一体化成套装配式预制钢筋混凝土模块水池

The design of integrated prefabricated reinforced concrete modular water tanks solves the problem of low construction efficiency in existing water tanks, and achieves rapid and efficient water tank construction as well as enhanced connection strength and sealing performance.

CN224514392UActive Publication Date: 2026-07-17JIANGSU JIUYI ENVIRONMENTAL PROTECTION TECHNOLOGY ENGINEERING CO LTD

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
JIANGSU JIUYI ENVIRONMENTAL PROTECTION TECHNOLOGY ENGINEERING CO LTD
Filing Date
2025-03-19
Publication Date
2026-07-17

AI Technical Summary

Technical Problem

The existing water tanks have long construction cycles, require a large amount of labor, have complex construction processes, and are easily affected by human factors, resulting in low construction efficiency.

Method used

The integrated prefabricated reinforced concrete modular water tank consists of a bottom support plate structure, a four-sided prefabricated structure, an internal support prefabricated structure, and a top closed cover prefabricated structure. The prefabricated concrete structure is completed in the factory and assembled on site. Staggered steel bar lap joints and clamps are used to connect and form a stable water tank structure.

Benefits of technology

It significantly simplifies the construction process, saves construction time, improves construction efficiency, enhances connection strength and sealing performance, and improves the overall performance and durability of the pool.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN224514392U_ABST
    Figure CN224514392U_ABST
Patent Text Reader

Abstract

本申请涉及一种一体化成套装配式预制钢筋混凝土模块水池,其涉及模块类水池领域,其包括底部底托板结构体系、四周围合装配式结构体系、内部支撑装配式结构体系和顶部闭合盖板装配式结构体系;所述四周围合装配式结构体系由装配式墙板通过连接墙连接而成;所述内部支撑装配式结构体系由装配式钢筋混凝土柱、装配式钢筋混凝土梁通过连接结构连接而成;所述底部底托板结构体系上预留有预留槽以及柱槽,所述装配式墙板能够插接在所述预留槽内,所述装配式钢筋混凝土柱能够插接在所述柱槽内;所述顶部闭合盖板装配式结构体系由多块预制成型的装配式钢筋混凝土模块板拼接而成。本申请具有简化了水池施工流程并提高了施工效率的效果。
Need to check novelty before this filing date? Find Prior Art