Steel column supported jig base

CN224325810UActive Publication Date: 2026-06-05GUANGZHOU JISHI CONSTR GRP

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
GUANGZHOU JISHI CONSTR GRP
Filing Date
2025-05-19
Publication Date
2026-06-05

AI Technical Summary

Technical Problem

The existing concrete strip foundations used to support steel columns are time-consuming and costly to dismantle.

Method used

The design adopts a steel column support frame foundation consisting of a cast-in-place concrete layer and multiple precast concrete blocks. The first connecting steel bar is embedded in the precast concrete block, and the connecting end protrudes upward above the cast-in-place concrete layer to connect the steel column. The cast-in-place concrete layer covers the upper surface of the strip foundation to enhance the connection strength, and the precast concrete blocks can be detached and connected to form a strip foundation.

Benefits of technology

This technology enables easy removal of cast-in-place concrete layers, reduces demolition costs, and allows for the reuse of precast concrete blocks, improving connection strength and construction efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224325810U_ABST
    Figure CN224325810U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of building engineering, especially a steel stand column support jig foundation, including concrete cast-in-place layer and a plurality of prefabricated concrete blocks, each prefabricated concrete block is detachably connected into strip foundation, at least part prefabricated concrete block has embedded first connecting reinforcement, each first connecting reinforcement has the embedded end embedded in prefabricated concrete block and the connecting end that protrudes to the above of prefabricated concrete block, the concrete cast-in-place layer is set on strip foundation, has played the role of the leveling of strip foundation, has strengthened the connecting strength between each prefabricated concrete block, and the connecting end is all protruded to the above of concrete cast-in-place layer, and the connecting end is used to connect steel stand column, when removing strip foundation, first remove concrete cast-in-place layer, then can be removed each prefabricated concrete block, each prefabricated concrete block can be repeatedly used, and the removal cost of strip foundation is reduced.
Need to check novelty before this filing date? Find Prior Art