Technical Summary
Technical Problem
Existing rectangular culvert prefabrication construction is inefficient and costly, while traditional layered prefabrication methods are time-consuming and require a large amount of manpower and equipment.
Method used
The rectangular culvert full-section precast formwork is adopted, including outer formwork components, core formwork components and support components, to achieve one-time full-section casting. Combined with pulley blocks and guide rail system, the construction process is simplified.
Benefits of technology
It improved construction efficiency, reduced construction costs, enhanced the quality and appearance of precast culverts, and shortened the construction period.
✦ Generated by Eureka AI based on patent content.
Smart Images

Figure CN223507387U_ABST
Abstract
The utility model relates to the technical field of culvert pipe prefabrication, in particular to a rectangular culvert pipe full-section prefabrication formwork. Comprising two side molds which are symmetrically arranged on the two side edges of the culvert pipe reinforcement cage; the core mold assembly is arranged in the culvert pipe reinforcement cage; a plurality of sets of parallel buttress assemblies are arranged in a bottom plate reinforcement cage, the buttress assemblies extend in the length direction of the core mold assembly, a guide rail is arranged above each buttress assembly, and the core mold assemblies slide along the guide rails so that the core mold assemblies can be pulled out of the poured culvert pipe reinforcement cage. According to the method, one-time pouring of the whole section of the rectangular culvert pipe can be achieved, layered prefabrication is not needed, concrete connection positions do not need to be treated, the appearance quality of the prefabricated culvert pipe is improved, the construction cost is saved, the construction efficiency is greatly improved, and the prefabrication construction period is shortened.