一种钢便桥钢管桩桩顶封闭装置

By designing a pile top sealing device at the top of the steel pipe piles of the temporary steel bridge, and using sealant and supporting components to isolate seawater, the problem of corrosion on the inner wall of the steel pipe piles was solved, the overall integrity was enhanced, and the anti-corrosion effect was achieved.

CN224514192UActive Publication Date: 2026-07-17CCCC THIRD HARBOR ENGINEERING CO LTD

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
CCCC THIRD HARBOR ENGINEERING CO LTD
Filing Date
2025-08-13
Publication Date
2026-07-17

AI Technical Summary

Technical Problem

Steel pipe piles for temporary steel bridges are prone to corrosion under high humidity, salt spray erosion, and tidal wave action, especially the inner wall is difficult to prevent corrosion, and traditional anti-corrosion measures are insufficient.

Method used

Design a steel pipe pile top sealing device for a temporary steel bridge, including a pile top cover plate and supporting components. The top of the steel pipe pile is mechanically isolated by a sealant filling layer and supporting components, and the main beam of the temporary steel bridge is supported by bolts to enhance the overall integrity.

Benefits of technology

It effectively prevents seawater and rainwater from entering the interior of the steel pipe pile, avoids internal wall corrosion, disperses the pressure on the main beam, and improves the corrosion resistance of the steel pipe pile.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224514192U_ABST
    Figure CN224514192U_ABST
Patent Text Reader

Abstract

本实用新型涉及钢管桩施工技术领域,且公开了一种钢便桥钢管桩桩顶封闭装置,包括:安装在钢管桩上的桩顶盖板和支撑件;钢管桩的表面对称开设有用于对接钢便桥主梁的限位槽;所述桩顶盖板包括密封板部,所述密封板部上对称设置有对接板部,所述密封板部连接在钢管桩的内壁,所述对接板部的表面与限位槽的内壁连接,所述密封板部与钢管桩之间设置有密封胶填充层,所述支撑件的顶部与对接部的底部连接。该钢便桥钢管桩桩顶封闭装置,通过设置桩顶盖板和密封胶填充层,对钢管桩的顶部进行机械隔离密封,避免海水和雨水进入钢管桩的内部,防止钢管桩的内壁受到腐蚀。
Need to check novelty before this filing date? Find Prior Art

Claims

1. A sealing device for the top of steel pipe piles of a temporary steel bridge, characterized in that, include: The pile top cover plate (3) and the support member (4) are installed on the steel pipe pile (1); The surface of the steel pipe pile (1) is symmetrically provided with limiting grooves (5) for connecting the main beam (2) of the steel temporary bridge; The pile top cover plate (3) includes a sealing plate part (31), and a butt plate part (32) is symmetrically arranged on the sealing plate part (31). The sealing plate part (31) is connected to the inner wall of the steel pipe pile (1). The surface of the butt plate part (32) is connected to the inner wall of the limiting groove (5). A sealant filling layer is provided between the sealing plate part (31) and the steel pipe pile (1). The top of the support member (4) is connected to the bottom of the butt part.

2. A closure device for the top of a steel pipe pile for a steel bridge according to claim 1, characterized in that The support member (4) includes a support plate (41), and beam support plates (42) are symmetrically arranged at the bottom of the support plate (41).

3. The steel pipe pile top sealing device for a temporary steel bridge according to claim 2, characterized in that, The support plate (41) and the beam support plate (42) are both made of galvanized steel plate, and the thickness of the support plate (41) and the beam support plate (42) is 10mm.

4. A closure device for the top of a steel pipe pile for a steel bridge according to claim 3, characterized in that Mounting holes (6) are provided on both the support plate (41) and the sealing plate (31). A docking hole (7) is provided on the main beam (2) of the steel temporary bridge. A bolt (8) is installed on the inner wall of the docking hole (7). One end of the bolt (8) passes through the mounting hole (6) on the support plate (41) and the mounting hole (6) on the sealing plate (31) in sequence, and a nut (9) is threaded onto one end of the bolt (8).

5. The closure device for the top of a steel pipe pile of a steel bridge according to claim 1, characterized in that, A pile connection assembly (10) is provided between two adjacent steel pipe piles (1); The pile connection assembly (10) includes a connecting rod (101), both ends of which are connected to a connecting plate (102), and one end of the connecting plate (102) is connected to the surface of the steel pipe pile (1).

6. The closure device for the top of a steel pipe pile of a steel bridge according to claim 1, characterized in that, The surfaces of the steel pipe piles (1) and the main beams (2) of the temporary steel bridge are provided with anti-corrosion primer layers, and the surfaces of the anti-corrosion primer layers are provided with anti-corrosion topcoat layers.