一种快速安装高炉风口小套的装置
By designing a rapid installation device that includes components such as main rod, top rod, and top plate, the problem of inconvenient installation of small sleeves at blast furnace tuyeres was solved, enabling a fast and safe installation process and improving blast furnace operation efficiency and economic benefits.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- HBIS LAOTING STEEL CO LTD
- Filing Date
- 2025-08-31
- Publication Date
- 2026-07-17
AI Technical Summary
The existing blast furnace tuyere sleeve installation device cannot be installed quickly, safely and reliably, resulting in excessively long installation time, high labor intensity for workers, and impact on blast furnace operation efficiency and economic benefits.
A rapid installation device was designed, comprising components such as a main rod, top plate, top rod, adjustable support column, impact pad, jack, pull rope, and lifting lug. Through the cooperation of the top rod and jack, the rapid and uniform installation of the blast furnace tuyeres sleeve is achieved.
This enabled the rapid installation of small tuyeres in blast furnaces, shortening installation time, reducing labor intensity for workers, decreasing downtime, and improving blast furnace operating efficiency and enterprise economic benefits.
Smart Images

Figure CN224513532U_ABST
Abstract
Claims
1. A device for rapid installation of a small bushing of a blast furnace tuyere, characterized in that: It includes a main rod (1), a top plate (3), top rods (4), an adjustable support column (5), a striking pad (6), a jack (7), a pulling rope (8), and a lifting lug (9). The main rod (1) is a long cylindrical rod, and the top plate (3) is a disc. The top plate (3) is fitted onto the front of the main rod (1). The top plate (3) and the main rod (1) are rotatably connected. Multiple top rods (4) are embedded on the circumference of the top plate (3). The top rods (4) are parallel to the main rod (1). The front ends of the multiple top rods (4) are respectively opposite to the rear end of the outer diameter of the blast furnace tuyeres. The adjustable support column (5) is placed vertically below the front of the main rod (1). The upper end of the adjustable support column (5) is aligned with the main rod (1). The lower surface is supported and connected. The striking pad (6) is a disc. The center of the two striking pads (6) is fitted into the middle and rear of the main rod (1) through the round hole. The center round hole of the two striking pads (6) is welded to the main rod (1). The hammer (7) is a cylinder. The center of the hammer (7) has a round hole. The center round hole of the hammer (7) is fitted onto the main rod (1) between the two striking pads (6). The center round hole of the hammer (7) is in sliding fit with the main rod (1). Two pulling ropes (8) are connected to the opposite sides of the hammer (7). The upper surface of the rear end of the main rod (1) is welded with a lifting lug (9). The lifting lug (9) is opposite to the hook of the electric hoist.
2. The apparatus for quick mounting of a small bush of a blast furnace tuyere according to claim 1, characterized by the fact that: A positioning pin (2) is welded to the front end of the main rod (1). The positioning pin (2) is along the length of the main rod (1). The front end of the positioning pin (2) is sharp and parallel to the central axis of the blast furnace tuyeres.
3. The apparatus for quick mounting of a small bush of a blast furnace tuyere according to claim 1, characterized by the fact that: The top plate (3) has a threaded hole in the center. A collar (10) is fixed at the position of the mounting top plate (3) of the main rod (1). The outer circumference of the collar (10) has threads that match the threaded hole in the center of the top plate (3). The threaded hole in the center of the top plate (3) is fitted onto the thread of the collar (10) of the main rod (1).
4. The apparatus for quick mounting of a small bush of a blast furnace tuyere according to claim 1, characterized by the fact that: The top plate (3) has multiple threaded holes around its circumference for mounting the top rods (4). The multiple top rods (4) are threaded rods, and the threads of the multiple top rods (4) are respectively matched with the threads of the multiple threaded holes of the top plate (3). The multiple top rods (4) are respectively screwed into the multiple threaded holes of the top plate (3).
5. The apparatus for quick mounting of a small bush of a blast furnace nozzle according to claim 1, characterized by the fact that: The adjustable support column (5) consists of a pull rod (11) and a sleeve (12). The outer diameter of the pull rod (11) matches the inner diameter of the sleeve (12). The pull rod (11) and the sleeve (12) are in sliding fit. The lower part of the pull rod (11) is inserted into the upper end of the sleeve (12). There is a set screw hole on the upper outer wall of the sleeve (12). The set screw (13) is connected to the pull rod (11) through the set screw hole. There is a semi-circular support ring (14) at the upper end of the pull rod (11). The inner diameter of the support ring (14) matches the outer circumference of the main rod (1). The support ring (14) rests on the lower surface of the main rod (1).