Villa module decoration production line

By introducing waterproof coating and testing stations into the villa modular decoration production line, the problem of insufficient module durability was solved, achieving the effects of improved durability and reduced costs.

CN224468730UActive Publication Date: 2026-07-07AN QING GUO FENG ZHU ZHAI CHAN YE HUA JI TUAN YOU XIAN GONG SI

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
AN QING GUO FENG ZHU ZHAI CHAN YE HUA JI TUAN YOU XIAN GONG SI
Filing Date
2025-08-08
Publication Date
2026-07-07

Smart Images

  • Figure CN224468730U_ABST
    Figure CN224468730U_ABST
Patent Text Reader

Abstract

The utility model provides a kind of villa module decoration production line, it is related to villa module assembly production technical field, including first assembly line, second assembly line, third assembly line, fourth assembly line and ferry area in turn;First assembly line includes module on-line station, door and window installation station, waterproof coating station and waterproof detection station in turn;Second assembly line includes first putty station, second putty station and putty polishing station in turn;Third assembly line includes ceramic tile sticking station, paint coating station and paint drying station in turn;Fourth assembly line includes jointing station, component installation station and off-line detection station in turn.The device is waterproofed by setting waterproof coating step and waterproof detection step, and waterproof pretreatment, improve the durability of villa module, avoid the maintenance and repair work caused by waterproof problem in later period, reduce overall cost.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model belongs to the field of villa module assembly and production technology, and more specifically, it relates to a villa module decoration production line. Background Technology

[0002] A villa modular decoration production line refers to an industrialized and standardized production method used to manufacture and assemble various modules (such as walls, roofs, floors, doors, and windows) of a villa. It combines modern production technology with prefabricated components and modular design, improving the efficiency and quality of villa decoration.

[0003] Chinese Patent No. CN202122529193.8 discloses a villa modular decoration production line, which includes a first production line, a second production line, a third production line, and a fourth production line connected sequentially via a transfer area. The first production line includes a module loading station, a door, window, and cabinet installation station, and a first coat of putty station arranged sequentially. The second production line includes a second coat of putty station and a putty sanding station arranged sequentially. The third production line includes a wall and floor tile installation station and a painting station arranged sequentially. The fourth production line includes a paint drying station, a component installation station, and an offline inspection station arranged sequentially. The module loading station is the starting end of the villa modular decoration production line, and the offline inspection station is the output end of the villa modular decoration production line. Streamlining the villa modular decoration in a factory can improve production efficiency, save costs, and reduce noise pollution to the surrounding environment.

[0004] Based on the above, the inventors have discovered the following problems: The above-mentioned patent uses a production line-style decoration method for villa modules, which can improve production efficiency, save costs, and reduce noise pollution to the surrounding environment. However, the above-mentioned patent does not include a waterproof coating step or a waterproof testing step. The waterproof pretreatment is inadequate, which reduces the durability of the villa modules and increases the overall cost due to the subsequent maintenance and repair work caused by waterproofing problems.

[0005] Therefore, in view of this, we have studied and improved the existing structure and its shortcomings, and provided a villa modular decoration production line in order to achieve a more practical value. Utility Model Content

[0006] The purpose and effectiveness of this utility model's modular villa decoration production line are achieved through the following specific technical means:

[0007] A modular villa renovation production line includes a first production line, a second production line, a third production line, a fourth production line, and a transfer area arranged sequentially. The first production line includes a module loading station, a door and window installation station, a waterproof coating station, and a waterproof testing station arranged sequentially. The second production line includes a first putty station, a second putty station, and a putty sanding station arranged sequentially. The third production line includes a tile laying station, a paint coating station, and a paint drying station arranged sequentially. The fourth production line includes a grout sealing station, a component installation station, and an offline inspection station arranged sequentially. The module loading station is the input end of the modular villa renovation production line, and the offline inspection station is the output end of the modular villa renovation production line.

[0008] Furthermore, the shuttle area includes a first shuttle area, a second shuttle area, and a third shuttle area.

[0009] Furthermore, the first and second production lines are connected through a first transfer area, the second and third production lines are connected through a second transfer area, and the third and fourth production lines are connected through a third transfer area.

[0010] Furthermore, the first and second production lines are arranged adjacent to each other, the second and third production lines are arranged adjacent to each other, and the third and fourth production lines are arranged adjacent to each other.

[0011] Furthermore, the outlet end of the waterproof testing station is connected to the inlet end of the first putty station, the outlet end of the putty sanding station is connected to the inlet end of the tile laying station, and the outlet end of the paint drying station is connected to the inlet end of the grout sealing station.

[0012] Furthermore, at least three of the following workstations are provided in sequence: door and window installation workstation, waterproof coating workstation, waterproof testing workstation, first putty workstation, second putty workstation, putty sanding workstation, tile laying workstation, paint coating workstation, paint drying workstation, grout sealing workstation, and component installation workstation.

