一种海管海缆回填专用船舶提效装置

By designing a special vessel efficiency-enhancing device for submarine pipeline and cable backfilling, and using supports, mobile cranes, and guiding components, the problems of long construction periods and high costs in submarine pipeline and cable backfilling operations have been solved, enabling efficient and continuous submarine cable backfilling operations.

CN224514242UActive Publication Date: 2026-07-17OFFSHORE OIL ENG CO LTD +1

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
OFFSHORE OIL ENG CO LTD
Filing Date
2025-06-13
Publication Date
2026-07-17

AI Technical Summary

Technical Problem

Existing submarine pipeline and cable backfilling operations are time-consuming and costly, especially in deep trenches where they are inefficient and easily affected by ocean currents, leading to inaccurate backfilling and waste.

Method used

Design a special vessel efficiency improvement device for submarine pipeline and cable backfilling. It adopts a support frame, a mobile crane, a guide assembly and a material unloading channel to realize assembly line operation, reduce the number of times the vessel is moved, and improve the accuracy and efficiency of material unloading by using a tapered duct and a material unloading pipe.

Benefits of technology

It improved backfilling efficiency by more than 50%, reduced backfill waste, avoided the use of cranes and grab buckets, and achieved efficient and continuous submarine cable backfilling.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224514242U_ABST
    Figure CN224514242U_ABST
Patent Text Reader

Abstract

本实用新型公开了一种海管海缆回填专用船舶提效装置,用于回填沟壑,包括支架以及安装于支架上的若干侧壁,侧壁上滑动设置有移动天车,若干侧壁两两成对设置,以围成下料空间,下料空间内设置下料通道,下料通道的一端连接于移动天车,另一端伸入沟壑内,移动天车内设置有回填物,且移动天车能够相对于侧壁往复滑动,以使移动天车内的回填物逐渐填充沟壑。该海管海缆回填专用船舶提效装置的下料通道可以直接伸到泥面需要抛石的位置,防止海流对回填物的干扰,造成回填不准,浪费回填物;并可以通过移动天车,从而可以沿船长方向移动抛石位置,最大限度减少移船次数,无需频繁移动船舶;可避免现有技术中吊机和抓斗机的使用,做到流水线作业。
Need to check novelty before this filing date? Find Prior Art

Claims

1. A backfilling device for a submarine pipeline and cable backfilling vessel for improving efficiency after laying a submarine pipeline, characterized in that, The device includes a support frame and several side walls mounted on the support frame. A mobile overhead crane is slidably mounted on the side walls. The side walls are arranged in pairs to form a material unloading space. A material unloading channel is provided in the material unloading space. One end of the material unloading channel is connected to the mobile overhead crane, and the other end extends into the trench. Backfill material is provided inside the mobile overhead crane, and the mobile overhead crane can slide back and forth relative to the side walls so that the backfill material inside the mobile overhead crane gradually fills the trench.

2. The device according to claim 1, characterized in that, The material unloading channel includes a tapered duct and a material unloading pipe. One end of the tapered duct is connected to the moving overhead crane, and the other end is connected to the material unloading pipe. The end of the material unloading pipe that is not connected to the tapered duct extends into the trench.

3. The device according to claim 2, characterized in that, Along the direction of the backfill material's descent, the cross-sectional area of ​​the tapered conduit gradually decreases.

4. The device for efficiency improvement of a pipelaying vessel according to claim 2, characterized in that, The discharge pipe includes several discharge guide tubes, which are connected in sequence to form a tubular discharge pipe. The number of discharge guide tubes is limited to allow the discharge pipe to extend into the trench.

5. The device according to claim 4, characterized in that, The discharge pipe also includes clamps, and adjacent discharge pipes are connected by clamps.

6. The device according to claim 1, characterized in that, The inner wall of the feeding guide tube is lined with a wear-resistant layer.

7. The device according to claim 1, characterized in that, The efficiency-enhancing device for submarine pipeline and cable backfilling vessels also includes a guide assembly, which is installed on the side wall to guide the linear movement of the mobile crane. There are two side walls, which are arranged opposite each other.

8. The device according to claim 7, characterized in that, The guide assembly includes two spaced-apart guide rails, which are respectively mounted on two opposite side walls.

9. The device according to claim 8, characterized in that, The bottom of the mobile overhead crane is equipped with pulleys, which are slidably connected to the guide rails.

10. The device according to claim 8, characterized in that, The guiding assembly also includes a motor, which is located at both ends of the guide rail and is used to drive the mobile crane to move back and forth.