Lightweight porous concrete wallboard structure free of autoclaved molding

CN224078496UActive Publication Date: 2026-04-03河南省城乡规划设计研究总院股份有限公司
-1 Cites -1 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2025-03-31
Publication Date
2026-04-03

AI Technical Summary

Technical Problem

The connection between existing concrete slab walls mainly relies on special adhesives, which are costly and have a long curing time, affecting the construction progress, especially in multi-story buildings.

Method used

The design incorporates wall panels, mounting holes, mounting plates, connecting holes, and connecting plates. Combined with the use of right-angle steel and bolts, it enables rapid fixing and reinforcement between wall panels. The connection process is simplified through sliding and threaded connections.

Benefits of technology

It enables rapid connection between wall panels, saving time, reducing connection costs, effectively preventing loosening of connection parts, and improving construction efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224078496U_ABST
    Figure CN224078496U_ABST
Patent Text Reader

Abstract

The utility model provides a light porous concrete wallboard structure free of autoclaved molding, and relates to the technical field of concrete wallboards. The non-autoclaved lightweight porous concrete wallboard structure comprises a bottom plate, and a wallboard I is arranged on the upper surface of the bottom plate. According to the autoclaved-molding-free light porous concrete wallboard structure, through cooperation of the wallboard I, the mounting plate, the mounting hole II and the connecting plate, the wallboard I and the wallboard II are fixed to the ground, the mounting plate is inserted between the mounting hole I and the mounting hole II, the wallboard I and the wallboard II are connected, the connecting plate is inserted between the connecting hole I and the connecting hole II, and the wallboard I and the wallboard II are fixed to the ground through the matching of the wallboard I, the mounting plate, the mounting hole II and the connecting plate. The first wallboard and the right-angle board wall can be connected conveniently, and the problems that the cost is high, the curing time is long, epoxy resin needs to be completely cured for more than 24 hours, and the construction progress (especially a multi-story building) is affected due to the fact that special binders are adopted for connection mostly between some concrete board walls are solved.
Need to check novelty before this filing date? Find Prior Art