[0013] Furthermore, the output end of the offline testing station is provided with a temporary storage area.

[0014] Furthermore, material storage areas are set up near the first, second, third, and fourth production lines.

[0015] Compared with the prior art, the present invention has the following beneficial effects:

[0016] 1. By setting up waterproof coating and waterproof testing steps, the waterproof pretreatment improves the durability of the villa modules, avoids later maintenance and repair work caused by waterproofing problems, and reduces the overall cost.

[0017] 2. All stages of the villa module's decoration are completed on the production line, using an assembly line operation method to improve production efficiency. This production line can mass-produce villa modules of different types and styles.

[0018] 3. Since modular decoration is carried out in the factory, most of the decoration work is already completed, greatly reducing the workload on the construction site and saving time and manpower.

[0019] 4. By transporting villa modules to the construction site, they can be quickly assembled, shortening the overall construction cycle, reducing the construction period, and increasing the speed of project delivery. Attached Figure Description

[0020] Figure 1 This is a schematic diagram of the process structure of a villa modular decoration production line according to this utility model.

[0021] In the diagram, the correspondence between component names and drawing numbers is as follows:

[0022] 1. First production line; 2. Second production line; 3. Third production line; 4. Fourth production line; 5. First transfer area; 6. Second transfer area; 7. Third transfer area; 8. Module loading station; 9. Door and window installation station; 10. Waterproofing coating station; 11. Waterproofing testing station; 12. First putty station; 13. Second putty station; 14. Putty sanding station; 15. Tile laying station; 16. Paint coating station; 17. Paint drying station; 18. Grout sealing station; 19. Component installation station; 20. Offline inspection station; 21. Temporary storage area; 22. Material storage area. Detailed Implementation

[0023] The embodiments of this utility model will be described in further detail below with reference to the accompanying drawings and examples. The following examples are for illustrative purposes only and should not be construed as limiting the scope of this utility model.

[0024] In the description of this utility model, unless otherwise stated, "a plurality of" means two or more; the terms "upper," "lower," "left," "right," "inner," "outer," "front end," "rear end," "head," "tail," etc., indicate the orientation or positional relationship based on the orientation or positional relationship shown in the accompanying drawings, and are only for the convenience of describing this utility model and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, or be constructed and operated in a specific orientation, and therefore should not be construed as a limitation of this utility model. In addition, the terms "first," "second," "third," etc., are used for descriptive purposes only and should not be construed as indicating or implying relative importance.

[0025] In the description of this utility model, it should be noted that, unless otherwise explicitly specified and limited, the terms "connected" and "linked" should be interpreted broadly. For example, they can refer to a fixed connection, a detachable connection, or an integral connection; they can refer to a mechanical connection or an electrical connection; they can refer to a direct connection or an indirect connection through an intermediate medium. Those skilled in the art can understand the specific meaning of the above terms in this utility model based on the specific circumstances.

[0026] Example:

[0027] As attached Figure 1 As shown:

[0028] This utility model provides a modular villa decoration production line, comprising a first production line 1, a second production line 2, a third production line 3, a fourth production line 4, and a transfer area arranged sequentially. The first production line 1 includes a module loading station 8, a door and window installation station 9, a waterproof coating station 10, and a waterproof testing station 11 arranged sequentially. The second production line 2 includes a first putty station 12, a second putty station 13, and a putty sanding station 14 arranged sequentially. The third production line 3 includes a tile laying station 15, a paint coating station 16, and a paint drying station 17 arranged sequentially. The fourth production line 4 includes a grout sealing station 18, a component installation station 19, and an off-line inspection station arranged sequentially. Testing station 20; The module online station 8 is the input end of the villa module decoration production line, and the offline testing station 20 is the output end of the villa module decoration production line. The villa module enters the production line through the module online station 8, and then passes through the door and window installation station 9, waterproof coating station 10, waterproof testing station 11, first putty station 12, second putty station 13, putty sanding station 14, tile laying station 15, paint coating station 16, paint drying station 17, grout sealing station 18 and component installation station 19 in sequence to complete the decoration. After passing the inspection at the offline testing station 20, it is temporarily stored in the factory temporary storage area 21 or transported to the site to be assembled into a whole.

[0029] The shuttle area includes a first shuttle area 5, a second shuttle area 6, and a third shuttle area 7.

[0030] The first production line 1 and the second production line 2 are connected by the first transfer zone 5, the second production line 2 and the third production line 3 are connected by the second transfer zone 6, and the third production line 3 and the fourth production line 4 are connected by the third transfer zone 7.

[0031] The first production line 1 and the second production line 2 are arranged adjacent to each other, the second production line 2 and the third production line 3 are arranged adjacent to each other, and the third production line 3 and the fourth production line 4 are arranged adjacent to each other.

