一种地铁施工用顶板钻孔装置

By introducing a positioning block and a liquid storage chamber into the drilling device for the roof slab of subway construction, the problems of drill bit breakage and insufficient precision were solved, the drill bit was protected and cooled, and the stability and precision of drilling were improved.

CN224508499UActive Publication Date: 2026-07-17CHINA RAILWAY NO 5 ENGINEERING GROUP CO LTD +1

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
CHINA RAILWAY NO 5 ENGINEERING GROUP CO LTD
Filing Date
2025-06-24
Publication Date
2026-07-17

AI Technical Summary

Technical Problem

The drill bits of existing subway construction roof drilling equipment lack protective measures, are prone to breakage, and have insufficient drilling accuracy and efficiency.

Method used

A drilling device is designed, comprising a positioning block, an elastic mechanism, a liquid storage chamber, and a transmission assembly. The positioning block supports and protects the drill bit, the liquid storage chamber cools the drill bit, and the transmission assembly ensures drilling accuracy.

Benefits of technology

It effectively reduces the probability of drill bit breakage, improves drilling accuracy and efficiency, extends drill bit life, and ensures the stability and precision of the drilling process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224508499U_ABST
    Figure CN224508499U_ABST
Patent Text Reader

Abstract

本实用新型属于地铁施工技术领域,具体提供一种地铁施工用顶板钻孔装置,包括安装架、电机、安装板、传动组件和电钻,电机固定安装于安装架的底部,安装板滑动安装于安装架上,电机通过传动组件与安装板连接,安装板在电机的转动下上下滑动,电钻安装于安装板上,且电钻的钻头延伸出安装架的顶部,还包括定位块和弹性机构,定位块上开设有通孔,钻头滑动安装于通孔内,定位块通过弹性机构与安装架连接,且在弹力作用下与顶板抵接,弹性机构的弹力小于电机力。本实用新型通过定位块、定位块上的通孔和弹性机构的设置,能够在钻孔的过程中始终对钻头进行支撑保护,有效减少钻头的断裂概率,同时可以增大与顶板的接触面积,提高钻孔的精度。
Need to check novelty before this filing date? Find Prior Art

Claims

1. A drilling device for the roof slab of a subway construction project, comprising a mounting frame (1), a motor (2), a mounting plate (3), a transmission assembly (4), and an electric drill (5), wherein the motor (2) is fixedly mounted on the bottom of the mounting frame (1), the mounting plate (3) is slidably mounted on one end of the mounting frame (1) near the top, the output shaft of the motor (2) is connected to the mounting plate (3) through the transmission assembly (4), the mounting plate (3) slides up and down under the rotation of the motor (2), the electric drill (5) is mounted on the mounting plate (3), and the drill bit of the electric drill (5) extends out of the top of the mounting frame (1), characterized in that, It also includes a positioning block (6) and an elastic mechanism (7). The positioning block (6) has a through hole that matches the drill bit. The drill bit is slidably installed in the through hole. The positioning block (6) is connected to the mounting bracket (1) through the elastic mechanism (7) and abuts against the top plate under the elastic force of the elastic mechanism (7). The elastic force of the elastic mechanism (7) is less than the output force of the motor (2).

2. The roof drilling device for subway construction according to claim 1, characterized in that, The positioning block (6) is provided with a liquid storage chamber for storing coolant. The liquid storage chamber has several small holes that connect to the through hole. The side of the positioning block (6) that contacts the top plate is provided with multiple mounting holes at intervals. An elastic extrusion rod (8) is sealed and slidably installed in the mounting hole. One end of the elastic extrusion rod (8) is inserted into the liquid storage chamber, and the other end protrudes from the surface of the positioning block (6).

3. The roof drilling device for subway construction according to claim 2, characterized in that, The elastic compression rod (8) includes a connecting rod and a compression spring. The bottom end of the connecting rod is connected to the bottom of the liquid storage chamber through the compression spring, and the top end of the connecting rod extends out of the surface of the positioning block (6).

4. The roof drilling device for subway construction according to claim 3, characterized in that, The small hole is equipped with a valve, and the valve opens from the liquid storage cavity to the through hole.

5. The roof drilling device for subway construction according to claim 4, characterized in that, The holes are arranged in order from dense to sparse, with the highest density located near the surface of the positioning block (6).

6. The roof drilling device for subway construction according to any one of claims 1 to 5, characterized in that, The elastic mechanism (7) includes two telescopic rods (71) symmetrically arranged on both sides of the through hole and two connecting springs (72). The two ends of the telescopic rods (71) are fixedly connected to the mounting frame (1) and the positioning block (6) respectively. The connecting springs (72) are sleeved on the telescopic rods (71), and the two ends of the connecting springs (72) abut against the mounting frame (1) and the positioning block (6) respectively.

7. The roof drilling device for subway construction according to claim 6, characterized in that, The transmission assembly (4) includes a screw (41), a slider (42), and a stop plate (43). The stop plate (43) is fixedly installed on the mounting bracket (1). One end of the screw (41) is fixedly connected to the output shaft of the motor (2), and the other end is rotatably connected to the stop plate (43). The slider (42) has a threaded through hole that matches the screw (41). The slider (42) is threadedly connected to the screw (41), and the slider (42) is fixedly connected to the mounting plate (3).

8. The roof drilling device for subway construction according to claim 7, characterized in that, The screw (41) is provided with scale lines.

9. The roof drilling device for subway construction according to claim 8, characterized in that, The screw (41) is provided with a stop nut (9), which is threadedly connected to the screw (41). The stop nut (9) is installed above the slider (42). When the slider (42) contacts the stop nut (9), the slider (42) is fixed relative to the mounting bracket (1).