一种面板堆石坝的施工结构

By setting horizontal and vertical reinforcing bars on the slipform and combining them with threaded sleeves, steel ropes, and winches, the problem of side form instability caused by vibration during slipform construction was solved, thus achieving stable slipform sliding and high-quality concrete panel forming.

CN224514159UActive Publication Date: 2026-07-17CHINA WATER CONSERVANCY & HYDROPOWER NO 9 ENG BUREAU CO LTD

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
CHINA WATER CONSERVANCY & HYDROPOWER NO 9 ENG BUREAU CO LTD
Filing Date
2025-05-09
Publication Date
2026-07-17

AI Technical Summary

Technical Problem

In existing technologies, during the construction of concrete panels for rockfill dams using slipform construction, vibration can easily cause the side formwork to lose stability, making it impossible to effectively maintain the spacing between the two side formworks, resulting in the side formwork opening outwards.

Method used

The steel reinforcement body, consisting of horizontal and vertical bars, is connected to the side formwork via bolt sleeves. Combined with steel ropes, winches, and guide supports, it forms a stable load-bearing structure, ensuring the stability of the sliding formwork when it slides on the side formwork.

Benefits of technology

It effectively prevents the slipform from opening outward under external load, maintains the stability of the side formwork, and ensures the forming quality of the concrete panel.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224514159U_ABST
    Figure CN224514159U_ABST
Patent Text Reader

Abstract

本申请公开了一种面板堆石坝的施工结构,包括:两个相对间隔分布在堆石坝迎水面上的侧模,两个侧模之间有供混凝土面板浇筑成型的间隔空间。滑模通过在侧模上滑动,两个侧模受到较大外扩载荷时,能通过横筋进行受力对拉保持稳定而不会向外打开,解决现有技术容易导致两侧模向外打开失去稳定性的问题。
Need to check novelty before this filing date? Find Prior Art

Claims

1. A construction structure of a face rockfill dam, characterized by, include: Two relatively spaced side molds (3) are distributed on the water-facing side of the rockfill dam (1), and there is a space between the two side molds (3) for the concrete panel (2) to be cast. A transverse bar (31) and a longitudinal bar (32) are distributed between the two side molds (3); the transverse bar (31) and the longitudinal bar (32) are arranged vertically and then tied together to form a steel reinforcement body, which is located inside the concrete panel (2) to form a whole; The side mold (3) is provided with a through hole, and the external thread end of the transverse rib (31) extends into the through hole of the side mold (3); It also includes a threaded sleeve (4) with an internal threaded through hole. The internal threaded through hole of the threaded sleeve (4) is engaged with the external threads at both ends of the transverse rib (31) through the thread pair. The large end of the step of the threaded sleeve (4) stops at the outside of the side mold (3). It also includes a sliding mold (5) that can slide on the side mold (3), the sliding mold (5) being fixedly connected to a steel rope (51), and a winch (52) on the top surface of the rockfill dam (1), with the steel rope (51) wound and connected to the winch (52).

2. The construction structure of a face panel rock-fill dam according to claim 1, characterized in that: A guide support (6) is installed in the middle of the steel rope (51) for guidance and support.

3. The construction structure of a face panel rock-fill dam according to claim 2, characterized in that: The steel rope (51), winch (52), and guide support (6) are in two sets, which are used to connect the two ends of the sliding mold (5).