一种提升装置

Through the innovative design of the lifting device, the lifting height of the boom and maintenance operations are controlled, solving the problem of insufficient circuit board response time, improving the processing quality of the circuit boards and protecting the mounting fixtures.

CN224512988UActive Publication Date: 2026-07-17GUANGDE DONGWEI TECH CO LTD

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
GUANGDE DONGWEI TECH CO LTD
Filing Date
2025-08-05
Publication Date
2026-07-17

AI Technical Summary

Technical Problem

The existing lifting device causes insufficient reaction time of the circuit board in the chemical solution during the circuit board processing, making it unable to meet the qualification standards.

Method used

A lifting device was designed, which controls the lifting height of the boom through a combination of platform, boom, linear bearing and secondary lifting track, to ensure that the circuit board has sufficient reaction time in the chemical treatment tank, and uses a thrust cylinder to move the hanger out of the chemical treatment tank during maintenance.

Benefits of technology

This method ensures the circuit board reacts fully in the chemical treatment tank, improving treatment quality, preventing corrosion of the fixtures, and simplifying the maintenance process.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224512988U_ABST
    Figure CN224512988U_ABST
Patent Text Reader

Abstract

本实用新型公开了一种提升装置,包括框架,所述框架内中部连接有立柱,立柱内滑动连接有吊臂,吊臂远离立柱一端的下方搭接有对称布置的挂具,框架内部对应挂具的位置设置有药水处理槽,框架内中部对应药水处理槽的位置设置有平台;所述平台下方连接有多个三角斜撑支架,三角斜撑支架对应长边两端的位置均连接有轴承座;因为二次提升轨道与提升活动滚轮在接触前平台已经上升了一段较长的距离,所以二次提升轨道只会带动吊臂提升很少一段距离,并且能够控制二次提升的高度,吊臂提升很少一段距离能够保证电路板始终处于药水处理槽内,使电路板有更长的时间与药水反应,使电路板能够得到更加充分的反应,使电路板处理得更加合格。
Need to check novelty before this filing date? Find Prior Art

Claims

1. A hoisting device, characterized by: The frame (1) includes a column (11) connected to the middle of the frame (1), a boom (12) slidably connected inside the column (11), and symmetrically arranged hangers (13) attached to the lower part of the boom (12) away from the column (11). A chemical treatment tank (14) is provided inside the frame (1) at the position corresponding to the hanger (13), and a platform (2) is provided in the middle of the frame (1) at the position corresponding to the chemical treatment tank (14). Multiple triangular bracing supports (23) are connected below the platform (2). Bearing seats (24) are connected to both ends of the long side of the triangular bracing supports (23). A linear optical axis (25) is connected between the bearing seats (24). A linear bearing (26) is slidably connected to the outside of the linear optical axis (25). A secondary lifting track (27) is connected to the position of the linear bearing (26) near the boom (12). The secondary lifting track (27) overlaps the lower end of the column (11).

2. A lifting device according to claim 1, characterised in that: The platform (2) is connected to a plurality of evenly arranged fixed tracks (21) on the side near the boom (12). The boom (12) is connected to a lifting roller (22) near the fixed track (21). The lifting roller (22) is in intermittent contact with the fixed track (21).

3. A lifting device according to claim 2, characterised in that: The platform (2) is connected to a number of slider fixing square tubes (3) in the middle, and the upper surface of each slider fixing square tube (3) is connected to symmetrically arranged support sliders (31).

4. A lifting device according to claim 3, characterised in that: Each of the support sliders (31) is slidably connected to a support shaft (32), and the end of the support shaft (32) near the boom (12) is connected to a maintenance lifting rail (33).

5. A lifting device according to claim 4, characterised in that: Each of the four support shafts (32) is connected to a support shaft connecting tube (34) at the end away from the boom (12).

6. A lifting device according to claim 5, characterised in that: The middle part of the support shaft connecting square tube (34) away from the boom (12) is connected to a thrust cylinder (35), and the thrust cylinder (35) is connected to the slider fixing square tube (3).