特高拱坝生态旁通洞的岸塔闸室结构
By designing the shore tower gate chamber structure of the ecological bypass tunnel of the ultra-high arch dam, and adopting hoisting platform, arc and flat gates and central partition wall, the problems of complicated construction and high cost were solved, and the effects of simplified construction, reduced investment and improved safety were achieved.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- CHINA HYDROELECTRIC ENGINEERING CONSULTING GROUP CHENGDU RESEARCH HYDROELECTRIC INVESTIGATION DESIGN AND INSTITUTE
- Filing Date
- 2025-07-21
- Publication Date
- 2026-07-17
AI Technical Summary
In existing technologies, the diversion system for ultra-high arch dam construction has problems such as complicated construction, long construction period and high cost in terms of construction, ecological water supply and water storage and release control.
Design a shore tower gate chamber structure for an ecological bypass tunnel of an ultra-high arch dam, which includes a hoisting platform, an arc gate, and a flat gate. A partition wall is installed inside the gate chamber to improve safety, and a ladder is installed inside the tower shaft to facilitate gate operation and inspection.
It simplifies the construction process, reduces project investment, meets the requirements of flood control, ecological water supply and water storage and release, protects the gate from damage, and improves structural safety.
Smart Images

Figure CN224514166U_ABST
Abstract
Claims
1. The structure of the shore tower lock chamber of the ecological by-pass tunnel of the super-high arch dam, the inside of the shore tower lock chamber is provided with a hoist platform (1) in the horizontal direction, the hoist platform (1) separates the inner cavity of the shore tower lock chamber into a lower lock chamber cavity (2) and an upper tower shaft (3), the lock chamber cavity (2) is provided with a water inlet and a water outlet and forms a flow passage, characterized in that: An arc-shaped gate (4) and a flat gate (5) are installed sequentially along the direction of water flow in the flow channel.
2. The spillway structure of the super-high arch dam according to claim 1, wherein: The gate chamber (2) of the shore tower gate chamber is provided with a central partition wall (6) along the vertical line.