A dual-arm drilling, injection, and anchoring integrated trolley

By using a split-design drilling and anchor bolt arm assembly and supporting system, the problem that existing trolleys cannot drill holes and bolt bolts simultaneously has been solved, enabling efficient and precise dual-arm drilling operations.

CN224432578UActive Publication Date: 2026-06-30JIANGXI XINTONG MASCH MFG CO LTD

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
JIANGXI XINTONG MASCH MFG CO LTD
Filing Date
2025-08-11
Publication Date
2026-06-30

AI Technical Summary

Technical Problem

The existing double-arm anchor bolt trolley is too heavy to perform drilling and anchor bolting work simultaneously, resulting in inaccurate positioning and low work efficiency.

Method used

The drilling arm assembly and anchor bolt assembly are designed separately to complete drilling and anchor bolting work respectively. They are equipped with grouting pipes and mud mixing systems to enable drilling and anchor bolting to be carried out simultaneously. The clamping effect is improved by front and rear clamps.

Benefits of technology

It improved work efficiency, reduced weight, enhanced positioning accuracy, increased installation flexibility and versatility, and enabled simultaneous drilling and anchoring.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224432578U_ABST
    Figure CN224432578U_ABST
Patent Text Reader

Abstract

This utility model relates to a dual-arm drilling, injection, and anchoring integrated trolley, including a chassis and a frame assembly mounted on the chassis. The frame assembly is equipped with a drilling arm assembly for drilling and an anchor arm assembly for anchoring. The anchor arm assembly includes an anchor rod, a front clamp, a rear clamp, and a first telescopic propulsion beam for driving the rear clamp forward or retract. The front and rear ends of the anchor rod are connected to the front and rear clamps respectively, and the front and rear clamps are located on the first telescopic propulsion beam. The dual-arm drilling, injection, and anchoring integrated trolley obtained by this utility model has the following advantages: the separate design of the drilling arm assembly and the anchor arm assembly allows each arm to complete drilling and anchoring work respectively, enabling simultaneous drilling and anchoring, improving work efficiency. Simultaneously, the weight of the two arms is reduced, resulting in higher positioning accuracy, smaller overall mass, and stronger versatility; the front and rear clamps provide dual clamping of the anchor rod, resulting in good clamping effect and more flexible installation.
Need to check novelty before this filing date? Find Prior Art