一种船闸浮式系船柱埋件结构
By using the staggered arrangement and tight connection design of the guide rail assembly and corner guard assembly, the problems of inconvenient adjustment and low precision during the installation of floating mooring bollards were solved, achieving rapid alignment and stable connection, and improving construction efficiency and connection strength.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- HUNAN PROVINCIAL COMM PLANNING SURVEY & DESIGN INST CO LTD
- Filing Date
- 2025-06-30
- Publication Date
- 2026-07-17
AI Technical Summary
The existing floating mooring bollards are inconvenient to adjust during installation, have low construction accuracy, and the guide rails and corner guards are prone to misalignment during splicing, resulting in low installation efficiency and poor connection stability.
The design employs a guide rail assembly and a corner protector assembly. The guide rail assembly consists of multiple sections of guide rail, and the corner protector assembly consists of multiple sections of corner protector. Through the staggered arrangement and tight connection of the back connectors and fasteners, the guide rail and corner protector are ensured to be quickly aligned and stably fixed, improving installation efficiency and connection stability.
It enables rapid alignment and installation of guide rails and corner protectors, reduces installation difficulty, improves construction accuracy and connection stability, prevents guide rail weld breakage and corner protector detachment, and enhances construction efficiency and connection strength.
Smart Images

Figure CN224514177U_ABST