AI Technical Summary
Existing scissor lift aerial work platforms pose safety hazards due to falling objects and health problems for workers working under the scorching sun.
An enclosed support platform was designed, equipped with a water tank, water pump, atomizer, and sunshade. The water pump delivers water to the atomizer to generate water mist for cooling, and the sunshade reduces direct sunlight, improving safety and comfort.
It effectively prevents items from falling, reduces workers' physical exertion, and improves work efficiency and safety.
Smart Images

Figure CN223937592U_ABST
Abstract
Description
Technical Field
[0001] This utility model relates to the field of construction platform technology, specifically to a building construction platform. Background Technology
[0002] During building construction, construction platforms are key tools for ensuring worker safety and improving construction efficiency. Especially when working at heights, scissor lifts are often used to safely transport workers to designated heights for construction.
[0003] However, existing scissor lift aerial work platforms have some shortcomings in practical applications. First, although the guardrails on the outside of the platform provide basic safety protection for workers, the large hollow areas in their structural design make it easy for construction materials to fall through the hollows, creating safety hazards. Second, these platforms generally lack top shielding facilities, causing workers to be directly exposed to the sun when working in the scorching sun. This not only easily leads to excessive physical exertion but also causes sunburn, seriously affecting the health and work efficiency of workers. Utility Model Content
[0004] The purpose of this utility model is to provide a building construction platform to overcome the shortcomings of the prior art.
[0005] To achieve the above objectives, the technical solution adopted by this utility model is as follows:
[0006] A building construction platform includes a mobile lifting vehicle. A support platform is fixedly installed on the top of the mobile lifting vehicle. A protective door is rotatably installed on the left side of the support platform. Four support rods arranged in a rectangular pattern are fixedly installed on the top of the support platform. The tops of the four support rods are fixedly connected to the bottom of a mounting frame. A water tank is fixedly installed inside the support platform. A support plate is fixedly installed on the right side of the inner wall of the support platform. A water pump is fixedly installed on the top of the support plate. A connecting plate is fixedly installed on the bottom of the mounting frame. An atomizer is fixedly installed on the bottom of the connecting plate. The front side of the water pump is connected to the interior of the water tank through a pipe. The rear side of the water pump is connected to a delivery pipe, which is connected to the interior of the atomizer. A sunshade is fixedly installed on the top of the mounting frame.
[0007] The beneficial effects of this utility model are: the support platform is enclosed on all sides to prevent items from falling and causing safety hazards; water in the water tank is transported to the atomizer by a water pump; the atomizer sprays water mist to cool the working area; and the shielding plate reduces direct sunlight exposure to workers, thereby improving work efficiency.
[0008] Based on the above technical solution, the present invention can be further improved as follows.
[0009] Furthermore, elastic clamps are fixedly installed on the rear side of the inner wall of the support platform and the front side of the support rod located on the right side of the rear side, and the inner wall of the elastic clamps is in contact with the outer wall of the conveying pipe.
[0010] Furthermore, an elastic clamp is fixedly installed at the bottom of the mounting bracket, and the outer wall of the conveying pipe is in contact with the inner wall of the elastic clamp.
[0011] Furthermore, there are several elastic clamps and elastic clips, and they are evenly distributed.
[0012] Furthermore, the support platform has two mounting seats fixedly installed inside, which are symmetrically distributed front and back. Each of the two mounting seats has two T-shaped slots symmetrically distributed front and back. A first placement plate is slidably installed on the top of the front mounting seat, and a second placement plate is slidably installed on the top of the rear mounting seat. Two T-shaped blocks are fixedly installed on the bottom of the first and second placement plates, which are symmetrically distributed front and back. The four T-shaped blocks are slidably connected to the interior of the T-shaped slots at corresponding positions.
[0013] Furthermore, the top of the first placement plate is provided with a first placement groove, and the top of the second placement plate is provided with three evenly distributed second placement grooves. The opposite sides of the two mounting seats are provided with mounting grooves, and a mounting rod with its other end penetrating through the corresponding side T-shaped block is movably installed inside the mounting groove. Attached Figure Description
[0014] Figure 1 This is a three-dimensional structural diagram of the present invention from one perspective;
[0015] Figure 2 This is a three-dimensional structural diagram of the present invention from another perspective;
[0016] Figure 3 This is a front view of the internal structure of the support platform of this utility model;
[0017] Figure 4 This is a schematic diagram of the disassembled structure of the upper component of the support platform of this utility model;
[0018] Figure 5 This is a schematic diagram of the internal structure of the support platform of this utility model from the left view.
