一种既有轨道交通高架区间承台的帮宽结构

By constructing a widened pier around the existing elevated rail transit section pier and connecting them with prestressed steel strands to form an integral load-bearing structure, the problem of uneven bridge settlement caused by the separation of old and new concrete was solved, and the stable support and safe renovation of the pier structure were achieved.

CN224514038UActive Publication Date: 2026-07-17CHINA RAILWAY 24TH BUREAU GROUP CO LTD +1

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
CHINA RAILWAY 24TH BUREAU GROUP CO LTD
Filing Date
2025-08-01
Publication Date
2026-07-17

AI Technical Summary

Technical Problem

In the renovation and construction of existing elevated sections of rail transit, the existing technology increases the load-bearing capacity by pouring concrete around the existing abutment to expand its size. However, it is difficult to form an integral load-bearing system between the old and new concrete, which leads to the separation of the old and new concrete structures during long-term operation, causing uneven settlement of the bridge and even safety accidents.

Method used

A new, widened foundation is constructed around the existing foundation and connected by prestressed steel strands to form an integral structure. The existing foundation and the widened foundation work together to bear the load, and the crisscrossing prestressed steel strands improve the overall integrity and load-bearing capacity.

Benefits of technology

This design achieves good integrity and load-bearing capacity between the existing and widened foundations, ensuring stable support for the bridge structure above and avoiding uneven settlement caused by the separation of old and new concrete, thus ensuring construction safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224514038U_ABST
    Figure CN224514038U_ABST
Patent Text Reader

Abstract

本实用新型涉及箱梁施工技术领域,尤其是一种既有轨道交通高架区间承台的帮宽结构,包括包围在所述既有承台外围的拼宽承台,所述拼宽承台与所述既有承台之间通过预应力钢束连接构成整体结构,所述预应力钢束的两端锚固在对应的既有承台或拼宽承台上,所述既有承台与所述拼宽承台之间留有一定间隙,该间隙通过浇筑混凝土填充密实。本实用新型的优点是:结构简单合理,施工方便;拼宽承台与既有承台的整体性好,承力性能佳,可共同对上方的桥梁结构进行有效且稳定的支撑。
Need to check novelty before this filing date? Find Prior Art

Claims

1. A widening structure of a viaduct deck of an existing rail transit elevated section, for widening an existing deck, characterized in that: The structure includes a widened foundation surrounding the existing foundation. The widened foundation and the existing foundation are connected by prestressed steel strands to form an integral structure. The two ends of the prestressed steel strands are anchored to the corresponding existing foundation or the widened foundation. A certain gap is left between the existing foundation and the widened foundation, and this gap is filled and compacted by pouring concrete.

2. The widened structure of a support platform of an elevated section of an existing rail transit according to claim 1, characterized in that: Several prestressed steel strands are arranged in a crisscross pattern between the existing foundation and the widened foundation, and the prestressed steel strands are misaligned with each other.

3. The widened structure of a support platform of an elevated section of an existing rail transit according to claim 1, characterized in that: Two or more layers of prestressed steel strands are provided along the height direction of the existing foundation and the widened foundation, with the prestressed steel strands in each layer being evenly spaced.

4. The widened structure of a support platform of an elevated section of an existing rail transit according to claim 1, characterized in that: The two ends of the prestressed steel strand are anchored by sealing concrete.

5. The widened structure of a support platform of an elevated section of an existing rail transit according to claim 1, characterized in that: Pipes for the prestressed steel strands to pass through are provided in the existing foundation and the widened foundation.

6. The widened structure of a support platform of an elevated section of an existing rail transit according to claim 1, characterized in that: A new pile foundation is installed below the widened pier.