A temporary protective fence for sewage well reconstruction

By designing a foldable and retractable protective fence for the renovation of sewage wells, the problem of traditional protective fences being bulky and difficult to transport has been solved, enabling convenient transportation and rapid construction, and improving construction efficiency and stability.

CN224496018UActive Publication Date: 2026-07-14BEIJING HUAAN WYNN CONSTRUCTION ENGINEERING CO LTD

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
BEIJING HUAAN WYNN CONSTRUCTION ENGINEERING CO LTD
Filing Date
2025-08-11
Publication Date
2026-07-14

AI Technical Summary

Technical Problem

In the process of renovating traditional sewage wells, the protective fences are bulky and difficult to transport, which affects the construction efficiency.

Method used

A temporary protective fence consisting of posts and guardrails was designed. It adopts a foldable and retractable structure, and achieves rapid assembly and stable connection through dovetail blocks and snap-fit ​​structures. Support rods and telescopic frames improve transportation convenience and construction efficiency.

Benefits of technology

It enables convenient transportation and rapid construction of protective fences, improves construction efficiency, and enhances the stability of the construction site.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224496018U_ABST
    Figure CN224496018U_ABST
Patent Text Reader

Abstract

The utility model discloses a kind of temporary protective fences for sewage well reconstruction, comprising: upright and interval is set on ground;Guardrail is set between two adjacent the uprights;The guardrail includes support pole and telescopic frame, and the telescopic frame is set between two adjacent the support pole, and the telescopic frame includes telescopic pipe and telescopic rod, and the telescopic pipe is vertically slidingly connected in the support pole, and the telescopic rod is a group in twos, and middle position is rotatably connected each other, and the upper end of the telescopic rod of each group is rotatably connected in the telescopic pipe, and lower end is rotatably connected in the support pole.The utility model has the following advantages and effects: by setting folding storage type guardrail, the storage and transportation of entire protective fence can be realized, make mobile transportation process more convenient, convenient for turnover use, can be quickly unfolded on ground and build simultaneously, improve construction efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] This utility model relates to the field of protective fences, and in particular to a temporary protective fence for the renovation of sewage wells. Background Technology

[0002] With increasing environmental awareness and technological advancements, many regions are promoting wastewater renovation projects. Wastewater renovation typically refers to upgrading and improving existing wastewater treatment systems or facilities to enhance their treatment efficiency, expand treatment capacity, and reduce their environmental impact.

[0003] Traditional sewage well renovation processes require the excavation of sewage tanks in the ground, necessitating the installation of protective fencing at the construction site. However, traditional protective fencing is bulky, difficult to transport, and hinders its erection, thus reducing construction efficiency and requiring improvement. Utility Model Content

[0004] In view of the shortcomings of the existing technology, the purpose of this utility model is to provide a temporary protective fence for the renovation of sewage wells, which can improve construction efficiency.

[0005] The above-mentioned technical objective of this utility model is achieved through the following technical solution: a temporary protective fence for the renovation of a sewage well, comprising:

[0006] The columns are vertically positioned and spaced apart on the ground.

[0007] A guardrail is installed between two adjacent posts;

[0008] The guardrail includes support rods and telescopic frames. The telescopic frames are arranged between two adjacent support rods. The telescopic frames include telescopic tubes and telescopic rods. The telescopic tubes are vertically slidably connected to the support rods. The telescopic rods are arranged in pairs and are rotatably connected to each other at their middle positions. The upper end of each pair of telescopic rods is rotatably connected to the telescopic tube, and the lower end is rotatably connected to the support rod.

[0009] In a preferred embodiment, the present invention can be further configured such that a roller is provided at the lower end of the support rod.

[0010] In a preferred embodiment, the present invention can be further configured such that: the side wall of the support rod at the far end is provided with a dovetail block, and both sides of the column are provided with grooves for the dovetail block to be inserted and dovetail slots connecting the lower end of the grooves and for the dovetail block to be slidably inserted.

[0011] In a preferred embodiment, the present invention can be further configured such that: a pressure rod communicating with the groove is vertically threaded onto the column, and the pressure rod is used to press the upper end face of the dovetail block.