[0019] Figure 6 This is a schematic diagram showing the disassembled structure of the two mounting bases and their upper components of this utility model;
[0020] Figure 7 This is a schematic diagram showing the installation position of the mounting rod of this utility model.
[0021] The attached diagram lists the components represented by each number as follows:
[0022] 1. Mobile lifting vehicle; 2. Support platform; 3. Safety door; 4. Support rod; 5. Mounting frame; 6. Water tank; 7. Support plate; 8. Water pump; 9. Connecting plate; 10. Atomizer; 11. Delivery pipe; 12. Sunshade; 13. Elastic clamp; 14. Mounting base; 15. T-slot; 16. First placement plate; 17. Second placement plate; 18. T-block; 19. First placement slot; 20. Second placement slot; 21. Mounting slot; 22. Mounting rod; 23. Elastic clamp. Detailed Implementation
[0023] The principles and features of this utility model are described below with reference to the accompanying drawings. The examples given are only for explaining this utility model and are not intended to limit the scope of this utility model.
[0024] Example 1, such as Figures 1 to 7 As shown, a building construction platform includes a mobile lifting vehicle 1. A support platform 2 is fixedly installed on the top of the mobile lifting vehicle 1. A protective door 3 is rotatably installed on the left side of the support platform 2. Four support rods 4 arranged in a rectangular pattern are fixedly installed on the top of the support platform 2. The tops of the four support rods 4 are all fixedly connected to the bottom of the mounting frame 5. A water tank 6 is fixedly installed inside the support platform 2. A support plate 7 is fixedly installed on the right side of the inner wall of the support platform 2. A water pump 8 is fixedly installed on the top of the support plate 7. A connecting plate 9 is fixedly installed on the bottom of the mounting frame 5. An atomizer 10 is fixedly installed on the bottom of the connecting plate 9. The front side of the water pump 8 is connected to the interior of the water tank 6 through a pipe. The rear side of the water pump 8 is connected to a delivery pipe 11, which is connected to the interior of the atomizer 10. A sunshade 12 is fixedly installed on the top of the mounting frame 5.
[0025] Workers climb into the support platform 2 from the left side of the mobile lifting vehicle 1, and then close the safety door 3 to ensure safety during the work process. The mobile lifting vehicle 1 then operates, raising and lowering the support platform 2 to reach the designated work area. In summer, the water pump 8 delivers water from the water tank 6 to the atomizer 10 through the delivery pipe 11, enabling the atomizer 10 to work normally and cool the interior space of the support platform 2. The sunshade 12 further cools the interior space of the support platform 2. The support plate 7 ensures the normal operation of the water pump 8, and the support rod 4 is fastened to the top of the support platform 2, which can be easily removed when not in use or for maintenance.
[0026] Example 2 is a further improvement based on Example 1. Specifically, elastic clamps 13 are fixedly installed on the rear side of the inner wall of the support platform 2 and the front side of the support rod 4 located on the right side of the rear side. The inner wall of the elastic clamps 13 is in contact with the outer wall of the conveying pipe 11.
[0027] The delivery pipe 11 is restricted by the elastic clamp 13, making it more stable when delivering water.
[0028] Example 3 is a further improvement based on Example 2, and it is as follows: An elastic clamp 23 is fixedly installed at the bottom of the mounting frame 5, and the outer wall of the conveying pipe 11 is in contact with the inner wall of the elastic clamp 23.
[0029] The elastic clamp 23 further strengthens the restriction on the delivery pipe 11, ensuring the stability of the pipe connection.
[0030] Example 4 is a further improvement based on Example 3, and its specific details are as follows: there are several elastic clamps 13 and elastic clips 23, and they are evenly distributed.
[0031] The combination of multiple elastic clamps 13 and elastic clips 23 further strengthens the restriction on the conveying pipe 11, making it more stable in subsequent use, and also ensuring the firmness of the pipe connection.
