一种集成式热管理系统安装结构
By integrating modules such as cooling water pumps, compressors, and heat exchangers onto the base plate through the integrated thermal management system installation structure, the inconvenience of inspection and maintenance caused by traditional distributed installation is solved, the efficiency of inspection and assembly is improved, and the system reliability and integration are enhanced.
CN224510806UActive Publication Date: 2026-07-17GUANGXI OLAN HEAT MANAGEMENT TECH CO LTD
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- GUANGXI OLAN HEAT MANAGEMENT TECH CO LTD
- Filing Date
- 2025-06-24
- Publication Date
- 2026-07-17
AI Technical Summary
Technical Problem
The distributed installation of traditional thermal management system modules leads to inconvenience in inspection and maintenance, affecting efficiency.
Method used
An integrated thermal management system installation structure is adopted, which integrates the cooling water pump, compressor, heat exchanger, compressor controller and cooling water pump controller on the base plate and fixes them through partitions and support structures to achieve modular installation.
Benefits of technology
It improves the efficiency of thermal management system maintenance and assembly, enhances system reliability and integration, reduces noise and wear, and simplifies the maintenance process.
✦ Generated by Eureka AI based on patent content.
Smart Images

Figure CN224510806U_ABST
Abstract
本实用新型公开了一种集成式热管理系统安装结构,包括底板、冷却水泵安装位、换热器安装位和压缩机安装位,所述冷却水泵安装位、换热器安装位、压缩机安装位均设置在底板上,所述底板固定连接有第一隔板和第二隔板,所述第一隔板和第二隔板相垂直,所述压缩机安装位和冷却水泵安装位分别位于第二隔板的两侧,所述压缩机安装位和换热器安装位分别位于第一隔板的两侧,所述第一隔板靠近压缩机安装位的一侧固定连接有压缩机控制器连接板,所述第二隔板固定连接有水泵控制器连接板,所述第一隔板和第二隔板之间设有过线空间。本实用新型取得的有益效果:具有方便检修维护和生产装配的优点。
Need to check novelty before this filing date? Find Prior Art