一种结合现浇加预制的风电基础制作装置

By combining cast-in-place and precast wind power foundation construction equipment, and utilizing the coordinated operation of the core tube formwork system, flange formwork system, and buttress system, the problems of low formwork connection accuracy and insufficient construction access were solved, thus achieving efficient and stable wind power foundation construction.

CN224514266UActive Publication Date: 2026-07-17GAOMI LONGCHENG MASCH TECH CO LTD

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
GAOMI LONGCHENG MASCH TECH CO LTD
Filing Date
2025-08-14
Publication Date
2026-07-17

Smart Images

  • Figure CN224514266U_ABST
    Figure CN224514266U_ABST
Patent Text Reader

Abstract

本实用新型提供一种结合现浇加预制的风电基础制作装置,涉及风电基础施工技术领域。该结合现浇加预制的风电基础制作装置,包括核心筒模板系统、法兰盘模板系统、底部支撑及扶壁系统。核心筒模板系统由同心设置的核心柱外模和内模组成,形成浇筑核心筒的环形间隙;法兰盘模板系统固定于核心筒模板顶端;底部支撑提供竖向支撑,扶壁系统沿法兰盘模板周向分布。模板关键部位设加强型材,核心柱外模和内模设对应门洞供施工进出。装置采用现浇核心筒与预制扶壁结合的模式,提升了基础结构精度与稳定性,便于施工操作,提高了模板耐用性和施工效率,降低了材料浪费与成本。
Need to check novelty before this filing date? Find Prior Art