一种高炉热风炉快速平稳换炉系统

By using compressed air storage tanks and a rapid pressure equalization valve system during the hot blast stove replacement process, and independently pressurizing the hot blast stove with an air source, the problem of fluctuating air supply pressure is solved, enabling rapid and stable hot blast stove replacement and ensuring the stability and efficiency of blast furnace production.

CN224513534UActive Publication Date: 2026-07-17TANG STEEL INT ENG TECH CORP +2

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
TANG STEEL INT ENG TECH CORP
Filing Date
2025-06-17
Publication Date
2026-07-17

AI Technical Summary

Technical Problem

During the hot blast stove replacement process, the blast furnace air pressure fluctuates greatly, especially in the initial pressurization stage when the air volume and air pressure drop at the fastest rate and the greatest magnitude, resulting in unstable air supply conditions and affecting the smooth operation of blast furnace production.

Method used

The system employs a compressed air storage tank and a rapid pressure equalization valve system to pressurize the hot blast stove through an independent high-pressure air source, avoiding the direct pressurization by using a blower. This ensures balanced pressure inside the hot blast stove and enables a rapid and stable furnace replacement process.

Benefits of technology

It effectively reduced the fluctuation of air supply pressure during hot blast stove replacement, stabilized the blast furnace air supply pressure, shortened the replacement time, reduced the collapse of material, and ensured the stability and efficiency of blast furnace production.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224513534U_ABST
    Figure CN224513534U_ABST
Patent Text Reader

Abstract

本实用新型涉及一种高炉热风炉快速平稳换炉系统,属于冶金行业高炉炼铁生产工艺技术领域。技术方案是:包含压缩空气储罐(4)、快速均压阀(9)、热风炉(10)、冷风放风阀(11)、冷风均压阀(12)和冷风切断阀(13),压缩空气储罐(4)出口设手动截止阀(6)、气动快切阀(7)和储气罐出口止回阀(8),压缩空气储罐(4)出口通过管道和管道上安装的快速均压阀(9)分别与多座热风炉(10)相连通,每座热风炉(10)分别通过冷风管道和冷风管道上安装的冷风均压阀(12)、冷风切断阀(13)和冷风放风阀(11)与鼓风机相连接。本实用新型的有益效果是:减少热风炉均压过程中高炉送风压力波动,保证后续生产顺利进行。
Need to check novelty before this filing date? Find Prior Art

Claims

1. A blast furnace hot blast stove quick and smooth stove change system characterized by: It includes a compressed air storage tank (4), a manual shut-off valve (6) at the outlet of the storage tank, a pneumatic quick-cut valve (7) at the outlet of the storage tank, a check valve (8) at the outlet of the storage tank, a rapid equalizing valve (9), a hot air furnace (10), a cold air vent valve (11), a cold air equalizing valve (12) and a cold air shut-off valve (13). The outlet of the compressed air storage tank (4) is equipped with a manual shut-off valve (6) at the outlet of the storage tank, a pneumatic quick-cut valve (7) at the outlet of the storage tank and a check valve (8) at the outlet of the storage tank. The outlet of the compressed air storage tank (4) is connected to multiple hot air furnaces (10) through the rapid equalizing valve (9). Each hot air furnace (10) is connected to a blower through the cold air equalizing valve (12), the cold air shut-off valve (13) and the cold air vent valve (11).

2. A high-speed smooth stove changing system for a hot stove of a blast furnace according to claim 1, characterized in that: The compressed air storage tank (4) is connected to the air compressor (1) or the compressed air pipeline through the storage tank inlet pipe. The compressed air storage tank (4) is equipped with a pneumatic quick-cut valve (2) and a manual shut-off valve (3) at the inlet.

3. A high-speed smooth stove changing system for a hot stove of a blast furnace according to claim 1 or 2, characterized in that: A safety valve (5) is installed on the top of the compressed air storage tank (4).

4. The rapid and stable blast furnace hot blast stove replacement system according to claim 1, characterized in that: The fast pressure equalizing valve (9), cold air pressure equalizing valve (12), and cold air shut-off valve (13) are respectively installed in relation to each hot air furnace (10).