[0012] In a preferred embodiment, the present invention can be further configured as follows: the side wall of the column is rotatably connected to an installation tube, an installation rod is vertically slidably connected inside the installation tube, an elastic insertion rod is horizontally slidably connected inside the installation rod, the outer wall of the installation tube is provided with a row of insertion holes for the insertion rod to be inserted, and the lower end of the installation rod is provided with an installation plate for contacting the ground.

[0013] In a preferred embodiment, the present invention can be further configured such that: locking rings are provided on both sides of the column, a warning banner is provided between two adjacent columns, and both ends of the warning banner are provided with locking hooks to fasten the locking rings.

[0014] In a preferred embodiment, the present invention can be further configured such that: a storage slot for inserting the warning banner is vertically provided on the column.

[0015] In summary, this utility model has the following beneficial effects:

[0016] 1. By setting up foldable and retractable guardrails, the entire guardrail can be stored and transported in a retractable manner, making the mobile transportation process more convenient and easy to reuse. At the same time, it can be quickly unfolded on the ground for construction, improving construction efficiency.

[0017] 2. By setting a snap-fit ​​structure between the post and the guardrail, a quick connection and fixation between the post and the guardrail can be achieved, improving construction efficiency;

[0018] 3. By setting a flip-type support structure on the posts, diagonal bracing can be formed on the posts, increasing the stability of the entire protective fence during operation. Attached Figure Description

[0019] Figure 1 This is a structural schematic diagram of an embodiment;

[0020] Figure 2 This is a schematic diagram of the column structure in the embodiment;

[0021] Figure 3 This is a schematic diagram of the structure of the guardrail in an embodiment;

[0022] Figure 4 This is a schematic diagram of the structure of the warning banner in an embodiment.

[0023] Attached reference numerals: 1. Post; 11. Groove; 12. Dovetail groove; 13. Pressure bar; 14. Locking ring; 15. Storage slot; 2. Guardrail; 21. Dovetail block; 22. Support rod; 23. Telescopic frame; 231. Telescopic tube; 232. Telescopic rod; 24. Roller; 3. Mounting tube; 31. Mounting rod; 32. Insert rod; 33. Insertion hole; 34. Mounting plate; 4. Warning banner; 41. Locking hook. Detailed Implementation

[0024] The present invention will be further described in detail below with reference to the accompanying drawings.

[0025] like Figure 1 As shown, a temporary protective fence for the renovation of a sewage well includes posts 1 and guardrails 2. The posts 1 are vertically arranged on the ground at intervals, and the guardrails 2 are arranged between two adjacent posts 1.

[0026] like Figure 1 , Figure 2 , Figure 3 As shown, dovetail blocks 21 are provided on both ends of the guardrail 2, and grooves 11 for the dovetail blocks 21 to be inserted are provided on both sides of the post 1, as well as dovetail grooves 12 that connect the lower end of the grooves 11 and allow the dovetail blocks 21 to slide into them.

[0027] like Figure 1 , Figure 2 As shown, a pressure rod 13 with a communicating groove 11 is vertically threaded onto the column 1. The pressure rod 13 is used to press the upper end face of the dovetail block 21.

[0028] When a protective fence needs to be erected, the posts 1 are vertically placed on the ground. Then, the dovetail blocks 21 at both ends of the guardrail 2 are inserted into the grooves 11, and the guardrail 2 is controlled to move downwards, causing the dovetail blocks 21 to slide and embed into the dovetail grooves 12, thus achieving lateral limitation. Next, the pressure rod 13 is tightened, pressing the upper surface of the dovetail blocks 21 to achieve vertical limitation, thereby completing the rapid erection of the protective fence and improving construction efficiency.

[0029] like Figure 3 As shown, the guardrail 2 includes support rods 22 and telescopic frames 23. The support rods 22 are spaced apart and each has a roller 24 at its lower end for moving the guardrail 2 on the ground. The telescopic frame 23 is located between two adjacent support rods 22 and includes a telescopic tube 231 and a telescopic rod 232.

[0030] like Figure 3 As shown, the telescopic tube 231 is vertically slidably connected to the support rod 22, and the telescopic rods 232 are in pairs and rotatably connected to each other at their middle positions. The upper end of each pair of telescopic rods 232 is rotatably connected to the telescopic tube 231, and the lower end is rotatably connected to the support rod 22.

[0031] Therefore, by setting up a foldable and retractable guardrail 2, the entire guardrail can be stored and transported in a retractable manner, making the mobile transportation process more convenient and easy to reuse. At the same time, it can be quickly deployed on the ground for construction, improving construction efficiency.