[0032] Example 5 is a further improvement on Example 1, and is as follows: Two mounting seats 14 are fixedly installed inside the support platform 2 and are symmetrically distributed front and back. Two T-shaped slots 15 are opened inside the two mounting seats 14 and are symmetrically distributed front and back. A first placement plate 16 is slidably installed on the top of the front mounting seat 14 and a second placement plate 17 is slidably installed on the top of the rear mounting seat 14. Two T-shaped blocks 18 are fixedly installed at the bottom of the first placement plate 16 and the second placement plate 17 and are symmetrically distributed front and back. The four T-shaped blocks 18 are slidably connected to the interior of the T-shaped slots 15 at corresponding positions.
[0033] The cooperation between the T-block 18 and the T-slot 15 makes the installation of the first placement plate 16 and the second placement plate 17 more convenient and improves the stability after installation. The top of the first placement plate 16 and the second placement plate 17 can be used to place the tools needed during the work process, so that the tools are more concentrated and avoid being scattered inside the support platform 2.
[0034] Example 6 is a further improvement based on Example 5, and is as follows: The top of the first placement plate 16 is provided with a first placement groove 19, the top of the second placement plate 17 is provided with three evenly distributed second placement grooves 20, and the opposite sides of the two mounting seats 14 are provided with mounting grooves 21. The mounting rod 22 with the other end penetrating the corresponding side T-shaped block 18 is movably installed inside the mounting groove 21.
[0035] The first placement slot 19 and the second placement slot 20 have different shapes, and different items are placed according to the different shapes of the tools. The stability of the first placement plate 16 and the second placement plate 17 after installation is ensured by the cooperation of the mounting rod 22 and the T-block 18.
[0036] Although embodiments of the present invention have been shown and described above, it is understood that the above embodiments are exemplary and should not be construed as limiting the present invention. Those skilled in the art can make changes, modifications, substitutions and variations to the above embodiments within the scope of the present invention.
Claims
1. A building construction platform, comprising a mobile lifting vehicle (1), characterized in that: The mobile lifting vehicle (1) is fixedly equipped with a support platform (2). A protective door (3) is rotatably installed on the left side of the support platform (2). Four support rods (4) are fixedly installed on the top of the support platform (2) in a rectangular arrangement. The tops of the four support rods (4) are fixedly connected to the bottom of the mounting frame (5). A water tank (6) is fixedly installed inside the support platform (2). A support plate (7) is fixedly installed on the right side of the inner wall of the support platform (2). A water pump (8) is fixedly installed on the top of the support plate (7). A connecting plate (9) is fixedly installed on the bottom of the mounting frame (5). An atomizer (10) is fixedly installed on the bottom of the connecting plate (9). The front side of the water pump (8) is connected to the inside of the water tank (6) through a pipe. The rear side of the water pump (8) is connected to a delivery pipe (11). The delivery pipe (11) is connected to the inside of the atomizer (10). A sunshade (12) is fixedly installed on the top of the mounting frame (5).
2. The building construction platform according to claim 1, characterized in that, The inner wall of the support platform (2) and the front side of the support rod (4) located on the right side are both fixedly installed with elastic clamps (13), and the inner wall of the elastic clamps (13) is in contact with the outer wall of the conveying pipe (11).
3. A building construction platform according to claim 2, characterized in that, An elastic clip (23) is fixedly installed at the bottom of the mounting bracket (5), and the outer wall of the conveying pipe (11) is in contact with the inner wall of the elastic clip (23).
4. A building construction platform according to claim 3, characterized in that, The number of elastic clamps (13) and elastic clips (23) are both several and evenly distributed.
5. A building construction platform according to claim 1, characterized in that, The support platform (2) has two mounting seats (14) fixedly installed inside, which are symmetrically distributed front and back. Each of the two mounting seats (14) has two T-shaped grooves (15) symmetrically distributed front and back. A first placement plate (16) is slidably installed on the top of the front mounting seat (14), and a second placement plate (17) is slidably installed on the top of the rear mounting seat (14). The bottom of the first placement plate (16) and the second placement plate (17) are fixedly installed with two T-shaped blocks (18) symmetrically distributed front and back. The four T-shaped blocks (18) are slidably connected to the interior of the T-shaped grooves (15) at the corresponding positions.
6. A building construction platform according to claim 5, characterized in that, The top of the first placement plate (16) is provided with a first placement groove (19), and the top of the second placement plate (17) is provided with three evenly distributed second placement grooves (20). The two mounting seats (14) are provided with mounting grooves (21) on opposite sides. The mounting grooves (21) are movably installed with mounting rods (22) whose other end passes through the corresponding side T-shaped block (18).