一种变电站施工线缆收放装置
By introducing a sponge block and cleaning fluid system into the cable winding and unwinding device for substation construction, combined with the design of the winding mechanism, the problem of oil erosion of the cable insulation layer was solved, achieving clean cable winding and improved safety.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- JIANGSU ZHONGYE ELECTRIC POWER CONSTRUCTION CO LTD
- Filing Date
- 2025-07-11
- Publication Date
- 2026-07-17
Smart Images

Figure CN224512880U_ABST
Abstract
Claims
1. A substation construction cable deployment device comprising a trolley (1) and a winding mechanism, characterized in that, The top of the trolley (1) is fixedly connected to two mounting posts (17), the tops of the two mounting posts (17) are fixedly connected to a first mounting box (18), the top of the first mounting box (18) is glued to a first sponge block (19), the top of the trolley (1) is fixedly connected to two support rods (20), the tops of the two support rods (20) are fixedly connected to a connecting plate (21), the bottom of the connecting plate (21) is fixedly connected to multiple springs (22), the bottom ends of the multiple springs (22) are fixedly connected to a second mounting box (23), the bottom of the second mounting box (23) is glued to a second sponge block (1901), the top of the trolley (1) is fixedly connected to a mounting bracket ( 12) A liquid storage tank (13) is fixedly connected to the top of the mounting bracket (12). A liquid outlet pipe (15) is sealed and inserted into the bottom of the liquid storage tank (13). A valve (16) is provided on the liquid outlet pipe (15). A diversion pipe (1501) is fixedly connected to the bottom of the liquid outlet pipe (15). A plurality of first telescopic pipes (24) are fixedly connected to the bottom of the liquid outlet pipe (15). The bottom end of the first telescopic pipe (24) passes through the second mounting box (23) and is inserted into the second sponge block (1901). A plurality of second telescopic pipes (2401) are fixedly connected to the top of the diversion pipe (1501). The top end of the second telescopic pipe (2401) passes through the first mounting box (18) and is inserted into the first sponge block (19).
2. A substation construction cable deployment device according to claim 1, wherein, The winding mechanism includes a winding drum (3), and two mounting blocks (2) are fixedly connected to the top of the trolley (1). The winding drum (3) is snapped between the top of the two mounting blocks (2). A pressure block is fixedly connected to the top of the mounting blocks (2), and the pressure block presses on the top of the winding drum (3).
3. A substation construction cable deployment device according to claim 2, wherein, One of the mounting blocks (2) is fixedly connected to a support block on one side, and a motor (4) is fixedly connected to the top of the support block. The output end of the motor (4) is keyed to a first gear (5), and the output end of the motor (4) is engaged with one end of the winding drum (3).
4. A substation construction cable deployment device according to claim 1, wherein, The top of the trolley (1) is fixedly connected to two support plates (6). A reciprocating screw (9) is rotatably installed between the two support plates (6) through an interlocking bearing. A slide (11) is threadedly connected to the outer wall of the reciprocating screw (9). A guide wheel is rotatably connected to the top of the slide (11). A second gear (7) is keyed to one end of the reciprocating screw (9). The second gear (7) is connected to the first gear (5) by a toothed belt (8).
5. A substation construction cable deployment device according to claim 4, wherein, A slide rod (10) is fixedly connected between the two support plates (6), and the slide frame (11) is slidably sleeved with the slide rod (10).
6. A substation construction cable deployment device according to claim 1, wherein, The top of the liquid storage tank (13) is provided with a filling port (14), and the top of the filling port (14) is threaded with a sealing cap.
7. A substation construction cable deployment device according to claim 1, wherein, The top of the trolley (1) is fixedly connected to a handrail, and the outer wall of the handrail is provided with anti-slip grooves.