[0032] The outlet of the waterproof testing station 11 is connected to the inlet of the first putty station 12, the outlet of the putty sanding station 14 is connected to the inlet of the tile laying station 15, and the outlet of the paint drying station 17 is connected to the inlet of the grout sealing station 18.

[0033] Among them, at least three of the following are provided in sequence: door and window installation station 9, waterproof coating station 10, waterproof testing station 11, first putty station 12, second putty station 13, putty sanding station 14, tile laying station 15, paint coating station 16, paint drying station 17, grout sealing station 18, and component installation station 19.

[0034] The output end of the offline testing station 20 is provided with a temporary storage area 21.

[0035] Material storage areas 2 are located near the first production line 1, the second production line 2, the third production line 3, and the fourth production line 4.

[0036] The specific usage and function of this embodiment are as follows:

[0037] First, check the integrity of the device. Only after confirming that there are no problems can it be used. When using it, the villa module first enters the production line through module loading station 8, and then passes through door and window installation station 9, waterproof coating station 10, waterproof testing station 11, first putty station 12, second putty station 13, putty sanding station 14, tile laying station 15, paint coating station 16, paint drying station 17, grout sealing station 18, and component installation station 19 in sequence to complete the decoration. After passing the inspection at the off-line testing station 20, it is temporarily stored in the factory storage area 21 or transported to the site for assembly into a whole. By setting up waterproof coating and waterproof testing steps, waterproof pretreatment is carried out, which improves the durability of the villa module and avoids the later maintenance and repair work caused by waterproof problems, thus reducing the overall cost. All decoration stages of the villa module are completed on the production line, adopting an assembly line operation method to improve production efficiency. This production line can mass-produce villa modules of different types and styles. Since modular decoration is carried out in the factory, most of the decoration work is already completed, greatly reducing the workload on the construction site and saving time and manpower. By transporting the villa modules to the construction site, they can be quickly assembled, shortening the overall construction cycle, reducing the construction period, and improving the delivery speed of the project. The device has a novel overall design and simple structure, so it is worth promoting and using widely.

[0038] The embodiments of this utility model are given for illustrative and descriptive purposes only, and are not intended to be exhaustive or to limit the utility model to the forms disclosed. Many modifications and variations will be apparent to those skilled in the art. The embodiments were chosen and described in order to better illustrate the principles and practical applications of this utility model, and to enable those skilled in the art to understand this utility model and design various embodiments with various modifications suitable for a particular purpose.

Claims

1. A modular villa decoration production line, characterized in that: It includes a first production line (1), a second production line (2), a third production line (3), a fourth production line (4), and a transfer area, arranged in sequence; The first production line (1) includes a module loading station (8), a door and window installation station (9), a waterproof coating station (10), and a waterproof testing station (11) arranged sequentially. The second production line (2) includes a first putty station (12), a second putty station (13), and a putty sanding station (14) arranged in sequence; The third production line (3) includes a tile-laying station (15), a painting station (16), and a paint drying station (17) arranged in sequence; The fourth production line (4) includes a grout sealing station (18), a component installation station (19), and an off-line inspection station (20) arranged sequentially. The module online station (8) is the input end of the villa module decoration production line, and the offline inspection station (20) is the output end of the villa module decoration production line.

2. The villa modular decoration production line as described in claim 1, characterized in that: The shuttle area includes a first shuttle area (5), a second shuttle area (6) and a third shuttle area (7).

3. The villa modular decoration production line as described in claim 1, characterized in that: The first production line (1) and the second production line (2) are connected through the first transfer area (5), the second production line (2) and the third production line (3) are connected through the second transfer area (6), and the third production line (3) and the fourth production line (4) are connected through the third transfer area (7).

4. The villa modular decoration production line as described in claim 1, characterized in that: The first production line (1) and the second production line (2) are arranged adjacent to each other, the second production line (2) and the third production line (3) are arranged adjacent to each other, and the third production line (3) and the fourth production line (4) are arranged adjacent to each other.

5. The villa modular decoration production line as described in claim 1, characterized in that: The outlet of the waterproof testing station (11) is connected to the inlet of the first putty station (12), the outlet of the putty sanding station (14) is connected to the inlet of the tile laying station (15), and the outlet of the paint drying station (17) is connected to the inlet of the grout sealing station (18).

6. A villa modular decoration production line as described in any one of claims 1-5, characterized in that: The door and window installation station (9), waterproof coating station (10), waterproof testing station (11), first putty station (12), second putty station (13), putty sanding station (14), tile laying station (15), paint coating station (16), paint drying station (17), grout sealing station (18), and component installation station (19) are each provided with at least 3 stations in sequence.

7. A villa modular decoration production line as described in any one of claims 1-5, characterized in that: The output end of the offline testing station (20) is provided with a temporary storage area (21).

8. A villa modular decoration production line as described in any one of claims 1-5, characterized in that: Material storage areas (22) are set up near the first production line (1), the second production line (2), the third production line (3) and the fourth production line (4).