[0032] like Figure 2As shown, a mounting tube 3 is rotatably connected to the side wall of the column 1, and a mounting rod 31 is vertically and slidably connected inside the mounting tube 3. A flexible insertion rod 32 is horizontally and slidably connected inside the mounting rod 31. A row of insertion holes 33 for the insertion rod 32 is provided on the outer wall of the mounting tube 3, and a mounting plate 34 for contacting the ground is provided at the lower end of the mounting rod 31.

[0033] When the post 1 is installed on the ground, the control installation tube 3 is flipped outward, and then the insertion rod 32 is pressed into the installation rod 31. The control installation rod 31 is then slid outward, and finally the installation plate 34 is flipped to touch the ground, so that the insertion rod 32 is inserted into the corresponding insertion hole 33. Then the installation plate 34 is fixed on the ground, forming a diagonal bracing structure on the post 1, which increases the stability of the entire protective fence during operation.

[0034] like Figure 1 , Figure 4 As shown, locking rings 14 are provided on both sides of the column 1, and a warning banner 4 is provided between two adjacent columns 1. Both ends of the warning banner 4 are provided with locking hooks 41 to hook the locking rings 14. A storage slot 15 for inserting the warning banner 4 is vertically provided on the column 1.

[0035] When it is necessary to install the warning banner 4, take the warning banner 4 out of the storage slot 15, unfold the warning banner 4, hook the locking hook 41 on the warning banner 4 onto the locking ring 14 on the column 1, so that the warning banner 4 can be unfolded and used to warn people.

[0036] The specific embodiments are merely explanations of this utility model and are not intended to limit it. After reading this specification, those skilled in the art can make modifications to these embodiments without contributing any inventive step, but such modifications are protected by patent law as long as they fall within the scope of the claims of this utility model.

Claims

1. A temporary protective fence for the renovation of a sewage well, characterized in that: include: Columns (1) are vertically and spaced apart on the ground; A guardrail (2) is installed between two adjacent posts (1); The guardrail (2) includes a support rod (22) and a telescopic frame (23). The telescopic frame (23) is arranged between two adjacent support rods (22). The telescopic frame (23) includes a telescopic tube (231) and a telescopic rod (232). The telescopic tube (231) is vertically slidably connected to the support rod (22). The telescopic rods (232) are arranged in pairs and are rotatably connected to each other at their middle positions. The upper end of each telescopic rod (232) is rotatably connected to the telescopic tube (231), and the lower end is rotatably connected to the support rod (22).

2. The temporary protective fence for the renovation of a sewage well according to claim 1, characterized in that: The lower end of the support rod (22) is provided with a roller (24).

3. The temporary protective fence for the renovation of a sewage well according to claim 1, characterized in that: The support rod (22) at the far end has a dovetail block (21) on its side wall. Both sides of the column (1) are provided with a groove (11) for the dovetail block (21) to be inserted and a dovetail groove (12) connecting the lower end of the groove (11) and allowing the dovetail block (21) to slide into it.

4. A temporary protective fence for the renovation of a sewage well according to claim 3, characterized in that: The column (1) is vertically threaded with a pressure rod (13) that communicates with the groove (11). The pressure rod (13) is used to press the upper end face of the dovetail block (21).

5. A temporary protective fence for the renovation of a sewage well according to claim 1, characterized in that: The side wall of the column (1) is rotatably connected to an installation tube (3), and an installation rod (31) is vertically slidably connected inside the installation tube (3). An elastic insertion rod (32) is horizontally slidably connected inside the installation rod (31). A row of insertion holes (33) for the insertion rod (32) to be inserted is provided on the outer wall of the installation tube (3). The lower end of the installation rod (31) is provided with an installation plate (34) for contacting the ground.

6. A temporary protective fence for the renovation of a sewage well according to claim 1, characterized in that: Locking rings (14) are provided on both sides of the column (1), and a warning banner (4) is provided between two adjacent columns (1). Both ends of the warning banner (4) are provided with locking hooks (41) to hook the locking rings (14).

7. A temporary protective fence for the renovation of a sewage well according to claim 6, characterized in that: The column (1) is vertically provided with a storage slot (15) for inserting the warning banner (4).