一种风管吊装装置

By connecting the symmetrically arranged lifting beam structure with the duct flange and combining it with a multi-point suspension design, the balance and safety issues during duct hoisting are solved, achieving stable lifting of the duct and protection of the hoisting straps, thus improving construction efficiency and safety.

CN224513003UActive Publication Date: 2026-07-17CHINA HUASHI ENTERPRISES

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
CHINA HUASHI ENTERPRISES
Filing Date
2025-07-31
Publication Date
2026-07-17

AI Technical Summary

Technical Problem

Maintaining balance during duct installation is difficult, and the duct flanges are prone to cutting and abrasion of the lifting straps, posing safety hazards.

Method used

The symmetrically arranged lifting beam structure is connected to the duct flange and fixed with locking bolts. Hook structures and independent lifting straps are set at both ends of the lifting beam structure to form a multi-point lifting layout, avoiding direct contact between the lifting straps and the flange.

Benefits of technology

It improves the balance and stability of the hoisting process, reduces installation difficulty and collision risk, extends the service life of the hoisting sling, and enhances construction safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224513003U_ABST
    Figure CN224513003U_ABST
Patent Text Reader

Abstract

本实用新型公开了一种风管吊装装置,其属于安装工程技术领域,包括吊梁结构、钩挂结构和吊装带,至少两个吊梁结构关于风管主体对称设置,吊梁结构上开设有吊接孔和连接孔,连接孔与法兰孔对应设置,连接孔和对应的法兰孔之间能够通过锁紧螺栓连接,以将吊梁结构可拆卸地固定于风管主体的端部;每个吊梁结构两端的吊接孔各设置有一个钩挂结构,钩挂结构能够钩挂并锁定于吊接孔;对应每个钩挂结构设置有一个吊装带,多个吊装带的自由端汇聚于共同吊点。综上所述,该风管吊装装置通过吊梁结构多点平衡吊挂的设计,实现了风管吊装过程的平衡与稳定;同时,避免了吊装带被风管主体的法兰切割磨损的风险,增强了吊装作业的安全性。
Need to check novelty before this filing date? Find Prior Art

Claims

1. A wind pipe hoisting device, an end portion of a wind pipe body (100) is fixedly connected with a flange (200) along a self circumference, a plurality of flange holes (201) are arranged on the flange (200) along a self extension direction, characterized in that, The duct hoisting device includes: At least two hanging beam structures (1) are symmetrically arranged about the duct body (100). The hanging beam structure (1) is provided with a lifting hole (11) and a connecting hole (12). The connecting hole (12) is corresponding to the flange hole (201). The connecting hole (12) and the corresponding flange hole (201) can be connected by a locking bolt (13) to detachably fix the hanging beam structure (1) to the end of the duct body (100). Hook structure (2), each of the lifting holes (11) at both ends of each of the lifting beam structures (1) is provided with a hook structure (2), the hook structure (2) can hook and lock into the lifting hole (11); Lifting slings (3) are provided for each hook structure (2), and the free ends of multiple lifting slings (3) converge at a common lifting point.

2. The duct hoisting device according to claim 1, characterized by The radial cross section of the duct body (100) is rectangular, and two hanging beam structures (1) are provided and extend in a straight line, with one hanging beam structure (1) provided on each of the two long sides corresponding to the ends of the duct body (100).

3. The duct hoisting device according to claim 1, characterized by The radial section of the duct body (100) is circular, and there are two hanging beam structures (1) that extend in an arc shape. The radius of the hanging beam structure (1) is the same as the radius of the radial section of the duct body (100).

4. The duct hoisting device according to claim 1, characterized in that, The lifting beam structure (1) is a channel steel (14), which includes a longitudinal support plate (141) and transverse support plates (142) respectively perpendicularly arranged on both sides of the longitudinal support plate (141). The three are arranged in a U-shape. The transverse support plate (142) is parallel to the flange (200). The transverse support plate (142) near the flange (200) has the connection hole (12), and the longitudinal support plate (141) has the lifting hole (11).

5. The duct hoist device of claim 1, wherein The lifting beam structure (1) is an angle steel (15), which includes a vertical support plate (151) and a horizontal support plate (152) that are perpendicular to each other. The horizontal support plate (152) is parallel to the flange (200). The horizontal support plate (152) has the connecting hole (12), and the vertical support plate (151) has the lifting hole (11).

6. The duct hoist device of claim 1, wherein A plurality of reinforcing rods (16) are provided between the two opposing hanging beam structures (1), and the plurality of reinforcing rods (16) are arranged at intervals along the extension direction of the hanging beam structure (1).

7. The duct hoist device of claim 6, wherein The reinforcing rod (16) has a threaded portion (161) formed on the outer surface near both ends. The reinforcing rod (16) is sequentially inserted into the lifting holes (11) of the two lifting beam structures (1). The limiting nut (17) is threaded to the threaded portion (161), thereby fixing the reinforcing rod (16) to the lifting beam structure (1).

8. The duct hoist device of claim 1, wherein The hook structure (2) includes a hook (21) and a locking rod (22). The hook (21) is U-shaped and can be hooked into the lifting hole (11). The locking rod (22) can pass through one side rod of the hook (21) and is threadedly connected to the other side rod, thereby locking the hook (21) into the lifting hole (11).

9. The duct hoist device of claim 1, wherein The connecting hole (12) is oblong.

10. The duct hoist device of claim 1, wherein The lifting sling (3) is made of steel wire rope and the length of the lifting sling (3) is adjustable.